Volume 2
· Transmission & Distribution · House Installation
· Management & Administration · Utilization of Energy
GOOD & BAD
of
Mini Hydro Power
Klaus Jorde
with the resources of Entec AG
Ekart Hartmann, Heinz Unger
Edited by
Roman Ritter
GTZ
ASEAN-German Mini Hydro Project
(AGMHP)
GOOD & BAD
of
Mini Hydro Power
GOOD & BAD of Mini Hydro Power
Imprint
GOOD & BAD
of Mini Hydro Power
Authors:
Klaus Jorde with the resources of Entec AG;
Ekart Hartmann, Heinz Unger
Editing:
Roman Ritter, GTZ
Photos, drawings and graphics provided by:
The Indonesian-German Mini Hydro Power Project (MHPP)
Published by:
The ASEAN Centre for Energy (ACE)
under the direction of its Executive Director, Nguyen Manh Hung,
supported by the ASEAN-German Mini Hydro Project (AGMHP)
Jl. HR. Rasuna Said, Blok X-2, Kav 7-8, Kuningan
Jakarta 12950, Indonesia
Phone : +62 (0)21 527 8027
Fax : +62 (0)21 529 63820
Websites : http://www.aseanenergy.org
http://agmhp.aseanenergy.org
http://www.gtz.de/energy
First published by ACE in June 2009
Photographs, drawings and any other graphical elements are intellectual copyright protected
and therefore must not be extracted separately from this publication.
However, complete chapters of this book may be translated into other languages and thereby
be reproduced for training purposes, provided the publisher is informed of these purposes
and proper acknowledgements are made.
Disclaimer:
The publication has been prepared to illustrate good & bad practice examples in micro and mini hydro power
planning, implementation, operation & management.
While all reasonable care has been taken in the preparation of this publication, the authors, editors, ACE, AGMHP,
Entec AG, GTZ, MHPP, PT Entec Indonesia and any other individuals and parties involved accept no responsibility
for damage, injury or any other undesirable events resulting from its application or interpretation.
The ultimate responsibility for quality, reliability and safety remains with designers, suppliers, installation teams
and operating agencies. It is strongly recommended that any design, construction, electrical or mechanical
installation, operation, maintenance and repair works are carried out and/or supervised and checked by qualified
technicians and engineers only.
ISBN : 978-979-8978-26-5 / 978-979-8978-28-9
i
GOOD & BAD of Mini Hydro Power
Table of Contents
Volume 2
4 TRANSMISSION & DISTRIBUTION 161
4.1 General Basics 162
4.1.1 Basics for Grid Planning, Design & Layout 162
4.1.2 Implications of Productive End Use on Network Design 163
4.2 Major Components 164
4.2.1 Transformer Station 164
4.2.2 Distribution Poles and Lines 168
4.2.3 Wiring connections 170
4.2.4 Maintenance 178
5 HOUSE INSTALLATION 181
5.1 General 182
5.2 Major Elements 183
5.2.1 Service Connection 184
5.2.2 Current Limiting Device 186
5.2.3 Metering 188
5.2.4 House Wiring and Fittings 192
6 MANAGEMENT & ADMINISTRATION 201
6.1 Community Participation and Mobilisation 202
6.2 Institutional Setup 207
6.3 Capacity Building and Training 210
6.4 Tariff Policy 211
6.5 Financial Management 215
6.6 Monitoring and Documentation 216
7 UTILIZATION OF ENERGY 219
ii
GOOD & BAD of Mini Hydro Power
Volume 1
1 SITE IDENTIFICATION 1
1.1 General 2
1.2 Run of River Hydro Power Station 2
1.3 Feasibility 4
1.3.1 Site Identification and Flow Measurement 4
1.3.2 Rough Calculation of Possible Hydro and Electrical Power 6
1.3.3 Estimate Electrical Load 7
1.3.4 How to Measure the River/Stream Flow? 7
1.3.5 Discharge Measurements and Flow Duration Curve 14
1.3.6 Head Measurement 15
1.3.7 General Project Data 24
1.3.8 Synergies, Ownership and Management 26
1.3.9 Energy Supply and Demand 27
1.3.10 Consultants 29
2 CIVIL WORKS 31
2.1 Construction Basics 32
2.2 Individual Components 44
2.2.1 Weir and Intake 44
2.2.2 Sand Trap - Settling Basin 53
2.2.3 Headrace Channel 57
2.2.4 Forebay 70
2.2.5 Trash Rack 75
2.2.6 Spillway 81
2.2.7 Penstock and Support 85
2.2.8 Power House and Tailrace 97
3 ELECTRO-MECHANICAL EQUIPMENT 105
3.1 Basics 106
3.2 Individual Components 111
3.2.1 Turbine 111
3.2.2 Main Elements of a Generator 117
3.2.3 Panel, Controller and Ballast 121
3.2.4 Inside the Power House 129
3.2.5 Power House Wiring 136
3.2.6 Mechanical Transmission 143
3.2.7 Tools and Spare Parts 152
iii
GOOD & BAD of Mini Hydro Power
Foreword
The urgent call for reducing the carbon footprint of our economies combined with the world’s
ever growing demand for scaling-up access to energy is a priority challenge on the global
agenda which defines the role for renewables.
Renewable energies offer climate-friendly, low risk technology options for decentralized
power generation. In remote areas, utilizing local renewables to support the development
of poor rural communities is often more economically viable than transporting diesel fuel
or expanding the national electricity grid over long distances. In locations where however
the network infrastructure is already in place, harnessing natural resources for feeding power
into the central grid also offers an important source of local income that contributes to
macroeconomic stability by gaining independence from price-volatile fossil fuels.
In the light of this, the Association of South East Asian Nations (ASEAN) is emphasizing the
need to strengthen the development of renewable energies. Promoting mutual cooperation
for the transfer of knowledge and skills in order to narrow development gaps among the
ASEAN countries, to empower the region’s peoples, and ultimately to alleviate poverty is seen
as the way forward.
With this publication, ‘GOOD & BAD of Mini Hydro Power’, the ASEAN Centre for Energy (ACE)
aims to provide valuable lessons from experiences gained in one member country for the
dissemination of good practices throughout the whole region. This is intended to support
the capacity development of ASEAN’s human resources in the sustainable planning, design,
implementation, management, operation and maintenance of mini hydro power (MHP).
The two underlying principles of this book are:“a picture is worth a thousand words”and“the
only real mistake is the one from which we learn nothing”. Thus – along the sequence ‘from
water to wire’ – contrasting pictures of good & bad examples are provided to illustrate what
actually defines the difference. Each picture is complemented by short explanations so that
the book can serve as a technical training manual that offers direct and easy-to-understand
guidance.
Although MHP is a relatively mature and cost-competitive energy technology, a lot of
mistakes are still being made which lead to increased maintenance cost, reduced power
output, shortened service life or even physical danger. The good news is that in many cases
it is only small changes which need to be made – doing things the right way often requires
no more funds than doing them the wrong way. However, what is definitely required is a
proper awareness and expertise among hydro practitioners and their principals for whom,
quite literally,“knowledge is power”.
Nguyen Manh Hung Roman Ritter
ACE, Executive Director GTZ, Principal Advisor AGMHP
iv
GOOD & BAD of Mini Hydro Power
Acknowledgements
This book draws on countless photographs and experiences which have been collected in
practically applying international MHP know-how for the successful improvement of mini
hydro power implementation in Indonesia.
Therefore special thanks go to the Indonesian Directorate General for Electricity and Energy
Utilization (DGEEU) and its Mini Hydro Power Project (MHPP) which has been jointly
implemented for more than 10 years by DGEEU and GTZ, the German Technical Cooperation
– Deutsche Gesellschaft für Technische Zusammenarbeit.
Big thanks also go to the team of authors who made great efforts in bringing together Entec’s
expertise in MHP development with the didactical concept of using contrasting pictures
which require only short explanations to point out the decisive difference.
Last but certainly not least, the ASEAN Centre for Energy (ACE) is highly grateful to the German
Federal Ministry for Economic Cooperation and Development (BMZ) for its continuous support
of the ASEAN-German Mini Hydro Project (AGMHP) which provided the necessary resources
for compiling this publication.
Nguyen Manh Hung
ACE, Executive Director
v
Transmission & Distribution
161GOOD & BAD of Mini Hydro Power
4. Transmission &
Distribution
Transmission & Distribution
162 GOOD & BAD of Mini Hydro Power
4.1 GENERAL BASICS
Small island grid
This graph depicts major elements of a small island grid which are the transmission line, the
transformers and the distribution line.
At the powerhouse, the low voltage from the generator is transformed via a step up
transformer to high voltage in order to reduce losses when transmitting the electricity over
longer distances. In small island grids with relatively short distances, stepping up to medium
voltage is often sufficient for the transmission.
The transmission line usually ends at a central point in the village. There, the voltage is
transformed via a step down transformer to low voltage again and the distribution line will
make the connection to houses and small industrial facilities.
4.1.1 Basics for Grid Planning, Design & Layout
For a proper technical layout of a transmission and distribution system, a lot of expertise
and experience is required. Since such work can only be done by well trained, authorized
professionals, no more than just a few selected issues are listed here:
potential consumers
Distance from power house to grid, and from grid to consumers shall be as short as
possible less length of cables reduces the losses and the cost of the system
look for a dry location, easy terrain and
enough ground clearance of cable
It should be not longer than 30 – 50 m
Transmission & Distribution
163GOOD & BAD of Mini Hydro Power
Minimum ground clearance should follow local regulations; for low voltage lines it
should be at least:
- 4.5 meters for off road installations
- 5 meters alongside of road installations
- 5.5 meters crossing roads installations
For medium voltage lines, ground clearance has to be even higher. Check local
regulations
Define appropriate type, diameter and lengths of cables needed as well as number,
type and material of poles, including all accessories and pole top hardware
4.1.2 Implications of Productive End Use on Network Design
If electricity is only used for lighting,TVs and other small domestic appliances, the distribution
can be designed as a low-cost 1-phase system.
However, in order to allow its users to fully benefit from MHP, also productive end use of
electricity – often requiring 3-phase connections – should be enabled. How this can be done
withoutprovidingeverysinglehouseholdwithanexpensive3-phaseconnectionisexemplary
shown in the above graphic.
Transmission & Distribution
164 GOOD & BAD of Mini Hydro Power
4.2 MAJOR COMPONENTS
4.2.1 Transformer Station
Main elements & design principles of a transformer station:
Medium voltage line on the top for longer transmission lines & small currents (line
length longer than 1-3 km)
Protection elements (lightning protection, disconnector, overcurrent protection)
depending local regulations
Concrete poles with pole top hardware (insulators)
Transformer on elevated platform = safety for the public
Low voltage distribution line below medium voltage line for shorter transmission
lines & higher currents (line length less than 1-3 km)
Transmission & Distribution
165GOOD & BAD of Mini Hydro Power
Good example of a transformer station
Why is this a good example?
Transformer is out of reach of humans and animals
It is mounted high enough so that nobody can reach it accidentally – minimum
ground clearance should be according to local regulations
Transformer is fixed on a steel frame, held by two concrete poles
Cables are well arranged for an easy understanding of the system
Transmission & Distribution
166 GOOD & BAD of Mini Hydro Power
Bad example of a transformer station
Why is this a bad example?
Transformers are not out of reach of humans and animals, humans can be injured
accidentally
Risk of injury and death is high
Sabotage is easy possible
How can I improve it?
Transformers must be out of reach:
- either set the transformers at least 4 meters above ground or
- protect the area with a strong, grounded fence
Each transformer has to be grounded
Cabling has to be clear, well arranged and installed with a minimum ground
clearance of 4.5 m for low voltage lines and even more for medium voltage lines.
Transmission & Distribution
167GOOD & BAD of Mini Hydro Power
Good example of a transformer station
Why is this a good example?
Suitable fence protects transformer against unauthorized access
Transformer on the ground makes maintenance easier
The fence prevents access by unauthorized person or animals
The height of the fence should be at least 2 m
A gravel pad keeps the surface and the equipment dry
Transmission & Distribution
168 GOOD & BAD of Mini Hydro Power
4.2.2 Distribution Poles and Lines
Bad example of distribution pole & lines
Why is this a bad example?
The distribution pole looks unsafe, poorly built and not supported
The line is not free, plants are very close to the wires
The minimum distance above ground-level is not kept, so it’s a very dangerous
situation
The transformer is also at ground level; blank wires can harm people and animals
How can I improve it?
Approach and improve such dangerous installations only with well trained
authorized professionals
Transmission & Distribution
169GOOD & BAD of Mini Hydro Power
Good example of distribution pole & lines
Why is this a good example?
The pole is perfectly vertical and stabilized by guy wires
All cables are properly fastened to the pole top hardware
The power line looks healthy, well built and well supported
The line is installed free, there are no house part, tree or plants near the wire
The distance above ground-level is ok. If somebody passes the line, there is no risk to
touch the dangerous blank wires
The line is built with concrete poles, making the line more durable and more robust
Service drops to the panel are in ducts and fastened to the pole
Panel is out of reach of unauthorized persons
Transmission & Distribution
170 GOOD & BAD of Mini Hydro Power
4.2.3 Wiring connections
Bad wiring connection
Why is this a bad example?
Knots and tapes are unsuitable for wiring connections
Approved connection clamp is missing
Note:
EACH UNPROPER CONNECTION IS PRONE TO BREAK CABLES WILL FALL TO THE
GROUND CAUSING DANGER TO LIFE AND PROPERTY!
Transmission & Distribution
171GOOD & BAD of Mini Hydro Power
Good wiring connection
Why is this a good example?
These clamps consists of two parts which are tightened after inserting the cable
These clamps can withstand the tension of the cables between two poles
Use only approved clamping devices to avoid breakdowns during operation
Transmission & Distribution
172 GOOD & BAD of Mini Hydro Power
Bad wiring connection
Why are these bad examples?
Connection is made with the cable itself, approved connection clamp is missing
Careless done wiring connection, without clamp and without connection box
Blank wire, without insulation is a high risk to get injured by electrical accident
How can I improve it?
Such works have to be done by professionals only
Use ONLY approved parts and accessories for cable connections
Make all connections very carefully and use a connection box with clamps inside
Note:
IMPROPER CABLE CONNECTIONS ARE A HAZARD FOR THE SYSTEM AND COULD
CAUSE ACCIDENTS OR FIRES!
Transmission & Distribution
173GOOD & BAD of Mini Hydro Power
Good wiring connections
Why are these good examples?
Well designed and built service pole, concrete type set in a solid concrete foundation
Cables are well arranged and fixed to the pole
Panel with fuses well built and safe
Guy wires absorb the forces caused to the pole by the cables
Transmission & Distribution
174 GOOD & BAD of Mini Hydro Power
Bad example of a wiring connection
Why is this a bad example?
The various connections are unsystematically arranged and confusing everybody
who needs to locate a possible failure
The cables hang around without being fixed
How can I improve it?
Cabling works have to be carried out by professionals only
Wiring connections have to be done well, for example by using a connection panel
with terminals inside
Transmission & Distribution
175GOOD & BAD of Mini Hydro Power
Good example of a wiring connection
Why is this a good example?
The cable under tension is held by the clamp
The clamp is fixed to the pole
The cable is around the pole without tension
Note:
ALWAYS LEAVE A CERTAIN LENGTH OF CABLE WITHOUT TENSION BETWEEN
THE CLAMPS!
Transmission & Distribution
176 GOOD & BAD of Mini Hydro Power
Bad example of a street light wiring
Why is this a bad example?
The cable is under tension
The socket is fixed with the power cable itself
How can I improve it?
Fix the socket to the pole and install the cable without tension
Transmission & Distribution
177GOOD & BAD of Mini Hydro Power
Good examples of street light installation
Why is this a good example?
Power cables are free of any tension
Bulb sockets are not hanging at the power cables but they are fastened to the
lampshades
The lampshades are fixed to the poles
The electrical connections are protected by the improvised lampshades
Energy saving light bulbs are used
Transmission & Distribution
178 GOOD & BAD of Mini Hydro Power
4.2.4 Maintenance
What needs to be done for the pole maintenance?
Switch off power first
Check stability of pole before you go to the top
Check guy wires as well
When stability and guy wires are ok, then you can go to the top,
if necessary in order to:
Check cable connection and cable tension (overhead clearance)
Check pole top hardware
Clean insulators from dirt
Note:
CHECK WOODEN POLES MORE OFTEN – PARTICULARLY IF THEY START ROTTING!
Transmission & Distribution
179GOOD & BAD of Mini Hydro Power
Good selection of tools
Why is this a good example?
Tools for good electrical workmanship for transmission and distribution lines as well
as for house installations
For well done electrical work, the need of good tools is essential
The shown tools are necessary, because of different shapes and sizes.
Note:
FOR EACH SHAPE AND SIZE, USE THE SPECIFIC TOOL!
KEEP TOOLS CLEAN AND TAKE CARE OF THEM!
House Installation
180 GOOD & BAD of Mini Hydro Power
House Installation
181GOOD & BAD of Mini Hydro Power
5 HOUSE INSTALLATION
5. House Installation
House Installation
182 GOOD & BAD of Mini Hydro Power
5.1 GENERAL
Electricity – when not handled with proper care – is very dangerous for people
and their property
Note:
IN ORDER TO PREVENT DANGEROUS SITUATIONS, HOUSE INSTALLATIONS HAVE TO BE
DONE ACCORDING TO THE LOCAL REGULATIONS AND BY EDUCATED AND CERTIFIED
PROFESSIONALS ONLY!
House Installation
183GOOD & BAD of Mini Hydro Power
5.2 MAJOR ELEMENTS
This graph depicts major elements of the house installation (however, ground electrode as
part of the earthing system is not shown here) which are illustrated in more detail in this
chapter.
House Installation
184 GOOD & BAD of Mini Hydro Power
5.2.1 Service Connection
Service connection - bad
Why is this a bad example?
There is no distance between the cable and the roof; the insulation will eventually
be damaged by the roof
This can create short circuits and fire
Note:
THIS KIND OF WIRING IS VERY DANGEROUS – ESPECIALLY FOR A WOODEN HOUSE!
House Installation
185GOOD & BAD of Mini Hydro Power
Service connection - good
Why is this a good example?
The service drop from the distribution system is under tension
It is installed high enough to be out of reach
The cable between connection and meter is without tension
Meter is well protected under the roof against rain and moisture
Cable fixed with clamps to the underside of a roof beam
House Installation
186 GOOD & BAD of Mini Hydro Power
5.2.2 Current Limiting Device
Current limiting device - bad
Why are these bad examples?
Current limiting device is burned because of missing fuse; fuse was bypassed
Bypassing a fuse is the worst you can do, directly attacking life and property
Never install limiting devices like this
Never bypass limiting devices
House Installation
187GOOD & BAD of Mini Hydro Power
Current limiting device - good
Why are these good examples?
The fuses are fixed properly
Incoming and outgoing lines are well separated
There is no bypass visible
House Installation
188 GOOD & BAD of Mini Hydro Power
5.2.3 Metering
Metering - bad
Why is this a bad example?
Wiring should always be straight and well protected
Loose or hanging wires may cause connection losses and damage insulations
How can I improve it?
Fix the connection of the service drop to the house in order to remove the tension
on the service cables
Wiring should be done by the shortest and clearest way possible – straight and
protected within cable ducts
House Installation
189GOOD & BAD of Mini Hydro Power
Metering - good
Why is this a good example?
The meters are fixed in a proper cabinet and well protected against rain and
moisture
The cables come all from the bottom, no loose or hanging wires
House Installation
190 GOOD & BAD of Mini Hydro Power
Metering - bad
Why is this a bad example?
Meters are costly and need to be protected in order to keep functioning
Birds faeces touching electrical wires can damage the insulation and create a short
circuit
Note:
NEVER ALLOW DUST OR MOISTURE TO SPREAD NEAR ELECTRICAL INSTALLATIONS!
House Installation
191GOOD & BAD of Mini Hydro Power
Metering - good
Why is this a good example?
Wiring is clearly arranged. It would be even better to put the wires inside a cable
duct
The meters are sealed
The current limiting devices are inside a panel
House Installation
192 GOOD & BAD of Mini Hydro Power
5.2.4 House Wiring and Fittings
Bad components
Why are these components bad for house installations?
Wires have only one single layer of insulation. When this insulation is damaged, the
danger of an accident is immediately given
It is international standard to use wires only within closed electrical cabinets / panels
or if they are fixed 100% within protection pipes or ducts
All cables are specified for usage only up to a certain maximum current. Apparently
the cables in the right picture were selected wrongly and used for a much higher current,
with a very high danger of cable fire
Note:
NEVER USE WIRES!
House Installation
193GOOD & BAD of Mini Hydro Power
Good components
Why are these components good for house installations?
Cables have double insulation, with separately insulated wires inside
Depending on the required current of your equipment, use always the appropriate
cable with the correct diameter
Contact a professional to check local regulations on the required minimum
diameters for different electrical installations
Note:
ONLY USE CABLES OF THE RIGHT DIAMETER!
House Installation
194 GOOD & BAD of Mini Hydro Power
House wiring and fittings - bad
Why is this a bad example?
This is a very dangerous situation and the installation was made by a layman without
any knowledge of electricity
Wires are used instead of double insulated cables
Only a question of time until somebody becomes injured and/or a cable fire starts
How can I improve the situation?
Contact a professional, who knows how to do electrical installations according to
safety-requirements
House Installation
195GOOD & BAD of Mini Hydro Power
House wiring and fittings - good
Why is this a good example?
Service board with switches and current limiting devices
The incoming and outgoing cables are well fixed on the wall
Proper installation on a service-board
Flashlight in case of a black out
House Installation
196 GOOD & BAD of Mini Hydro Power
Sockets, plugs and switches - bad
Why is this a bad example?
These are very dangerous examples on how electricity should never be handled; it
can harm humans, destroy the connected electrical appliances and cause fire
Wires are used instead of cables; not being laid in a pipe/duct
To turn electricity on/off, a socket is used instead of a switch
How can I improve it?
Contact a professional who knows how to do electrical installations
Raise households’awareness for the danger of electricity
Familiarize households with good practice examples
Perform regular household inspections (e.g. when collecting the electricity tariff)
and disconnect houses in which safety rules are not followed
House Installation
197GOOD & BAD of Mini Hydro Power
Sockets, plugs and switches - good
Why are these good examples?
The power supply cables are installed within ducts to prevent damages or faults
Socket and switches are of approved type
The sockets are grounded (i.e. have earthing) which makes the use of appliances
safer
A correct type of plug is used to take the electricity from the socket
Installations were made by a professional
House Installation
198 GOOD & BAD of Mini Hydro Power
Lamp installations - bad
Why is this a bad example?
Lamps are hanging directly on electrical wires, putting tension on the connection
Socket is fixed on wood directly without heat protection
Wood was heated up already
How can I improve the situation?
Screw sockets and other electrical components correctly to the wall or to the ceiling
Use only sockets which can be fastened with bolts or screws
Never keep wires under tension
Never leave bare wires without insulation
House Installation
199GOOD & BAD of Mini Hydro Power
Lamp installation - good
Why is this a good example?
Lamp-socket is fixed to the beam (be sure there is no wood directly under the
socket)
There is no tension on the cable
A cable (not wires !) is used and properly fixed
Management & Administration
200 GOOD & BAD of Mini Hydro Power
Management & Administration
201GOOD & BAD of Mini Hydro Power
6 MANAGEMENT AND
ADMINISTRATION
6. Management &
Administration
Management & Administration
202 GOOD & BAD of Mini Hydro Power
6.1 COMMUNITY PARTICIPATION AND MOBILISATION
Participation of the community is a crucial factor for success
Key aspects for community participation:
The Community has to be involved from the very beginning of a project, starting
from the first site visit; in an ideal case: community itself took the initiative and proposed
the construction of a MHP scheme
Organize regular meetings between community and consultant during the planning
stage, and between community, consultant and contractor during construction stage in
weekly intervals, to inform and coordinate all activities and to give the parties the chance
to discuss potential conflicts (compensation for damages to property, etc); make sure
that women get the chance to actively participate in, and contribute to the discussions
Keep all involved stakeholders (contractor, government officers, etc) informed and
up to date with latest developments and plans make sure that community and villagers
do not receive different information from different sources
Make clear which party is expected to contribute what (financial and technical
inputs for project, village contribution, etc)
Management & Administration
203GOOD & BAD of Mini Hydro Power
Village meeting where MHP issues are discussed
Make clear that villagers’ contribution to construction work, either in cash or labor
is a condition to implement the project. Villagers’ contribution significantly boosts their
feeling of ownership of the plant. However, make sure that contribution is reasonable
and within their ability (e.g. labor contribution by the community during harvest periods
will be very limited)
Transfer information on technical, institutional, and environmental issues: necessity
of management and operation of MHP system, protection of river catchment, solving of
water usage conflicts, etc.
Don’t raise wrong expectations in the community about the MHP project (e.g.
community has to understand and be aware of power supply limits during the dry season)
transparency
When presenting the project always consider and explicitly mention related costs
not covered by the project (e.g. metering system per household, workshop equipment
for productive use of energy, household cabling) people must always be aware of all
costs related to the project
Management & Administration
204 GOOD & BAD of Mini Hydro Power
Involvement of Women
Women are very often more trustworthy and experienced in managing the
household finances and thus more qualified as book keepers of the MHP finances during
the operation stage
Usually women tend to have a deeper understanding of the importance of the
implementation and sustainable operation of the MHP and the resulting improvement
to their and their children’s’ livelihood. Women therefore usually have a much greater
interest to see the project implemented and well maintained, making them the priority
group to address for community mobilization
Project agents are in the position to stress the presence of women during all
meetings, even if it is not common in the culture and tradition The MHP project is an
“innovation”and thus can be introduced in an“innovative”way
Encourage women to express their opinion and suggestions regarding the MHP
system, as well as the productive use of energy
Management & Administration
205GOOD & BAD of Mini Hydro Power
Key Questions in Community Mobilisation and Participation
What is important for whom and when? Consider if for certain issues separate
meetings with men and women are useful (also depending on total number of people
and available facilities)
How much time is needed for which kind of meeting? Take your time for community
meetings! MHP might be a very new concept for the community, resulting in lengthy
discussions
Which decisions have to be taken at what stage of the project? Mention important
deadlines (planned project schedule, start of operation, opening of bank account, etc.).
Establish a plan of action for the activities required from the community (legal registration
process, definition of land use rights, compensation, labor input)
Which language is spoken in the village and what is the level of education? select
staff and media accordingly
Use videos, pictures etc to make people easily understand! If Power Point
presentations are used, present short and concise text only, with many photos
Limit presentations to the essential and leave enough time for discussions,
questions, input from villagers
Management & Administration
206 GOOD & BAD of Mini Hydro Power
Key Issues of Community Mobilization
Planning & construction of MHP system and definition of duties of community
during these stages
Identification of management and operation staff. Management staff should be
appointed at an early stage of the project to coordinate with the contractors and for
organizing community contribution. Operation staff should participate in the installation
of the electromechanical equipment.
Identification of training measures for operation and management staff
Activities regarding productive use of electricity (awareness creation workshop,
capacity building measures)
Definition of expected contribution from community (contribution in cash or labor,
set up of an institution, selection of staff, opening and managing of a bank account for
operation and maintenance, tariff and sanction system, develop productive use…)
Clarification of land/water use rights
Compensation of land owners (e.g. damages to property)
Clarification of water usage to avoid later conflicts between water use for power
production and irrigation or water supply
Management & Administration
207GOOD & BAD of Mini Hydro Power
6.2 INSTITUTIONAL SETUP
Key issues of institutional setup:
When a community-based organization is needed to take over ownership of the
system and thus also responsibility for its operation, preferably an already existing
organization should be used (e.g. cooperative managing the irrigation system in the
village). If no such organization exists, identify a suitable institutional and organizational
setup for the MHP project under consideration of the local conditions
Within the organization individual staff must be assigned for specific tasks of
operation and management (OM). A typical staffing looks like this:
o 2 operators (mandatory)
o 1 book keeper (mandatory)
o 1 head of management (optional)
o 1 secretary (optional)
Identify suitable OM staff (see below)
Clarify legal and regulatory issues regarding a formal registration of the community
as owner, operator and beneficiary of the project
For each staff position a detailed task description should be written up and made
accessible for the customers
Management & Administration
208 GOOD & BAD of Mini Hydro Power
Salaries for each position must be agreed accordingly
Depending on the size of the system, staff may have to be employed part-time or full
time
Operators should earn more since their tasks are heavy, and also more difficult and
time-consuming
If salaries are set too low, they do not attract and/or motivate the people with
required skills to do a good job
But if salaries are too high, they are difficult to be covered by tariff payments
Salary has to be competitive to avoid migration of trained staff
The community must agree on a reasonable tariff system covering all expected costs
The community must agree on a sanction system in case of late or non-payment of
tariffs
Define and collect an initial fee from all customers to cover the first salary payments
and as a sign of commitment from the community
Management & Administration
209GOOD & BAD of Mini Hydro Power
Selection of Staff for Management & Operation
Selection of qualified staff is crucial for a sustainable operation of the plant!
Staff should be selected under consideration of the following:
o Technical skills and education,
o Know-how on book keeping, etc.
o Relevant, long and varied experience in the field
o Tendency to stay in the village over the long term.
o Don’t choose candidates who plan to move away in the future (e.g. unmarried
young men are more likely to move away)
o Involve women as much as possible
Note:
CHOOSE TRUSTWORTHY PEOPLE!
Management & Administration
210 GOOD & BAD of Mini Hydro Power
6.3 CAPACITY BUILDING AND TRAINING
Aspects for efficient capacity building and training:
Conduct training and capacity building measures separate from village meetings in
small groups in an interactive and participatory way
In case of several villages in one area, get operators, book keepers and secretaries
together for a common training workshop
For training in small groups as well as workshop training use demonstration material /
visual aids, like log-books, book-keeping folders, etc
If possible invite an operator / secretary from an existing MHP system or organize
a visit to an MHP system in operation, with some village representatives (preferably the
selected OM staff) this would facilitate a direct exchange
Award certificates to those attended a training successfully in order to raise their
social standing and thereby the qualified influence on the MHP
Management & Administration
211GOOD & BAD of Mini Hydro Power
6.4 TARIFF POLICY
Only the fuel is for free – everything else costs a lot
to operate a MHP in good condition
THAT’S WHY SUFFICIENT & REGULAR TARIFF REVENUES ARE NEEDED!
For repair of civil works For any tools, lubricants, etc.
For workers’salaries
For all kind of repairs and spare parts of electro-mechanical equipment
Management & Administration
212 GOOD & BAD of Mini Hydro Power
Elements to be considered for Tariff Calculation:
The tariff needs to be based on the cost recovery principle (long-term unit costs) to
ensure the MHP’s viability and should reflect the customers’energy usage (to be charged
lump sum per appliance or per kWh in case of electricity meters)
Poor village communities often can not afford to pay the MHP’s initial investment by
themselves and therefore depend on subsidies. In these cases, the investment should
never be covered fully by the subsidy but still require contributions from the villagers (in
cash or in kind) to increase their sense of ownership
Paying subsidies to cover the operating costs is absolutely counter-productive and
should never be an option! It would make the MHP’s operation too much dependent on
factorsbeyondthevillage’sinfluenceandreducethesenseofownershipandappreciation
for electricity
Income generation through productive use of energy improves consumers’ ability to
pay; often higher tariffs con be paid for productive end uses
The tariff system should also fix regular tariff increases (e.g. yearly) in order to
compensate for price increases of spare parts, etc due to inflation
Fix penalty fees for late payment, electricity pilferage etc
The tariff needs to be fixed based on a proper cash flow calculation. With a laptop
and a high-beamer, the process of assessing and agreeing on an appropriate tariff can
effectively be facilitated by changing various input figures in a spreadsheet in order to
immediately see and discuss the consequences in front of a village meeting
discounted cash flow analysis
based on assumptions
O&M costs
lifetime of the
system components
investment
costs
required number
of staff
salaries
revenues from
electricity sales
load factor
tariff (system)
Management & Administration
213GOOD & BAD of Mini Hydro Power
To fix an appropriate tariff, all expected future expenditures must be considered:
% of revenues
to be assigned
Salaries for all staff (operators, book keeper, etc.) About 30-40%
Expenditures for daily routine O&M (tools, small About 5-10%
spare parts, lubricant, stationary for book keeping, etc.)
Savings for serious repairs and purchse of bigger spare About 5-10%
parts as reserve into bank account! About 50-60%
Ability and willingness to pay
Tariff should be in line with the consumers’ ability and willingness to pay. The ability and
willingness to pay is thereby influenced by:
Note:
TO ASSESS AFFORDABILITY COMPARE THE TARIFF WITH OTHER EXPENDITURES OF
THE HOUSEHOLDS (E.G. KEROSENE FOR LAMPS, CIGARETTS, ETC)!
WOMEN SHOULD BE THE PRIORITY GROUP TO DISCUSS EXPENDITURES. THEY OFTEN
HAVE A BETTER UNDERSTANDING & AWARENESS OF THE ACTUAL LIVING COSTS!
REGARDING THE WILLINGNESS TO PAY IT MIGHT BE NECESSARY TO CLARIFY THAT
“CHEAP ELECTRICITY MEANS NO ELECTRICTY”!
Ability and
willingness to
pay
Income Situation
paying modalities
opportunity costs
subjectively sensed benefits
and comfort
anticipated or known
practices regarding electricity
pricing elsewhere
others
weekly at market day
monthly
Management & Administration
214 GOOD & BAD of Mini Hydro Power
Metering and Tariff Collection Options:
Standard kWh meter (fair and transparent, but relatively high costs for the hardware
and the meter reading)
Digital kWh meter (allows time and amount related tariffs, but high costs and
technically complex reading/billing)
Pre-paid systems (fair and transparent, no meter reading, but high costs and less
forgery proof)
Current limiter (to limit peak demand, no meter reading, very cheap, but danger of
fraud and theft and time of usage not considered)
Flat rate (no hardware cost, but needs a lot of social control to prevent waste of
electricity, risk of higher peaks because of no load control)
All customers pay regularly
a tariff which is high enough
to cover the MHP’s costs
Management & Administration
215GOOD & BAD of Mini Hydro Power
6.5 FINANCIAL MANAGEMENT
How to manage finances?
All payments must be recorded in a book and on customers’ cards, and must be
signed by the customer and the bookkeeper to verify the payment
Every financial transaction must be recorded in a cash book
Get receipts for revenues and expenditures, number them and keep them in a folder
Open a bank account (in the name of the organization) for which 2 persons (for
mutual control) must countersign for any withdrawal of money
Deposit revenues as often as possible (e.g. monthly) into the account
Check the balance of funds (also in the bank account)
Transparency is of crucial importance to keep peoples’ confidence and support and
to solve problems which might arise – the book keeper / treasurer must be a very
trustworthy person
Note:
FINANCIAL TRANSACTIONS MUST BE TRANSPARENT!
KEEP ALL INCOME IN A BANK ACCOUNT!
Management & Administration
216 GOOD & BAD of Mini Hydro Power
6.6 MONITORING AND DOCUMENTATION
All important activities, meetings etc are noted in the log book
What should be monitored & documented and why?
A thorough record of routine O&M and also of any unusual events occurring in the
system will facilitate troubleshooting, e.g. when experts from outside the village are
consulted for help
All civil and electro-mechanical parts of an MHP system must be inspected
periodically important results of these monitoring activities must be recorded in a log
book
Protocols of community meetings in connection with the MHP system should
be recorded in the log book, including any important decisions, agreements and
conclusions
Important actions and occurrences with regard to finances, book keeping and
administration should also be recorded in the log book
Note:
PROPER MONITORING AND GOOD RECORDS MAKE OPERATION AND MAINTENANCE
WORKS EASIER AND ENHANCES CUSTOMER’S TRUST!
Management & Administration
217GOOD & BAD of Mini Hydro Power
Public information on boards at the MHP and in the village
Publishing information about the MHP
All consumers must be kept informed of activities of management and operations
staff, any difficulties encountered, planning for the future, etc, either through meetings
and/or reporting on information boards
The better people are informed, the better their understanding and acceptance, and
the higher their motivation to regularly pay electricity bills (they have a right to know
what their money is used for)
Transparency increases acceptance and satisfaction of consumers
Publish protocols of community meetings on the MHP system, reports from the
operator and the bookkeeper, the balance of funds (income and expenditures), and the
balance of the bank account, status of tariff payments, etc
Transparent reporting of financial matters helps to establish and maintain good
governance and prevent corruption
Site information
board
Transparent
reporting
Utilization of Energy
218 GOOD & BAD of Mini Hydro Power
Utilization of Energy
219GOOD & BAD of Mini Hydro Power
7 UTILIZATION OF ENERGY
Utilization of Energy
220 GOOD & BAD of Mini Hydro Power
Always choose energy efficient appliances!
How to make efficient use of energy?
Choose energy efficient bulbs and energy efficient appliances wherever possible.
All kind of energy efficient bulbs are available on the market. Their price is higher but
therefore they last much longer, need less energy and help safe a lot of money in the
long run
Whenever you buy electric appliances (refrigerator, rice cooker etc.) look at the
wattage and ask for the energy efficient models. Don’t hesitate to ask your local MHP
operator for support
Switch-off the light and other appliances if you don’t use them
Paint walls of house in a light colors such as white. This will intensify the effect of
light
Note:
BEING ENERGY EFFICIENT HELPS TO REDUCE PEAK LOAD AND OVERLOAD OF THE MHP
SYSTEM!
Utilization of Energy
221GOOD & BAD of Mini Hydro Power
Get the most benefit from MHP: Use it productively!
Electric coconot
rasping
Threshing by a turbine
driven machine
Time consuming
manual coconut
rasping
Exhausting manual
threshing
Production of brown
sugar with fire wood
Electric stove for
processing
Utilization of Energy
222 GOOD & BAD of Mini Hydro Power
Why productive use is so important?
Once the MHP is built, it provides energy at relatively low-cost. In most cases, using
the MHP more does not increase its costs. Therefore it should be used more – especially
during daytime when energy is not needed for lighting in households. Productive use is
highly beneficial, since it typically uses daytime hours to achieve added value and create
additional income or reduce work load
Productively used MHP can replace existing diesel gensets, e.g. for milling. Diesel
and petrol fuel is expensive today and harmful for the environment
Additional revenues from selling energy to any kind of business improves the cash
flow of the MHP system significantly and thus allows for more sustainable operation
Develop ideas on how to use energy / electricity from the MHP system for appliances
which reduce your workload and which can create additional income (e.g. grinding coffee
and selling it at higher price than beans, preparing brown sugar with electric stoves
thus saving fire wood, producing furniture with electric carpentry machines, welding
workshop, sewing workshop etc.)
Utilization of Energy
223GOOD & BAD of Mini Hydro Power
Direct mechanic versus electrical drive
What are the basic technical options for productive use of energy?
Bigger machines (thresher, huller, grinder etc.) can be driven either directly by the
turbine or by electricity
Pro’s & Con’s of direct drive: technically easy, no motor required, less conversion
losses, system can be controlled manually but machine/s must be installed inside the
powerhouse, generator cannot be driven simultaneously
Pro’s & Con’s of electric drive: machine/s can be installed almost anywhere,
simultaneous electricity supply of households possible if total capacity sufficient, but
technically more sophisticated control system for the MHP is required (!), electric motor
required (additional cost), 30-60% conversion losses, for starting current the motor might
need 3-5 times higher power (!), for bigger machines a 3-phase supply is required
A combination of direct drive and electricity generation can be the least cost
solution providing for productive use in the powerhouse during certain times and
electricity supply for households during the rest of the day
Direct mechanic
drive
Electrical
drive
Directly driven
huller
Electrically driven
sewing machine
Utilization of Energy
224 GOOD & BAD of Mini Hydro Power
What has to be considered for productive use?
What is the capacity available from the MHP system? What kind of machines can be
used?
At what time of the day is the capacity available (consider needs for irrigation,
drinking water, etc)?
Make a brainstorming on options for productive uses in the village and prioritize
Start with “low hanging fruits”! It is easier to start with activities like threshing,
hulling etc. which are already common to the villagers than to produce completely new
things for which they do not yet know the market
Who is actually interested? Should it be organized as a “community activity” or as an
individual“private business”?
Collect information about investment and operation cost for the productive use and
analyze the cash flow (look for external support when needed)
Which tariff should be applied for productive use of electricity? Make it attractive for
the users (of machines etc) but also profitable for the MHP operating institution
The more individual productive uses, the more complex is the technical control
requirement and/or the need for coordination. Evaluate the possibility of establishing
specific“small industrial areas”where productive use is bundled
Utilization of Energy
225GOOD & BAD of Mini Hydro Power
Technical requirements for bigger electric drives
What has to be considered for driving a bigger machine by
electricity?
An electric motor of sufficient capacity to drive the machine (e.g. replacement of a
diesel or petrol genset) is needed
The network design must provide a 3 phase connection (380 V) at the location
where the machine (> 1 kW) is going to be installed
The required starting current must be available at the respective location; a soft
starting facility can be used to reduce this starting current
A load control device (e.g. ELC electric load controller, flow controller) must be
installed, because appliances of higher capacity provoke significant load fluctuations
when being switched on and off. These fluctuations need to be managed automatically
by the system
If total capacity of the MHP system is not enough for household and productive
consumption times of usage must be defined and controlled by switches ( in the
picture)
Utilization of Energy
226 GOOD & BAD of Mini Hydro Power
Alternative setting for productive use:
The load on each phase should be about the same
Small industrial areas often need a 3-phase connection
Utilization of Energy
227GOOD & BAD of Mini Hydro Power
Beneficial utilization of energy requires
comprehensive awareness creation
Beneficial utilization of energy from MHP depends on a multitude of aspects which
can be handled easier if also the beneficiaries of the MHP are well aware of them
Awareness creation on environmental aspects is crucial! Deforestation in the
catchment area affects a river’s flow: it will decrease in dry season and rain fall will bring
destructive floods. Both results in energy shortage
Note:
PEOPLE APPRECIATE ELECTRICITY FROM THEIR MHP. INSTRUCT THEM THAT IT WILL BE
GONE WHEN THE NATURE IS DESTROYED. MAKE THEM PARTNERS IN PROTECTING THE
ENVIRONMENT!
Utilization of Energy
228 GOOD & BAD of Mini Hydro Power
If badly handled, electricty is dangerous …
COMMON PEOPLE DO NOT HAVE ANY EXPERIENCES WITH USE OF ELECTRICITY.
THEY NEITHER DO KNOW ABOUT THE DANGERS!
IT’S NECESSARY TO INFORM THAT ELECTRICTY IS DANGEROUS
IF NOT CORRECTLY HANDLED!
Utilization of Energy
229GOOD & BAD of Mini Hydro Power
… and a blessing, if done right!
ELECTRICITY IS THE CONTRIBUTION
TO A BETTER FUTURE
FOR OUR CHILDREN!
Utilization of Energy
230 GOOD & BAD of Mini Hydro Power
ISBN978-979-8978-26-5
ISBN978-979-8978-28-9(Vol.2)
Jl.HR.Rasuna Said Blok X-2,Kav.7 - 8,Kuningan
Jakarta - Indonesia
ASEAN-German Mini Hydro Project (AGMHP)
ASEAN Center for Energy

More Related Content

What's hot

Tata power delhi distribution's solar journey
Tata power delhi distribution's solar journeyTata power delhi distribution's solar journey
Tata power delhi distribution's solar journey
Tata Power Delhi Distribution Limited
 
Tata Power - DDL Company Profile
Tata Power - DDL Company ProfileTata Power - DDL Company Profile
Tata Power - DDL Company Profile
Tata Power Delhi Distribution Limited
 
Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...
Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...
Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...
Benoit Hardy-Vallée, Ph.D.
 
Link Resources SDVOSB Capabilities Statement 2013
Link Resources SDVOSB Capabilities Statement 2013Link Resources SDVOSB Capabilities Statement 2013
Link Resources SDVOSB Capabilities Statement 2013
gasanden
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement Corporate
gasanden
 
Universities as “Smart Cities” in a Globally Connected World - How Will They ...
Universities as “Smart Cities” in a Globally Connected World - How Will They ...Universities as “Smart Cities” in a Globally Connected World - How Will They ...
Universities as “Smart Cities” in a Globally Connected World - How Will They ...
Larry Smarr
 
Ontario’s renewable energy, smart grid and EV policy
Ontario’s renewable energy, smart grid and EV policyOntario’s renewable energy, smart grid and EV policy
Ontario’s renewable energy, smart grid and EV policy
Suncharge Corporation
 
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Smart Villages
 
Friost & Sullivan - Eltek (hybrid power systems) award write up
Friost & Sullivan  -  Eltek (hybrid power systems) award write upFriost & Sullivan  -  Eltek (hybrid power systems) award write up
Friost & Sullivan - Eltek (hybrid power systems) award write up
Eltek
 
Industry business
Industry businessIndustry business
Industry business
Schneider Electric India
 
T&D India (Apr 2017): The Face of Smart Grid
T&D India (Apr 2017): The Face of Smart GridT&D India (Apr 2017): The Face of Smart Grid
T&D India (Apr 2017): The Face of Smart Grid
T&D India
 
Overview of Clean Energy Community resources
Overview of Clean Energy Community resourcesOverview of Clean Energy Community resources
Overview of Clean Energy Community resources
Metropolitan Area Planning Council
 
T&D India (November 2017) - Swithchgear & Control Panels
T&D India (November 2017) - Swithchgear & Control PanelsT&D India (November 2017) - Swithchgear & Control Panels
T&D India (November 2017) - Swithchgear & Control Panels
T&D India
 
7th Power & Electricity Conference
7th Power & Electricity Conference7th Power & Electricity Conference
7th Power & Electricity Conference
Kahren Navarro
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
zubeditufail
 
High Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc PowerHigh Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc Power
Eltek
 
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
zubeditufail
 

What's hot (18)

Tata power delhi distribution's solar journey
Tata power delhi distribution's solar journeyTata power delhi distribution's solar journey
Tata power delhi distribution's solar journey
 
Tata Power - DDL Company Profile
Tata Power - DDL Company ProfileTata Power - DDL Company Profile
Tata Power - DDL Company Profile
 
Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...
Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...
Community Economic Development/Revitalization, Utilizing Electrical Micro Gri...
 
Link Resources SDVOSB Capabilities Statement 2013
Link Resources SDVOSB Capabilities Statement 2013Link Resources SDVOSB Capabilities Statement 2013
Link Resources SDVOSB Capabilities Statement 2013
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement Corporate
 
Universities as “Smart Cities” in a Globally Connected World - How Will They ...
Universities as “Smart Cities” in a Globally Connected World - How Will They ...Universities as “Smart Cities” in a Globally Connected World - How Will They ...
Universities as “Smart Cities” in a Globally Connected World - How Will They ...
 
Ontario’s renewable energy, smart grid and EV policy
Ontario’s renewable energy, smart grid and EV policyOntario’s renewable energy, smart grid and EV policy
Ontario’s renewable energy, smart grid and EV policy
 
Gvt 02
Gvt 02Gvt 02
Gvt 02
 
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
 
Friost & Sullivan - Eltek (hybrid power systems) award write up
Friost & Sullivan  -  Eltek (hybrid power systems) award write upFriost & Sullivan  -  Eltek (hybrid power systems) award write up
Friost & Sullivan - Eltek (hybrid power systems) award write up
 
Industry business
Industry businessIndustry business
Industry business
 
T&D India (Apr 2017): The Face of Smart Grid
T&D India (Apr 2017): The Face of Smart GridT&D India (Apr 2017): The Face of Smart Grid
T&D India (Apr 2017): The Face of Smart Grid
 
Overview of Clean Energy Community resources
Overview of Clean Energy Community resourcesOverview of Clean Energy Community resources
Overview of Clean Energy Community resources
 
T&D India (November 2017) - Swithchgear & Control Panels
T&D India (November 2017) - Swithchgear & Control PanelsT&D India (November 2017) - Swithchgear & Control Panels
T&D India (November 2017) - Swithchgear & Control Panels
 
7th Power & Electricity Conference
7th Power & Electricity Conference7th Power & Electricity Conference
7th Power & Electricity Conference
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
 
High Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc PowerHigh Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc Power
 
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
ESIA 132kV Underground Single Circuit Transmission Line from Creek City Grid ...
 

Similar to Good and bad_of_mini_hydro_power_vol.2

Good and bad_of_mini_hydro_power_vol.1
Good and bad_of_mini_hydro_power_vol.1Good and bad_of_mini_hydro_power_vol.1
Good and bad_of_mini_hydro_power_vol.1
hprabowo
 
Mobile Battery charger on Coin Insertion
Mobile Battery charger on Coin InsertionMobile Battery charger on Coin Insertion
Mobile Battery charger on Coin Insertion
IRJET Journal
 
Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...
Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...
Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...
Hitesh Kumar Singh
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Implementing Agreement (IA)
 
00 peg71-120dpi
00 peg71-120dpi00 peg71-120dpi
00 peg71-120dpi
EVANDRO OLIVEIRA
 
An advanced multilevel converter topology with Reduced switching elements
An advanced multilevel converter topology with Reduced switching elementsAn advanced multilevel converter topology with Reduced switching elements
An advanced multilevel converter topology with Reduced switching elements
Asoka Technologies
 
BSNL electrical engineering report file
BSNL electrical engineering report fileBSNL electrical engineering report file
BSNL electrical engineering report file
Aman singh
 
NOCA CLEAN ENERGY_PPP_Website_With_Housing
NOCA CLEAN ENERGY_PPP_Website_With_HousingNOCA CLEAN ENERGY_PPP_Website_With_Housing
NOCA CLEAN ENERGY_PPP_Website_With_HousingSir Collin H.Haughton
 
Analysis Of Power Dissipation Amp Low Power VLSI Chip Design
Analysis Of Power Dissipation  Amp  Low Power VLSI Chip DesignAnalysis Of Power Dissipation  Amp  Low Power VLSI Chip Design
Analysis Of Power Dissipation Amp Low Power VLSI Chip Design
Bryce Nelson
 
Analysis of Power Dissipation & Low Power VLSI Chip Design
Analysis of Power Dissipation & Low Power VLSI Chip DesignAnalysis of Power Dissipation & Low Power VLSI Chip Design
Analysis of Power Dissipation & Low Power VLSI Chip Design
Editor IJMTER
 
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
IRJET Journal
 
Twenties deliverable 10.3 Providing flexibility with a virtual power plant
Twenties deliverable 10.3 Providing flexibility with a virtual power plantTwenties deliverable 10.3 Providing flexibility with a virtual power plant
Twenties deliverable 10.3 Providing flexibility with a virtual power plantJonathan Dybkj
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report9951081577
 
IRJET- Efficient Power Utilization in Communication Towers
IRJET- Efficient Power Utilization in Communication TowersIRJET- Efficient Power Utilization in Communication Towers
IRJET- Efficient Power Utilization in Communication Towers
IRJET Journal
 
Tarining Report on Siemens
Tarining Report on SiemensTarining Report on Siemens
Tarining Report on Siemens
Student
 
PUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANY
PUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANYPUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANY
PUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANY
iQHub
 
Energy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumersEnergy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumers
Kevin Koshy Varghese
 
IRJET- Survey of Micro Grid Cost Reduction Techniques
IRJET-  	  Survey of Micro Grid Cost Reduction TechniquesIRJET-  	  Survey of Micro Grid Cost Reduction Techniques
IRJET- Survey of Micro Grid Cost Reduction Techniques
IRJET Journal
 

Similar to Good and bad_of_mini_hydro_power_vol.2 (20)

Good and bad_of_mini_hydro_power_vol.1
Good and bad_of_mini_hydro_power_vol.1Good and bad_of_mini_hydro_power_vol.1
Good and bad_of_mini_hydro_power_vol.1
 
Mobile Battery charger on Coin Insertion
Mobile Battery charger on Coin InsertionMobile Battery charger on Coin Insertion
Mobile Battery charger on Coin Insertion
 
SMART GRID(a) (3)
SMART GRID(a) (3)SMART GRID(a) (3)
SMART GRID(a) (3)
 
Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...
Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...
Project report on Vehicle accident and Alcohol sensing alert with Engine Lock...
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
00 peg71-120dpi
00 peg71-120dpi00 peg71-120dpi
00 peg71-120dpi
 
An advanced multilevel converter topology with Reduced switching elements
An advanced multilevel converter topology with Reduced switching elementsAn advanced multilevel converter topology with Reduced switching elements
An advanced multilevel converter topology with Reduced switching elements
 
BSNL electrical engineering report file
BSNL electrical engineering report fileBSNL electrical engineering report file
BSNL electrical engineering report file
 
Generator grid connection_guide
Generator grid connection_guideGenerator grid connection_guide
Generator grid connection_guide
 
NOCA CLEAN ENERGY_PPP_Website_With_Housing
NOCA CLEAN ENERGY_PPP_Website_With_HousingNOCA CLEAN ENERGY_PPP_Website_With_Housing
NOCA CLEAN ENERGY_PPP_Website_With_Housing
 
Analysis Of Power Dissipation Amp Low Power VLSI Chip Design
Analysis Of Power Dissipation  Amp  Low Power VLSI Chip DesignAnalysis Of Power Dissipation  Amp  Low Power VLSI Chip Design
Analysis Of Power Dissipation Amp Low Power VLSI Chip Design
 
Analysis of Power Dissipation & Low Power VLSI Chip Design
Analysis of Power Dissipation & Low Power VLSI Chip DesignAnalysis of Power Dissipation & Low Power VLSI Chip Design
Analysis of Power Dissipation & Low Power VLSI Chip Design
 
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
 
Twenties deliverable 10.3 Providing flexibility with a virtual power plant
Twenties deliverable 10.3 Providing flexibility with a virtual power plantTwenties deliverable 10.3 Providing flexibility with a virtual power plant
Twenties deliverable 10.3 Providing flexibility with a virtual power plant
 
Doc a.7-tlc report
Doc a.7-tlc reportDoc a.7-tlc report
Doc a.7-tlc report
 
IRJET- Efficient Power Utilization in Communication Towers
IRJET- Efficient Power Utilization in Communication TowersIRJET- Efficient Power Utilization in Communication Towers
IRJET- Efficient Power Utilization in Communication Towers
 
Tarining Report on Siemens
Tarining Report on SiemensTarining Report on Siemens
Tarining Report on Siemens
 
PUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANY
PUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANYPUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANY
PUBLIC CHARGING INFRASTRUCTURE USAGE IN GERMANY
 
Energy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumersEnergy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumers
 
IRJET- Survey of Micro Grid Cost Reduction Techniques
IRJET-  	  Survey of Micro Grid Cost Reduction TechniquesIRJET-  	  Survey of Micro Grid Cost Reduction Techniques
IRJET- Survey of Micro Grid Cost Reduction Techniques
 

Recently uploaded

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
obonagu
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
iemerc2024
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 

Recently uploaded (20)

BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
原版制作(unimelb毕业证书)墨尔本大学毕业证Offer一模一样
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Self-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptxSelf-Control of Emotions by Slidesgo.pptx
Self-Control of Emotions by Slidesgo.pptx
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 

Good and bad_of_mini_hydro_power_vol.2

  • 1. Volume 2 · Transmission & Distribution · House Installation · Management & Administration · Utilization of Energy GOOD & BAD of Mini Hydro Power
  • 2. Klaus Jorde with the resources of Entec AG Ekart Hartmann, Heinz Unger Edited by Roman Ritter GTZ ASEAN-German Mini Hydro Project (AGMHP) GOOD & BAD of Mini Hydro Power
  • 3. GOOD & BAD of Mini Hydro Power Imprint GOOD & BAD of Mini Hydro Power Authors: Klaus Jorde with the resources of Entec AG; Ekart Hartmann, Heinz Unger Editing: Roman Ritter, GTZ Photos, drawings and graphics provided by: The Indonesian-German Mini Hydro Power Project (MHPP) Published by: The ASEAN Centre for Energy (ACE) under the direction of its Executive Director, Nguyen Manh Hung, supported by the ASEAN-German Mini Hydro Project (AGMHP) Jl. HR. Rasuna Said, Blok X-2, Kav 7-8, Kuningan Jakarta 12950, Indonesia Phone : +62 (0)21 527 8027 Fax : +62 (0)21 529 63820 Websites : http://www.aseanenergy.org http://agmhp.aseanenergy.org http://www.gtz.de/energy First published by ACE in June 2009 Photographs, drawings and any other graphical elements are intellectual copyright protected and therefore must not be extracted separately from this publication. However, complete chapters of this book may be translated into other languages and thereby be reproduced for training purposes, provided the publisher is informed of these purposes and proper acknowledgements are made. Disclaimer: The publication has been prepared to illustrate good & bad practice examples in micro and mini hydro power planning, implementation, operation & management. While all reasonable care has been taken in the preparation of this publication, the authors, editors, ACE, AGMHP, Entec AG, GTZ, MHPP, PT Entec Indonesia and any other individuals and parties involved accept no responsibility for damage, injury or any other undesirable events resulting from its application or interpretation. The ultimate responsibility for quality, reliability and safety remains with designers, suppliers, installation teams and operating agencies. It is strongly recommended that any design, construction, electrical or mechanical installation, operation, maintenance and repair works are carried out and/or supervised and checked by qualified technicians and engineers only. ISBN : 978-979-8978-26-5 / 978-979-8978-28-9 i
  • 4. GOOD & BAD of Mini Hydro Power Table of Contents Volume 2 4 TRANSMISSION & DISTRIBUTION 161 4.1 General Basics 162 4.1.1 Basics for Grid Planning, Design & Layout 162 4.1.2 Implications of Productive End Use on Network Design 163 4.2 Major Components 164 4.2.1 Transformer Station 164 4.2.2 Distribution Poles and Lines 168 4.2.3 Wiring connections 170 4.2.4 Maintenance 178 5 HOUSE INSTALLATION 181 5.1 General 182 5.2 Major Elements 183 5.2.1 Service Connection 184 5.2.2 Current Limiting Device 186 5.2.3 Metering 188 5.2.4 House Wiring and Fittings 192 6 MANAGEMENT & ADMINISTRATION 201 6.1 Community Participation and Mobilisation 202 6.2 Institutional Setup 207 6.3 Capacity Building and Training 210 6.4 Tariff Policy 211 6.5 Financial Management 215 6.6 Monitoring and Documentation 216 7 UTILIZATION OF ENERGY 219 ii
  • 5. GOOD & BAD of Mini Hydro Power Volume 1 1 SITE IDENTIFICATION 1 1.1 General 2 1.2 Run of River Hydro Power Station 2 1.3 Feasibility 4 1.3.1 Site Identification and Flow Measurement 4 1.3.2 Rough Calculation of Possible Hydro and Electrical Power 6 1.3.3 Estimate Electrical Load 7 1.3.4 How to Measure the River/Stream Flow? 7 1.3.5 Discharge Measurements and Flow Duration Curve 14 1.3.6 Head Measurement 15 1.3.7 General Project Data 24 1.3.8 Synergies, Ownership and Management 26 1.3.9 Energy Supply and Demand 27 1.3.10 Consultants 29 2 CIVIL WORKS 31 2.1 Construction Basics 32 2.2 Individual Components 44 2.2.1 Weir and Intake 44 2.2.2 Sand Trap - Settling Basin 53 2.2.3 Headrace Channel 57 2.2.4 Forebay 70 2.2.5 Trash Rack 75 2.2.6 Spillway 81 2.2.7 Penstock and Support 85 2.2.8 Power House and Tailrace 97 3 ELECTRO-MECHANICAL EQUIPMENT 105 3.1 Basics 106 3.2 Individual Components 111 3.2.1 Turbine 111 3.2.2 Main Elements of a Generator 117 3.2.3 Panel, Controller and Ballast 121 3.2.4 Inside the Power House 129 3.2.5 Power House Wiring 136 3.2.6 Mechanical Transmission 143 3.2.7 Tools and Spare Parts 152 iii
  • 6. GOOD & BAD of Mini Hydro Power Foreword The urgent call for reducing the carbon footprint of our economies combined with the world’s ever growing demand for scaling-up access to energy is a priority challenge on the global agenda which defines the role for renewables. Renewable energies offer climate-friendly, low risk technology options for decentralized power generation. In remote areas, utilizing local renewables to support the development of poor rural communities is often more economically viable than transporting diesel fuel or expanding the national electricity grid over long distances. In locations where however the network infrastructure is already in place, harnessing natural resources for feeding power into the central grid also offers an important source of local income that contributes to macroeconomic stability by gaining independence from price-volatile fossil fuels. In the light of this, the Association of South East Asian Nations (ASEAN) is emphasizing the need to strengthen the development of renewable energies. Promoting mutual cooperation for the transfer of knowledge and skills in order to narrow development gaps among the ASEAN countries, to empower the region’s peoples, and ultimately to alleviate poverty is seen as the way forward. With this publication, ‘GOOD & BAD of Mini Hydro Power’, the ASEAN Centre for Energy (ACE) aims to provide valuable lessons from experiences gained in one member country for the dissemination of good practices throughout the whole region. This is intended to support the capacity development of ASEAN’s human resources in the sustainable planning, design, implementation, management, operation and maintenance of mini hydro power (MHP). The two underlying principles of this book are:“a picture is worth a thousand words”and“the only real mistake is the one from which we learn nothing”. Thus – along the sequence ‘from water to wire’ – contrasting pictures of good & bad examples are provided to illustrate what actually defines the difference. Each picture is complemented by short explanations so that the book can serve as a technical training manual that offers direct and easy-to-understand guidance. Although MHP is a relatively mature and cost-competitive energy technology, a lot of mistakes are still being made which lead to increased maintenance cost, reduced power output, shortened service life or even physical danger. The good news is that in many cases it is only small changes which need to be made – doing things the right way often requires no more funds than doing them the wrong way. However, what is definitely required is a proper awareness and expertise among hydro practitioners and their principals for whom, quite literally,“knowledge is power”. Nguyen Manh Hung Roman Ritter ACE, Executive Director GTZ, Principal Advisor AGMHP iv
  • 7. GOOD & BAD of Mini Hydro Power Acknowledgements This book draws on countless photographs and experiences which have been collected in practically applying international MHP know-how for the successful improvement of mini hydro power implementation in Indonesia. Therefore special thanks go to the Indonesian Directorate General for Electricity and Energy Utilization (DGEEU) and its Mini Hydro Power Project (MHPP) which has been jointly implemented for more than 10 years by DGEEU and GTZ, the German Technical Cooperation – Deutsche Gesellschaft für Technische Zusammenarbeit. Big thanks also go to the team of authors who made great efforts in bringing together Entec’s expertise in MHP development with the didactical concept of using contrasting pictures which require only short explanations to point out the decisive difference. Last but certainly not least, the ASEAN Centre for Energy (ACE) is highly grateful to the German Federal Ministry for Economic Cooperation and Development (BMZ) for its continuous support of the ASEAN-German Mini Hydro Project (AGMHP) which provided the necessary resources for compiling this publication. Nguyen Manh Hung ACE, Executive Director v
  • 8. Transmission & Distribution 161GOOD & BAD of Mini Hydro Power 4. Transmission & Distribution
  • 9. Transmission & Distribution 162 GOOD & BAD of Mini Hydro Power 4.1 GENERAL BASICS Small island grid This graph depicts major elements of a small island grid which are the transmission line, the transformers and the distribution line. At the powerhouse, the low voltage from the generator is transformed via a step up transformer to high voltage in order to reduce losses when transmitting the electricity over longer distances. In small island grids with relatively short distances, stepping up to medium voltage is often sufficient for the transmission. The transmission line usually ends at a central point in the village. There, the voltage is transformed via a step down transformer to low voltage again and the distribution line will make the connection to houses and small industrial facilities. 4.1.1 Basics for Grid Planning, Design & Layout For a proper technical layout of a transmission and distribution system, a lot of expertise and experience is required. Since such work can only be done by well trained, authorized professionals, no more than just a few selected issues are listed here: potential consumers Distance from power house to grid, and from grid to consumers shall be as short as possible less length of cables reduces the losses and the cost of the system look for a dry location, easy terrain and enough ground clearance of cable It should be not longer than 30 – 50 m
  • 10. Transmission & Distribution 163GOOD & BAD of Mini Hydro Power Minimum ground clearance should follow local regulations; for low voltage lines it should be at least: - 4.5 meters for off road installations - 5 meters alongside of road installations - 5.5 meters crossing roads installations For medium voltage lines, ground clearance has to be even higher. Check local regulations Define appropriate type, diameter and lengths of cables needed as well as number, type and material of poles, including all accessories and pole top hardware 4.1.2 Implications of Productive End Use on Network Design If electricity is only used for lighting,TVs and other small domestic appliances, the distribution can be designed as a low-cost 1-phase system. However, in order to allow its users to fully benefit from MHP, also productive end use of electricity – often requiring 3-phase connections – should be enabled. How this can be done withoutprovidingeverysinglehouseholdwithanexpensive3-phaseconnectionisexemplary shown in the above graphic.
  • 11. Transmission & Distribution 164 GOOD & BAD of Mini Hydro Power 4.2 MAJOR COMPONENTS 4.2.1 Transformer Station Main elements & design principles of a transformer station: Medium voltage line on the top for longer transmission lines & small currents (line length longer than 1-3 km) Protection elements (lightning protection, disconnector, overcurrent protection) depending local regulations Concrete poles with pole top hardware (insulators) Transformer on elevated platform = safety for the public Low voltage distribution line below medium voltage line for shorter transmission lines & higher currents (line length less than 1-3 km)
  • 12. Transmission & Distribution 165GOOD & BAD of Mini Hydro Power Good example of a transformer station Why is this a good example? Transformer is out of reach of humans and animals It is mounted high enough so that nobody can reach it accidentally – minimum ground clearance should be according to local regulations Transformer is fixed on a steel frame, held by two concrete poles Cables are well arranged for an easy understanding of the system
  • 13. Transmission & Distribution 166 GOOD & BAD of Mini Hydro Power Bad example of a transformer station Why is this a bad example? Transformers are not out of reach of humans and animals, humans can be injured accidentally Risk of injury and death is high Sabotage is easy possible How can I improve it? Transformers must be out of reach: - either set the transformers at least 4 meters above ground or - protect the area with a strong, grounded fence Each transformer has to be grounded Cabling has to be clear, well arranged and installed with a minimum ground clearance of 4.5 m for low voltage lines and even more for medium voltage lines.
  • 14. Transmission & Distribution 167GOOD & BAD of Mini Hydro Power Good example of a transformer station Why is this a good example? Suitable fence protects transformer against unauthorized access Transformer on the ground makes maintenance easier The fence prevents access by unauthorized person or animals The height of the fence should be at least 2 m A gravel pad keeps the surface and the equipment dry
  • 15. Transmission & Distribution 168 GOOD & BAD of Mini Hydro Power 4.2.2 Distribution Poles and Lines Bad example of distribution pole & lines Why is this a bad example? The distribution pole looks unsafe, poorly built and not supported The line is not free, plants are very close to the wires The minimum distance above ground-level is not kept, so it’s a very dangerous situation The transformer is also at ground level; blank wires can harm people and animals How can I improve it? Approach and improve such dangerous installations only with well trained authorized professionals
  • 16. Transmission & Distribution 169GOOD & BAD of Mini Hydro Power Good example of distribution pole & lines Why is this a good example? The pole is perfectly vertical and stabilized by guy wires All cables are properly fastened to the pole top hardware The power line looks healthy, well built and well supported The line is installed free, there are no house part, tree or plants near the wire The distance above ground-level is ok. If somebody passes the line, there is no risk to touch the dangerous blank wires The line is built with concrete poles, making the line more durable and more robust Service drops to the panel are in ducts and fastened to the pole Panel is out of reach of unauthorized persons
  • 17. Transmission & Distribution 170 GOOD & BAD of Mini Hydro Power 4.2.3 Wiring connections Bad wiring connection Why is this a bad example? Knots and tapes are unsuitable for wiring connections Approved connection clamp is missing Note: EACH UNPROPER CONNECTION IS PRONE TO BREAK CABLES WILL FALL TO THE GROUND CAUSING DANGER TO LIFE AND PROPERTY!
  • 18. Transmission & Distribution 171GOOD & BAD of Mini Hydro Power Good wiring connection Why is this a good example? These clamps consists of two parts which are tightened after inserting the cable These clamps can withstand the tension of the cables between two poles Use only approved clamping devices to avoid breakdowns during operation
  • 19. Transmission & Distribution 172 GOOD & BAD of Mini Hydro Power Bad wiring connection Why are these bad examples? Connection is made with the cable itself, approved connection clamp is missing Careless done wiring connection, without clamp and without connection box Blank wire, without insulation is a high risk to get injured by electrical accident How can I improve it? Such works have to be done by professionals only Use ONLY approved parts and accessories for cable connections Make all connections very carefully and use a connection box with clamps inside Note: IMPROPER CABLE CONNECTIONS ARE A HAZARD FOR THE SYSTEM AND COULD CAUSE ACCIDENTS OR FIRES!
  • 20. Transmission & Distribution 173GOOD & BAD of Mini Hydro Power Good wiring connections Why are these good examples? Well designed and built service pole, concrete type set in a solid concrete foundation Cables are well arranged and fixed to the pole Panel with fuses well built and safe Guy wires absorb the forces caused to the pole by the cables
  • 21. Transmission & Distribution 174 GOOD & BAD of Mini Hydro Power Bad example of a wiring connection Why is this a bad example? The various connections are unsystematically arranged and confusing everybody who needs to locate a possible failure The cables hang around without being fixed How can I improve it? Cabling works have to be carried out by professionals only Wiring connections have to be done well, for example by using a connection panel with terminals inside
  • 22. Transmission & Distribution 175GOOD & BAD of Mini Hydro Power Good example of a wiring connection Why is this a good example? The cable under tension is held by the clamp The clamp is fixed to the pole The cable is around the pole without tension Note: ALWAYS LEAVE A CERTAIN LENGTH OF CABLE WITHOUT TENSION BETWEEN THE CLAMPS!
  • 23. Transmission & Distribution 176 GOOD & BAD of Mini Hydro Power Bad example of a street light wiring Why is this a bad example? The cable is under tension The socket is fixed with the power cable itself How can I improve it? Fix the socket to the pole and install the cable without tension
  • 24. Transmission & Distribution 177GOOD & BAD of Mini Hydro Power Good examples of street light installation Why is this a good example? Power cables are free of any tension Bulb sockets are not hanging at the power cables but they are fastened to the lampshades The lampshades are fixed to the poles The electrical connections are protected by the improvised lampshades Energy saving light bulbs are used
  • 25. Transmission & Distribution 178 GOOD & BAD of Mini Hydro Power 4.2.4 Maintenance What needs to be done for the pole maintenance? Switch off power first Check stability of pole before you go to the top Check guy wires as well When stability and guy wires are ok, then you can go to the top, if necessary in order to: Check cable connection and cable tension (overhead clearance) Check pole top hardware Clean insulators from dirt Note: CHECK WOODEN POLES MORE OFTEN – PARTICULARLY IF THEY START ROTTING!
  • 26. Transmission & Distribution 179GOOD & BAD of Mini Hydro Power Good selection of tools Why is this a good example? Tools for good electrical workmanship for transmission and distribution lines as well as for house installations For well done electrical work, the need of good tools is essential The shown tools are necessary, because of different shapes and sizes. Note: FOR EACH SHAPE AND SIZE, USE THE SPECIFIC TOOL! KEEP TOOLS CLEAN AND TAKE CARE OF THEM!
  • 27. House Installation 180 GOOD & BAD of Mini Hydro Power
  • 28. House Installation 181GOOD & BAD of Mini Hydro Power 5 HOUSE INSTALLATION 5. House Installation
  • 29. House Installation 182 GOOD & BAD of Mini Hydro Power 5.1 GENERAL Electricity – when not handled with proper care – is very dangerous for people and their property Note: IN ORDER TO PREVENT DANGEROUS SITUATIONS, HOUSE INSTALLATIONS HAVE TO BE DONE ACCORDING TO THE LOCAL REGULATIONS AND BY EDUCATED AND CERTIFIED PROFESSIONALS ONLY!
  • 30. House Installation 183GOOD & BAD of Mini Hydro Power 5.2 MAJOR ELEMENTS This graph depicts major elements of the house installation (however, ground electrode as part of the earthing system is not shown here) which are illustrated in more detail in this chapter.
  • 31. House Installation 184 GOOD & BAD of Mini Hydro Power 5.2.1 Service Connection Service connection - bad Why is this a bad example? There is no distance between the cable and the roof; the insulation will eventually be damaged by the roof This can create short circuits and fire Note: THIS KIND OF WIRING IS VERY DANGEROUS – ESPECIALLY FOR A WOODEN HOUSE!
  • 32. House Installation 185GOOD & BAD of Mini Hydro Power Service connection - good Why is this a good example? The service drop from the distribution system is under tension It is installed high enough to be out of reach The cable between connection and meter is without tension Meter is well protected under the roof against rain and moisture Cable fixed with clamps to the underside of a roof beam
  • 33. House Installation 186 GOOD & BAD of Mini Hydro Power 5.2.2 Current Limiting Device Current limiting device - bad Why are these bad examples? Current limiting device is burned because of missing fuse; fuse was bypassed Bypassing a fuse is the worst you can do, directly attacking life and property Never install limiting devices like this Never bypass limiting devices
  • 34. House Installation 187GOOD & BAD of Mini Hydro Power Current limiting device - good Why are these good examples? The fuses are fixed properly Incoming and outgoing lines are well separated There is no bypass visible
  • 35. House Installation 188 GOOD & BAD of Mini Hydro Power 5.2.3 Metering Metering - bad Why is this a bad example? Wiring should always be straight and well protected Loose or hanging wires may cause connection losses and damage insulations How can I improve it? Fix the connection of the service drop to the house in order to remove the tension on the service cables Wiring should be done by the shortest and clearest way possible – straight and protected within cable ducts
  • 36. House Installation 189GOOD & BAD of Mini Hydro Power Metering - good Why is this a good example? The meters are fixed in a proper cabinet and well protected against rain and moisture The cables come all from the bottom, no loose or hanging wires
  • 37. House Installation 190 GOOD & BAD of Mini Hydro Power Metering - bad Why is this a bad example? Meters are costly and need to be protected in order to keep functioning Birds faeces touching electrical wires can damage the insulation and create a short circuit Note: NEVER ALLOW DUST OR MOISTURE TO SPREAD NEAR ELECTRICAL INSTALLATIONS!
  • 38. House Installation 191GOOD & BAD of Mini Hydro Power Metering - good Why is this a good example? Wiring is clearly arranged. It would be even better to put the wires inside a cable duct The meters are sealed The current limiting devices are inside a panel
  • 39. House Installation 192 GOOD & BAD of Mini Hydro Power 5.2.4 House Wiring and Fittings Bad components Why are these components bad for house installations? Wires have only one single layer of insulation. When this insulation is damaged, the danger of an accident is immediately given It is international standard to use wires only within closed electrical cabinets / panels or if they are fixed 100% within protection pipes or ducts All cables are specified for usage only up to a certain maximum current. Apparently the cables in the right picture were selected wrongly and used for a much higher current, with a very high danger of cable fire Note: NEVER USE WIRES!
  • 40. House Installation 193GOOD & BAD of Mini Hydro Power Good components Why are these components good for house installations? Cables have double insulation, with separately insulated wires inside Depending on the required current of your equipment, use always the appropriate cable with the correct diameter Contact a professional to check local regulations on the required minimum diameters for different electrical installations Note: ONLY USE CABLES OF THE RIGHT DIAMETER!
  • 41. House Installation 194 GOOD & BAD of Mini Hydro Power House wiring and fittings - bad Why is this a bad example? This is a very dangerous situation and the installation was made by a layman without any knowledge of electricity Wires are used instead of double insulated cables Only a question of time until somebody becomes injured and/or a cable fire starts How can I improve the situation? Contact a professional, who knows how to do electrical installations according to safety-requirements
  • 42. House Installation 195GOOD & BAD of Mini Hydro Power House wiring and fittings - good Why is this a good example? Service board with switches and current limiting devices The incoming and outgoing cables are well fixed on the wall Proper installation on a service-board Flashlight in case of a black out
  • 43. House Installation 196 GOOD & BAD of Mini Hydro Power Sockets, plugs and switches - bad Why is this a bad example? These are very dangerous examples on how electricity should never be handled; it can harm humans, destroy the connected electrical appliances and cause fire Wires are used instead of cables; not being laid in a pipe/duct To turn electricity on/off, a socket is used instead of a switch How can I improve it? Contact a professional who knows how to do electrical installations Raise households’awareness for the danger of electricity Familiarize households with good practice examples Perform regular household inspections (e.g. when collecting the electricity tariff) and disconnect houses in which safety rules are not followed
  • 44. House Installation 197GOOD & BAD of Mini Hydro Power Sockets, plugs and switches - good Why are these good examples? The power supply cables are installed within ducts to prevent damages or faults Socket and switches are of approved type The sockets are grounded (i.e. have earthing) which makes the use of appliances safer A correct type of plug is used to take the electricity from the socket Installations were made by a professional
  • 45. House Installation 198 GOOD & BAD of Mini Hydro Power Lamp installations - bad Why is this a bad example? Lamps are hanging directly on electrical wires, putting tension on the connection Socket is fixed on wood directly without heat protection Wood was heated up already How can I improve the situation? Screw sockets and other electrical components correctly to the wall or to the ceiling Use only sockets which can be fastened with bolts or screws Never keep wires under tension Never leave bare wires without insulation
  • 46. House Installation 199GOOD & BAD of Mini Hydro Power Lamp installation - good Why is this a good example? Lamp-socket is fixed to the beam (be sure there is no wood directly under the socket) There is no tension on the cable A cable (not wires !) is used and properly fixed
  • 47. Management & Administration 200 GOOD & BAD of Mini Hydro Power
  • 48. Management & Administration 201GOOD & BAD of Mini Hydro Power 6 MANAGEMENT AND ADMINISTRATION 6. Management & Administration
  • 49. Management & Administration 202 GOOD & BAD of Mini Hydro Power 6.1 COMMUNITY PARTICIPATION AND MOBILISATION Participation of the community is a crucial factor for success Key aspects for community participation: The Community has to be involved from the very beginning of a project, starting from the first site visit; in an ideal case: community itself took the initiative and proposed the construction of a MHP scheme Organize regular meetings between community and consultant during the planning stage, and between community, consultant and contractor during construction stage in weekly intervals, to inform and coordinate all activities and to give the parties the chance to discuss potential conflicts (compensation for damages to property, etc); make sure that women get the chance to actively participate in, and contribute to the discussions Keep all involved stakeholders (contractor, government officers, etc) informed and up to date with latest developments and plans make sure that community and villagers do not receive different information from different sources Make clear which party is expected to contribute what (financial and technical inputs for project, village contribution, etc)
  • 50. Management & Administration 203GOOD & BAD of Mini Hydro Power Village meeting where MHP issues are discussed Make clear that villagers’ contribution to construction work, either in cash or labor is a condition to implement the project. Villagers’ contribution significantly boosts their feeling of ownership of the plant. However, make sure that contribution is reasonable and within their ability (e.g. labor contribution by the community during harvest periods will be very limited) Transfer information on technical, institutional, and environmental issues: necessity of management and operation of MHP system, protection of river catchment, solving of water usage conflicts, etc. Don’t raise wrong expectations in the community about the MHP project (e.g. community has to understand and be aware of power supply limits during the dry season) transparency When presenting the project always consider and explicitly mention related costs not covered by the project (e.g. metering system per household, workshop equipment for productive use of energy, household cabling) people must always be aware of all costs related to the project
  • 51. Management & Administration 204 GOOD & BAD of Mini Hydro Power Involvement of Women Women are very often more trustworthy and experienced in managing the household finances and thus more qualified as book keepers of the MHP finances during the operation stage Usually women tend to have a deeper understanding of the importance of the implementation and sustainable operation of the MHP and the resulting improvement to their and their children’s’ livelihood. Women therefore usually have a much greater interest to see the project implemented and well maintained, making them the priority group to address for community mobilization Project agents are in the position to stress the presence of women during all meetings, even if it is not common in the culture and tradition The MHP project is an “innovation”and thus can be introduced in an“innovative”way Encourage women to express their opinion and suggestions regarding the MHP system, as well as the productive use of energy
  • 52. Management & Administration 205GOOD & BAD of Mini Hydro Power Key Questions in Community Mobilisation and Participation What is important for whom and when? Consider if for certain issues separate meetings with men and women are useful (also depending on total number of people and available facilities) How much time is needed for which kind of meeting? Take your time for community meetings! MHP might be a very new concept for the community, resulting in lengthy discussions Which decisions have to be taken at what stage of the project? Mention important deadlines (planned project schedule, start of operation, opening of bank account, etc.). Establish a plan of action for the activities required from the community (legal registration process, definition of land use rights, compensation, labor input) Which language is spoken in the village and what is the level of education? select staff and media accordingly Use videos, pictures etc to make people easily understand! If Power Point presentations are used, present short and concise text only, with many photos Limit presentations to the essential and leave enough time for discussions, questions, input from villagers
  • 53. Management & Administration 206 GOOD & BAD of Mini Hydro Power Key Issues of Community Mobilization Planning & construction of MHP system and definition of duties of community during these stages Identification of management and operation staff. Management staff should be appointed at an early stage of the project to coordinate with the contractors and for organizing community contribution. Operation staff should participate in the installation of the electromechanical equipment. Identification of training measures for operation and management staff Activities regarding productive use of electricity (awareness creation workshop, capacity building measures) Definition of expected contribution from community (contribution in cash or labor, set up of an institution, selection of staff, opening and managing of a bank account for operation and maintenance, tariff and sanction system, develop productive use…) Clarification of land/water use rights Compensation of land owners (e.g. damages to property) Clarification of water usage to avoid later conflicts between water use for power production and irrigation or water supply
  • 54. Management & Administration 207GOOD & BAD of Mini Hydro Power 6.2 INSTITUTIONAL SETUP Key issues of institutional setup: When a community-based organization is needed to take over ownership of the system and thus also responsibility for its operation, preferably an already existing organization should be used (e.g. cooperative managing the irrigation system in the village). If no such organization exists, identify a suitable institutional and organizational setup for the MHP project under consideration of the local conditions Within the organization individual staff must be assigned for specific tasks of operation and management (OM). A typical staffing looks like this: o 2 operators (mandatory) o 1 book keeper (mandatory) o 1 head of management (optional) o 1 secretary (optional) Identify suitable OM staff (see below) Clarify legal and regulatory issues regarding a formal registration of the community as owner, operator and beneficiary of the project For each staff position a detailed task description should be written up and made accessible for the customers
  • 55. Management & Administration 208 GOOD & BAD of Mini Hydro Power Salaries for each position must be agreed accordingly Depending on the size of the system, staff may have to be employed part-time or full time Operators should earn more since their tasks are heavy, and also more difficult and time-consuming If salaries are set too low, they do not attract and/or motivate the people with required skills to do a good job But if salaries are too high, they are difficult to be covered by tariff payments Salary has to be competitive to avoid migration of trained staff The community must agree on a reasonable tariff system covering all expected costs The community must agree on a sanction system in case of late or non-payment of tariffs Define and collect an initial fee from all customers to cover the first salary payments and as a sign of commitment from the community
  • 56. Management & Administration 209GOOD & BAD of Mini Hydro Power Selection of Staff for Management & Operation Selection of qualified staff is crucial for a sustainable operation of the plant! Staff should be selected under consideration of the following: o Technical skills and education, o Know-how on book keeping, etc. o Relevant, long and varied experience in the field o Tendency to stay in the village over the long term. o Don’t choose candidates who plan to move away in the future (e.g. unmarried young men are more likely to move away) o Involve women as much as possible Note: CHOOSE TRUSTWORTHY PEOPLE!
  • 57. Management & Administration 210 GOOD & BAD of Mini Hydro Power 6.3 CAPACITY BUILDING AND TRAINING Aspects for efficient capacity building and training: Conduct training and capacity building measures separate from village meetings in small groups in an interactive and participatory way In case of several villages in one area, get operators, book keepers and secretaries together for a common training workshop For training in small groups as well as workshop training use demonstration material / visual aids, like log-books, book-keeping folders, etc If possible invite an operator / secretary from an existing MHP system or organize a visit to an MHP system in operation, with some village representatives (preferably the selected OM staff) this would facilitate a direct exchange Award certificates to those attended a training successfully in order to raise their social standing and thereby the qualified influence on the MHP
  • 58. Management & Administration 211GOOD & BAD of Mini Hydro Power 6.4 TARIFF POLICY Only the fuel is for free – everything else costs a lot to operate a MHP in good condition THAT’S WHY SUFFICIENT & REGULAR TARIFF REVENUES ARE NEEDED! For repair of civil works For any tools, lubricants, etc. For workers’salaries For all kind of repairs and spare parts of electro-mechanical equipment
  • 59. Management & Administration 212 GOOD & BAD of Mini Hydro Power Elements to be considered for Tariff Calculation: The tariff needs to be based on the cost recovery principle (long-term unit costs) to ensure the MHP’s viability and should reflect the customers’energy usage (to be charged lump sum per appliance or per kWh in case of electricity meters) Poor village communities often can not afford to pay the MHP’s initial investment by themselves and therefore depend on subsidies. In these cases, the investment should never be covered fully by the subsidy but still require contributions from the villagers (in cash or in kind) to increase their sense of ownership Paying subsidies to cover the operating costs is absolutely counter-productive and should never be an option! It would make the MHP’s operation too much dependent on factorsbeyondthevillage’sinfluenceandreducethesenseofownershipandappreciation for electricity Income generation through productive use of energy improves consumers’ ability to pay; often higher tariffs con be paid for productive end uses The tariff system should also fix regular tariff increases (e.g. yearly) in order to compensate for price increases of spare parts, etc due to inflation Fix penalty fees for late payment, electricity pilferage etc The tariff needs to be fixed based on a proper cash flow calculation. With a laptop and a high-beamer, the process of assessing and agreeing on an appropriate tariff can effectively be facilitated by changing various input figures in a spreadsheet in order to immediately see and discuss the consequences in front of a village meeting discounted cash flow analysis based on assumptions O&M costs lifetime of the system components investment costs required number of staff salaries revenues from electricity sales load factor tariff (system)
  • 60. Management & Administration 213GOOD & BAD of Mini Hydro Power To fix an appropriate tariff, all expected future expenditures must be considered: % of revenues to be assigned Salaries for all staff (operators, book keeper, etc.) About 30-40% Expenditures for daily routine O&M (tools, small About 5-10% spare parts, lubricant, stationary for book keeping, etc.) Savings for serious repairs and purchse of bigger spare About 5-10% parts as reserve into bank account! About 50-60% Ability and willingness to pay Tariff should be in line with the consumers’ ability and willingness to pay. The ability and willingness to pay is thereby influenced by: Note: TO ASSESS AFFORDABILITY COMPARE THE TARIFF WITH OTHER EXPENDITURES OF THE HOUSEHOLDS (E.G. KEROSENE FOR LAMPS, CIGARETTS, ETC)! WOMEN SHOULD BE THE PRIORITY GROUP TO DISCUSS EXPENDITURES. THEY OFTEN HAVE A BETTER UNDERSTANDING & AWARENESS OF THE ACTUAL LIVING COSTS! REGARDING THE WILLINGNESS TO PAY IT MIGHT BE NECESSARY TO CLARIFY THAT “CHEAP ELECTRICITY MEANS NO ELECTRICTY”! Ability and willingness to pay Income Situation paying modalities opportunity costs subjectively sensed benefits and comfort anticipated or known practices regarding electricity pricing elsewhere others weekly at market day monthly
  • 61. Management & Administration 214 GOOD & BAD of Mini Hydro Power Metering and Tariff Collection Options: Standard kWh meter (fair and transparent, but relatively high costs for the hardware and the meter reading) Digital kWh meter (allows time and amount related tariffs, but high costs and technically complex reading/billing) Pre-paid systems (fair and transparent, no meter reading, but high costs and less forgery proof) Current limiter (to limit peak demand, no meter reading, very cheap, but danger of fraud and theft and time of usage not considered) Flat rate (no hardware cost, but needs a lot of social control to prevent waste of electricity, risk of higher peaks because of no load control) All customers pay regularly a tariff which is high enough to cover the MHP’s costs
  • 62. Management & Administration 215GOOD & BAD of Mini Hydro Power 6.5 FINANCIAL MANAGEMENT How to manage finances? All payments must be recorded in a book and on customers’ cards, and must be signed by the customer and the bookkeeper to verify the payment Every financial transaction must be recorded in a cash book Get receipts for revenues and expenditures, number them and keep them in a folder Open a bank account (in the name of the organization) for which 2 persons (for mutual control) must countersign for any withdrawal of money Deposit revenues as often as possible (e.g. monthly) into the account Check the balance of funds (also in the bank account) Transparency is of crucial importance to keep peoples’ confidence and support and to solve problems which might arise – the book keeper / treasurer must be a very trustworthy person Note: FINANCIAL TRANSACTIONS MUST BE TRANSPARENT! KEEP ALL INCOME IN A BANK ACCOUNT!
  • 63. Management & Administration 216 GOOD & BAD of Mini Hydro Power 6.6 MONITORING AND DOCUMENTATION All important activities, meetings etc are noted in the log book What should be monitored & documented and why? A thorough record of routine O&M and also of any unusual events occurring in the system will facilitate troubleshooting, e.g. when experts from outside the village are consulted for help All civil and electro-mechanical parts of an MHP system must be inspected periodically important results of these monitoring activities must be recorded in a log book Protocols of community meetings in connection with the MHP system should be recorded in the log book, including any important decisions, agreements and conclusions Important actions and occurrences with regard to finances, book keeping and administration should also be recorded in the log book Note: PROPER MONITORING AND GOOD RECORDS MAKE OPERATION AND MAINTENANCE WORKS EASIER AND ENHANCES CUSTOMER’S TRUST!
  • 64. Management & Administration 217GOOD & BAD of Mini Hydro Power Public information on boards at the MHP and in the village Publishing information about the MHP All consumers must be kept informed of activities of management and operations staff, any difficulties encountered, planning for the future, etc, either through meetings and/or reporting on information boards The better people are informed, the better their understanding and acceptance, and the higher their motivation to regularly pay electricity bills (they have a right to know what their money is used for) Transparency increases acceptance and satisfaction of consumers Publish protocols of community meetings on the MHP system, reports from the operator and the bookkeeper, the balance of funds (income and expenditures), and the balance of the bank account, status of tariff payments, etc Transparent reporting of financial matters helps to establish and maintain good governance and prevent corruption Site information board Transparent reporting
  • 65. Utilization of Energy 218 GOOD & BAD of Mini Hydro Power
  • 66. Utilization of Energy 219GOOD & BAD of Mini Hydro Power 7 UTILIZATION OF ENERGY
  • 67. Utilization of Energy 220 GOOD & BAD of Mini Hydro Power Always choose energy efficient appliances! How to make efficient use of energy? Choose energy efficient bulbs and energy efficient appliances wherever possible. All kind of energy efficient bulbs are available on the market. Their price is higher but therefore they last much longer, need less energy and help safe a lot of money in the long run Whenever you buy electric appliances (refrigerator, rice cooker etc.) look at the wattage and ask for the energy efficient models. Don’t hesitate to ask your local MHP operator for support Switch-off the light and other appliances if you don’t use them Paint walls of house in a light colors such as white. This will intensify the effect of light Note: BEING ENERGY EFFICIENT HELPS TO REDUCE PEAK LOAD AND OVERLOAD OF THE MHP SYSTEM!
  • 68. Utilization of Energy 221GOOD & BAD of Mini Hydro Power Get the most benefit from MHP: Use it productively! Electric coconot rasping Threshing by a turbine driven machine Time consuming manual coconut rasping Exhausting manual threshing Production of brown sugar with fire wood Electric stove for processing
  • 69. Utilization of Energy 222 GOOD & BAD of Mini Hydro Power Why productive use is so important? Once the MHP is built, it provides energy at relatively low-cost. In most cases, using the MHP more does not increase its costs. Therefore it should be used more – especially during daytime when energy is not needed for lighting in households. Productive use is highly beneficial, since it typically uses daytime hours to achieve added value and create additional income or reduce work load Productively used MHP can replace existing diesel gensets, e.g. for milling. Diesel and petrol fuel is expensive today and harmful for the environment Additional revenues from selling energy to any kind of business improves the cash flow of the MHP system significantly and thus allows for more sustainable operation Develop ideas on how to use energy / electricity from the MHP system for appliances which reduce your workload and which can create additional income (e.g. grinding coffee and selling it at higher price than beans, preparing brown sugar with electric stoves thus saving fire wood, producing furniture with electric carpentry machines, welding workshop, sewing workshop etc.)
  • 70. Utilization of Energy 223GOOD & BAD of Mini Hydro Power Direct mechanic versus electrical drive What are the basic technical options for productive use of energy? Bigger machines (thresher, huller, grinder etc.) can be driven either directly by the turbine or by electricity Pro’s & Con’s of direct drive: technically easy, no motor required, less conversion losses, system can be controlled manually but machine/s must be installed inside the powerhouse, generator cannot be driven simultaneously Pro’s & Con’s of electric drive: machine/s can be installed almost anywhere, simultaneous electricity supply of households possible if total capacity sufficient, but technically more sophisticated control system for the MHP is required (!), electric motor required (additional cost), 30-60% conversion losses, for starting current the motor might need 3-5 times higher power (!), for bigger machines a 3-phase supply is required A combination of direct drive and electricity generation can be the least cost solution providing for productive use in the powerhouse during certain times and electricity supply for households during the rest of the day Direct mechanic drive Electrical drive Directly driven huller Electrically driven sewing machine
  • 71. Utilization of Energy 224 GOOD & BAD of Mini Hydro Power What has to be considered for productive use? What is the capacity available from the MHP system? What kind of machines can be used? At what time of the day is the capacity available (consider needs for irrigation, drinking water, etc)? Make a brainstorming on options for productive uses in the village and prioritize Start with “low hanging fruits”! It is easier to start with activities like threshing, hulling etc. which are already common to the villagers than to produce completely new things for which they do not yet know the market Who is actually interested? Should it be organized as a “community activity” or as an individual“private business”? Collect information about investment and operation cost for the productive use and analyze the cash flow (look for external support when needed) Which tariff should be applied for productive use of electricity? Make it attractive for the users (of machines etc) but also profitable for the MHP operating institution The more individual productive uses, the more complex is the technical control requirement and/or the need for coordination. Evaluate the possibility of establishing specific“small industrial areas”where productive use is bundled
  • 72. Utilization of Energy 225GOOD & BAD of Mini Hydro Power Technical requirements for bigger electric drives What has to be considered for driving a bigger machine by electricity? An electric motor of sufficient capacity to drive the machine (e.g. replacement of a diesel or petrol genset) is needed The network design must provide a 3 phase connection (380 V) at the location where the machine (> 1 kW) is going to be installed The required starting current must be available at the respective location; a soft starting facility can be used to reduce this starting current A load control device (e.g. ELC electric load controller, flow controller) must be installed, because appliances of higher capacity provoke significant load fluctuations when being switched on and off. These fluctuations need to be managed automatically by the system If total capacity of the MHP system is not enough for household and productive consumption times of usage must be defined and controlled by switches ( in the picture)
  • 73. Utilization of Energy 226 GOOD & BAD of Mini Hydro Power Alternative setting for productive use: The load on each phase should be about the same Small industrial areas often need a 3-phase connection
  • 74. Utilization of Energy 227GOOD & BAD of Mini Hydro Power Beneficial utilization of energy requires comprehensive awareness creation Beneficial utilization of energy from MHP depends on a multitude of aspects which can be handled easier if also the beneficiaries of the MHP are well aware of them Awareness creation on environmental aspects is crucial! Deforestation in the catchment area affects a river’s flow: it will decrease in dry season and rain fall will bring destructive floods. Both results in energy shortage Note: PEOPLE APPRECIATE ELECTRICITY FROM THEIR MHP. INSTRUCT THEM THAT IT WILL BE GONE WHEN THE NATURE IS DESTROYED. MAKE THEM PARTNERS IN PROTECTING THE ENVIRONMENT!
  • 75. Utilization of Energy 228 GOOD & BAD of Mini Hydro Power If badly handled, electricty is dangerous … COMMON PEOPLE DO NOT HAVE ANY EXPERIENCES WITH USE OF ELECTRICITY. THEY NEITHER DO KNOW ABOUT THE DANGERS! IT’S NECESSARY TO INFORM THAT ELECTRICTY IS DANGEROUS IF NOT CORRECTLY HANDLED!
  • 76. Utilization of Energy 229GOOD & BAD of Mini Hydro Power … and a blessing, if done right! ELECTRICITY IS THE CONTRIBUTION TO A BETTER FUTURE FOR OUR CHILDREN!
  • 77. Utilization of Energy 230 GOOD & BAD of Mini Hydro Power
  • 78. ISBN978-979-8978-26-5 ISBN978-979-8978-28-9(Vol.2) Jl.HR.Rasuna Said Blok X-2,Kav.7 - 8,Kuningan Jakarta - Indonesia ASEAN-German Mini Hydro Project (AGMHP) ASEAN Center for Energy