Feasibility Study for the
 CEL Solar Photovoltaic
Power Pilot Project in El
        Salvador
     L. Martín Gómez Rocha
   NMSU-Institute for Energy and
 Environment, College of Engineering




                        New Mexico State University
PV Pilot Project, El Salvador

• Proposal
  • In 2011, USTDA released RFPs for four
    projects in Latin America
  • Awarded to NMSU in January 2012
  • Contract signed in May 2012 (start delayed
    until August)




                                 New Mexico State University
PV Pilot Project, El Salvador

• Background
  • El Salvador opened its energy market in 2007
  • Over 15 small utilities (most of them private)
  • Comisión Ejecutiva Hidroeléctrica del Rio
    Lempa (CEL), public utility that used to be in
    charge of the whole electricity generation in
    the country
  • There is now a competitive market ~1,300
    MW total

                                  New Mexico State University
PV Pilot Project, El Salvador

• Background
  • No fossil fuels resources in country
  • El Salvador heavily depends on imported oil
  • High cost of electricity ~25 cents/kWh
  • El Salvador wants to expand its renewable
    energy resources including hydropower, solar,
    wind, geothermal.
  • CEL is tendering a 14 MW PV plant.


                                 New Mexico State University
PV Pilot Project, El Salvador

• Background
  • CEL already has a 24 kWp pilot project at its
    headquarters in San Salvador.




                                  New Mexico State University
PV Pilot Project, El Salvador
• NMSU Study
    • Composed of 11 Tasks:
•   Task 1: Kick-Off Meeting and Inception Report
    – Subtask 1.1: Kick-Off Meeting
    – Subtask 1.2: Inception Report


•   Task 2: Technical Analysis
    – Subtask 2.1: Available Documentation
    – Subtask 2.2: Solar Resource and Site Assessments
    – Subtask 2.3: Preliminary Comparative Analysis of Solar Photovoltaic
      Technologies
    – Subtask 2.4: Technical Configuration and Preliminary Conceptual Design


•   Task 3: Preliminary Environmental Impact Assessment


    •                                                   New Mexico State University
PV Pilot Project, El Salvador
• Task 3: Preliminary Environmental Impact Assessment

• Task 4: U.S. Sources of Supply, identifying the potential
  value of U.S. exports of products and services

• Task 5: Financial Analysis

• Task 6: Risk Analysis




                                         New Mexico State University
PV Pilot Project, El Salvador
 •   Task 7: Regulatory Review
     – Subtask 7.1 : Permits
     – Subtask 7.2: Tariff Filing


 •   Task 8: Development Impact Assessment

 •   Task 9: Implementation Plan

 •   Task 10: Financing Plan

 •   Task 11: Final Report



                                             New Mexico State University
PV Pilot Project, El Salvador

• Task 2
•   It is the backbone of the study

•   The results from this Task will determine the rest of the study

•   Will define the size of the project, according to the available land
    and solar resource

•   It is the next step of the study, due by the end of January




                                                    New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations

Hydropower plant “Cerrón Grande”




                                   New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations

Hydropower plant “Cerrón Grande”

•   69 Km (43 mi) from San Salvador

•   Excellent roads to the site




                                      New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations


•   Available land: 10.4 Ha

•   Plots (parcelas) 19, 23 & 24




                                   New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations




•   “Cerrón Grande”




                          New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations
                “Cerrón Grande”




                                  New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations

Hydropower plant “5 de Noviembre”




                                    New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations

Hydropower plant “5 de Noviembre”

89 Km (56 mi) from San Salvador

Excellent roads to the site

Available land: 9.2 Ha

Plots: 34, 36 & 38, Soccer field and La Pista




                                                New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations




“5 de Noviembre”




                       New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations
                “5 de Noviembre”




                                   New Mexico State University
PV Pilot Project, El Salvador
• Proposed
  locations
“5 de Noviembre”

La Pista (The runway) 5.4 Ha

   Will be used temporarily for the
   service facilities of the company
   repowering the hydropower
   plant, +20-25 MW.




                                       New Mexico State University
PV Pilot Project, El Salvador
• Proposed locations

“5 de Noviembre”

   In La Pista, there is a manmade
   hill (~45 feet high) from the
   materials removed during the
   building of the hydropower plant.




                                       New Mexico State University
PV Pilot Project, El Salvador
• Environmental issues (Task 3)
  – El Salvador has severe problems of deforestation
  – Environmental laws are really tough
  – For instance, for every 8 inch diameter tree being cut, 10
    trees have to be planted
  – Environmental forms to be submitted for projects less than
    5 MW or 5 Ha
  – A comprehensive Environmental Impact Assessment is
    required for projects larger than 5 MW or 5 Ha (expensive)




                                        New Mexico State University
PV Pilot Project, El Salvador
• Interconnection issues
  – It seems there will not be any technical problems
    hooking the photovoltaic plant to the grid at both
    sites
  – In “Cerrón Grande” there is a distribution line @
    46KV, about 200 meters from the project site
  – In “5 de Noviembre” there is an “electrical bus” in
    the substation that is not being used and there is
    enough room in the transformers (@41.6 MVA).


                                     New Mexico State University
PV Pilot Project, El Salvador
• Interconnection issues




                           New Mexico State University
PV Pilot Project, El Salvador
• Solar Resource

• They have been monitoring
  in several places
• UES, UCA, Meteorological
  Stations, LaGeo (DNI)
• Good solar resource in most
  of the country; 5.8 kWh/m2
  average solar irradiance




                                New Mexico State University
PV Pilot Project, El Salvador
• PV project already installed at the
  International Airport in Comalapa

  – Air Force Base (Salvadoran and USAF)

  – 99 kWp total at two sites




                                New Mexico State University
PV Pilot Project, El Salvador
• International Airport at Comalapa




                               New Mexico State University
PV Pilot Project, El Salvador
• International Airport at Comalapa




                               New Mexico State University
PV Pilot Project, El Salvador
• International Airport at Comalapa




                               New Mexico State University
PV Pilot Project, El Salvador
• International Airport at Comalapa




                               New Mexico State University
PV Pilot Project, El Salvador

• Final Remarks
  – The energy sector legal framework allows the development of
    PV projects in El Salvador.
  – El Salvador government policies are looking to diversify its
    energy portfolio
  – We are thinking of two 4 MWp photovoltaic plant, one for each
    site
  – NMSU is looking to expand markets for solar products from
    American and New Mexican suppliers
  – One important goal of the project is to reduce the high price of
    electricity in El Salvador



                                               New Mexico State University

More Related Content

Viewers also liked

O.N.E. Inc Corporate Profile 01-2012
O.N.E. Inc Corporate Profile 01-2012O.N.E. Inc Corporate Profile 01-2012
O.N.E. Inc Corporate Profile 01-2012
Samuel L. Crumby Jr.
 
Gestão de pessoas
Gestão de pessoasGestão de pessoas
Session 3A - B.J. Tomlinson
Session 3A - B.J. TomlinsonSession 3A - B.J. Tomlinson
Session 3A - B.J. Tomlinson
Reenergize
 
Legend of Tarzan
Legend of Tarzan Legend of Tarzan
Legend of Tarzan
Rustam Sayal
 
Diploma_Thesis_Abstract
Diploma_Thesis_AbstractDiploma_Thesis_Abstract
Diploma_Thesis_Abstract
Panagiotis Grivas
 
2012 Reenergize the Americas 4A: Raúl Felix
2012 Reenergize the Americas 4A: Raúl Felix2012 Reenergize the Americas 4A: Raúl Felix
2012 Reenergize the Americas 4A: Raúl Felix
Reenergize
 
Caleb Henke Resume For Class
Caleb Henke Resume For ClassCaleb Henke Resume For Class
Caleb Henke Resume For Class
Caleb Henke
 
Session 4A - Rajan Gupta
Session 4A - Rajan GuptaSession 4A - Rajan Gupta
Session 4A - Rajan Gupta
Reenergize
 
Gestão de pessoas
Gestão de pessoasGestão de pessoas
Paradoxes of Executive Coaching
Paradoxes of Executive CoachingParadoxes of Executive Coaching
Paradoxes of Executive Coaching
Mikhail Klarin, PhD, BCC, PCC
 
Le competenze di leadership nelle professioni sanitarie(1)
Le competenze di leadership nelle professioni sanitarie(1)Le competenze di leadership nelle professioni sanitarie(1)
Le competenze di leadership nelle professioni sanitarie(1)
Felix B. Lecce
 
Malarial parasite
Malarial parasiteMalarial parasite
Malarial parasite
Mahesh Lamsal
 
Etiqueta En La Oficina
Etiqueta En La OficinaEtiqueta En La Oficina
Etiqueta En La Oficina
guestd5522f
 
Trabajo Final
Trabajo FinalTrabajo Final
Trabajo Final
LuzGuzmanAldana
 

Viewers also liked (14)

O.N.E. Inc Corporate Profile 01-2012
O.N.E. Inc Corporate Profile 01-2012O.N.E. Inc Corporate Profile 01-2012
O.N.E. Inc Corporate Profile 01-2012
 
Gestão de pessoas
Gestão de pessoasGestão de pessoas
Gestão de pessoas
 
Session 3A - B.J. Tomlinson
Session 3A - B.J. TomlinsonSession 3A - B.J. Tomlinson
Session 3A - B.J. Tomlinson
 
Legend of Tarzan
Legend of Tarzan Legend of Tarzan
Legend of Tarzan
 
Diploma_Thesis_Abstract
Diploma_Thesis_AbstractDiploma_Thesis_Abstract
Diploma_Thesis_Abstract
 
2012 Reenergize the Americas 4A: Raúl Felix
2012 Reenergize the Americas 4A: Raúl Felix2012 Reenergize the Americas 4A: Raúl Felix
2012 Reenergize the Americas 4A: Raúl Felix
 
Caleb Henke Resume For Class
Caleb Henke Resume For ClassCaleb Henke Resume For Class
Caleb Henke Resume For Class
 
Session 4A - Rajan Gupta
Session 4A - Rajan GuptaSession 4A - Rajan Gupta
Session 4A - Rajan Gupta
 
Gestão de pessoas
Gestão de pessoasGestão de pessoas
Gestão de pessoas
 
Paradoxes of Executive Coaching
Paradoxes of Executive CoachingParadoxes of Executive Coaching
Paradoxes of Executive Coaching
 
Le competenze di leadership nelle professioni sanitarie(1)
Le competenze di leadership nelle professioni sanitarie(1)Le competenze di leadership nelle professioni sanitarie(1)
Le competenze di leadership nelle professioni sanitarie(1)
 
Malarial parasite
Malarial parasiteMalarial parasite
Malarial parasite
 
Etiqueta En La Oficina
Etiqueta En La OficinaEtiqueta En La Oficina
Etiqueta En La Oficina
 
Trabajo Final
Trabajo FinalTrabajo Final
Trabajo Final
 

Similar to 2012 Reenergize the Americas 5B: Martin Gomez

Jeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaskaJeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaska
james hamilton
 
ISES 2013 - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...
ISES 2013  - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...ISES 2013  - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...
ISES 2013 - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...
Student Energy
 
EPIC Overview 6-15
EPIC Overview 6-15EPIC Overview 6-15
EPIC Overview 6-15
Johan Enslin
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative Energy
Kevin Haroff
 
CaLEAP Energy Strategies Workshop June 25, 2013
CaLEAP Energy Strategies Workshop June 25, 2013CaLEAP Energy Strategies Workshop June 25, 2013
CaLEAP Energy Strategies Workshop June 25, 2013
Public Technology Institute
 
1 diego pulido, bifi pv psda, antofagasta (chile) 2015
1 diego pulido, bifi pv psda, antofagasta (chile) 20151 diego pulido, bifi pv psda, antofagasta (chile) 2015
1 diego pulido, bifi pv psda, antofagasta (chile) 2015
Sandia National Laboratories: Energy & Climate: Renewables
 
SolarPowerIfinal2.ppt
SolarPowerIfinal2.pptSolarPowerIfinal2.ppt
SolarPowerIfinal2.ppt
Ashish Taywade
 
K-Solar Program Overview
K-Solar Program OverviewK-Solar Program Overview
K-Solar Program Overview
New York Power Authority
 
Update on Water/ Wastewater Programs at BCC
Update on Water/ Wastewater Programs at BCCUpdate on Water/ Wastewater Programs at BCC
Update on Water/ Wastewater Programs at BCC
Stone Soup Leadership Institute
 
Casl Fact Sht
Casl Fact ShtCasl Fact Sht
Casl Fact Sht
Chris O'Neal
 
Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...
Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...
Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...
Invest Northern Ireland
 
John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014
John Hoffner
 
Humboldt wave connecttm pilot project2
Humboldt wave connecttm pilot project2Humboldt wave connecttm pilot project2
Humboldt wave connecttm pilot project2
a11235813
 
Phila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus OverviewPhila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus Overview
Rodney Jones Sr.
 
2012 Reenergize the Americas 1A: Dennis Thomas
2012 Reenergize the Americas 1A: Dennis Thomas2012 Reenergize the Americas 1A: Dennis Thomas
2012 Reenergize the Americas 1A: Dennis Thomas
Reenergize
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
The Texas Network, LLC
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
BhautikPatel46
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
kevinpatel169
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
ParthRathod41
 
Ips connect 2015 richard rocheleau
Ips connect 2015 richard rocheleauIps connect 2015 richard rocheleau
Ips connect 2015 richard rocheleau
james_hamilton
 

Similar to 2012 Reenergize the Americas 5B: Martin Gomez (20)

Jeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaskaJeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaska
 
ISES 2013 - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...
ISES 2013  - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...ISES 2013  - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...
ISES 2013 - Day 3 - Stephen Roosa (Association of Energy Engineers) - The Tr...
 
EPIC Overview 6-15
EPIC Overview 6-15EPIC Overview 6-15
EPIC Overview 6-15
 
Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative Energy
 
CaLEAP Energy Strategies Workshop June 25, 2013
CaLEAP Energy Strategies Workshop June 25, 2013CaLEAP Energy Strategies Workshop June 25, 2013
CaLEAP Energy Strategies Workshop June 25, 2013
 
1 diego pulido, bifi pv psda, antofagasta (chile) 2015
1 diego pulido, bifi pv psda, antofagasta (chile) 20151 diego pulido, bifi pv psda, antofagasta (chile) 2015
1 diego pulido, bifi pv psda, antofagasta (chile) 2015
 
SolarPowerIfinal2.ppt
SolarPowerIfinal2.pptSolarPowerIfinal2.ppt
SolarPowerIfinal2.ppt
 
K-Solar Program Overview
K-Solar Program OverviewK-Solar Program Overview
K-Solar Program Overview
 
Update on Water/ Wastewater Programs at BCC
Update on Water/ Wastewater Programs at BCCUpdate on Water/ Wastewater Programs at BCC
Update on Water/ Wastewater Programs at BCC
 
Casl Fact Sht
Casl Fact ShtCasl Fact Sht
Casl Fact Sht
 
Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...
Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...
Energy Storage Solutions for an Intelligent Future, Mick Barlow, Energy Stora...
 
John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014John Hoffner Resume Dec 2014
John Hoffner Resume Dec 2014
 
Humboldt wave connecttm pilot project2
Humboldt wave connecttm pilot project2Humboldt wave connecttm pilot project2
Humboldt wave connecttm pilot project2
 
Phila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus OverviewPhila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus Overview
 
2012 Reenergize the Americas 1A: Dennis Thomas
2012 Reenergize the Americas 1A: Dennis Thomas2012 Reenergize the Americas 1A: Dennis Thomas
2012 Reenergize the Americas 1A: Dennis Thomas
 
Update on ERCOT Activities
Update on ERCOT ActivitiesUpdate on ERCOT Activities
Update on ERCOT Activities
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
 
Ips connect 2015 richard rocheleau
Ips connect 2015 richard rocheleauIps connect 2015 richard rocheleau
Ips connect 2015 richard rocheleau
 

More from Reenergize

2012 Reenergize the Americas 4B: Duncan Wood
2012 Reenergize the Americas 4B: Duncan Wood2012 Reenergize the Americas 4B: Duncan Wood
2012 Reenergize the Americas 4B: Duncan Wood
Reenergize
 
2012 Reenergize the Americas 2B: Miguel Velez-Reyes
2012 Reenergize the Americas 2B: Miguel Velez-Reyes2012 Reenergize the Americas 2B: Miguel Velez-Reyes
2012 Reenergize the Americas 2B: Miguel Velez-Reyes
Reenergize
 
2012 Reenergize the Americas 3A: Richard Turner
2012 Reenergize the Americas 3A: Richard Turner2012 Reenergize the Americas 3A: Richard Turner
2012 Reenergize the Americas 3A: Richard Turner
Reenergize
 
2012 Reenergize the Americas 4A: Benjamin Torres-Barron
2012 Reenergize the Americas 4A: Benjamin Torres-Barron2012 Reenergize the Americas 4A: Benjamin Torres-Barron
2012 Reenergize the Americas 4A: Benjamin Torres-Barron
Reenergize
 
2012 Reenergize the Americas 2A: Jesse Thompson
2012 Reenergize the Americas 2A: Jesse Thompson2012 Reenergize the Americas 2A: Jesse Thompson
2012 Reenergize the Americas 2A: Jesse Thompson
Reenergize
 
2012 ReEnergize the Americas 6B: Cathy Swain
2012 ReEnergize the Americas 6B: Cathy Swain2012 ReEnergize the Americas 6B: Cathy Swain
2012 ReEnergize the Americas 6B: Cathy Swain
Reenergize
 
2012 Reenergize the Americas 3A: Harry Shulte
2012 Reenergize the Americas 3A: Harry Shulte2012 Reenergize the Americas 3A: Harry Shulte
2012 Reenergize the Americas 3A: Harry Shulte
Reenergize
 
2012 ReEnergize the Americas 3B: Gene Rodriguez
2012 ReEnergize the Americas 3B: Gene Rodriguez2012 ReEnergize the Americas 3B: Gene Rodriguez
2012 ReEnergize the Americas 3B: Gene Rodriguez
Reenergize
 
2012 ReEnergize the Americas 2B: Nathanial Robinson
2012 ReEnergize the Americas 2B: Nathanial Robinson2012 ReEnergize the Americas 2B: Nathanial Robinson
2012 ReEnergize the Americas 2B: Nathanial Robinson
Reenergize
 
2012 Reenergize the Americas 4A: Esaúl Ramírez
2012 Reenergize the Americas 4A: Esaúl Ramírez2012 Reenergize the Americas 4A: Esaúl Ramírez
2012 Reenergize the Americas 4A: Esaúl Ramírez
Reenergize
 
2012 Reenergize the Americas 3B: Ralph Martinez
2012 Reenergize the Americas 3B: Ralph Martinez2012 Reenergize the Americas 3B: Ralph Martinez
2012 Reenergize the Americas 3B: Ralph Martinez
Reenergize
 
2012 Reenergize the Americas 1A: Reinhard Peter
2012 Reenergize the Americas 1A: Reinhard Peter2012 Reenergize the Americas 1A: Reinhard Peter
2012 Reenergize the Americas 1A: Reinhard Peter
Reenergize
 
2012 Reenergize the Americas 5A: Luis Perez
2012 Reenergize the Americas 5A: Luis Perez2012 Reenergize the Americas 5A: Luis Perez
2012 Reenergize the Americas 5A: Luis Perez
Reenergize
 
2012 Reenergize the Americas 4A: Alejando Peraza Garcia
2012 Reenergize the Americas 4A: Alejando Peraza Garcia2012 Reenergize the Americas 4A: Alejando Peraza Garcia
2012 Reenergize the Americas 4A: Alejando Peraza Garcia
Reenergize
 
2012 Reenergize the Americas 1B: John Peichel
2012 Reenergize the Americas  1B: John Peichel2012 Reenergize the Americas  1B: John Peichel
2012 Reenergize the Americas 1B: John Peichel
Reenergize
 
2012 Reenergize the Americas 4B: Jim Peach
2012 Reenergize the Americas 4B: Jim Peach2012 Reenergize the Americas 4B: Jim Peach
2012 Reenergize the Americas 4B: Jim Peach
Reenergize
 
2012 Reenergize the Americas 5B: Allan Oliver
2012 Reenergize the Americas 5B: Allan Oliver2012 Reenergize the Americas 5B: Allan Oliver
2012 Reenergize the Americas 5B: Allan Oliver
Reenergize
 
2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle
2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle
2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle
Reenergize
 
2012 Reenergize the Americas 2A: David Mendoza
2012 Reenergize the Americas 2A: David Mendoza2012 Reenergize the Americas 2A: David Mendoza
2012 Reenergize the Americas 2A: David Mendoza
Reenergize
 
2012 Reenergize the Americas 1B: Craig Mataczynski
2012 Reenergize the Americas 1B: Craig Mataczynski2012 Reenergize the Americas 1B: Craig Mataczynski
2012 Reenergize the Americas 1B: Craig Mataczynski
Reenergize
 

More from Reenergize (20)

2012 Reenergize the Americas 4B: Duncan Wood
2012 Reenergize the Americas 4B: Duncan Wood2012 Reenergize the Americas 4B: Duncan Wood
2012 Reenergize the Americas 4B: Duncan Wood
 
2012 Reenergize the Americas 2B: Miguel Velez-Reyes
2012 Reenergize the Americas 2B: Miguel Velez-Reyes2012 Reenergize the Americas 2B: Miguel Velez-Reyes
2012 Reenergize the Americas 2B: Miguel Velez-Reyes
 
2012 Reenergize the Americas 3A: Richard Turner
2012 Reenergize the Americas 3A: Richard Turner2012 Reenergize the Americas 3A: Richard Turner
2012 Reenergize the Americas 3A: Richard Turner
 
2012 Reenergize the Americas 4A: Benjamin Torres-Barron
2012 Reenergize the Americas 4A: Benjamin Torres-Barron2012 Reenergize the Americas 4A: Benjamin Torres-Barron
2012 Reenergize the Americas 4A: Benjamin Torres-Barron
 
2012 Reenergize the Americas 2A: Jesse Thompson
2012 Reenergize the Americas 2A: Jesse Thompson2012 Reenergize the Americas 2A: Jesse Thompson
2012 Reenergize the Americas 2A: Jesse Thompson
 
2012 ReEnergize the Americas 6B: Cathy Swain
2012 ReEnergize the Americas 6B: Cathy Swain2012 ReEnergize the Americas 6B: Cathy Swain
2012 ReEnergize the Americas 6B: Cathy Swain
 
2012 Reenergize the Americas 3A: Harry Shulte
2012 Reenergize the Americas 3A: Harry Shulte2012 Reenergize the Americas 3A: Harry Shulte
2012 Reenergize the Americas 3A: Harry Shulte
 
2012 ReEnergize the Americas 3B: Gene Rodriguez
2012 ReEnergize the Americas 3B: Gene Rodriguez2012 ReEnergize the Americas 3B: Gene Rodriguez
2012 ReEnergize the Americas 3B: Gene Rodriguez
 
2012 ReEnergize the Americas 2B: Nathanial Robinson
2012 ReEnergize the Americas 2B: Nathanial Robinson2012 ReEnergize the Americas 2B: Nathanial Robinson
2012 ReEnergize the Americas 2B: Nathanial Robinson
 
2012 Reenergize the Americas 4A: Esaúl Ramírez
2012 Reenergize the Americas 4A: Esaúl Ramírez2012 Reenergize the Americas 4A: Esaúl Ramírez
2012 Reenergize the Americas 4A: Esaúl Ramírez
 
2012 Reenergize the Americas 3B: Ralph Martinez
2012 Reenergize the Americas 3B: Ralph Martinez2012 Reenergize the Americas 3B: Ralph Martinez
2012 Reenergize the Americas 3B: Ralph Martinez
 
2012 Reenergize the Americas 1A: Reinhard Peter
2012 Reenergize the Americas 1A: Reinhard Peter2012 Reenergize the Americas 1A: Reinhard Peter
2012 Reenergize the Americas 1A: Reinhard Peter
 
2012 Reenergize the Americas 5A: Luis Perez
2012 Reenergize the Americas 5A: Luis Perez2012 Reenergize the Americas 5A: Luis Perez
2012 Reenergize the Americas 5A: Luis Perez
 
2012 Reenergize the Americas 4A: Alejando Peraza Garcia
2012 Reenergize the Americas 4A: Alejando Peraza Garcia2012 Reenergize the Americas 4A: Alejando Peraza Garcia
2012 Reenergize the Americas 4A: Alejando Peraza Garcia
 
2012 Reenergize the Americas 1B: John Peichel
2012 Reenergize the Americas  1B: John Peichel2012 Reenergize the Americas  1B: John Peichel
2012 Reenergize the Americas 1B: John Peichel
 
2012 Reenergize the Americas 4B: Jim Peach
2012 Reenergize the Americas 4B: Jim Peach2012 Reenergize the Americas 4B: Jim Peach
2012 Reenergize the Americas 4B: Jim Peach
 
2012 Reenergize the Americas 5B: Allan Oliver
2012 Reenergize the Americas 5B: Allan Oliver2012 Reenergize the Americas 5B: Allan Oliver
2012 Reenergize the Americas 5B: Allan Oliver
 
2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle
2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle
2012 Reenergize the Americas 2B: Juan A. Mujica-Kohle
 
2012 Reenergize the Americas 2A: David Mendoza
2012 Reenergize the Americas 2A: David Mendoza2012 Reenergize the Americas 2A: David Mendoza
2012 Reenergize the Americas 2A: David Mendoza
 
2012 Reenergize the Americas 1B: Craig Mataczynski
2012 Reenergize the Americas 1B: Craig Mataczynski2012 Reenergize the Americas 1B: Craig Mataczynski
2012 Reenergize the Americas 1B: Craig Mataczynski
 

Recently uploaded

PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
Bisnar Chase Personal Injury Attorneys
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
Assessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptxAssessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptx
Kavitha Krishnan
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 

Recently uploaded (20)

PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Top five deadliest dog breeds in America
Top five deadliest dog breeds in AmericaTop five deadliest dog breeds in America
Top five deadliest dog breeds in America
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
Assessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptxAssessment and Planning in Educational technology.pptx
Assessment and Planning in Educational technology.pptx
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 

2012 Reenergize the Americas 5B: Martin Gomez

  • 1. Feasibility Study for the CEL Solar Photovoltaic Power Pilot Project in El Salvador L. Martín Gómez Rocha NMSU-Institute for Energy and Environment, College of Engineering New Mexico State University
  • 2. PV Pilot Project, El Salvador • Proposal • In 2011, USTDA released RFPs for four projects in Latin America • Awarded to NMSU in January 2012 • Contract signed in May 2012 (start delayed until August) New Mexico State University
  • 3. PV Pilot Project, El Salvador • Background • El Salvador opened its energy market in 2007 • Over 15 small utilities (most of them private) • Comisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL), public utility that used to be in charge of the whole electricity generation in the country • There is now a competitive market ~1,300 MW total New Mexico State University
  • 4. PV Pilot Project, El Salvador • Background • No fossil fuels resources in country • El Salvador heavily depends on imported oil • High cost of electricity ~25 cents/kWh • El Salvador wants to expand its renewable energy resources including hydropower, solar, wind, geothermal. • CEL is tendering a 14 MW PV plant. New Mexico State University
  • 5. PV Pilot Project, El Salvador • Background • CEL already has a 24 kWp pilot project at its headquarters in San Salvador. New Mexico State University
  • 6. PV Pilot Project, El Salvador • NMSU Study • Composed of 11 Tasks: • Task 1: Kick-Off Meeting and Inception Report – Subtask 1.1: Kick-Off Meeting – Subtask 1.2: Inception Report • Task 2: Technical Analysis – Subtask 2.1: Available Documentation – Subtask 2.2: Solar Resource and Site Assessments – Subtask 2.3: Preliminary Comparative Analysis of Solar Photovoltaic Technologies – Subtask 2.4: Technical Configuration and Preliminary Conceptual Design • Task 3: Preliminary Environmental Impact Assessment • New Mexico State University
  • 7. PV Pilot Project, El Salvador • Task 3: Preliminary Environmental Impact Assessment • Task 4: U.S. Sources of Supply, identifying the potential value of U.S. exports of products and services • Task 5: Financial Analysis • Task 6: Risk Analysis New Mexico State University
  • 8. PV Pilot Project, El Salvador • Task 7: Regulatory Review – Subtask 7.1 : Permits – Subtask 7.2: Tariff Filing • Task 8: Development Impact Assessment • Task 9: Implementation Plan • Task 10: Financing Plan • Task 11: Final Report New Mexico State University
  • 9. PV Pilot Project, El Salvador • Task 2 • It is the backbone of the study • The results from this Task will determine the rest of the study • Will define the size of the project, according to the available land and solar resource • It is the next step of the study, due by the end of January New Mexico State University
  • 10. PV Pilot Project, El Salvador • Proposed locations Hydropower plant “Cerrón Grande” New Mexico State University
  • 11. PV Pilot Project, El Salvador • Proposed locations Hydropower plant “Cerrón Grande” • 69 Km (43 mi) from San Salvador • Excellent roads to the site New Mexico State University
  • 12. PV Pilot Project, El Salvador • Proposed locations • Available land: 10.4 Ha • Plots (parcelas) 19, 23 & 24 New Mexico State University
  • 13. PV Pilot Project, El Salvador • Proposed locations • “Cerrón Grande” New Mexico State University
  • 14. PV Pilot Project, El Salvador • Proposed locations “Cerrón Grande” New Mexico State University
  • 15. PV Pilot Project, El Salvador • Proposed locations Hydropower plant “5 de Noviembre” New Mexico State University
  • 16. PV Pilot Project, El Salvador • Proposed locations Hydropower plant “5 de Noviembre” 89 Km (56 mi) from San Salvador Excellent roads to the site Available land: 9.2 Ha Plots: 34, 36 & 38, Soccer field and La Pista New Mexico State University
  • 17. PV Pilot Project, El Salvador • Proposed locations “5 de Noviembre” New Mexico State University
  • 18. PV Pilot Project, El Salvador • Proposed locations “5 de Noviembre” New Mexico State University
  • 19. PV Pilot Project, El Salvador • Proposed locations “5 de Noviembre” La Pista (The runway) 5.4 Ha Will be used temporarily for the service facilities of the company repowering the hydropower plant, +20-25 MW. New Mexico State University
  • 20. PV Pilot Project, El Salvador • Proposed locations “5 de Noviembre” In La Pista, there is a manmade hill (~45 feet high) from the materials removed during the building of the hydropower plant. New Mexico State University
  • 21. PV Pilot Project, El Salvador • Environmental issues (Task 3) – El Salvador has severe problems of deforestation – Environmental laws are really tough – For instance, for every 8 inch diameter tree being cut, 10 trees have to be planted – Environmental forms to be submitted for projects less than 5 MW or 5 Ha – A comprehensive Environmental Impact Assessment is required for projects larger than 5 MW or 5 Ha (expensive) New Mexico State University
  • 22. PV Pilot Project, El Salvador • Interconnection issues – It seems there will not be any technical problems hooking the photovoltaic plant to the grid at both sites – In “Cerrón Grande” there is a distribution line @ 46KV, about 200 meters from the project site – In “5 de Noviembre” there is an “electrical bus” in the substation that is not being used and there is enough room in the transformers (@41.6 MVA). New Mexico State University
  • 23. PV Pilot Project, El Salvador • Interconnection issues New Mexico State University
  • 24. PV Pilot Project, El Salvador • Solar Resource • They have been monitoring in several places • UES, UCA, Meteorological Stations, LaGeo (DNI) • Good solar resource in most of the country; 5.8 kWh/m2 average solar irradiance New Mexico State University
  • 25. PV Pilot Project, El Salvador • PV project already installed at the International Airport in Comalapa – Air Force Base (Salvadoran and USAF) – 99 kWp total at two sites New Mexico State University
  • 26. PV Pilot Project, El Salvador • International Airport at Comalapa New Mexico State University
  • 27. PV Pilot Project, El Salvador • International Airport at Comalapa New Mexico State University
  • 28. PV Pilot Project, El Salvador • International Airport at Comalapa New Mexico State University
  • 29. PV Pilot Project, El Salvador • International Airport at Comalapa New Mexico State University
  • 30. PV Pilot Project, El Salvador • Final Remarks – The energy sector legal framework allows the development of PV projects in El Salvador. – El Salvador government policies are looking to diversify its energy portfolio – We are thinking of two 4 MWp photovoltaic plant, one for each site – NMSU is looking to expand markets for solar products from American and New Mexican suppliers – One important goal of the project is to reduce the high price of electricity in El Salvador New Mexico State University