Agreement No. CE17/2008 (GE)
Landslip Prevention and Mitigation Programme, 2008, Package B,
Landslip Prevention and Mitigation Works in New Territories East and
West – Investigation, Design and Construction
Contract No. GE/2010/23
Landslip Prevention and Mitigation Programme, 2008, Package B, Landslip
Prevention and Mitigation Works in New Territories East and West
The Sham Tseng San Tsuen Site
深井商業新村
深井新村
舒安台
清快塘新村九龍紗廠
眷屬宿舍
Existing
Check Dam
(Feature
No. 6SE-
C/ND1)
深康路
• Width: 650m
• Elevation diff.: 80m max. (+20
mPD at site entrance and +100
mPD at baffles at RB8)
+75mPD
+20mPD
+35mPD
+60mPD
+100mPD
Hazard Mitigation Works
 Provision of Flexible Barriers to protect against Open
Hillslope Landslides and Boulder Fall hazards
 Provision of Rigid Barriers and Baffles to protect against
Channelised Debris Flows hazards
 Localised in-situ stabilisation works (soil nails and
buttresses) for areas of Hillslope Distress and large surface
boulders
 Landscape Treatment to blend the mitigation works with
the surrounding environment
Approach to Hazard Mitigation comprises:
Rigid Barrier and Baffles
Flexible Barrier
 To contain CDF and BF hazards
 To contain OHL and BF hazards
Landscape Treatment
 To minimise visual impacts
1. 3 soil nail regions plus additional soil nails
in areas underneath flexible barriers and
near the Kowloon Textile Family Dormitory
2. 8 nos. of rigid barriers and 285 nos. of
baffles
3. 460m of TSMF (Geobrugg 3000 kJ)
4. A 40m long gabion wall for guiding CDF
towards rigid barrier
5. A connection channel of 18m long for
guiding debris to the existing check dam
6. Surface drainage, maintenance access,
boulder buttresses and greening works
Rigid Barriers
Flexible Barriers
Legend
Soil Nails Zone
Connection Channel
Gabion Walls
General View of Study Area and Scope of Major Works
深井商
業新村
深井新村
舒安台
現有的剛
性泥石壩
工地範圍
出入口
Baffles & Buttresses
Greening
• Flexible barriers: shrub and seedling tree planting
at front (Photo 1)
• Soil nail areas: erosion control mat +
hydroseeding and seedling tree / shrub mix
planting (Photo 2)
• Rigid barriers: Painted antique brown with
climbers (Photos 4 & 5) + shrub and seedling tree
planting at front (Photo 3) + whip planting at the
back.
• Reinstate affect slope surface by broadcast
seeding. All exposed concrete surfaces and steel
furniture shall be painted antique brown.
• 目的:美化環境,配合生態及可持續
Photo 1
Photo 2
Photo 5
Flexible
barriers
Baffles
Photo 3 Photo 4
RB3
Soil nailed
Region A
Q&A
Q: Any plan to reduce visual impact of baffles
before natural vegetation takes over?
A: Experience is that natural vegetation takes
around two to three wet seasons to re-establish.
Measures including camouflage net / paint and
provision of pioneer plant cover such as Wedelia
trilobata (蟛蜞菊) were being examined as a
measure to reduce short term visual impact as
necessary.
Soil-
nailed
Area
Soil-
nailed
Area
Before, end 2011 After, early 2015 (2 years after planting)
(Above) Ground cover formed by Wedelia
trilobata (蟛蜞菊)
(Above) Camouflage net
Wu Uk
After, May 2016 (6 years after planting)After, Apr 2012 (2 years after planting)
Q&A
Luk Keng
Hong Lok Yuen Site and Wu Uk Site
Hong Lok Yuen Site
• Hazards: CDF and OHL
• Scope: 1065 nos. of soil nails, 2 rigid barriers and 120m of flexible barriers
• Site Constraint - Difficult access and a general lack of works area. The Site is above
private man-made features of approx. 50m height, and in close proximity to a quite
residential neighbourhood. Site operation was restricted by rules imposed by the Hong
Lok Yuen Management Office (HLYMO):
• Not to carry out grouting on the Saturdays;
• No noisy works before 9:00 AM, afternoon of Saturday and all public holiday; and
• Call the HLYMO to report the leaving of all workers and return all permits at the
end of each working day (18:00 as requested by the HLYMO)
• Prolonged liaison with HLYMO for works areas and the construction time for the
protective works in early stages of the site works..
Wu Uk Site
• Hazard: OHL and BF
• Scope: 479 nos. of soil
nails and buttress
- End -

GE201023

  • 1.
    Agreement No. CE17/2008(GE) Landslip Prevention and Mitigation Programme, 2008, Package B, Landslip Prevention and Mitigation Works in New Territories East and West – Investigation, Design and Construction Contract No. GE/2010/23 Landslip Prevention and Mitigation Programme, 2008, Package B, Landslip Prevention and Mitigation Works in New Territories East and West
  • 2.
    The Sham TsengSan Tsuen Site 深井商業新村 深井新村 舒安台 清快塘新村九龍紗廠 眷屬宿舍 Existing Check Dam (Feature No. 6SE- C/ND1) 深康路 • Width: 650m • Elevation diff.: 80m max. (+20 mPD at site entrance and +100 mPD at baffles at RB8) +75mPD +20mPD +35mPD +60mPD +100mPD
  • 3.
    Hazard Mitigation Works Provision of Flexible Barriers to protect against Open Hillslope Landslides and Boulder Fall hazards  Provision of Rigid Barriers and Baffles to protect against Channelised Debris Flows hazards  Localised in-situ stabilisation works (soil nails and buttresses) for areas of Hillslope Distress and large surface boulders  Landscape Treatment to blend the mitigation works with the surrounding environment Approach to Hazard Mitigation comprises: Rigid Barrier and Baffles Flexible Barrier  To contain CDF and BF hazards  To contain OHL and BF hazards Landscape Treatment  To minimise visual impacts
  • 4.
    1. 3 soilnail regions plus additional soil nails in areas underneath flexible barriers and near the Kowloon Textile Family Dormitory 2. 8 nos. of rigid barriers and 285 nos. of baffles 3. 460m of TSMF (Geobrugg 3000 kJ) 4. A 40m long gabion wall for guiding CDF towards rigid barrier 5. A connection channel of 18m long for guiding debris to the existing check dam 6. Surface drainage, maintenance access, boulder buttresses and greening works Rigid Barriers Flexible Barriers Legend Soil Nails Zone Connection Channel Gabion Walls General View of Study Area and Scope of Major Works 深井商 業新村 深井新村 舒安台 現有的剛 性泥石壩 工地範圍 出入口 Baffles & Buttresses
  • 5.
    Greening • Flexible barriers:shrub and seedling tree planting at front (Photo 1) • Soil nail areas: erosion control mat + hydroseeding and seedling tree / shrub mix planting (Photo 2) • Rigid barriers: Painted antique brown with climbers (Photos 4 & 5) + shrub and seedling tree planting at front (Photo 3) + whip planting at the back. • Reinstate affect slope surface by broadcast seeding. All exposed concrete surfaces and steel furniture shall be painted antique brown. • 目的:美化環境,配合生態及可持續 Photo 1 Photo 2 Photo 5 Flexible barriers Baffles Photo 3 Photo 4 RB3 Soil nailed Region A
  • 6.
    Q&A Q: Any planto reduce visual impact of baffles before natural vegetation takes over? A: Experience is that natural vegetation takes around two to three wet seasons to re-establish. Measures including camouflage net / paint and provision of pioneer plant cover such as Wedelia trilobata (蟛蜞菊) were being examined as a measure to reduce short term visual impact as necessary. Soil- nailed Area Soil- nailed Area Before, end 2011 After, early 2015 (2 years after planting) (Above) Ground cover formed by Wedelia trilobata (蟛蜞菊) (Above) Camouflage net Wu Uk
  • 7.
    After, May 2016(6 years after planting)After, Apr 2012 (2 years after planting) Q&A Luk Keng
  • 8.
    Hong Lok YuenSite and Wu Uk Site Hong Lok Yuen Site • Hazards: CDF and OHL • Scope: 1065 nos. of soil nails, 2 rigid barriers and 120m of flexible barriers • Site Constraint - Difficult access and a general lack of works area. The Site is above private man-made features of approx. 50m height, and in close proximity to a quite residential neighbourhood. Site operation was restricted by rules imposed by the Hong Lok Yuen Management Office (HLYMO): • Not to carry out grouting on the Saturdays; • No noisy works before 9:00 AM, afternoon of Saturday and all public holiday; and • Call the HLYMO to report the leaving of all workers and return all permits at the end of each working day (18:00 as requested by the HLYMO) • Prolonged liaison with HLYMO for works areas and the construction time for the protective works in early stages of the site works.. Wu Uk Site • Hazard: OHL and BF • Scope: 479 nos. of soil nails and buttress
  • 9.