BUDGET BASICS
Total Budget of $2.97 Billion Includes:
• General Fund Revenues & Expenditure: $1.18B
• Enterprise & Other Funds: $1.49B
• CIP Expenditures: $298 M
2
FY 14 YEAR-END
PROJECTED GENERAL
FUND RESERVES
Amount Percent of
General Fund
Revenue
(3 Year Average)
FY 2014 Year-End Unrestricted
Balance
$164M 15.3%
Emergency Reserve $86M 8.0%
Stability Reserve $64M 6.0%
FY 2015 Reserve Requirement $150M 14.0%
Projected Excess Equity $14M 1.3%
5
WHERE DID WE FIND MONEY IN THE
PAST?
6
Harmful
Cuts!
Harmful
Cuts!
WHAT’S THE IMPACT IN
THIS COMING YEAR?
• Service levels are improving but still lower overall than
before the recession.
• The service level reductions have a disproportionate
impact on low/moderate income families and historically
neglected neighborhoods.
• An infrastructure that is in disrepair due to deferred
maintenance and repair (M&R)
• A backlog of new infrastructure needs including thing like
fire stations
7
PROGRAMS AND SERVICES:
HIGHLIGHTS
8
PUBLIC SAFETY
DEPARTMENTS
Increasing Size of Police Academies ($4.0M)
• 9 additional positions per academy
Police Officer Retention ($3.2M)
• Uniforms and recruitment activities
Additional Fire Academies ($1.1M)
• Total of 3 per year
Skyline Temporary Fire Station ($1.0M)
• 6 months of staffing
• Facility paid for with FY14 surplus
Fire Fast Response Pilot ($600,000)
• 2 Person teams mostly to respond to medical calls
9
LIBRARY
• Adding Hours ($1.5M)
• Branch libraries 4 additional hours per week
• Central Library 5 additional hours per week
• 12 Branches (those already open on weekends)
getting expanded Saturday & Sunday hours
• Library After School Program ($0.5M)
• “Do Your Homework @ the Library”
• Funds transferred from the budget for buying
books and other material.
10
NEIGHBORHOOD
FACILITIES
Park Assessment Expansion ($0.4M)
• FY 14—playgrounds and parking lots
• FY 15—30 community parks
New Park Facilities ($0.8M)
• Ed Cramer Park
• Central Avenue Mini-Park
• Cabrillo Heights Neighborhood Park
• Solana Ranch Neighborhood Park
• San Ysidro Neighborhood Park (Former Fire Station Site)
12
NEIGHBORHOOD
SERVICES
Community Plan Updates ($0.9M)
Sidewalks & Street Lights Improvements ($1.4M)
• This represents new money (1 time) money in Mayor’s
Budget
Streets & Sidewalk Assessments ($0.7M)
• Streets Condition Assessment ($560,000)
• Sidewalk Condition/Needs Assessment ($100,000)
13
YOUTH PROGRAMS
FUNDED
• CONNECT2Careers ($0.2M)
UNFUNDED CBA REQUEST
• Youth Development Office/Youth Advisor ($175,000)
• Youth Opportunity Pass Program ($200,000)
14
ACCOUNTABILITY
ENFORCEMENT
FUNDED
• Property Value Protection Ordinance ($0.1M)
• Offset by $93,260 revenue
UNFUNDED CBA REQUEST
• Increased Enforcement of the Living Wage
Ordinance ($0.2M)
17
CAPITAL IMPROVEMENT
PROGRAM
18
FY 2015 CIP BUDGET
BY ASSET TYPE
Waste Water
29%
Water
Distribution &
Reclamation
24%
Transportation
14%
Parks 7%
Buildings 22%
Landfill 2% Other 2%
19
3RD DEFERRED CAPITAL BOND
$120,000,000
What’s It Being Spent On?
Facilities $48.6M
Streets $44.1M
Sidewalks $ 1.0M
ADA Improvements $ 4.3M
Storm Drains $22.0M
20
REORGANIZATION OF
ENGINEERING &
CAPITAL PROJECTS
PUBLIC WORKS—ENGINEERING & CAPITAL
PROJECTS
INCREASED TRANSPARENCY
• Moved from general fund to an internal service fund so City can
better track funding of projects.
INCREASED STAFFING
• 35.85 additional staff to support current and expected expansion of
the capital improvement program
21
ASSESSMENTS IN FY15
• General fund facilities/buildings ($1.2M)
• Parks ($0.4M)
• Water & wastewater ($9.1M)
• Sidewalks ($0.1M)
• Streets ($0.6M)
22
SIDEWALKS & STREETS
CIP FUNDS
SIDEWALK REPAIR/RECONSTRUCTION
• Deferred Capital Bond 3: $ 1.0M
• City CDBG CIP: $ 3.5M
STREETS REPAIR/CONSTRUCTION
• Deferred Capital Bond 3: $44.1M
23
CONCERNS & DISCUSSIONS
24
WHAT SHOULD YOU ASK?
Testing for Fairness & Equity
• Where are needs greatest?
• Who pays?
• Who benefits?
• Who decides?
• Who is left out?
25
BIG DISCUSSIONS
• Insuring Government Transparency
• Not Maximizing Public Investment
• Failure of Managed Competition
• Costly Underfunding of Facilities’
Maintenance & Repair
• Revenue Challenges
26
TRANSPARENCY/OPEN
GOVERNMENT
5-Year CIP & CIP Service Levels
• “As was outlined in Council Policy 000-32, future public input
will be provided for the Multi-Year Capital Plan rather than the
annual budget process.” (IBA, p.69)
Open Government Commitments
• Funding 1.0 FTE for an Open Data Officer in FY15 .
• Spending $500,000 for retention of City email.
27
NOT MAXIMIZING PUBLIC
INVESTMENTS
Analytics & Performance Management
Department
• Described as having wide range of functions, but it’s not clear
how it will accomplish those.
• No funding for departmental director or open data public portal.
• Only performance measures—cost savings from Managed
Competition
Managed Competition
• Locks in low service levels as goals
• Realized savings ignore process costs
• Expected savings far exceed what has been realized
• Huron report on Fleet Services indicates serious public safety
concerns
28
UNDERFUNDING OF FACILITIES’
MAINTENANCE & REPAIR (M&R)
Public Works—General Services—Facilities
Division
• Provides maintenance, custodial services and emergency
repairs for city owned buildings/facilities.
• Experienced a 23.2% reduction in staff between FY 2004 and
FY 2013
• FY 2014 added 9.00 positions led to reduced backlog and
greater focus on preventative maintenance.
• Asked for 52.00 positions in FY 2015 got 7.00.
29
REVENUE
CHALLENGES
Delays In Deferred Capital Bond Series
• $85M behind from FY 2013 and FY 2014
• Deferred Capital Bond 3 facing legal challenge
Need for a General Obligation “GO” Bond for
Infrastructure
• Estimates of need are around $2B for a “Megabond”
30
LEARN MORE
Read the Fiscal Year 2015 Proposed Budget on the City’s website.
• http://www.sandiego.gov/fm/proposed/
Read the Independent Budget Analyst’s report on the Proposed
Budget.
• http://www.sandiego.gov/iba/pdf/reports/2014/14_15_140428.pdf
31
ADVOCATE!
32
PUBLIC BUDGET
ADVOCACY
OPPORTUNITIES
May 5th-May 9th –Budget Review Committee Hearings
• 9:00am-12:00pm & 2:00pm-5:00pm
• Schedule of departments/topics can be found at:
http://www.sandiego.gov/park-and-
recreation/pdf/fy15proposedbudgetcitycouncilhearingschedule.pdf
May 19th—Public Hearing on Mayor’s Proposed FY15
Budget
• 6:00pm
May 21st — Review of FY15 May Revise & FY14 Year-
End Budget Monitoring Report
• 9:00am-12:00pm
33
CONTACT
Facebook.com/CommunityBudgetAlliance
@onlinecpi.org
34
Speak Up:
Your neighborhood is counting on you!
35
Crystal Page | Community Budget Alliance | May 2, 2014
AGENDA
1. What to say: Tested messages in San
Diego on public spending and city
infrastructure
2. How to say it: Crafting strong
messages
3. How to wow them: Public speaking
mastery
4. Practice!
36
FAIR PUBLIC
INVESTMENT
37
BUDGET MESSAGE
THEMES
1. The value of City services and
infrastructure
 Prevailing attitude: “Trash collection, which sucks
$millions from the city budget...” -UT news story in March
2. Equity in spending for all
neighborhoods
 Some neighborhoods have been historically neglected.
 Aversion to any new spending.
38
THE POWER OF YOUR
VOICE
YOU are the expert on your
neighborhood.
The City budget is for you.
39
EFFECTIVE MESSAGES ON
INFRASTRUCTURE AND
SERVICES
Sources:
Two polls of San Diego County registered voters commissioned by CPI, in April 2012 and August 2012.
Americans for Tax Fairness national poll, June 2012
California Labor Federation statewide online survey, Dec. 2011.
40
Most voters approve of infrastructure spending that:
 Provides fairness for neglected neighborhoods
 Repairs roads, sidewalks and public facilities that
are in bad shape.
 Is an investment in our future economy.
KEY POINTS ON THE VALUE OF
CITY SERVICES AND FACILITIES
City services and facilities are essential to
residents and businesses.
Be specific: Schools, roads, water lines,
libraries, parks, police and fire stations.
Our safety and quality of life depend on
quality public services.
41
TESTED MESSAGES
1. Justice for neighborhoods that have
been neglected:
“We must ensure every neighborhood in San
Diego gets a fair shake.”
“It’s a sound investment in the future of our
city to repair the roads, sidewalks and facilities
like libraries and fire stations that are in the
worst shape.”
42
TESTED MESSAGES, CONT.
2. Fairness and opportunity:
“San Diego’s quality of life needs to improve
for everyone, not just the people in wealthy
neighborhoods.”
“Residents of some neighborhoods have
access to far better roads, parks and police
services than in other neighborhoods. If we
want all San Diegans to have an equal
opportunity at success, we need to make fair
investments in our city’s infrastructure.”
43
TESTED MESSAGES, CONT.
3. Smart investment for taxpayers:
“Badly needed investments in our city will
provide a strong foundation for our local
economy.”
44
• “The longer we wait to
invest in needed city
repairs and
improvements, the more
it will cost all of us in the
future.”
WORDS AND PHRASES THAT WORK:
INFRASTRUCTURE SPENDING
45
MESSAGE
STRUCTURE
WHAT WORKS TO REACH PEOPLE AND
PERSUADE THEM
46
MESSAGE STRUCTURE 1:
VALUES, PROBLEM,
SOLUTION
1. First, connect with audience
values/emotions.
2. State your concerns (the problem).
3. Describe the solution with hope and
aspiration.
47
EXAMPLE:
CONNECT/CONCERN/HOPE
CONNECT: When I walk my dog Lulu around the neighborhood, I
love to see the kids playing in the park and riding their bikes. I’ve
watched many of them grow up since they were babies.
CONCERN: But I cringe every time I see the places where the
sidewalk stops or it’s so rutted that they swerve their bikes out
into the streets. And in the evening I worry about their safety in
the park because there aren’t enough lights.
HOPE: That’s why I’m here today to ask you to make sure the
sidewalks and the park are safe for those children, so I can
continue to watch them growing and thriving. They are our future.
48
MESSAGE STRUCTURE 2:
MESSAGE TRIANGLE
49
Main
take-home
message
Evidence or
supporting
point
Evidence or
supporting point
Evidence or
supporting
point
EXAMPLE:
MESSAGE TRIANGLE
50
We need fair
investment in
neglected
public
infrastructure.
Ensures that
every
neighborhood
gets a fair
shake
Provides a strong
foundation for
our local
economy.
Improves our
quality of life
PREPARING YOUR
MESSAGE
Think:
What do you want people to remember?
Why does it matter?
Write:
Keep it simple, honest and clear.
Add personal experience.
Use specifics – but be brief.
Avoid jargon. Use “kitchen table” language.
51
PUBLIC SPEAKING
MASTERY
HOW TO GET YOUR POINT ACROSS
CLEARLY
52
PREPARE AND PRACTICE!
Write your message.
Tell your story, keeping it short and focused.
Practice . Practice again.
Time yourself.
Prepare 1-minute and 2-minute versions.
Practice a strong concluding sentence.
53
SPEAK EFFECTIVELY
Be passionate!
 But reasonable and rational.
 Avoid sarcasm, rage, cursing.
Get to the point.
 But don’t rush. Speak clearly.
Stay focused. Use short sentences.
Pause. Breathe. Don’t “Ummm…”
54
ATTITUDE AND
STYLE MATTER.
Smile.
Breathe. Slow down.
Appear calm and confident.
Don’t fidget or wave your arms.
Look up. Make eye contact.
Use a relaxed and friendly tone.
55
CITY COUNCIL PROCESS
What to expect when your item comes up:
1. City staff presentation
2. Public testimony – organized presentations
3. Public testimony – individuals called by name
4. Councilmembers speak
5. Councilmembers vote
56
GET READY TO TESTIFY
Bring brief notes on your main points.
Dress however you feel confident.
Arrive on time.
Fill out a speaker slip.
Sit near the front so you can easily get
to the podium.
Listen respectfully. They can see you.
57
YOU’RE UP!
Start with your name and neighborhood.
Try to talk from the heart, rather than reading.
Look up at friendly councilmembers.
Speak up, but don’t yell.
Don’t be flustered when time is up. Have your
wrap-up statement ready.
If questioned, it’s fine to say “I don’t know.”
58
PRACTICE IN SMALL
GROUPS
1. Take a few minutes to review and practice
your message. Cut it to 1 minute.
2. Deliver it to the City Council (played by
others in your practice group).
3. Receive honest, constructive feedback.
59
Thank you!
PUBLIC BUDGET ADVOCACY
OPPORTUNITIES
May 5th-May 9th –Budget Review Committee Hearings
• 9:00am-12:00pm & 2:00pm-5:00pm
• Schedule of departments/topics can be found at:
http://www.sandiego.gov/park-and-
recreation/pdf/fy15proposedbudgetcitycouncilhearingschedule.pdf
May 19th—Public Hearing on Mayor’s Proposed FY15
Budget
• 6:00pm
May 21st — Review of FY15 May Revise & FY14 Year-
End Budget Monitoring Report
• 9:00am-12:00pm
60
61
FOR MORE
INFORMATION:
Contact Info:
Samer Naji
Snaji@onlineCPI.org
(619) 584-5744 x60
Find us online at:
OnlineCPI.org
Facebook.com/CommunityBudgetAlliance

More Related Content

What's hot

SCCAP Budget Proposal for FY’13
SCCAP Budget Proposal for FY’13SCCAP Budget Proposal for FY’13
SCCAP Budget Proposal for FY’13
Bobak Esfandiari
 
City Council February 21, 2013 CIP discussion
City Council February 21, 2013 CIP discussionCity Council February 21, 2013 CIP discussion
City Council February 21, 2013 CIP discussion
City of San Angelo Texas
 
Arboretum community meeting 2020 01-14
Arboretum  community meeting 2020 01-14Arboretum  community meeting 2020 01-14
Arboretum community meeting 2020 01-14
RamaChilamkurthy
 
DILG mandate of General Supervision
  DILG mandate of General Supervision  DILG mandate of General Supervision
DILG mandate of General Supervision
Alvin Almo
 

What's hot (20)

Crayons, Mappers& Somewheres, oh my!
Crayons, Mappers& Somewheres, oh my!Crayons, Mappers& Somewheres, oh my!
Crayons, Mappers& Somewheres, oh my!
 
C4 Form Follows Fun
C4 Form Follows FunC4 Form Follows Fun
C4 Form Follows Fun
 
A3 First Impressions
A3 First ImpressionsA3 First Impressions
A3 First Impressions
 
Fcar presentation 1 Oct 2015
Fcar presentation 1 Oct 2015Fcar presentation 1 Oct 2015
Fcar presentation 1 Oct 2015
 
FY 20 Comprehensive Plan & UDO Annual Review
FY 20 Comprehensive Plan & UDO Annual ReviewFY 20 Comprehensive Plan & UDO Annual Review
FY 20 Comprehensive Plan & UDO Annual Review
 
City Council Candidate Orientation 2019 - Anna Texas
City Council Candidate Orientation 2019 - Anna TexasCity Council Candidate Orientation 2019 - Anna Texas
City Council Candidate Orientation 2019 - Anna Texas
 
SCCAP Budget Proposal for FY’13
SCCAP Budget Proposal for FY’13SCCAP Budget Proposal for FY’13
SCCAP Budget Proposal for FY’13
 
City Council February 21, 2013 CIP discussion
City Council February 21, 2013 CIP discussionCity Council February 21, 2013 CIP discussion
City Council February 21, 2013 CIP discussion
 
Arboretum community meeting 2020 01-14
Arboretum  community meeting 2020 01-14Arboretum  community meeting 2020 01-14
Arboretum community meeting 2020 01-14
 
SNEAPA 2015 Program
SNEAPA 2015 ProgramSNEAPA 2015 Program
SNEAPA 2015 Program
 
Fy 2013 citizen budget outreach 09-10-12
Fy 2013 citizen budget outreach 09-10-12Fy 2013 citizen budget outreach 09-10-12
Fy 2013 citizen budget outreach 09-10-12
 
Church Finances and You
Church Finances and YouChurch Finances and You
Church Finances and You
 
District One Public Works Integrating Committee Applicant Workshop
District One Public Works Integrating Committee Applicant WorkshopDistrict One Public Works Integrating Committee Applicant Workshop
District One Public Works Integrating Committee Applicant Workshop
 
HRCA Budget Presentation | August 15, 2017
HRCA Budget Presentation | August 15, 2017HRCA Budget Presentation | August 15, 2017
HRCA Budget Presentation | August 15, 2017
 
GAC Orientation/ Gov. 101 Slides
GAC Orientation/ Gov. 101 SlidesGAC Orientation/ Gov. 101 Slides
GAC Orientation/ Gov. 101 Slides
 
Imagine Austin: The Way Forward
Imagine Austin: The Way ForwardImagine Austin: The Way Forward
Imagine Austin: The Way Forward
 
DILG mandate of General Supervision
  DILG mandate of General Supervision  DILG mandate of General Supervision
DILG mandate of General Supervision
 
MayoJennifer_Resume
MayoJennifer_ResumeMayoJennifer_Resume
MayoJennifer_Resume
 
NJ Future Noncontiguous Cluster Webinar I Sheehan
NJ Future Noncontiguous Cluster Webinar I SheehanNJ Future Noncontiguous Cluster Webinar I Sheehan
NJ Future Noncontiguous Cluster Webinar I Sheehan
 
USDA-2014
USDA-2014USDA-2014
USDA-2014
 

Similar to San Diego City FY 2015 Proposed Budget - Community Analysis

P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
Matt Meaker
 
Christina 2015 Asset Management Presentation
Christina 2015 Asset Management PresentationChristina 2015 Asset Management Presentation
Christina 2015 Asset Management Presentation
Christina Benty
 
CDBG CN 2016 Conference SlidesFINAL
CDBG CN 2016 Conference SlidesFINALCDBG CN 2016 Conference SlidesFINAL
CDBG CN 2016 Conference SlidesFINAL
Kimberly Johnson
 
Community information session presentation final 080513
Community information session presentation final 080513Community information session presentation final 080513
Community information session presentation final 080513
maitlandyoursay
 

Similar to San Diego City FY 2015 Proposed Budget - Community Analysis (20)

City of Anna Texas 2020 Budget Workshop
City of Anna Texas 2020 Budget WorkshopCity of Anna Texas 2020 Budget Workshop
City of Anna Texas 2020 Budget Workshop
 
2017 San Jose, CA Zero-Based Budgeting Results
2017 San Jose, CA Zero-Based Budgeting Results2017 San Jose, CA Zero-Based Budgeting Results
2017 San Jose, CA Zero-Based Budgeting Results
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
 
Christina 2015 Asset Management Presentation
Christina 2015 Asset Management PresentationChristina 2015 Asset Management Presentation
Christina 2015 Asset Management Presentation
 
Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714
 
Hemet City Manager Update to Community Given by Christopher Lopez
Hemet City Manager Update to Community Given by Christopher LopezHemet City Manager Update to Community Given by Christopher Lopez
Hemet City Manager Update to Community Given by Christopher Lopez
 
Play Your Part: Understanding How Cities Can Take Advantage of IRA Grants, Ne...
Play Your Part: Understanding How Cities Can Take Advantage of IRA Grants, Ne...Play Your Part: Understanding How Cities Can Take Advantage of IRA Grants, Ne...
Play Your Part: Understanding How Cities Can Take Advantage of IRA Grants, Ne...
 
Triple Bottom Line Calculator
Triple Bottom Line CalculatorTriple Bottom Line Calculator
Triple Bottom Line Calculator
 
Vision for Haverhill Comprehensive Plan Concept & Framework
Vision for Haverhill Comprehensive Plan Concept & FrameworkVision for Haverhill Comprehensive Plan Concept & Framework
Vision for Haverhill Comprehensive Plan Concept & Framework
 
2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation 2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation
 
Santa Monica Talks 2012
Santa Monica Talks 2012Santa Monica Talks 2012
Santa Monica Talks 2012
 
Budget.ppt
Budget.pptBudget.ppt
Budget.ppt
 
Budget.ppt
Budget.pptBudget.ppt
Budget.ppt
 
Grants 101 Public Funding Basics, Trends & Successful Strategies 10 26-2018
Grants 101 Public Funding Basics, Trends & Successful Strategies 10 26-2018Grants 101 Public Funding Basics, Trends & Successful Strategies 10 26-2018
Grants 101 Public Funding Basics, Trends & Successful Strategies 10 26-2018
 
Urban Regeneration in Greater Manchester - Professor Steve Curwell
Urban Regeneration in Greater Manchester - Professor Steve CurwellUrban Regeneration in Greater Manchester - Professor Steve Curwell
Urban Regeneration in Greater Manchester - Professor Steve Curwell
 
Somerville FY23 Proposed Budget
Somerville FY23 Proposed BudgetSomerville FY23 Proposed Budget
Somerville FY23 Proposed Budget
 
Budget (1).ppt
Budget (1).pptBudget (1).ppt
Budget (1).ppt
 
CDBG CN 2016 Conference SlidesFINAL
CDBG CN 2016 Conference SlidesFINALCDBG CN 2016 Conference SlidesFINAL
CDBG CN 2016 Conference SlidesFINAL
 
Mark Luce Presentation from SFMS
Mark Luce Presentation from SFMSMark Luce Presentation from SFMS
Mark Luce Presentation from SFMS
 
Community information session presentation final 080513
Community information session presentation final 080513Community information session presentation final 080513
Community information session presentation final 080513
 

More from Center On Policy Initiatives

The impact of foreclosures on our community normitas d1 updated
The impact of foreclosures on our community normitas d1 updatedThe impact of foreclosures on our community normitas d1 updated
The impact of foreclosures on our community normitas d1 updated
Center On Policy Initiatives
 

More from Center On Policy Initiatives (15)

Raise Up San Diego Organized Presentation for June 11 Hearing
Raise Up San Diego Organized Presentation for June 11 HearingRaise Up San Diego Organized Presentation for June 11 Hearing
Raise Up San Diego Organized Presentation for June 11 Hearing
 
CPI 2013 Impact Report
CPI 2013 Impact ReportCPI 2013 Impact Report
CPI 2013 Impact Report
 
Support for the Barrio Logan Community Update Alternative 1 proposal
Support for the Barrio Logan Community Update Alternative 1 proposalSupport for the Barrio Logan Community Update Alternative 1 proposal
Support for the Barrio Logan Community Update Alternative 1 proposal
 
Community planning group training
Community planning group training Community planning group training
Community planning group training
 
Community Budget Alliance Presentation to Council at the Evening Budget Hearing
Community Budget Alliance Presentation to Council at the Evening Budget HearingCommunity Budget Alliance Presentation to Council at the Evening Budget Hearing
Community Budget Alliance Presentation to Council at the Evening Budget Hearing
 
City budget advocacy training 5 4-13
City budget advocacy training 5 4-13City budget advocacy training 5 4-13
City budget advocacy training 5 4-13
 
Fy 2014 proposed budget highlights
Fy 2014 proposed budget highlightsFy 2014 proposed budget highlights
Fy 2014 proposed budget highlights
 
City Budget Advocacy Training 5 4-13
City Budget Advocacy Training 5 4-13City Budget Advocacy Training 5 4-13
City Budget Advocacy Training 5 4-13
 
Presupuesto 102
Presupuesto 102Presupuesto 102
Presupuesto 102
 
Presupuesto 101
Presupuesto 101�Presupuesto 101�
Presupuesto 101
 
How to Read a City Budget (4 - 4 -13)
How to Read a City Budget (4 - 4 -13)How to Read a City Budget (4 - 4 -13)
How to Read a City Budget (4 - 4 -13)
 
Budget 102: A Guide to San Diego's Capital Improvement Program
Budget 102: A Guide to San Diego's Capital Improvement ProgramBudget 102: A Guide to San Diego's Capital Improvement Program
Budget 102: A Guide to San Diego's Capital Improvement Program
 
Al Acta de Exenciones Especiales - No a la Prop 32
Al Acta de Exenciones Especiales - No a la Prop 32Al Acta de Exenciones Especiales - No a la Prop 32
Al Acta de Exenciones Especiales - No a la Prop 32
 
Revised prop 32 presentation 09 10-2012
Revised prop 32 presentation 09 10-2012Revised prop 32 presentation 09 10-2012
Revised prop 32 presentation 09 10-2012
 
The impact of foreclosures on our community normitas d1 updated
The impact of foreclosures on our community normitas d1 updatedThe impact of foreclosures on our community normitas d1 updated
The impact of foreclosures on our community normitas d1 updated
 

Recently uploaded

PD ARRAY THEORY FOR INTERMEDIATE (1).pdf
PD ARRAY THEORY FOR INTERMEDIATE (1).pdfPD ARRAY THEORY FOR INTERMEDIATE (1).pdf
PD ARRAY THEORY FOR INTERMEDIATE (1).pdf
JerrySMaliki
 
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
Amil Baba Dawood bangali
 
Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024Monthly Economic Monitoring of Ukraine No. 232, May 2024
Introduction to Economics II Chapter 28 Unemployment (1).pdf
Introduction to Economics II Chapter 28 Unemployment (1).pdfIntroduction to Economics II Chapter 28 Unemployment (1).pdf
Introduction to Economics II Chapter 28 Unemployment (1).pdf
Safa444074
 
what is the future of Pi Network currency.
what is the future of Pi Network currency.what is the future of Pi Network currency.
what is the future of Pi Network currency.
DOT TECH
 
Latino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino CaucusLatino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino Caucus
Danay Escanaverino
 

Recently uploaded (20)

PD ARRAY THEORY FOR INTERMEDIATE (1).pdf
PD ARRAY THEORY FOR INTERMEDIATE (1).pdfPD ARRAY THEORY FOR INTERMEDIATE (1).pdf
PD ARRAY THEORY FOR INTERMEDIATE (1).pdf
 
how to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchangehow to sell pi coins on Bitmart crypto exchange
how to sell pi coins on Bitmart crypto exchange
 
how can I sell my pi coins for cash in a pi APP
how can I sell my pi coins for cash in a pi APPhow can I sell my pi coins for cash in a pi APP
how can I sell my pi coins for cash in a pi APP
 
what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024what is the best method to sell pi coins in 2024
what is the best method to sell pi coins in 2024
 
how can I sell my locked pi coins safety.
how can I sell my locked pi coins safety.how can I sell my locked pi coins safety.
how can I sell my locked pi coins safety.
 
how can i make money selling pi coins in 2024
how can i make money selling pi coins in 2024how can i make money selling pi coins in 2024
how can i make money selling pi coins in 2024
 
Digital Finance Summit 2024 Partners Brochure
Digital Finance Summit 2024 Partners BrochureDigital Finance Summit 2024 Partners Brochure
Digital Finance Summit 2024 Partners Brochure
 
How can I sell my pi coins in Indonesia?
How can I  sell my pi coins in Indonesia?How can I  sell my pi coins in Indonesia?
How can I sell my pi coins in Indonesia?
 
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...
 
How can I sell my Pi coins in Vietnam easily?
How can I sell my Pi coins in Vietnam easily?How can I sell my Pi coins in Vietnam easily?
How can I sell my Pi coins in Vietnam easily?
 
Commercial Bank Economic Capsule - May 2024
Commercial Bank Economic Capsule - May 2024Commercial Bank Economic Capsule - May 2024
Commercial Bank Economic Capsule - May 2024
 
Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024Monthly Economic Monitoring of Ukraine No. 232, May 2024
Monthly Economic Monitoring of Ukraine No. 232, May 2024
 
Falcon Invoice Discounting: Optimizing Returns with Minimal Risk
Falcon Invoice Discounting: Optimizing Returns with Minimal RiskFalcon Invoice Discounting: Optimizing Returns with Minimal Risk
Falcon Invoice Discounting: Optimizing Returns with Minimal Risk
 
Isios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdfIsios-2024-Professional-Independent-Trustee-Survey.pdf
Isios-2024-Professional-Independent-Trustee-Survey.pdf
 
Introduction to Economics II Chapter 28 Unemployment (1).pdf
Introduction to Economics II Chapter 28 Unemployment (1).pdfIntroduction to Economics II Chapter 28 Unemployment (1).pdf
Introduction to Economics II Chapter 28 Unemployment (1).pdf
 
Webinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont BraunWebinar Exploring DORA for Fintechs - Simont Braun
Webinar Exploring DORA for Fintechs - Simont Braun
 
how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.how to sell pi coins at high rate quickly.
how to sell pi coins at high rate quickly.
 
what is the future of Pi Network currency.
what is the future of Pi Network currency.what is the future of Pi Network currency.
what is the future of Pi Network currency.
 
Jio Financial service Multibagger 2024 from India stock Market
Jio Financial service  Multibagger 2024 from India stock MarketJio Financial service  Multibagger 2024 from India stock Market
Jio Financial service Multibagger 2024 from India stock Market
 
Latino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino CaucusLatino Buying Power - May 2024 Presentation for Latino Caucus
Latino Buying Power - May 2024 Presentation for Latino Caucus
 

San Diego City FY 2015 Proposed Budget - Community Analysis

  • 1. FY 2015 PROPOSED BUDGET HIGHLIGHTS KYRA R. GREENE, PHD CENTER ON POLICY INITIATIVES COMMUNITY BUDGET ALLIANCE MAY 3, 2014
  • 2. BUDGET BASICS Total Budget of $2.97 Billion Includes: • General Fund Revenues & Expenditure: $1.18B • Enterprise & Other Funds: $1.49B • CIP Expenditures: $298 M 2
  • 3. FY 14 YEAR-END PROJECTED GENERAL FUND RESERVES Amount Percent of General Fund Revenue (3 Year Average) FY 2014 Year-End Unrestricted Balance $164M 15.3% Emergency Reserve $86M 8.0% Stability Reserve $64M 6.0% FY 2015 Reserve Requirement $150M 14.0% Projected Excess Equity $14M 1.3% 5
  • 4. WHERE DID WE FIND MONEY IN THE PAST? 6 Harmful Cuts! Harmful Cuts!
  • 5. WHAT’S THE IMPACT IN THIS COMING YEAR? • Service levels are improving but still lower overall than before the recession. • The service level reductions have a disproportionate impact on low/moderate income families and historically neglected neighborhoods. • An infrastructure that is in disrepair due to deferred maintenance and repair (M&R) • A backlog of new infrastructure needs including thing like fire stations 7
  • 7. PUBLIC SAFETY DEPARTMENTS Increasing Size of Police Academies ($4.0M) • 9 additional positions per academy Police Officer Retention ($3.2M) • Uniforms and recruitment activities Additional Fire Academies ($1.1M) • Total of 3 per year Skyline Temporary Fire Station ($1.0M) • 6 months of staffing • Facility paid for with FY14 surplus Fire Fast Response Pilot ($600,000) • 2 Person teams mostly to respond to medical calls 9
  • 8. LIBRARY • Adding Hours ($1.5M) • Branch libraries 4 additional hours per week • Central Library 5 additional hours per week • 12 Branches (those already open on weekends) getting expanded Saturday & Sunday hours • Library After School Program ($0.5M) • “Do Your Homework @ the Library” • Funds transferred from the budget for buying books and other material. 10
  • 9. NEIGHBORHOOD FACILITIES Park Assessment Expansion ($0.4M) • FY 14—playgrounds and parking lots • FY 15—30 community parks New Park Facilities ($0.8M) • Ed Cramer Park • Central Avenue Mini-Park • Cabrillo Heights Neighborhood Park • Solana Ranch Neighborhood Park • San Ysidro Neighborhood Park (Former Fire Station Site) 12
  • 10. NEIGHBORHOOD SERVICES Community Plan Updates ($0.9M) Sidewalks & Street Lights Improvements ($1.4M) • This represents new money (1 time) money in Mayor’s Budget Streets & Sidewalk Assessments ($0.7M) • Streets Condition Assessment ($560,000) • Sidewalk Condition/Needs Assessment ($100,000) 13
  • 11. YOUTH PROGRAMS FUNDED • CONNECT2Careers ($0.2M) UNFUNDED CBA REQUEST • Youth Development Office/Youth Advisor ($175,000) • Youth Opportunity Pass Program ($200,000) 14
  • 12. ACCOUNTABILITY ENFORCEMENT FUNDED • Property Value Protection Ordinance ($0.1M) • Offset by $93,260 revenue UNFUNDED CBA REQUEST • Increased Enforcement of the Living Wage Ordinance ($0.2M) 17
  • 14. FY 2015 CIP BUDGET BY ASSET TYPE Waste Water 29% Water Distribution & Reclamation 24% Transportation 14% Parks 7% Buildings 22% Landfill 2% Other 2% 19
  • 15. 3RD DEFERRED CAPITAL BOND $120,000,000 What’s It Being Spent On? Facilities $48.6M Streets $44.1M Sidewalks $ 1.0M ADA Improvements $ 4.3M Storm Drains $22.0M 20
  • 16. REORGANIZATION OF ENGINEERING & CAPITAL PROJECTS PUBLIC WORKS—ENGINEERING & CAPITAL PROJECTS INCREASED TRANSPARENCY • Moved from general fund to an internal service fund so City can better track funding of projects. INCREASED STAFFING • 35.85 additional staff to support current and expected expansion of the capital improvement program 21
  • 17. ASSESSMENTS IN FY15 • General fund facilities/buildings ($1.2M) • Parks ($0.4M) • Water & wastewater ($9.1M) • Sidewalks ($0.1M) • Streets ($0.6M) 22
  • 18. SIDEWALKS & STREETS CIP FUNDS SIDEWALK REPAIR/RECONSTRUCTION • Deferred Capital Bond 3: $ 1.0M • City CDBG CIP: $ 3.5M STREETS REPAIR/CONSTRUCTION • Deferred Capital Bond 3: $44.1M 23
  • 20. WHAT SHOULD YOU ASK? Testing for Fairness & Equity • Where are needs greatest? • Who pays? • Who benefits? • Who decides? • Who is left out? 25
  • 21. BIG DISCUSSIONS • Insuring Government Transparency • Not Maximizing Public Investment • Failure of Managed Competition • Costly Underfunding of Facilities’ Maintenance & Repair • Revenue Challenges 26
  • 22. TRANSPARENCY/OPEN GOVERNMENT 5-Year CIP & CIP Service Levels • “As was outlined in Council Policy 000-32, future public input will be provided for the Multi-Year Capital Plan rather than the annual budget process.” (IBA, p.69) Open Government Commitments • Funding 1.0 FTE for an Open Data Officer in FY15 . • Spending $500,000 for retention of City email. 27
  • 23. NOT MAXIMIZING PUBLIC INVESTMENTS Analytics & Performance Management Department • Described as having wide range of functions, but it’s not clear how it will accomplish those. • No funding for departmental director or open data public portal. • Only performance measures—cost savings from Managed Competition Managed Competition • Locks in low service levels as goals • Realized savings ignore process costs • Expected savings far exceed what has been realized • Huron report on Fleet Services indicates serious public safety concerns 28
  • 24. UNDERFUNDING OF FACILITIES’ MAINTENANCE & REPAIR (M&R) Public Works—General Services—Facilities Division • Provides maintenance, custodial services and emergency repairs for city owned buildings/facilities. • Experienced a 23.2% reduction in staff between FY 2004 and FY 2013 • FY 2014 added 9.00 positions led to reduced backlog and greater focus on preventative maintenance. • Asked for 52.00 positions in FY 2015 got 7.00. 29
  • 25. REVENUE CHALLENGES Delays In Deferred Capital Bond Series • $85M behind from FY 2013 and FY 2014 • Deferred Capital Bond 3 facing legal challenge Need for a General Obligation “GO” Bond for Infrastructure • Estimates of need are around $2B for a “Megabond” 30
  • 26. LEARN MORE Read the Fiscal Year 2015 Proposed Budget on the City’s website. • http://www.sandiego.gov/fm/proposed/ Read the Independent Budget Analyst’s report on the Proposed Budget. • http://www.sandiego.gov/iba/pdf/reports/2014/14_15_140428.pdf 31
  • 28. PUBLIC BUDGET ADVOCACY OPPORTUNITIES May 5th-May 9th –Budget Review Committee Hearings • 9:00am-12:00pm & 2:00pm-5:00pm • Schedule of departments/topics can be found at: http://www.sandiego.gov/park-and- recreation/pdf/fy15proposedbudgetcitycouncilhearingschedule.pdf May 19th—Public Hearing on Mayor’s Proposed FY15 Budget • 6:00pm May 21st — Review of FY15 May Revise & FY14 Year- End Budget Monitoring Report • 9:00am-12:00pm 33
  • 30. Speak Up: Your neighborhood is counting on you! 35 Crystal Page | Community Budget Alliance | May 2, 2014
  • 31. AGENDA 1. What to say: Tested messages in San Diego on public spending and city infrastructure 2. How to say it: Crafting strong messages 3. How to wow them: Public speaking mastery 4. Practice! 36
  • 33. BUDGET MESSAGE THEMES 1. The value of City services and infrastructure  Prevailing attitude: “Trash collection, which sucks $millions from the city budget...” -UT news story in March 2. Equity in spending for all neighborhoods  Some neighborhoods have been historically neglected.  Aversion to any new spending. 38
  • 34. THE POWER OF YOUR VOICE YOU are the expert on your neighborhood. The City budget is for you. 39
  • 35. EFFECTIVE MESSAGES ON INFRASTRUCTURE AND SERVICES Sources: Two polls of San Diego County registered voters commissioned by CPI, in April 2012 and August 2012. Americans for Tax Fairness national poll, June 2012 California Labor Federation statewide online survey, Dec. 2011. 40 Most voters approve of infrastructure spending that:  Provides fairness for neglected neighborhoods  Repairs roads, sidewalks and public facilities that are in bad shape.  Is an investment in our future economy.
  • 36. KEY POINTS ON THE VALUE OF CITY SERVICES AND FACILITIES City services and facilities are essential to residents and businesses. Be specific: Schools, roads, water lines, libraries, parks, police and fire stations. Our safety and quality of life depend on quality public services. 41
  • 37. TESTED MESSAGES 1. Justice for neighborhoods that have been neglected: “We must ensure every neighborhood in San Diego gets a fair shake.” “It’s a sound investment in the future of our city to repair the roads, sidewalks and facilities like libraries and fire stations that are in the worst shape.” 42
  • 38. TESTED MESSAGES, CONT. 2. Fairness and opportunity: “San Diego’s quality of life needs to improve for everyone, not just the people in wealthy neighborhoods.” “Residents of some neighborhoods have access to far better roads, parks and police services than in other neighborhoods. If we want all San Diegans to have an equal opportunity at success, we need to make fair investments in our city’s infrastructure.” 43
  • 39. TESTED MESSAGES, CONT. 3. Smart investment for taxpayers: “Badly needed investments in our city will provide a strong foundation for our local economy.” 44 • “The longer we wait to invest in needed city repairs and improvements, the more it will cost all of us in the future.”
  • 40. WORDS AND PHRASES THAT WORK: INFRASTRUCTURE SPENDING 45
  • 41. MESSAGE STRUCTURE WHAT WORKS TO REACH PEOPLE AND PERSUADE THEM 46
  • 42. MESSAGE STRUCTURE 1: VALUES, PROBLEM, SOLUTION 1. First, connect with audience values/emotions. 2. State your concerns (the problem). 3. Describe the solution with hope and aspiration. 47
  • 43. EXAMPLE: CONNECT/CONCERN/HOPE CONNECT: When I walk my dog Lulu around the neighborhood, I love to see the kids playing in the park and riding their bikes. I’ve watched many of them grow up since they were babies. CONCERN: But I cringe every time I see the places where the sidewalk stops or it’s so rutted that they swerve their bikes out into the streets. And in the evening I worry about their safety in the park because there aren’t enough lights. HOPE: That’s why I’m here today to ask you to make sure the sidewalks and the park are safe for those children, so I can continue to watch them growing and thriving. They are our future. 48
  • 44. MESSAGE STRUCTURE 2: MESSAGE TRIANGLE 49 Main take-home message Evidence or supporting point Evidence or supporting point Evidence or supporting point
  • 45. EXAMPLE: MESSAGE TRIANGLE 50 We need fair investment in neglected public infrastructure. Ensures that every neighborhood gets a fair shake Provides a strong foundation for our local economy. Improves our quality of life
  • 46. PREPARING YOUR MESSAGE Think: What do you want people to remember? Why does it matter? Write: Keep it simple, honest and clear. Add personal experience. Use specifics – but be brief. Avoid jargon. Use “kitchen table” language. 51
  • 47. PUBLIC SPEAKING MASTERY HOW TO GET YOUR POINT ACROSS CLEARLY 52
  • 48. PREPARE AND PRACTICE! Write your message. Tell your story, keeping it short and focused. Practice . Practice again. Time yourself. Prepare 1-minute and 2-minute versions. Practice a strong concluding sentence. 53
  • 49. SPEAK EFFECTIVELY Be passionate!  But reasonable and rational.  Avoid sarcasm, rage, cursing. Get to the point.  But don’t rush. Speak clearly. Stay focused. Use short sentences. Pause. Breathe. Don’t “Ummm…” 54
  • 50. ATTITUDE AND STYLE MATTER. Smile. Breathe. Slow down. Appear calm and confident. Don’t fidget or wave your arms. Look up. Make eye contact. Use a relaxed and friendly tone. 55
  • 51. CITY COUNCIL PROCESS What to expect when your item comes up: 1. City staff presentation 2. Public testimony – organized presentations 3. Public testimony – individuals called by name 4. Councilmembers speak 5. Councilmembers vote 56
  • 52. GET READY TO TESTIFY Bring brief notes on your main points. Dress however you feel confident. Arrive on time. Fill out a speaker slip. Sit near the front so you can easily get to the podium. Listen respectfully. They can see you. 57
  • 53. YOU’RE UP! Start with your name and neighborhood. Try to talk from the heart, rather than reading. Look up at friendly councilmembers. Speak up, but don’t yell. Don’t be flustered when time is up. Have your wrap-up statement ready. If questioned, it’s fine to say “I don’t know.” 58
  • 54. PRACTICE IN SMALL GROUPS 1. Take a few minutes to review and practice your message. Cut it to 1 minute. 2. Deliver it to the City Council (played by others in your practice group). 3. Receive honest, constructive feedback. 59 Thank you!
  • 55. PUBLIC BUDGET ADVOCACY OPPORTUNITIES May 5th-May 9th –Budget Review Committee Hearings • 9:00am-12:00pm & 2:00pm-5:00pm • Schedule of departments/topics can be found at: http://www.sandiego.gov/park-and- recreation/pdf/fy15proposedbudgetcitycouncilhearingschedule.pdf May 19th—Public Hearing on Mayor’s Proposed FY15 Budget • 6:00pm May 21st — Review of FY15 May Revise & FY14 Year- End Budget Monitoring Report • 9:00am-12:00pm 60
  • 56. 61 FOR MORE INFORMATION: Contact Info: Samer Naji Snaji@onlineCPI.org (619) 584-5744 x60 Find us online at: OnlineCPI.org Facebook.com/CommunityBudgetAlliance