Get the most benefit with the least effort

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

3
0

Beginning Web Performance

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

4
Start with a really slow site

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

5
0.1

Start Measuring

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

6
Or use RUM for real user data (boomerang/mPulse)

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

7
0.2

enable gzip

http://slideshare.net/billwscott/improving-netflix-performance-experience
Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

8
You can pre-gzip

gzip_static in nginx

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

9
0.3

ImageOptim

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

10
0.4

Cache

Cache-control: public, max-age=31415926

http://www.mnot.net/cache_docs/

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

11
Yes, that was 10 million pies

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

12
0

Congratulations

You’ve just been promoted

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

13
1

What the Experts Do

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

14
1.1

CDN

Serve your root domain through a CDN

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

15
1.1

CDN

And make sure your CSS is on the same domain

http://www.jonathanklein.net/2014/02/revisiting-cookieless-domain.html

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

16
1.2

Split JavaScript

"critical": in the HEAD,
"enhancements": loaded async

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

17
1.3

Audit your CSS

Chrome WebDev tools
Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

18
1.4

Parallelise downloads

You can have higher bandwidth, you cannot have lower latency.
Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

19
1.5

Flush Early and Often

Get bytes to the client ASAP to avoid TCP Slow
Start, and speed up CSS

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

20
1.6

Increase initcwnd

Initial Congestion Window: Number of packets to
send before waiting for an ACK

http://www.cdnplanet.com/blog/tune-tcp-initcwnd-for-optimumperformance/

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

21
1.6

Increase initcwnd

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

22
1.6b

Also...

net.ipv4.tcp_slow_start_after_idle=0

http://www.lognormal.com/blog/2012/09/27/linux-tcpip-tuning/

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

23
1.7

PageSpeed

mod_pagespeed and ngx_pagespeed

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

24
Relax

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

25
2

You’ve reached crazyland

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

26
Sort in ascending order of signal latency

• Electrons through copper
• Light through fibre
• Pulsars
• Station Wagons
• Smoke Signals

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

27
Study real user data

Look for potential places to parallelise, predict or
cache

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

28
2.1 Pre-load

Pre-fetch assets required for the next page in a
process flow

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

29
2.1b pre-render

<link rel="prerender" href="url">

https://developers.google.com/chrome/whitepapers/prerender

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

30
2.2 Post-load

Fetch optional assets after onload

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

31
2.3 Detect broken accept-encoding

Many Windows anti-viruses and firewalls disable
gzip by munging the Accept-Encoding header

http://www.lognormal.com/blog/2012/08/17/accept-encoding-stats/

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

32
2.4 Prepare for HTTP/2.0

Multiple assets on the same connection and TLS by
default.
Breaks many of our rules.

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

33
2.5 Understand 3PoFs

Use blackhole.webpagetest.org

http://blog.patrickmeenan.com/2011/10/testing-for-frontend-spof.html

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

34
2.6 Understand the IFrame Loader Technique

Take required but non-critical assets out of the
critical path

http://www.lognormal.com/blog/2012/12/12/the-script-loader-pattern/

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

35
Can you predict round-trip-time?

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

36
Can you predict round-trip-time?

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

37
References

•
•
•
•
•
•
•
•
•
•
•
•

WebPageTest – http://webpagetest.org
Boomerang – http://lognormal.github.io/boomerang/doc/
SOASTA mPulse – http://www.soasta.com/free
Netflix gzip study – http://www.slideshare.net/billwscott/improving-netflix-performance-experience
Nginx gzip_static – http://wiki.nginx.org/HttpGzipStaticModule
ImageOptim – http://imageoptim.com/
Caching – http://www.mnot.net/cache_docs/
Same domain CSS – http://www.jonathanklein.net/2014/02/revisiting-cookieless-domain.html
initcwnd – http://www.cdnplanet.com/blog/tune-tcp-initcwnd-for-optimum-performance/
Linux TCP Tuning – http://www.lognormal.com/blog/2012/09/27/linux-tcpip-tuning/
Prerender – https://developers.google.com/chrome/whitepapers/prerender
FE SPoF – http://blog.patrickmeenan.com/2011/10/testing-for-frontend-spof.html

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

38
Thank You!
Questions?

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

39
• Philip Tellis
• @bluesmoon
• philip@bluesmoon.info
• www.SOASTA.com
• boomerang
• LogNormal Blog

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

40
Image Credits

• Apple Pie
http://www.flickr.com/photos/24609729@N00/3353226142/
• Kittens in a PC
http://www.flickr.com/photos/43525343@N08/6417971383/

Confoo 2014 / 2014-02-27

FE Performance: Beginner to Expert to Crazy Person

41

Frontend Performance: Beginner to Expert to Crazy Person

  • 1.
    • Philip Tellis •@bluesmoon • ptellis@soasta.com • SOASTA • boomerang Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 1
  • 2.
    FE Performance: Beginnerto Expert to Crazy Person Philip Tellis / ptellis@soasta.com Confoo 2014 / 2014-02-27 Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 2
  • 3.
    Get the mostbenefit with the least effort Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 3
  • 4.
    0 Beginning Web Performance Confoo2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 4
  • 5.
    Start with areally slow site Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 5
  • 6.
    0.1 Start Measuring Confoo 2014/ 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 6
  • 7.
    Or use RUMfor real user data (boomerang/mPulse) Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 7
  • 8.
  • 9.
    You can pre-gzip gzip_staticin nginx Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 9
  • 10.
    0.3 ImageOptim Confoo 2014 /2014-02-27 FE Performance: Beginner to Expert to Crazy Person 10
  • 11.
    0.4 Cache Cache-control: public, max-age=31415926 http://www.mnot.net/cache_docs/ Confoo2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 11
  • 12.
    Yes, that was10 million pies Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 12
  • 13.
    0 Congratulations You’ve just beenpromoted Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 13
  • 14.
    1 What the ExpertsDo Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 14
  • 15.
    1.1 CDN Serve your rootdomain through a CDN Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 15
  • 16.
    1.1 CDN And make sureyour CSS is on the same domain http://www.jonathanklein.net/2014/02/revisiting-cookieless-domain.html Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 16
  • 17.
    1.2 Split JavaScript "critical": inthe HEAD, "enhancements": loaded async Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 17
  • 18.
    1.3 Audit your CSS ChromeWebDev tools Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 18
  • 19.
    1.4 Parallelise downloads You canhave higher bandwidth, you cannot have lower latency. Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 19
  • 20.
    1.5 Flush Early andOften Get bytes to the client ASAP to avoid TCP Slow Start, and speed up CSS Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 20
  • 21.
    1.6 Increase initcwnd Initial CongestionWindow: Number of packets to send before waiting for an ACK http://www.cdnplanet.com/blog/tune-tcp-initcwnd-for-optimumperformance/ Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 21
  • 22.
    1.6 Increase initcwnd Confoo 2014/ 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 22
  • 23.
  • 24.
    1.7 PageSpeed mod_pagespeed and ngx_pagespeed Confoo2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 24
  • 25.
    Relax Confoo 2014 /2014-02-27 FE Performance: Beginner to Expert to Crazy Person 25
  • 26.
    2 You’ve reached crazyland Confoo2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 26
  • 27.
    Sort in ascendingorder of signal latency • Electrons through copper • Light through fibre • Pulsars • Station Wagons • Smoke Signals Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 27
  • 28.
    Study real userdata Look for potential places to parallelise, predict or cache Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 28
  • 29.
    2.1 Pre-load Pre-fetch assetsrequired for the next page in a process flow Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 29
  • 30.
    2.1b pre-render <link rel="prerender"href="url"> https://developers.google.com/chrome/whitepapers/prerender Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 30
  • 31.
    2.2 Post-load Fetch optionalassets after onload Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 31
  • 32.
    2.3 Detect brokenaccept-encoding Many Windows anti-viruses and firewalls disable gzip by munging the Accept-Encoding header http://www.lognormal.com/blog/2012/08/17/accept-encoding-stats/ Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 32
  • 33.
    2.4 Prepare forHTTP/2.0 Multiple assets on the same connection and TLS by default. Breaks many of our rules. Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 33
  • 34.
    2.5 Understand 3PoFs Useblackhole.webpagetest.org http://blog.patrickmeenan.com/2011/10/testing-for-frontend-spof.html Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 34
  • 35.
    2.6 Understand theIFrame Loader Technique Take required but non-critical assets out of the critical path http://www.lognormal.com/blog/2012/12/12/the-script-loader-pattern/ Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 35
  • 36.
    Can you predictround-trip-time? Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 36
  • 37.
    Can you predictround-trip-time? Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 37
  • 38.
    References • • • • • • • • • • • • WebPageTest – http://webpagetest.org Boomerang– http://lognormal.github.io/boomerang/doc/ SOASTA mPulse – http://www.soasta.com/free Netflix gzip study – http://www.slideshare.net/billwscott/improving-netflix-performance-experience Nginx gzip_static – http://wiki.nginx.org/HttpGzipStaticModule ImageOptim – http://imageoptim.com/ Caching – http://www.mnot.net/cache_docs/ Same domain CSS – http://www.jonathanklein.net/2014/02/revisiting-cookieless-domain.html initcwnd – http://www.cdnplanet.com/blog/tune-tcp-initcwnd-for-optimum-performance/ Linux TCP Tuning – http://www.lognormal.com/blog/2012/09/27/linux-tcpip-tuning/ Prerender – https://developers.google.com/chrome/whitepapers/prerender FE SPoF – http://blog.patrickmeenan.com/2011/10/testing-for-frontend-spof.html Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 38
  • 39.
    Thank You! Questions? Confoo 2014/ 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 39
  • 40.
    • Philip Tellis •@bluesmoon • philip@bluesmoon.info • www.SOASTA.com • boomerang • LogNormal Blog Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 40
  • 41.
    Image Credits • ApplePie http://www.flickr.com/photos/24609729@N00/3353226142/ • Kittens in a PC http://www.flickr.com/photos/43525343@N08/6417971383/ Confoo 2014 / 2014-02-27 FE Performance: Beginner to Expert to Crazy Person 41