SlideShare a Scribd company logo
FORTIS HOSPITAL , NOIDA, U.P.
CASE STUDY
Submitted by
Aditi Miglani 207
Sudhanshu 268
Tarundeep 276
FORTIS HOSPITAL , NOIDA, U.P.
INTRODUCTION
Fortis Hospital Noida is located near Delhi and is a Centre of Excellence
for Orthopaedics and Neurosciences with a focus on Cardiac Sciences,
Minimally Invasive Surgeriesand Oncology.
Departmentsand specialty centers
Cardiac Surgery
Cardiology
Dermatology
Dialysis
ENT
Gastroenterology
GeneralSurgery
Imaging
Nephrology
Neurology
Neurosurgery
Ob-Gyn
Oncology
Orthopedics
Pediatrics
Rehabilitation
Stem Cell Therapy
Urology
Numberof doctors: 150
Numberof beds: 177
Yearestablished: 2004
Facilities
Private Rooms
Cafeteria/restaurant
Phone inrooms
Internetconnection
Bank/ATM
Money exchange
Pharmacy
Ahluwalia Contracts
(India) Limited
(ISO 9001:2000 Company)
Engineering ¨ Designing ¨ Construction
Head Office : A-177, Okhla Indl Area, Ph-I, New Delhi – 110 020
Tel : 91-011-49410574, Fax : 91-011-49410553
ARCHITECT AND CONTRACTOR.
FORTISHOSPITALISLOCATEDAT SEC -62,NOIDA( UP)
ITLIESOPPOSITE SEC -63INDUSTRIALAREA.
SITE AREA : 7 ACRES
GR. COVERAGE :35%
BUILDING HT. :24MTS.
GEN.& VISITORS :50/day
FORTIS HOSPITAL , NOIDA, U.P.
LOCATION
36.2KMS., 50 MINS DRIVE
17.2KMS, 30MIN
FORTIS
METROSTATIONNEARTHESITE
SITE
FROM INDIRAGANDHI INTERNATIONALAIRPORT
FROM NIZAMUDDINRAILWAYSTATION
APPROACH.
VEHICULARMOVEMENT
PEDESTRIANMOVEMENT
EMERGENCYMOVEMENT
SERVICEMOVEMENT
CLASHPOINT
EMERGENCY ENTRY PEDESTRIAN ENTRY
MAINEXIT
SERVICE
ENTRY
MAINENTRY
N
S
I
T
E
P
L
A
N
PARKING
ENTRANCE
GUARD ROOM
PARKING
SITE
 THESURROUNDINGSCOMPRISETHE
RESIDENTIALAREAOF SECTOR62AND
ALSOTHEINDUSTRIALAREAOF SECTOR 63
WHICHLIESOPPOSITE IT.
 THEHOSPITALHASBEEN DESIGNED
KEEPINGINMINDTHEARCHITECTUREOF
THESURROUNDINGBUILDINGSANDTHUS
ITMERGESWELL WITHTHESITEANDTHE
SURROUNDINGS.
SURROUNDINGS
WEST
EAST
SOUTH
NORTHLIGHT TOOPD
CONSULTATIONROOMS
WARDSGETPROPER AIR
CIRCULATIONANDAMPLE LIGHT DUETO
DIAGONALPLACEMENT OF THEBLOCK
WIND DIRECTION AND ORIENTATION
 LONG CORRIDORCONNECTINGEMERGENCYWAITING
ANDDIAGNOSTICWAITINGSEPARATESPUBLIC
TRAFFICFROM HOSPITALTRAFFIC.
 EMERGENCYWELL CONNECTEDWITHDIAGNOSTIC
AREA.
 GRIDUSED= 7.2 MX 7.2 M
 ALL FLOOR WALL JUNCTIONSANDCORNERSARE
ROUNDEDWITHEPOXY RAISINS.
PROPER ZONINGOF PUBLIC LIFTLOBBY HELPS PUBLIC
&HOSPITALFUNCTIONS.
ZONING AND CIRCULATION
 -CENTRALPATHOLOGY AND
BLOOD BANK.
 -PERIPHERAL AREAGIVENTOADMN
ANDKITCHENTOENSUREPROPER
VENTILATION.
 -MORTUARYPLACED NEARTOTHE
LOADING AREAFOR EASY HANDLING
OFDEAD BODIES. CIRCULATION
SERVICES
UTILITY
O.T.
DIAGNOSIS
CONSULTANT
EMERGENCY
BASEMENT FLOOR PLAN
 ADJACENTLAWNLVL BROUGHT DOWN TOFACILITATELIGHT&
VENTILATIONINTOTHEADM AREA.
N
GROUNDFLOORPLAN
CIRCULATION
SERVICES
UTILITY
O.T.
DIAGNOSIS
CONSULTANT
EMERGENCY
 OPD ANDIPD BLOCKS ARE CONNECTED
TOGETHERVIA ATRIUM AT GROUND
FLOOR.
 30CONSULTATIONROOMS ON GROUNDFLOOR. SIZE
3.6 MX3.6MOR 3.6M X 5.0 M( wherecorridoris of less
width).
 ANAPPROPRIATECHANNELISATIONOF
WAITINGAREA INO.P.D. BLOCK BY
VIRTUALCOVEWAITING.
N
FIRST FLOOR PLAN
CIRCULATION
SERVICES
UTILITY
O.T.
DIAGNOSIS
CONSULTANT
EMERGENCY
 WIDTHOF CORRIDOR
= 2400MM
ASPER STANDARDS= 2250
MM
N
 ICU’SHAVINGTHEIRUTILITY
AREAINTHECENTRECORE.
 DUMB WAITERSHAVEBEEN
PROVIDED FOR STERILESUPPLY
FROM C.S.S.D.
 SOUTHERNSIDE ONTHEICUFLOOR GIVENTO
DOCTORSANDRELATEDSUPPORT AREAS.
 ALL REQUIREDSERVICESTOTHISHIGH
STERILITY AREAIS CATEREDTO AT
BASEMENT FLOOR.
 -O.T. PLACEMENT IN
SEPARATEBLOCK HELPS
TOFILTERTHEPUBLIC
TRAFFICOF ICUAWAY
FROM THISHIGH
STERILEAREA.
CIRCULATION
SERVICES
UTILITY
O.T.
DIAGNOSIS
CONSULTANT
EMERGENCY
SECONDFLOOR PLAN
N
 NO SPECIFIEDRECOVERYROOM.
PATIENTSARESHIFTEDTOTHEIR
RESPECTIVEWARDS.
 ACENTRALIZEDNURSING
STATION.
 DIRTYUTILITYINLABOUR ROOM.
 INTERNALCONNECTIONBETWEEN LABOURROOM
TODELIVERYROOM ANDOPERATIONTHEATRE.
CIRCULATION
SERVICES
UTILITY
O.T.
DIAGNOSIS
CONSULTANT
EMERGENCY
THIRDFLOOR PLAN
N
FOURTHAND FIFTH FLOOR PLAN
CIRCULATION
SERVICES
UTILITY
O.T.
DIAGNOSIS
CONSULTANT
EMERGENCY
N
SCHEMATIC SECTION
4000
4000
4000
4000
4000
4000
4000
BRIDGE
WATER TREATMENT,GAS SUPPLY,STORES & LOCKERS,MORGUE,ELEC RM,AC RM,CSSD,LAUNDRY,KITCHEN,ADMN,PATH LAB,BLOOD BANK
DIAGNOSTIC , EMERGENCY OPD, PHYSIOTHERAPY
OPD CONSULTATION ROOMSDIAGNOSTIC
GL
ATRIUM, CAFE
OPERATION THEATRESI.C.Us & DOCTORS’ ROOMS
DELIVERY SUITES, PRIVATE & GENERAL WARDS,
NURSE STATION
WARDS
WARDS
 OPD CONSULTATIONROOMSRECEIVE
NORTHLIGHT.
 DEPARTMENTS: EYE, GYNAECOLOGY,ENT,
INTERNALMEDICINE,PAEDSTRIC,
PSYCHIATRYETC.
 CAFÉIN THEATRIUMISEASILY ACCESSIBLEFROM
WAITINGAREAS
 A MINIDIAGNOSTICAREA(PHYSIOTHERAPY)
PROVIDED INOPD
 OPD BLOCK IS 3STOREYED HIGH
 3 STAIRCASESAND2 LIFTSHAVE BEEN
PROVIDEDINTHISBLOCK
OUT PATIENT DEPARTMENT
O.P.D. BEING A DAY CARE BLOCK SEPERATED
FROM THE I.P.D. BLOCK
N
 -PATIENTLIFTPLACEMENT CLOSE
TOCASUALTYEASESITS
CIRCULATIONTOO.T.
 -CORRIDORRECEIVINGDIRECTSUNLIGHT
REDUCESTHEEFFECTOF LONG DARK
CORRIDOR.
 WIDTHOF CORRIDOR
= 2400MM
ASPER STANDARDS= 2250
MM
DIAGNOSTIC BLOCK
N
O. T COMPLEX
 -O.T. PLACEMENT IN
SEPARATEBLOCK HELPS
TOFILTERTHEPUBLIC
TRAFFICOF ICUAWAY
FROM THISHIGH
STERILEAREA.
 DUMB WAITERSHAVEBEEN
PROVIDED FOR STERILESUPPLY
FROM C.S.S.D.
WARDS
SINGLEROOM
DOUBLE ROOM
WAITINGLOUNGE SINGLEROOM
FORTIS FLOORING WALL FINISHES CEILING
ENTRANCE
LOBBY
NON GLAZED
NON
SLIPPERY
CERAMIC
TILES
PLASTIC EMULSION PAINT
UPTO 3’6” &CREAM
COLORED PAINT ABOVE
GYPSUM
BOARD FALSE
CEILING
OPD
WAITING
MARBLE CHIP
WHITE
MOSAIC
PLASTIC EMULSION PAINT
UPTO 3’-6” &CREAM
COLOURED ABOVE
CREAM
COLOURED
CEILING
MATERIAL
CHANGING ROOMS
FLOORING WALL FINISHES CEILING
WHITE MARBLE
CHIPS IN WHITE
CEMENT MOSAIC
FLOORING
PLASTIC EMULSION
PAINT UPTO 5 FT. AND
CREAM COLOURED
PAINT ABOVE
GYPSUM
BOARD FALSE
CEILING
CEMENT
CONCRETE
WHITE PAINTED WALLS
KOTA STONE WHITE PAINTED WALLS GYPSUM
BOARD FALSE
CEILINGS
GLAZED CERAMIC
TILES
GYPSUM
BOARD FALSE
CEILINGS
FLOORS
REST OF FLOORS
CORRIDORS
BASEMENT FLR
O.T.
FINISHES
STRUCTURE
- TRIANGULAR PERGOLA BALANCES AND
VISUALLYCONNECTS2 BLOCKS.
 RED BANDS HAVEBEEN PROVIDEDON THEEXTERIOR
INMINIMUMQUANTITYIN CONTRASTTOTHEWHITE
EXTERIORFINISH.THISCONCEPT ISCALLED
MINIMALISM ( generally used with red &white colour
combination) -TO AVOIDMONOTONYOF COLOUR
ANDFOR EASY VISIBILITYFROM ANY AIRPLANE.
INFERENCE
 THEI.P.D.BLOCK INA DIAGONAL PLACEMENT
RELIEVES THE HEAVY MASS OF BUILDINGANDSETUP
INTOCONEOF VISION.
 RED BANDS HAVEBEEN PROVIDEDON THEEXTERIOR
INMINIMUMQUANTITYINCONTRASTTO THEWHITE
EXTERIORFINISH.THISCONCEPT ISCALLED
MINIMALISM ( generally used with red &white colour
combination) -TOAVOID MONOTONYOF COLOUR
ANDFOR EASY VISIBILITYFROM ANY AIRPLANE.
 BUILDINGFINISHES AREKEPT LIGHT IN COLOUR TO
DECREASETHE VISUAL DENSITYOF HEAVY MASS.
 WALL EDGESAND CORNERSROUNDEDWITH EPOXY
RESINS.
MERITS:
 O.P.D. BEING A DAY CAREBLOCK SEPERATEDFROM
THEI.P.D. BLOCK
 TO AVOIDEXCESSIVE HEAT PENETRATIONINTOTHE
ATRIUMALTERNATETRANSPARENTAND
TRANSLUSCENTPOLYCARBONATESHEETS HAVE BEEN
USED
 BUILDINGPLANNEDALONG CENTRALATRIUMAXIS
WATER SUP PLY
SOURCE NOIDA MAIN SUPPLY & BORE WELL
ELECTRICAL
SOURCES SUB ST. SEC. 62 OF 11000 KVA
DEMERITS:
 NO SPECIFIEDRECOVERY ROOMS.
PATIENTSAREDIRECTLYSHIFTED TO
THEWARDSAFTEROPERATION.
 TOOMANY ENTRIESTOTHE
SITECREATECLASH POINTS
FOR TRAFFICMOVEMENT.
 NO UNLOADING AREA FOR KITCHENANDTHUS
EMERGENCY TRAFFIC ISAFFECTED.
 AREA UNDERROADSIS35%OF THETOTALAREA:
WHICHISMORE THANREQUIRED.

More Related Content

What's hot

Apollo Hospital case study
Apollo Hospital case studyApollo Hospital case study
Apollo Hospital case study
Pulkit Yadav
 

What's hot (20)

Apollo Hospital case study
Apollo Hospital case studyApollo Hospital case study
Apollo Hospital case study
 
Final literature study of hospital
Final literature study of hospitalFinal literature study of hospital
Final literature study of hospital
 
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
FORTIS HOSPITAL AMRITSAR CASE STUDY WITH LIBRARY STUDY
 
Fortis Hospital Mohali Case Study
Fortis Hospital Mohali Case StudyFortis Hospital Mohali Case Study
Fortis Hospital Mohali Case Study
 
Case study on Fortis Hospital , Noida
Case study on Fortis Hospital , Noida Case study on Fortis Hospital , Noida
Case study on Fortis Hospital , Noida
 
fortis hospital mohali case study
fortis hospital mohali case study fortis hospital mohali case study
fortis hospital mohali case study
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDYHOSPITAL CASE STUDY
HOSPITAL CASE STUDY
 
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSARCASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
CASE STUDY HOSPITAL SAKET NEW DELHI AND EMC GREEN AVENUE AMRITSAR
 
case study on hospital design
case study on hospital designcase study on hospital design
case study on hospital design
 
Appolo hospital
Appolo hospitalAppolo hospital
Appolo hospital
 
Hospital
HospitalHospital
Hospital
 
Casestudy hospital taran taran
Casestudy hospital taran taran Casestudy hospital taran taran
Casestudy hospital taran taran
 
Continental hospital
Continental hospitalContinental hospital
Continental hospital
 
Hospital Services (Library & Case Study)
Hospital Services (Library & Case Study)Hospital Services (Library & Case Study)
Hospital Services (Library & Case Study)
 
Library study
Library studyLibrary study
Library study
 
Literature case study
Literature case studyLiterature case study
Literature case study
 
Hospital Design Case Study
Hospital Design Case StudyHospital Design Case Study
Hospital Design Case Study
 
Pearl Hospital Project
Pearl Hospital ProjectPearl Hospital Project
Pearl Hospital Project
 
Ghdtrchjbnjtdtc
GhdtrchjbnjtdtcGhdtrchjbnjtdtc
Ghdtrchjbnjtdtc
 
International case study on massachusetts general hospital
International case study on massachusetts general hospitalInternational case study on massachusetts general hospital
International case study on massachusetts general hospital
 

Similar to FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY

Hospital aiims presentation
Hospital aiims presentationHospital aiims presentation
Hospital aiims presentation
Vishvendu pandey
 
Medanta the medicity
Medanta   the medicityMedanta   the medicity
Medanta the medicity
Medanta - The Medicity
 
CharakMemorialhospitalServices.pptx
CharakMemorialhospitalServices.pptxCharakMemorialhospitalServices.pptx
CharakMemorialhospitalServices.pptx
CHARAK MEMORIAL HOSPITAL PVT. LTD .
 

Similar to FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY (20)

Hospital aiims presentation
Hospital aiims presentationHospital aiims presentation
Hospital aiims presentation
 
Which are Top 10 ENT Hospitals In India?
Which are Top 10 ENT Hospitals In India?Which are Top 10 ENT Hospitals In India?
Which are Top 10 ENT Hospitals In India?
 
Disharge process
Disharge processDisharge process
Disharge process
 
MINAKSHI-MAJUMDER-PROJECT-rabindranath-tagore-full-project.pdf
MINAKSHI-MAJUMDER-PROJECT-rabindranath-tagore-full-project.pdfMINAKSHI-MAJUMDER-PROJECT-rabindranath-tagore-full-project.pdf
MINAKSHI-MAJUMDER-PROJECT-rabindranath-tagore-full-project.pdf
 
Medanta the medicity
Medanta   the medicityMedanta   the medicity
Medanta the medicity
 
Parkway Group Healthcare: A Marketing Excellence Study
Parkway Group Healthcare: A Marketing Excellence StudyParkway Group Healthcare: A Marketing Excellence Study
Parkway Group Healthcare: A Marketing Excellence Study
 
Liv Hospital Turkey
Liv Hospital Turkey Liv Hospital Turkey
Liv Hospital Turkey
 
del.pdf
del.pdfdel.pdf
del.pdf
 
Medanta the Medicity
Medanta the MedicityMedanta the Medicity
Medanta the Medicity
 
MIRAGE PortfolioLR
MIRAGE PortfolioLRMIRAGE PortfolioLR
MIRAGE PortfolioLR
 
ENT
ENTENT
ENT
 
SMART DEVICES IN HOSPITALS (1).pptx
SMART DEVICES IN HOSPITALS (1).pptxSMART DEVICES IN HOSPITALS (1).pptx
SMART DEVICES IN HOSPITALS (1).pptx
 
Outpatient Department (OPD).. overview, introduction and more info
Outpatient Department (OPD).. overview, introduction and more infoOutpatient Department (OPD).. overview, introduction and more info
Outpatient Department (OPD).. overview, introduction and more info
 
Ppt2
Ppt2Ppt2
Ppt2
 
Cancer Treatment In Dubai - International Modern Hospital
Cancer Treatment In Dubai - International Modern HospitalCancer Treatment In Dubai - International Modern Hospital
Cancer Treatment In Dubai - International Modern Hospital
 
Use of IT in the Hospitals
Use of IT in the HospitalsUse of IT in the Hospitals
Use of IT in the Hospitals
 
Presentation1
Presentation1Presentation1
Presentation1
 
Apollo
ApolloApollo
Apollo
 
Presentation1
Presentation1Presentation1
Presentation1
 
CharakMemorialhospitalServices.pptx
CharakMemorialhospitalServices.pptxCharakMemorialhospitalServices.pptx
CharakMemorialhospitalServices.pptx
 

More from Prince Pathania (10)

Documentation of Pragpur - Garli,Himachal Pradesh
Documentation of Pragpur - Garli,Himachal PradeshDocumentation of Pragpur - Garli,Himachal Pradesh
Documentation of Pragpur - Garli,Himachal Pradesh
 
Select city walk mall case study
Select city walk mall case studySelect city walk mall case study
Select city walk mall case study
 
Westend MALL
Westend MALLWestend MALL
Westend MALL
 
Shopping mall ppt
Shopping mall pptShopping mall ppt
Shopping mall ppt
 
Shoping mall ppt
Shoping mall pptShoping mall ppt
Shoping mall ppt
 
Case study trilium MALL AMRITSAR
Case study trilium MALL AMRITSARCase study trilium MALL AMRITSAR
Case study trilium MALL AMRITSAR
 
Case study a1westend
Case study a1westendCase study a1westend
Case study a1westend
 
Dashmesh academy
Dashmesh academyDashmesh academy
Dashmesh academy
 
PAUL RUDOLPH PHILOSOPHY
PAUL RUDOLPH PHILOSOPHY PAUL RUDOLPH PHILOSOPHY
PAUL RUDOLPH PHILOSOPHY
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 

Recently uploaded

Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
Avinash Rai
 

Recently uploaded (20)

PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
Industrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training ReportIndustrial Training Report- AKTU Industrial Training Report
Industrial Training Report- AKTU Industrial Training Report
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Open Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPointOpen Educational Resources Primer PowerPoint
Open Educational Resources Primer PowerPoint
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...The impact of social media on mental health and well-being has been a topic o...
The impact of social media on mental health and well-being has been a topic o...
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
size separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticssize separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceutics
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17How to Manage Notification Preferences in the Odoo 17
How to Manage Notification Preferences in the Odoo 17
 

FORTIS HOSPITAL NOIDA CASE STUDY WITH LIBRARY STUDY

  • 1. FORTIS HOSPITAL , NOIDA, U.P. CASE STUDY Submitted by Aditi Miglani 207 Sudhanshu 268 Tarundeep 276
  • 2. FORTIS HOSPITAL , NOIDA, U.P. INTRODUCTION Fortis Hospital Noida is located near Delhi and is a Centre of Excellence for Orthopaedics and Neurosciences with a focus on Cardiac Sciences, Minimally Invasive Surgeriesand Oncology. Departmentsand specialty centers Cardiac Surgery Cardiology Dermatology Dialysis ENT Gastroenterology GeneralSurgery Imaging Nephrology Neurology Neurosurgery Ob-Gyn Oncology Orthopedics Pediatrics Rehabilitation Stem Cell Therapy Urology Numberof doctors: 150 Numberof beds: 177 Yearestablished: 2004 Facilities Private Rooms Cafeteria/restaurant Phone inrooms Internetconnection Bank/ATM Money exchange Pharmacy
  • 3. Ahluwalia Contracts (India) Limited (ISO 9001:2000 Company) Engineering ¨ Designing ¨ Construction Head Office : A-177, Okhla Indl Area, Ph-I, New Delhi – 110 020 Tel : 91-011-49410574, Fax : 91-011-49410553 ARCHITECT AND CONTRACTOR.
  • 4. FORTISHOSPITALISLOCATEDAT SEC -62,NOIDA( UP) ITLIESOPPOSITE SEC -63INDUSTRIALAREA. SITE AREA : 7 ACRES GR. COVERAGE :35% BUILDING HT. :24MTS. GEN.& VISITORS :50/day FORTIS HOSPITAL , NOIDA, U.P. LOCATION
  • 5. 36.2KMS., 50 MINS DRIVE 17.2KMS, 30MIN FORTIS METROSTATIONNEARTHESITE SITE FROM INDIRAGANDHI INTERNATIONALAIRPORT FROM NIZAMUDDINRAILWAYSTATION APPROACH.
  • 8.  THESURROUNDINGSCOMPRISETHE RESIDENTIALAREAOF SECTOR62AND ALSOTHEINDUSTRIALAREAOF SECTOR 63 WHICHLIESOPPOSITE IT.  THEHOSPITALHASBEEN DESIGNED KEEPINGINMINDTHEARCHITECTUREOF THESURROUNDINGBUILDINGSANDTHUS ITMERGESWELL WITHTHESITEANDTHE SURROUNDINGS. SURROUNDINGS
  • 9. WEST EAST SOUTH NORTHLIGHT TOOPD CONSULTATIONROOMS WARDSGETPROPER AIR CIRCULATIONANDAMPLE LIGHT DUETO DIAGONALPLACEMENT OF THEBLOCK WIND DIRECTION AND ORIENTATION
  • 10.  LONG CORRIDORCONNECTINGEMERGENCYWAITING ANDDIAGNOSTICWAITINGSEPARATESPUBLIC TRAFFICFROM HOSPITALTRAFFIC.  EMERGENCYWELL CONNECTEDWITHDIAGNOSTIC AREA.  GRIDUSED= 7.2 MX 7.2 M  ALL FLOOR WALL JUNCTIONSANDCORNERSARE ROUNDEDWITHEPOXY RAISINS. PROPER ZONINGOF PUBLIC LIFTLOBBY HELPS PUBLIC &HOSPITALFUNCTIONS. ZONING AND CIRCULATION
  • 11.  -CENTRALPATHOLOGY AND BLOOD BANK.  -PERIPHERAL AREAGIVENTOADMN ANDKITCHENTOENSUREPROPER VENTILATION.  -MORTUARYPLACED NEARTOTHE LOADING AREAFOR EASY HANDLING OFDEAD BODIES. CIRCULATION SERVICES UTILITY O.T. DIAGNOSIS CONSULTANT EMERGENCY BASEMENT FLOOR PLAN  ADJACENTLAWNLVL BROUGHT DOWN TOFACILITATELIGHT& VENTILATIONINTOTHEADM AREA. N
  • 12. GROUNDFLOORPLAN CIRCULATION SERVICES UTILITY O.T. DIAGNOSIS CONSULTANT EMERGENCY  OPD ANDIPD BLOCKS ARE CONNECTED TOGETHERVIA ATRIUM AT GROUND FLOOR.  30CONSULTATIONROOMS ON GROUNDFLOOR. SIZE 3.6 MX3.6MOR 3.6M X 5.0 M( wherecorridoris of less width).  ANAPPROPRIATECHANNELISATIONOF WAITINGAREA INO.P.D. BLOCK BY VIRTUALCOVEWAITING. N
  • 14.  ICU’SHAVINGTHEIRUTILITY AREAINTHECENTRECORE.  DUMB WAITERSHAVEBEEN PROVIDED FOR STERILESUPPLY FROM C.S.S.D.  SOUTHERNSIDE ONTHEICUFLOOR GIVENTO DOCTORSANDRELATEDSUPPORT AREAS.  ALL REQUIREDSERVICESTOTHISHIGH STERILITY AREAIS CATEREDTO AT BASEMENT FLOOR.  -O.T. PLACEMENT IN SEPARATEBLOCK HELPS TOFILTERTHEPUBLIC TRAFFICOF ICUAWAY FROM THISHIGH STERILEAREA. CIRCULATION SERVICES UTILITY O.T. DIAGNOSIS CONSULTANT EMERGENCY SECONDFLOOR PLAN N
  • 15.  NO SPECIFIEDRECOVERYROOM. PATIENTSARESHIFTEDTOTHEIR RESPECTIVEWARDS.  ACENTRALIZEDNURSING STATION.  DIRTYUTILITYINLABOUR ROOM.  INTERNALCONNECTIONBETWEEN LABOURROOM TODELIVERYROOM ANDOPERATIONTHEATRE. CIRCULATION SERVICES UTILITY O.T. DIAGNOSIS CONSULTANT EMERGENCY THIRDFLOOR PLAN N
  • 16. FOURTHAND FIFTH FLOOR PLAN CIRCULATION SERVICES UTILITY O.T. DIAGNOSIS CONSULTANT EMERGENCY N
  • 17. SCHEMATIC SECTION 4000 4000 4000 4000 4000 4000 4000 BRIDGE WATER TREATMENT,GAS SUPPLY,STORES & LOCKERS,MORGUE,ELEC RM,AC RM,CSSD,LAUNDRY,KITCHEN,ADMN,PATH LAB,BLOOD BANK DIAGNOSTIC , EMERGENCY OPD, PHYSIOTHERAPY OPD CONSULTATION ROOMSDIAGNOSTIC GL ATRIUM, CAFE OPERATION THEATRESI.C.Us & DOCTORS’ ROOMS DELIVERY SUITES, PRIVATE & GENERAL WARDS, NURSE STATION WARDS WARDS
  • 18.  OPD CONSULTATIONROOMSRECEIVE NORTHLIGHT.  DEPARTMENTS: EYE, GYNAECOLOGY,ENT, INTERNALMEDICINE,PAEDSTRIC, PSYCHIATRYETC.  CAFÉIN THEATRIUMISEASILY ACCESSIBLEFROM WAITINGAREAS  A MINIDIAGNOSTICAREA(PHYSIOTHERAPY) PROVIDED INOPD  OPD BLOCK IS 3STOREYED HIGH  3 STAIRCASESAND2 LIFTSHAVE BEEN PROVIDEDINTHISBLOCK OUT PATIENT DEPARTMENT O.P.D. BEING A DAY CARE BLOCK SEPERATED FROM THE I.P.D. BLOCK N
  • 19.  -PATIENTLIFTPLACEMENT CLOSE TOCASUALTYEASESITS CIRCULATIONTOO.T.  -CORRIDORRECEIVINGDIRECTSUNLIGHT REDUCESTHEEFFECTOF LONG DARK CORRIDOR.  WIDTHOF CORRIDOR = 2400MM ASPER STANDARDS= 2250 MM DIAGNOSTIC BLOCK N
  • 20. O. T COMPLEX  -O.T. PLACEMENT IN SEPARATEBLOCK HELPS TOFILTERTHEPUBLIC TRAFFICOF ICUAWAY FROM THISHIGH STERILEAREA.  DUMB WAITERSHAVEBEEN PROVIDED FOR STERILESUPPLY FROM C.S.S.D.
  • 22. FORTIS FLOORING WALL FINISHES CEILING ENTRANCE LOBBY NON GLAZED NON SLIPPERY CERAMIC TILES PLASTIC EMULSION PAINT UPTO 3’6” &CREAM COLORED PAINT ABOVE GYPSUM BOARD FALSE CEILING OPD WAITING MARBLE CHIP WHITE MOSAIC PLASTIC EMULSION PAINT UPTO 3’-6” &CREAM COLOURED ABOVE CREAM COLOURED CEILING MATERIAL
  • 23. CHANGING ROOMS FLOORING WALL FINISHES CEILING WHITE MARBLE CHIPS IN WHITE CEMENT MOSAIC FLOORING PLASTIC EMULSION PAINT UPTO 5 FT. AND CREAM COLOURED PAINT ABOVE GYPSUM BOARD FALSE CEILING CEMENT CONCRETE WHITE PAINTED WALLS KOTA STONE WHITE PAINTED WALLS GYPSUM BOARD FALSE CEILINGS GLAZED CERAMIC TILES GYPSUM BOARD FALSE CEILINGS FLOORS REST OF FLOORS CORRIDORS BASEMENT FLR O.T. FINISHES
  • 24. STRUCTURE - TRIANGULAR PERGOLA BALANCES AND VISUALLYCONNECTS2 BLOCKS.  RED BANDS HAVEBEEN PROVIDEDON THEEXTERIOR INMINIMUMQUANTITYIN CONTRASTTOTHEWHITE EXTERIORFINISH.THISCONCEPT ISCALLED MINIMALISM ( generally used with red &white colour combination) -TO AVOIDMONOTONYOF COLOUR ANDFOR EASY VISIBILITYFROM ANY AIRPLANE.
  • 25. INFERENCE  THEI.P.D.BLOCK INA DIAGONAL PLACEMENT RELIEVES THE HEAVY MASS OF BUILDINGANDSETUP INTOCONEOF VISION.  RED BANDS HAVEBEEN PROVIDEDON THEEXTERIOR INMINIMUMQUANTITYINCONTRASTTO THEWHITE EXTERIORFINISH.THISCONCEPT ISCALLED MINIMALISM ( generally used with red &white colour combination) -TOAVOID MONOTONYOF COLOUR ANDFOR EASY VISIBILITYFROM ANY AIRPLANE.  BUILDINGFINISHES AREKEPT LIGHT IN COLOUR TO DECREASETHE VISUAL DENSITYOF HEAVY MASS.  WALL EDGESAND CORNERSROUNDEDWITH EPOXY RESINS. MERITS:  O.P.D. BEING A DAY CAREBLOCK SEPERATEDFROM THEI.P.D. BLOCK
  • 26.  TO AVOIDEXCESSIVE HEAT PENETRATIONINTOTHE ATRIUMALTERNATETRANSPARENTAND TRANSLUSCENTPOLYCARBONATESHEETS HAVE BEEN USED  BUILDINGPLANNEDALONG CENTRALATRIUMAXIS
  • 27. WATER SUP PLY SOURCE NOIDA MAIN SUPPLY & BORE WELL ELECTRICAL SOURCES SUB ST. SEC. 62 OF 11000 KVA
  • 28. DEMERITS:  NO SPECIFIEDRECOVERY ROOMS. PATIENTSAREDIRECTLYSHIFTED TO THEWARDSAFTEROPERATION.  TOOMANY ENTRIESTOTHE SITECREATECLASH POINTS FOR TRAFFICMOVEMENT.  NO UNLOADING AREA FOR KITCHENANDTHUS EMERGENCY TRAFFIC ISAFFECTED.  AREA UNDERROADSIS35%OF THETOTALAREA: WHICHISMORE THANREQUIRED.