INSPECTION OF WORKING
AREA & TOOL
PREPARATION OF
WORKING AREA & TOOL
START
PIC CHECK AND BRIEFING
BEFORE ERECTION
FINISH
INSPECTION OF PLATFORM
INSTALL PLATFORM
(SCAFFOLDING + STAIR + ASIBA)
CHECK RESULT OF
UNINSTALL ROOF CANOPY
CHECK
NO
YES
CHECK
YES
CHECK
NO
CHECK
NO
YES
YES
NO
START WORKING
UNISTALL PLATFORM
CHECK
NO
YES
START
UNLOADING
MATERIAL
FINISH
WORK ROAD
ERECTION COLUMN
INSTALL BONDECK
INSTALL STAIR
PREPARATION
ERECTION AND INSTALL
STEEL MEMBER
INSTALL RAFTER
TOUCH UP PAINT
GROUTING BASE
PLATE
INSTALL FLOOR MEMBER INSTALL WIREMESH
INSTALL STEEL
GRATING
INSTALL ROOF & WALL
MEMBER
FINISHING
INSTALL ROOF INSTALL WALL
INSTALL FLASHING
AND RWDP
START
UNLOADING
MATERIAL
FINISH
WORK ROAD
ERECTION COLUMN
INSTALL BONDECK
INSTALL STAIR
PREPARATION
ERECTION AND INSTALL
STEEL MEMBER
INSTALL RAFTER
TOUCH UP PAINT
GROUTING BASE
PLATE
INSTALL FLOOR MEMBER INSTALL WIREMESH
INSTALL STEEL
GRATING
INSTALL ROOF & WALL
MEMBER
FINISHING
INSTALL ROOF INSTALL WALL
INSTALL FLASHING
AND RWDP
HEAVIEST CRANE
MOVE TO WORKING
ROAD
START
CHECK
MOVE TEST, JACKING
TEST, LOAD TEST
NO
FINISH
STACKING
STEEL PLATES AT
WORKING ROAD
LEVELING AND
COMPACTION
WORKING ROAD
CHECK
YES
NO
READY TO STEEL
ERECTION
YES
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
LIFTING
NO
FINISH
POSITIONING CRANE
AND SUPPLY TRUCK
PREPARATION
LANDING, JACKING,
AND LAYDOWN AREA
CHECK
YES
NO
READY TO UNLOADING
PROCESS
YES
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
ERECTION
NO
FINISH
PREPARATION OF
WORKING TOOLS
POSITIONING CRANE
AND STEEL MEMBERS
CHECK
YES
NO INSTALL COLUMN AND
TEMPORARY
ANCHORAGE ROPE
YES
INSTALL RAFTER AND
STRUT BEAM
CHECK
VERTICALITY
NO
INSTALL BRACING AND
SETTING
YES
CHECK
BOLT TIGHTENING
NO
YES
CHECK
NO
YES
GROUT BASE PLATE
INSTALL STAIR
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
ERECTION
NO
FINISH
PREPARATION OF
WORKING TOOLS
POSITIONING CRANE
AND STEEL MEMBERS
CHECK
YES
NO
INSTALL SCAFFOLDING
AND TEMPORARY
ANCHORAGE ROPE
YES
INSTALL RAFTER AND
STRUT BEAM
CHECK
VERTICALITY
NO
INSTALL BRACING AND
SETTING
YES
CHECK
BOLT TIGHTENING
NO
YES
CHECK
NO
YES
GROUT BASE PLATE
INSTALL STAIR
INSTALL COLUMN
UNINSTALL
SCAFFOLDING
CHECK
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
ERECTION
NO
FINISH
PREPARATION OF
WORKING TOOLS
POSITIONING CRANE
AND STEEL MEMBERS
CHECK
YES
NO INSTALL COLUMN AND
TEMPORARY
ANCHORAGE ROPE
YES
INSTALL RAFTER AND
STRUT BEAM
CHECK
VERTICALITY
NO
INSTALL BRACING AND
SETTING
YES
CHECK
BOLT TIGHTENING
NO
YES
CHECK
NO
GROUT BASE PLATE
INSTALL STAIR
BOLT TIGHTENING
CHECK
NO
YES
YES
INSTALL RAILING AND
OTHER MEMBERS
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
ERECTION
NO
FINISH
PREPARATION OF
WORKING TOOLS
POSITIONING CRANE
AND BONDECK
MATERIAL
CHECK
YES
NO
LIFTING BONDECK
YES
INSTALL BONDECK
AND SHEAR
CONNECTOR
CHECK
TOUCH UP PAINT
NO
LIFTING AND INSTALL
WIREMESH
YES
CHECK
INSTALL END STOP
FORMWORK
NO
YES
CHECK
NO
YES
NEXT STEP (MS
POURING)
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
ERECTION
NO
FINISH
PREPARATION OF
WORKING TOOLS
POSITIONING CRANE
AND BONDECK
MATERIAL
CHECK
YES
NO LIFTING BONDECK
YES
INSTALL BONDECK
AND SHEAR
CONNECTOR
CHECK
TOUCH UP PAINT
NO
LIFTING AND INSTALL
WIREMESH
YES
CHECK
INSTALL END STOP
FORMWORK
NO
YES
CHECK
NO
YES
NEXT STEP (MS
POURING)
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
LIFTING
NO
FINISH
INSTALL PURLIN AND
GIRT ROOF AND WALL
POSITIONING CRANE
AND MATERIAL ROOF
AND WALL
CHECK
YES
NO
YES
CHECK
INSTALL GUTTER
NO
INSTALL ROOFING AND
WALLING
YES
CHECK
INSTALL FLASING AND
RWDP
NO
YES
CHECK
NO
YES
INSTALL BARRICADE
AND PROTECT LIFTING
AREA (LINE OF FIRE)
START
CHECK
PIC CHECK AND
BRIEFING BEFORE
LIFTING
NO
FINISH
INSTALL PURLIN AND
GIRT ROOF AND WALL
POSITIONING CRANE
AND MATERIAL ROOF
AND WALL
CHECK
YES
NO
YES
CHECK
INSTALL GUTTER
NO
INSTALL ROOFING AND
WALLING
YES
CHECK
INSTALL FLASING AND
RWDP
NO
YES
CHECK
NO
YES
GROUTING BASE
PLATE
HEAVIEST CRANE
MOVE TO WORKING
ROAD
START
CHECK
MOVE TEST, JACKING
TEST, LOAD TEST
NO
FINISH
TECHNICAL QUERY
FIND VARIATION
CHECK
YES
NO
READY TO STEEL
ERECTION
YES
TENDER
DOC.
IFT VS IFC
NEW ITEM
COSTED

Flowchart Steel Structure Flowchart Steel Structure .pptx

  • 1.
    INSPECTION OF WORKING AREA& TOOL PREPARATION OF WORKING AREA & TOOL START PIC CHECK AND BRIEFING BEFORE ERECTION FINISH INSPECTION OF PLATFORM INSTALL PLATFORM (SCAFFOLDING + STAIR + ASIBA) CHECK RESULT OF UNINSTALL ROOF CANOPY CHECK NO YES CHECK YES CHECK NO CHECK NO YES YES NO START WORKING UNISTALL PLATFORM CHECK NO YES
  • 2.
    START UNLOADING MATERIAL FINISH WORK ROAD ERECTION COLUMN INSTALLBONDECK INSTALL STAIR PREPARATION ERECTION AND INSTALL STEEL MEMBER INSTALL RAFTER TOUCH UP PAINT GROUTING BASE PLATE INSTALL FLOOR MEMBER INSTALL WIREMESH INSTALL STEEL GRATING INSTALL ROOF & WALL MEMBER FINISHING INSTALL ROOF INSTALL WALL INSTALL FLASHING AND RWDP
  • 3.
    START UNLOADING MATERIAL FINISH WORK ROAD ERECTION COLUMN INSTALLBONDECK INSTALL STAIR PREPARATION ERECTION AND INSTALL STEEL MEMBER INSTALL RAFTER TOUCH UP PAINT GROUTING BASE PLATE INSTALL FLOOR MEMBER INSTALL WIREMESH INSTALL STEEL GRATING INSTALL ROOF & WALL MEMBER FINISHING INSTALL ROOF INSTALL WALL INSTALL FLASHING AND RWDP
  • 4.
    HEAVIEST CRANE MOVE TOWORKING ROAD START CHECK MOVE TEST, JACKING TEST, LOAD TEST NO FINISH STACKING STEEL PLATES AT WORKING ROAD LEVELING AND COMPACTION WORKING ROAD CHECK YES NO READY TO STEEL ERECTION YES
  • 5.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE LIFTING NO FINISH POSITIONING CRANE AND SUPPLY TRUCK PREPARATION LANDING, JACKING, AND LAYDOWN AREA CHECK YES NO READY TO UNLOADING PROCESS YES
  • 6.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE ERECTION NO FINISH PREPARATION OF WORKING TOOLS POSITIONING CRANE AND STEEL MEMBERS CHECK YES NO INSTALL COLUMN AND TEMPORARY ANCHORAGE ROPE YES INSTALL RAFTER AND STRUT BEAM CHECK VERTICALITY NO INSTALL BRACING AND SETTING YES CHECK BOLT TIGHTENING NO YES CHECK NO YES GROUT BASE PLATE INSTALL STAIR
  • 7.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE ERECTION NO FINISH PREPARATION OF WORKING TOOLS POSITIONING CRANE AND STEEL MEMBERS CHECK YES NO INSTALL SCAFFOLDING AND TEMPORARY ANCHORAGE ROPE YES INSTALL RAFTER AND STRUT BEAM CHECK VERTICALITY NO INSTALL BRACING AND SETTING YES CHECK BOLT TIGHTENING NO YES CHECK NO YES GROUT BASE PLATE INSTALL STAIR INSTALL COLUMN UNINSTALL SCAFFOLDING CHECK
  • 8.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE ERECTION NO FINISH PREPARATION OF WORKING TOOLS POSITIONING CRANE AND STEEL MEMBERS CHECK YES NO INSTALL COLUMN AND TEMPORARY ANCHORAGE ROPE YES INSTALL RAFTER AND STRUT BEAM CHECK VERTICALITY NO INSTALL BRACING AND SETTING YES CHECK BOLT TIGHTENING NO YES CHECK NO GROUT BASE PLATE INSTALL STAIR BOLT TIGHTENING CHECK NO YES YES INSTALL RAILING AND OTHER MEMBERS
  • 9.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE ERECTION NO FINISH PREPARATION OF WORKING TOOLS POSITIONING CRANE AND BONDECK MATERIAL CHECK YES NO LIFTING BONDECK YES INSTALL BONDECK AND SHEAR CONNECTOR CHECK TOUCH UP PAINT NO LIFTING AND INSTALL WIREMESH YES CHECK INSTALL END STOP FORMWORK NO YES CHECK NO YES NEXT STEP (MS POURING)
  • 10.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE ERECTION NO FINISH PREPARATION OF WORKING TOOLS POSITIONING CRANE AND BONDECK MATERIAL CHECK YES NO LIFTING BONDECK YES INSTALL BONDECK AND SHEAR CONNECTOR CHECK TOUCH UP PAINT NO LIFTING AND INSTALL WIREMESH YES CHECK INSTALL END STOP FORMWORK NO YES CHECK NO YES NEXT STEP (MS POURING)
  • 11.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE LIFTING NO FINISH INSTALL PURLIN AND GIRT ROOF AND WALL POSITIONING CRANE AND MATERIAL ROOF AND WALL CHECK YES NO YES CHECK INSTALL GUTTER NO INSTALL ROOFING AND WALLING YES CHECK INSTALL FLASING AND RWDP NO YES CHECK NO YES
  • 12.
    INSTALL BARRICADE AND PROTECTLIFTING AREA (LINE OF FIRE) START CHECK PIC CHECK AND BRIEFING BEFORE LIFTING NO FINISH INSTALL PURLIN AND GIRT ROOF AND WALL POSITIONING CRANE AND MATERIAL ROOF AND WALL CHECK YES NO YES CHECK INSTALL GUTTER NO INSTALL ROOFING AND WALLING YES CHECK INSTALL FLASING AND RWDP NO YES CHECK NO YES GROUTING BASE PLATE
  • 13.
    HEAVIEST CRANE MOVE TOWORKING ROAD START CHECK MOVE TEST, JACKING TEST, LOAD TEST NO FINISH TECHNICAL QUERY FIND VARIATION CHECK YES NO READY TO STEEL ERECTION YES TENDER DOC. IFT VS IFC NEW ITEM COSTED