Project Profile

Research Laboratory
Washington DC area

Research lab uses advanced technology to
reduce energy use and carbon footprint
On the campus of a not-for-profit research laboratory outside Washington, engineers,
physicists and mathematicians have been solving some of the nation’s most critical
challenges for more than 70 years. The research facility organized in 1942 shortly after
the U.S. entered World War II, and today is engaged in more than 600 programs designed
to “enhance national security through science and technology” for the U.S. government.
The laboratory is also committed to improving its sustainability efforts across the sprawling
campus, including a goal to reduce CO2 emissions by 5,700 metric tons. In 2011, as facility
managers began to explore ways to achieve the goal, their Johnson Controls team long-time partners at the facility - suggested they focus on improving efficiency within
their HVAC system through an approach called Central Plant Optimization.

Create and sustain energy savings with Central Plant Optimization
In most buildings, HVAC systems consume a great deal of energy. And among the various
HVAC systems such as airside, chillers and boilers, the chiller plant uses the most energy.
Central Plant Optimization is a process designed to achieve persistent, peak performance
of the plant.
Johnson Controls Central Plant Optimization™ 30 (CPO 30) is a holistic strategy
that considers everything from infrastructure design and component selection to
measurement, verification and maintenance of the central plant. Backed by patented
software algorithms, the whole-system approach to optimization helps customers reach
the highest potential in plant efficiency and can deliver sustained energy savings of up to
60 percent.
At the laboratory, Johnson Controls — in collaboration with its partner
Optimum Energy — conducted a detailed engineering simulation and analysis
which showed that by optimizing the central plant, facility managers could
achieve greater operating efficiency, substantial energy savings and a significantly
lower carbon footprint.
“Securing the utility rebates was an
arduous process. We might have
given up, but our Johnson Controls
team stuck with it and got us the
funding we needed to pursue this
important project.”
Facility Manager
Research Laboratory

The plan focused on one of the 20 buildings on campus and called for the
addition of variable speed drives on two chillers, two chilled water pumps,
one glycol pump, two condenser water pumps and the implementation of
CPO 30, powered by Optimum Energy.
By implementing the plan in its totality, the analysis showed facility managers
could expect to achieve:
•	 Increased central plant efficiency: Efficiency is expected to improve by 34.8%.
•	 Energy savings: Savings are estimated at 1,549,000 kWh annually.
•	 Reduced carbon footprint: The project will yield a reduction of 1,068 metric
tons of CO2 each year, nearly 20% of the campus’ total reduction goal.
•	 Financial savings: The combined efforts will result in cost savings of
$140,000 annually.

Research Laboratory Central
Plant Optimization™ 30 Project

The anticipated savings were so significant, facility managers and their Johnson
Controls team asked the local utility to consider awarding a custom rebate to help
offset the cost of implementation — the first time the utility had been presented
with such an ambitious request. But because the team was armed with detailed,
measurable expectations provided by the optimization software, Johnson Controls
committed to helping the utility understand how the research facility would
benefit from the implementation of CPO 30.

Initial Capital
Investment

$771,664

The good news came five months later.

Utility Rebates
and Incentives

$407,248

An added incentive: Rebates cut investment payback
time in half

Annual
Operations
Cost Reduction

$140,769

The local utility agreed to award the laboratory with rebates and incentives
totaling more than $400,000, cutting the investment and payback time in half
and making it possible for facility managers to move forward with the project.

Simple Payback
on Investment

2.59 years

To date, the Central Plant Optimization project is on target to achieve its savings
goals. And with its web-based measurement, verification and management
capabilities, CPO 30 will help the research laboratory continuously maintain
and optimize the performance of its HVAC system into the future, ensuring that
energy reductions persist year-after-year.

Printed on recycled paper.
Johnson Controls and the Johnson Controls logo are registered trademarks and Central Plant Optimization™ is
a trademark of Johnson Controls, Inc., or its affiliates, in the United States of America and/or other countries.
©2014 Johnson Controls, Inc.    P.O. Box 423, Milwaukee, WI 53201    Printed in USA    CSST-14-272
www.johnsoncontrols.com

More Related Content

What's hot

Snyders Lance CS LOW RES
Snyders Lance CS LOW RESSnyders Lance CS LOW RES
Snyders Lance CS LOW RESShane Acernese
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon
 
September 2011 - Michigan Energy Forum - David Yanochko
September 2011 - Michigan Energy Forum - David YanochkoSeptember 2011 - Michigan Energy Forum - David Yanochko
September 2011 - Michigan Energy Forum - David YanochkoAnnArborSPARK
 
Demand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves CostDemand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves CostMcKenney's Inc
 
A LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTS
A LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTSA LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTS
A LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTSBeth Miller
 
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...IoEnergy, Inc.
 
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDana Ray Nilsson (Swalla)
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintMcKenney's Inc
 
Updates on implementation of ISO 50001
Updates on implementation of ISO 50001Updates on implementation of ISO 50001
Updates on implementation of ISO 50001nooone
 
New technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsNew technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsProcess Ecology Inc
 
On demand boiler system fujifilm hunt chemicals
On demand boiler system   fujifilm hunt chemicalsOn demand boiler system   fujifilm hunt chemicals
On demand boiler system fujifilm hunt chemicalsTNenergy
 
Fast Track to Energy Savings
Fast Track to Energy SavingsFast Track to Energy Savings
Fast Track to Energy SavingsMcKenney's Inc
 
BB steamload Poster
BB steamload PosterBB steamload Poster
BB steamload PosterZhou Cao
 
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...Craig Heal
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid ResilienceAdvisian
 
Analytika - Research University case study
Analytika - Research University case studyAnalytika - Research University case study
Analytika - Research University case studyCimetrics Inc
 

What's hot (19)

Snyders Lance CS LOW RES
Snyders Lance CS LOW RESSnyders Lance CS LOW RES
Snyders Lance CS LOW RES
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro Fertilizer
 
September 2011 - Michigan Energy Forum - David Yanochko
September 2011 - Michigan Energy Forum - David YanochkoSeptember 2011 - Michigan Energy Forum - David Yanochko
September 2011 - Michigan Energy Forum - David Yanochko
 
Demand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves CostDemand Control Ventilation Reduces HVAC Load, Saves Cost
Demand Control Ventilation Reduces HVAC Load, Saves Cost
 
Berg canlan case study (1)
Berg canlan case study (1)Berg canlan case study (1)
Berg canlan case study (1)
 
A LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTS
A LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTSA LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTS
A LARGE UK-BASED WATER UTILITY SWITCHED TO RESULTS
 
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
Upgrade at Georgia Pacific’s Mt. Olive Production Facility Corrects Lighting ...
 
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_versionDoE_Final_Report_H2_Electrolyzer_PUBLIC_version
DoE_Final_Report_H2_Electrolyzer_PUBLIC_version
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
 
Updates on implementation of ISO 50001
Updates on implementation of ISO 50001Updates on implementation of ISO 50001
Updates on implementation of ISO 50001
 
New technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sandsNew technology evaluation for SAGD facilities in oil sands
New technology evaluation for SAGD facilities in oil sands
 
On demand boiler system fujifilm hunt chemicals
On demand boiler system   fujifilm hunt chemicalsOn demand boiler system   fujifilm hunt chemicals
On demand boiler system fujifilm hunt chemicals
 
Fast Track to Energy Savings
Fast Track to Energy SavingsFast Track to Energy Savings
Fast Track to Energy Savings
 
Official Final Poster
Official Final PosterOfficial Final Poster
Official Final Poster
 
BB steamload Poster
BB steamload PosterBB steamload Poster
BB steamload Poster
 
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
FLC Pool Heating Project Powerpoint City of Fremantle 24092014 post CEEP comm...
 
Boiler optimization journey
Boiler optimization journeyBoiler optimization journey
Boiler optimization journey
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid Resilience
 
Analytika - Research University case study
Analytika - Research University case studyAnalytika - Research University case study
Analytika - Research University case study
 

Similar to Case Study: Johnson Controls and Optimum Energy

Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
Targeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalTargeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalBetterBricks
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnercare Inc.
 
7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case study7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case studyKristina Klimovich
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Hayley Pallister
 
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaThe Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaDicky Edwin Hindarto
 
SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16Ezra Nielsen
 
Ispe the energy saving in the pharmaceutical industry
Ispe   the energy saving in the pharmaceutical industryIspe   the energy saving in the pharmaceutical industry
Ispe the energy saving in the pharmaceutical industryMarcello Pasquazzo
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014GWT
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityDiana Nash
 
Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15Garrick AUGUSTUS
 
Jisc con optimisation, improved sustainability across the estate through us...
Jisc   con optimisation, improved sustainability across the estate through us...Jisc   con optimisation, improved sustainability across the estate through us...
Jisc con optimisation, improved sustainability across the estate through us...JISC's Green ICT Programme
 
Atlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - UkrainianAtlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - UkrainianCarter D. Johnson
 
Case studies in residual use and energy conservation in wastewater treatment ...
Case studies in residual use and energy conservation in wastewater treatment ...Case studies in residual use and energy conservation in wastewater treatment ...
Case studies in residual use and energy conservation in wastewater treatment ...yvonnie manera
 

Similar to Case Study: Johnson Controls and Optimum Energy (20)

Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Targeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance HospitalTargeting 100! Envisioning the High Performance Hospital
Targeting 100! Envisioning the High Performance Hospital
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case study7.16.2013 green financesf prologis case study
7.16.2013 green financesf prologis case study
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010
 
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesiaThe Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
The Joint Crediting Mechanism (JCM) MRV and methodology development in indonesia
 
SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16SLCC Annual Energy Report FY 15-16
SLCC Annual Energy Report FY 15-16
 
Ispe the energy saving in the pharmaceutical industry
Ispe   the energy saving in the pharmaceutical industryIspe   the energy saving in the pharmaceutical industry
Ispe the energy saving in the pharmaceutical industry
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
 
Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15Garricks-Updated Resume-VA15
Garricks-Updated Resume-VA15
 
Jisc con optimisation, improved sustainability across the estate through us...
Jisc   con optimisation, improved sustainability across the estate through us...Jisc   con optimisation, improved sustainability across the estate through us...
Jisc con optimisation, improved sustainability across the estate through us...
 
Presentation
PresentationPresentation
Presentation
 
Atlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - UkrainianAtlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - Ukrainian
 
Aggregate case study
Aggregate case studyAggregate case study
Aggregate case study
 
Case studies in residual use and energy conservation in wastewater treatment ...
Case studies in residual use and energy conservation in wastewater treatment ...Case studies in residual use and energy conservation in wastewater treatment ...
Case studies in residual use and energy conservation in wastewater treatment ...
 

Recently uploaded

Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Thierry Lestable
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsExpeed Software
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesThousandEyes
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityScyllaDB
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Julian Hyde
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Jeffrey Haguewood
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsPaul Groth
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...Elena Simperl
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...Product School
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1DianaGray10
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2DianaGray10
 
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCustom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCzechDreamin
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
 
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka DoktorováCzechDreamin
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeCzechDreamin
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaCzechDreamin
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoTAnalytics
 

Recently uploaded (20)

Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT Professionals
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2UiPath Test Automation using UiPath Test Suite series, part 2
UiPath Test Automation using UiPath Test Suite series, part 2
 
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCustom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara Laskowska
 
IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024IoT Analytics Company Presentation May 2024
IoT Analytics Company Presentation May 2024
 

Case Study: Johnson Controls and Optimum Energy

  • 1. Project Profile Research Laboratory Washington DC area Research lab uses advanced technology to reduce energy use and carbon footprint On the campus of a not-for-profit research laboratory outside Washington, engineers, physicists and mathematicians have been solving some of the nation’s most critical challenges for more than 70 years. The research facility organized in 1942 shortly after the U.S. entered World War II, and today is engaged in more than 600 programs designed to “enhance national security through science and technology” for the U.S. government. The laboratory is also committed to improving its sustainability efforts across the sprawling campus, including a goal to reduce CO2 emissions by 5,700 metric tons. In 2011, as facility managers began to explore ways to achieve the goal, their Johnson Controls team long-time partners at the facility - suggested they focus on improving efficiency within their HVAC system through an approach called Central Plant Optimization. Create and sustain energy savings with Central Plant Optimization In most buildings, HVAC systems consume a great deal of energy. And among the various HVAC systems such as airside, chillers and boilers, the chiller plant uses the most energy. Central Plant Optimization is a process designed to achieve persistent, peak performance of the plant. Johnson Controls Central Plant Optimization™ 30 (CPO 30) is a holistic strategy that considers everything from infrastructure design and component selection to measurement, verification and maintenance of the central plant. Backed by patented software algorithms, the whole-system approach to optimization helps customers reach the highest potential in plant efficiency and can deliver sustained energy savings of up to 60 percent.
  • 2. At the laboratory, Johnson Controls — in collaboration with its partner Optimum Energy — conducted a detailed engineering simulation and analysis which showed that by optimizing the central plant, facility managers could achieve greater operating efficiency, substantial energy savings and a significantly lower carbon footprint. “Securing the utility rebates was an arduous process. We might have given up, but our Johnson Controls team stuck with it and got us the funding we needed to pursue this important project.” Facility Manager Research Laboratory The plan focused on one of the 20 buildings on campus and called for the addition of variable speed drives on two chillers, two chilled water pumps, one glycol pump, two condenser water pumps and the implementation of CPO 30, powered by Optimum Energy. By implementing the plan in its totality, the analysis showed facility managers could expect to achieve: • Increased central plant efficiency: Efficiency is expected to improve by 34.8%. • Energy savings: Savings are estimated at 1,549,000 kWh annually. • Reduced carbon footprint: The project will yield a reduction of 1,068 metric tons of CO2 each year, nearly 20% of the campus’ total reduction goal. • Financial savings: The combined efforts will result in cost savings of $140,000 annually. Research Laboratory Central Plant Optimization™ 30 Project The anticipated savings were so significant, facility managers and their Johnson Controls team asked the local utility to consider awarding a custom rebate to help offset the cost of implementation — the first time the utility had been presented with such an ambitious request. But because the team was armed with detailed, measurable expectations provided by the optimization software, Johnson Controls committed to helping the utility understand how the research facility would benefit from the implementation of CPO 30. Initial Capital Investment $771,664 The good news came five months later. Utility Rebates and Incentives $407,248 An added incentive: Rebates cut investment payback time in half Annual Operations Cost Reduction $140,769 The local utility agreed to award the laboratory with rebates and incentives totaling more than $400,000, cutting the investment and payback time in half and making it possible for facility managers to move forward with the project. Simple Payback on Investment 2.59 years To date, the Central Plant Optimization project is on target to achieve its savings goals. And with its web-based measurement, verification and management capabilities, CPO 30 will help the research laboratory continuously maintain and optimize the performance of its HVAC system into the future, ensuring that energy reductions persist year-after-year. Printed on recycled paper. Johnson Controls and the Johnson Controls logo are registered trademarks and Central Plant Optimization™ is a trademark of Johnson Controls, Inc., or its affiliates, in the United States of America and/or other countries. ©2014 Johnson Controls, Inc.    P.O. Box 423, Milwaukee, WI 53201    Printed in USA    CSST-14-272 www.johnsoncontrols.com