The port of Antwerp owes its existence and success to its location on the Scheldt river, which allows large sea-going vessels to access the port. It is now the second largest port in Europe and among the top ports globally for container traffic. The port authority manages infrastructure like docks, cranes and dredgers across the left and right banks, and aims to maximize economic value for the city while strengthening competitive position through high-quality services and infrastructure development. Key facts highlighted include its central European location, excellent multi-modal transport connections, role in distribution and industry, and status as a major economic driver for Belgium.