Fal Telecommunications
CONNECTING WORLD
CONNECTING WORLD




Fal Telecommunications
 Telecom & IT System Integrators
CONNECTING WORLD




                    Solutions for Enterprises
Fal Telecom is a leading
•Qatari Telecommunication & Information Technology
provider and Systems Integrator,
• for Enterprises
•Public Administration entities
•For design, develop
•Manage flexible and innovative Telecom & IT solutions
•For efficiency of their business and citizen services
CONNECTING WORLD




Service portfolio
Fal Telecom offers a suite of services and solutions to design, deploy
and manage IT infrastructures and communication networks.
Installation services in:-
       • GSM Installations including DAS (IBS); LTE
       • FTTX – OSP – ISP & Migration
       • Microwave Installations
       • Data & Computer Networking
       • Switching & Transmission Systems
       • Telecom Power & UPS
CONNECTING WORLD



Chairman’s Vision & Statement
    At FALTEL, we follow a tradition of corporate excellence throughout our operations by
  emphasizing on performance and exceeding customer expectations through Quality,
  Flexibility and Right Approach.


         I am proud of the accomplishments made by our group in the last 10 years and

  the credit for this goes to our dedicated staff without which we would not    have   scaled
  such heights. We aim for further development and as we expand our            operations, we
  continue to stand firm against the challenges of the future by providing       unparalleled
  service to our customers.



                          Ahmed Mohammed A A Al Naimi

                                           Chairman
Fiber OpticWORLD
                 CONNECTING Systems




                   SOLUTIONS


Design, supply, installation and maintenance of………


      • Fiber Optic Cables

      • Fiber to the Building (FTTB)

      • Fiber to the home (FTTH)

      • Fiber in the Local Area Network .. LAN

      • Media Convertors

      • Fiber Transmission Networks
CONNECTING WORLD


                 FTTX
Preliminary Survey:
For Oman Fiber, KNETCO & Hayat
Communications
 Collection of data :-
      Electricity Number
      Water Number
      Q tel ID
      Number of connections etc
Areas done :-
           APC            NJC
           DFS            RYM
           KRG            KRR
           MKD            DME
           Wukair         AAT
           IHN            DNJ
           AMQ            KMN
CONNECTING WORLD



                  FTTX
Detailed Survey & Design
 MH / HH Details & Condition
    Duct occupation details
    Rope Availability
 DESIGN.
    DRAFT
    MANHOLE
    ODF
Areas done :-
           APC             NJC
           DFS             RYM
           KRG,            KRR
           MKD             AMQ
           Wukair          AAT
CONNECTING WORLD



                 FTTX
Cable Laying

Areas done :-
           APC          SGN
           RBY          KMN
           MKD          WBY
           KAE
           KRC
           MTS
           KRG
CONNECTING WORLD



                FTTX
ODF Termination, Closure installation, Splicing,
OTDR Testing & Documentation


Areas done :-
          APC
          MKD
          KRG
CONNECTING WORLD



             FTTX
Duct Blockage Clearance
  Areas done :-
       APC
       MKD
       KRG
CONNECTING WORLD

Installed Joint Closure
CONNECTING WORLD

Installed Joint Closure
CONNECTING WORLD

              DUCT BLOCK CLEARANCE
                                              Damagedduct
 Before excavation         After excavation
                                               (before cut)




                                              Damaged duct
After re-instatement       Repaired Duct
                                               (After cut)
CONNECTING WORLD

     ODF
CONNECTING WORLD




SPLICE TRAY ARRANGEMENT
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD




ATB & ONT INSTALLATION
CONNECTING WORLD
                       GSM

                  SOLUTIONS


• Site Acquisition and site survey

• GSM Base Station installation

• Indoor Building Solutions (IBS).. DAS

• Master Unit & Remote Unit Installation – Indoor Fiber

Connectivity

• GSM / Microwave Towers

• GSM Shelters

• Battery, Gensets and UPS

• Transmission Systems and FOC
CONNECTING WORLD




•Radio Network Design, Planning &
     Optimization On Turnkey /                                   Planning




                                         Design
     Consultancy basis
•In-building Coverage (DAS)                                      Design

Program Management                                                    Testing             A
• Manpower / Professional services


                                       Development
                                                                      Commissioning
• Turnkey implementation services                    Implementation   Integration         T
• Logistics & Vendor Management


                                                                  Optimization
•Onsite / Remote ..Tech Support
                                         O&M


• Network O&M
• Network Optimization                               Operation              Maintenance
• Network Benchmarking
CONNECTING WORLD




            RF NETWORKING
• RF Planning and Design
• Transmission Planning
• In-building Solutions (DAS)
• CW,RF and MW Surveys
• RF Drive / Walk Test and Optimization
• Network Audit
CONNECTING WORLD




       NETWORK IMPLEMENTATION

• BTS Site Implementation and Commissioning

• Switch Site Implementation
• OLT Equipment Installation and Commissioning

• Installation of Peripheral Equipments
• Network Integration, Testing and AT
• Operation and Maintenance of Cell Sites
CONNECTING WORLD

IBS Implementation

       ASPIRE TOWERS




      44 WEST BAY
CONNECTING WORLD

IBS Implementation

                           HOLIDAY VILLA




  W HOTEL
CONNECTING WORLD

IBS Implementation

              ASAS TOWERS




       MURGAB TOWERS
CONNECTING WORLD

IBS Implementation
                         CROWN PLAZA




    QTEL HQ 2 - LTE
CONNECTING WORLD

        IBS Implementation
      MAJOR RUNNING IBS INSTALLATIONS

•   NDIA – New Doha International Airport


    • Wakra Hospital


    • Gate Tower


     • World Trade Center
CONNECTING WORLD




New Doha International Airport
CONNECTING WORLD




                              Wakra Hospital




World Trade Center
CONNECTING WORLD




         •RU Installation Fiber Backbone
CONNECTING WORLD




Blown Fiber by Fal Telecom at Crown Plaza
CONNECTING WORLD



IT Service Areas:
We deliver IT services and technology solutions to companies and organizations of
all sizes that require true technical expertise to meet their goals. Our portfolio of
systems and services provide our customers with cost effective and resilient
business computing solutions with extended technical support from a single
provider. We provide a source of advice that you can trust. Our business
consultants understand your challenges and how effective IT and communications
can help to address them.


    •   IT Consulting Service
    •   Desktop, Web, Mobile Application Management
    •   IT Infrastructure Service
    •   Website and Social Application Management
    •   Outsourcing Service
    •   Software as a Service
    •   Security Service
CONNECTING WORLD




      ROPE – ERP APPLICATION
     RESOURCE OPTIMIZATION AND PERFOMANCE EVALUATION

ROPE’s objective is to facilitate the optimum deployment of resources in
enterprises and evaluate the performance of deployed resources, for
achieving maximum business results. Integrated Software, simplifies
operational functions, reduce overheads, improves efficiency and finally
helps you achieve a paperless organization ensuring 100% accountability for
man, material, money and the activities.

•   Human Capital Management
•   Financial Management
•   Procurement Management
•   Warehouse Management
•   Customer Relationship Management
•   Project Management
•   Fixed Asset Management
CONNECTING WORLD


      ERP Support Services for SAP / Oracle / Microsoft
• SAP ERP Consulting
• Oracle E-Business Suite Consulting
• Microsoft ERP Consulting
      Project Plan and Preparation
      Business Blue Print
      Realization Stage
      Design and Development
      Go Live and Support
      Annual Maintenance

• IT Resource Outsourcing
Many engineering organizations today seek both the flexibility to obtain human resources
as and when needed and the ability to "gear up" for projects that require specialized
application skills that are outside their 'primary" capability and/or focus area. FAL's staff
augmentation services can help you launch your projects quickly and mobilize faster with
the appropriate skill-sets and technical experience that accelerates the project initiation
phase and allows the core Project Management Board/Team to concentrate more on
establishing the correct execution approach for their critical project(s) which help a long
way in minimizing the delivery pressures, quality & safety concerns and more importantly,
the cost and time required for in-house training and skill development.
CONNECTING WORLD



          Mobile IT Services
•   Faltel IT division provides various mobile
    soultions for operators and enterprises

•   Mobile Media & Entertainment company
    focused on Value Added Services for Mobile
    Phone users

•   Deliver solutions to Enterprise customers
    through multiple Products and Service
CONNECTING WORLD




    Mobile Value Added Services
Net Work Solutions   Enterprise         m-VAS


SMSC                 M-Governance       Picture Posts
ZULO                 Fast Alerts        Mobshare
OBD                  BulkVoice          Mobile Content
IVR                  MovieOnline
USSD                 Blue Zone
Call Patching        M-CARP
CONNECTING WORLD
STRUCTURED CABLING SYSTEMS




                             Picture: Coutsey - Brandrex
CONNECTING WORLD
            STRUCTURED CABLING SYSTEMS

                          SOLUTIONS


Design, supply, installation and maintenance of

•   Data , Voice and Video Networks
•   Horizontal and vertical cables
•   Intra and inter building cables
•   Technical Support & Assistance
•   Cable Testing & Commissioning
•   Fault Location & Trouble Shooting
•   Certification of Cabling Installation
CONNECTING WORLD
       Switching Systems


            SOLUTIONS

Design, supply, installation and maintenance of………

       •     EPABX
       •     Interfacing systems and integration
       •     Local area Network Switches
       •     Main Distribution Frames
       •     Floor Distribution Boxes
       •     Connecting Network
       •     Power and backup arrangements
CONNECTING WORLD


Fal Telecom’s associates:

Fal Telecom has entered into strategic support arrangements
with the following – exclusively in the State of Qatar, with the
following companies – reputed in their field.
• QICK Telsol – Technical Manpower support from India in the
        field of GSM, RF Design and wireless networks
• ACME (India) – supply and installation of green field shelters for GSM
• Amitasha – supply of Telecom & Electrical towers
• XALTED Networks – Value added services in Telecom services
• AKR – Telecom civil works
• Security Zones – CCTV & BMS Management Services
CONNECTING WORLD


           CLIENTS LIST - REF
•    Qtel
 •   Qatar Petroleum
 •   Ministry of Defense
 •   NSN
 •   Motorola
 •   CXD
 •   Hayat Communications
 •   FCCI
 •   Oman Fiber
 •   KNETCO
 •   Shapoorji
•    Tadmur and many others
CONNECTING WORLD


Our Valuable Clients
CONNECTING WORLD


Our Valuable Clients
CONNECTING WORLD




CERTIFICATES
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD
CONNECTING WORLD

Structure Cabling - Supplier Support
CONNECTING WORLD




THANK YOU !



                    Fal Telecommunications W.L.L
                    P.O. BOX : 24271
                    8, Majed Tower, Al Hitmi Street,
                    Near Dar Ul Kutub,
                    Doha- Qatar.

                    Tel: (+974) 4451 2106
                    Fax: (+974) 4451 2107
                    E-mail : faltel@faltelecom.com
                    Web: www.faltelecom.com

Fal Telecom Qatar Profile

  • 1.
  • 2.
    CONNECTING WORLD Fal Telecommunications Telecom & IT System Integrators
  • 3.
    CONNECTING WORLD Solutions for Enterprises Fal Telecom is a leading •Qatari Telecommunication & Information Technology provider and Systems Integrator, • for Enterprises •Public Administration entities •For design, develop •Manage flexible and innovative Telecom & IT solutions •For efficiency of their business and citizen services
  • 4.
    CONNECTING WORLD Service portfolio FalTelecom offers a suite of services and solutions to design, deploy and manage IT infrastructures and communication networks. Installation services in:- • GSM Installations including DAS (IBS); LTE • FTTX – OSP – ISP & Migration • Microwave Installations • Data & Computer Networking • Switching & Transmission Systems • Telecom Power & UPS
  • 5.
    CONNECTING WORLD Chairman’s Vision& Statement At FALTEL, we follow a tradition of corporate excellence throughout our operations by emphasizing on performance and exceeding customer expectations through Quality, Flexibility and Right Approach. I am proud of the accomplishments made by our group in the last 10 years and the credit for this goes to our dedicated staff without which we would not have scaled such heights. We aim for further development and as we expand our operations, we continue to stand firm against the challenges of the future by providing unparalleled service to our customers. Ahmed Mohammed A A Al Naimi Chairman
  • 6.
    Fiber OpticWORLD CONNECTING Systems SOLUTIONS Design, supply, installation and maintenance of……… • Fiber Optic Cables • Fiber to the Building (FTTB) • Fiber to the home (FTTH) • Fiber in the Local Area Network .. LAN • Media Convertors • Fiber Transmission Networks
  • 7.
    CONNECTING WORLD FTTX Preliminary Survey: For Oman Fiber, KNETCO & Hayat Communications Collection of data :- Electricity Number Water Number Q tel ID Number of connections etc Areas done :- APC NJC DFS RYM KRG KRR MKD DME Wukair AAT IHN DNJ AMQ KMN
  • 8.
    CONNECTING WORLD FTTX Detailed Survey & Design MH / HH Details & Condition Duct occupation details Rope Availability DESIGN. DRAFT MANHOLE ODF Areas done :- APC NJC DFS RYM KRG, KRR MKD AMQ Wukair AAT
  • 9.
    CONNECTING WORLD FTTX Cable Laying Areas done :- APC SGN RBY KMN MKD WBY KAE KRC MTS KRG
  • 10.
    CONNECTING WORLD FTTX ODF Termination, Closure installation, Splicing, OTDR Testing & Documentation Areas done :- APC MKD KRG
  • 11.
    CONNECTING WORLD FTTX Duct Blockage Clearance Areas done :- APC MKD KRG
  • 12.
  • 13.
  • 14.
    CONNECTING WORLD DUCT BLOCK CLEARANCE Damagedduct Before excavation After excavation (before cut) Damaged duct After re-instatement Repaired Duct (After cut)
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
    CONNECTING WORLD ATB &ONT INSTALLATION
  • 20.
    CONNECTING WORLD GSM SOLUTIONS • Site Acquisition and site survey • GSM Base Station installation • Indoor Building Solutions (IBS).. DAS • Master Unit & Remote Unit Installation – Indoor Fiber Connectivity • GSM / Microwave Towers • GSM Shelters • Battery, Gensets and UPS • Transmission Systems and FOC
  • 21.
    CONNECTING WORLD •Radio NetworkDesign, Planning & Optimization On Turnkey / Planning Design Consultancy basis •In-building Coverage (DAS) Design Program Management Testing A • Manpower / Professional services Development Commissioning • Turnkey implementation services Implementation Integration T • Logistics & Vendor Management Optimization •Onsite / Remote ..Tech Support O&M • Network O&M • Network Optimization Operation Maintenance • Network Benchmarking
  • 22.
    CONNECTING WORLD RF NETWORKING • RF Planning and Design • Transmission Planning • In-building Solutions (DAS) • CW,RF and MW Surveys • RF Drive / Walk Test and Optimization • Network Audit
  • 23.
    CONNECTING WORLD NETWORK IMPLEMENTATION • BTS Site Implementation and Commissioning • Switch Site Implementation • OLT Equipment Installation and Commissioning • Installation of Peripheral Equipments • Network Integration, Testing and AT • Operation and Maintenance of Cell Sites
  • 24.
    CONNECTING WORLD IBS Implementation ASPIRE TOWERS 44 WEST BAY
  • 25.
  • 26.
    CONNECTING WORLD IBS Implementation ASAS TOWERS MURGAB TOWERS
  • 27.
    CONNECTING WORLD IBS Implementation CROWN PLAZA QTEL HQ 2 - LTE
  • 28.
    CONNECTING WORLD IBS Implementation MAJOR RUNNING IBS INSTALLATIONS • NDIA – New Doha International Airport • Wakra Hospital • Gate Tower • World Trade Center
  • 29.
    CONNECTING WORLD New DohaInternational Airport
  • 30.
    CONNECTING WORLD Wakra Hospital World Trade Center
  • 31.
    CONNECTING WORLD •RU Installation Fiber Backbone
  • 32.
    CONNECTING WORLD Blown Fiberby Fal Telecom at Crown Plaza
  • 33.
    CONNECTING WORLD IT ServiceAreas: We deliver IT services and technology solutions to companies and organizations of all sizes that require true technical expertise to meet their goals. Our portfolio of systems and services provide our customers with cost effective and resilient business computing solutions with extended technical support from a single provider. We provide a source of advice that you can trust. Our business consultants understand your challenges and how effective IT and communications can help to address them. • IT Consulting Service • Desktop, Web, Mobile Application Management • IT Infrastructure Service • Website and Social Application Management • Outsourcing Service • Software as a Service • Security Service
  • 34.
    CONNECTING WORLD ROPE – ERP APPLICATION RESOURCE OPTIMIZATION AND PERFOMANCE EVALUATION ROPE’s objective is to facilitate the optimum deployment of resources in enterprises and evaluate the performance of deployed resources, for achieving maximum business results. Integrated Software, simplifies operational functions, reduce overheads, improves efficiency and finally helps you achieve a paperless organization ensuring 100% accountability for man, material, money and the activities. • Human Capital Management • Financial Management • Procurement Management • Warehouse Management • Customer Relationship Management • Project Management • Fixed Asset Management
  • 35.
    CONNECTING WORLD ERP Support Services for SAP / Oracle / Microsoft • SAP ERP Consulting • Oracle E-Business Suite Consulting • Microsoft ERP Consulting  Project Plan and Preparation  Business Blue Print  Realization Stage  Design and Development  Go Live and Support  Annual Maintenance • IT Resource Outsourcing Many engineering organizations today seek both the flexibility to obtain human resources as and when needed and the ability to "gear up" for projects that require specialized application skills that are outside their 'primary" capability and/or focus area. FAL's staff augmentation services can help you launch your projects quickly and mobilize faster with the appropriate skill-sets and technical experience that accelerates the project initiation phase and allows the core Project Management Board/Team to concentrate more on establishing the correct execution approach for their critical project(s) which help a long way in minimizing the delivery pressures, quality & safety concerns and more importantly, the cost and time required for in-house training and skill development.
  • 36.
    CONNECTING WORLD Mobile IT Services • Faltel IT division provides various mobile soultions for operators and enterprises • Mobile Media & Entertainment company focused on Value Added Services for Mobile Phone users • Deliver solutions to Enterprise customers through multiple Products and Service
  • 37.
    CONNECTING WORLD Mobile Value Added Services Net Work Solutions Enterprise m-VAS SMSC M-Governance Picture Posts ZULO Fast Alerts Mobshare OBD BulkVoice Mobile Content IVR MovieOnline USSD Blue Zone Call Patching M-CARP
  • 38.
    CONNECTING WORLD STRUCTURED CABLINGSYSTEMS Picture: Coutsey - Brandrex
  • 39.
    CONNECTING WORLD STRUCTURED CABLING SYSTEMS SOLUTIONS Design, supply, installation and maintenance of • Data , Voice and Video Networks • Horizontal and vertical cables • Intra and inter building cables • Technical Support & Assistance • Cable Testing & Commissioning • Fault Location & Trouble Shooting • Certification of Cabling Installation
  • 40.
    CONNECTING WORLD Switching Systems SOLUTIONS Design, supply, installation and maintenance of……… • EPABX • Interfacing systems and integration • Local area Network Switches • Main Distribution Frames • Floor Distribution Boxes • Connecting Network • Power and backup arrangements
  • 41.
    CONNECTING WORLD Fal Telecom’sassociates: Fal Telecom has entered into strategic support arrangements with the following – exclusively in the State of Qatar, with the following companies – reputed in their field. • QICK Telsol – Technical Manpower support from India in the field of GSM, RF Design and wireless networks • ACME (India) – supply and installation of green field shelters for GSM • Amitasha – supply of Telecom & Electrical towers • XALTED Networks – Value added services in Telecom services • AKR – Telecom civil works • Security Zones – CCTV & BMS Management Services
  • 42.
    CONNECTING WORLD CLIENTS LIST - REF • Qtel • Qatar Petroleum • Ministry of Defense • NSN • Motorola • CXD • Hayat Communications • FCCI • Oman Fiber • KNETCO • Shapoorji • Tadmur and many others
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
    CONNECTING WORLD THANK YOU! Fal Telecommunications W.L.L P.O. BOX : 24271 8, Majed Tower, Al Hitmi Street, Near Dar Ul Kutub, Doha- Qatar. Tel: (+974) 4451 2106 Fax: (+974) 4451 2107 E-mail : faltel@faltelecom.com Web: www.faltelecom.com