STORAGE ROOM PLANNING
• Locate your storage rooms(s) between the receiving door and
the most important points of use
• Consider security, especially for meats and alcohol storage.
Put locks on the door and make these rooms visible from the
office!
• Select adjustable shelving:
– Chrome finish or wooden shelves are fine for dry storage rooms
• Provide adequate lighting, shielded in case of breakage
• Store all goods 6” off the floor at all times
• Consider high density shelving for large operations to save on
floor space
INTERNATIONAL
PLANNING WALK-IN REFRIGERATION
• Walk-in refrigeration consists of insulated panels
for the walls, floor and ceiling, and the refrigeration
system itself
• Air-cooled, top-mounted compressors will be less
expensive to buy but more expensive to operate
• Make sure your space has a chilled water loop
before selected a water cooled compressor
• If possible, plan for a depressed floor in any walk-
in refrigerators
• Share walls of walk-in refrigerators whenever
possible
• Also open walk-in freezers into refrigerators rather
than directly into your kitchen
INTERNATIONAL
PREPARATION AREA PLANNING
• Allow one 72” x 30” prep work area for each prep
employee
• Use space above and below the prep table surface for
storage of utensils and pans
– Drawers
– Open shelves
– Ceiling or wall mounted utensil racks
• Include table space on both sides of prep sinks to make
washing produce easier
• Don’t forget garbage cans and hand sinks!
INTERNATIONAL
PRODUCTION AREA PLANNING
• Consider your processes and staff use:
– How many people will be working on the line at the
same time?
– Will you be using an expeditor? Which side of the
service counter will they be working?
– Will servers do any plating or garnishing of apps or
desserts?
– Consider making the line capable of supporting prep
functions before service begins
INTERNATIONAL
PRODUCTION AREA PLANNING
Put batch cooking
equipment behind the à
la minute line, or at
either end of a single
line
The aisle between the line
and the service counter
should be 36”-42”
Combine all equipment so it
fits under a single ventilation
hood
Service counters
will need heat
lamps and plate
storage
The service wall
shown here is for all
your utilities and is
12” wide when you
have a double-sided
line like this one
Put the tallest pieces of equipment at
either end of the cooking line
INTERNATIONAL
PRODUCTION AREA ISSUES
• Include point-of-use refrigeration for prepped items
(doors or drawers)
• Plan on assembly space for plating and garnishing
(consider built-in cutting boards on the service counter)
• Include space for mise-en-place at sauté or wok stations
• Plan on space for dumping fried items (typically to the
left of fryers)
• You’ll want a nearby source of water for filling pots and
maybe steam kettles as well as for cleaning
INTERNATIONAL
PRODUCTION AREA ISSUES
• Space for mise-en-place at saute or wok
stations
• Space for dumping fried items (typically to
the left of fryers)
• Source of water for filling pots and kettles
as well as cleaning
INTERNATIONAL
PRODUCTION AREA ISSUES
• For safety reasons:
– Fryers must be minimum
17” from an open flame
– Avoid positioning fryers
right next to high traffic
area
Too close!
INTERNATIONAL
WAREWASHING AREA PLANNING
• Always keep soiled areas separate from clean areas
• Keep wet areas together if possible
• Include scrapping holes on soiled dishtables (above
garbage cans)
• Include pre-rinse facilities on your soiled dishtable
• Add overshelves for glass racks to save space/speed
racking
INTERNATIONAL
WAREWASHING AREA PLANNING
• Provide at least 48” of clean dishtable space for
cooling racks after removal from dishwasher
• Provide adequate clean serviceware storage in
an area that will stay clean
• You will need either a 3-compartment sink or an
automated pot-washer
INTERNATIONAL
WAREWASHING AREA PLANNING
Make sure a hand sink is
conveniently located
Have some landing
space on the soiled and
clean ends of your pot
sink
The soiled dishtable
should be accessible by
service staff and dish
staff
A pre-rinse
sink and faucet
helps your
dishmachine
work more
effectively
Leave plenty of room for
racks to cool after exiting
the machine
Use wall space next to
and above clean areas
for storage
This is a warewash area for a large
restaurant (250+ seats!) You may not need
such a big machine but the planning
principles are the same for small
operations.
Everything should flow from soiled
areas to clean areas
INTERNATIONAL

More Related Content

Viewers also liked

selection and arrangement of kitchan muk
 selection and arrangement of kitchan  muk selection and arrangement of kitchan  muk
selection and arrangement of kitchan muk
munavar muk
 
DBE, DU MBA(BE) corporate presentation
DBE, DU MBA(BE) corporate presentationDBE, DU MBA(BE) corporate presentation
DBE, DU MBA(BE) corporate presentation
Gaurav Chandra
 
Tambaú docesemcalda
Tambaú docesemcaldaTambaú docesemcalda
Tambaú docesemcalda
cynthia rego
 
Secuencia 2 tf
Secuencia 2 tfSecuencia 2 tf
Secuencia 2 tf
jamechaves
 
Presentation1
Presentation1Presentation1
Presentation1epical
 
地図で見る横須賀ヒストリー
地図で見る横須賀ヒストリー地図で見る横須賀ヒストリー
地図で見る横須賀ヒストリー
Nobuyuki Kobayashi
 
Facility design 5
Facility design 5Facility design 5
Facility design 5
cathiprofitko
 
Facility Design 3a
Facility Design 3aFacility Design 3a
Facility Design 3a
cathiprofitko
 
Managing revenue 1
Managing revenue  1Managing revenue  1
Managing revenue 1
cathiprofitko
 
Medicinal tea
Medicinal teaMedicinal tea
Medicinal tea
anup dubey
 
Food needs and yields
Food needs and yieldsFood needs and yields
Food needs and yields
choppergirly
 
Facility design 1
Facility design   1Facility design   1
Facility design 1
cathiprofitko
 
Integrating The Skills
Integrating The SkillsIntegrating The Skills
Integrating The Skillsasuma
 
Managing revenue 2
Managing revenue  2Managing revenue  2
Managing revenue 2
cathiprofitko
 
CE 2016 syllabus
CE 2016 syllabusCE 2016 syllabus
CE 2016 syllabus
cathiprofitko
 
Facility design 4
Facility design 4Facility design 4
Facility design 4
cathiprofitko
 
Facility design 2
Facility design   2Facility design   2
Facility design 2
cathiprofitko
 

Viewers also liked (18)

selection and arrangement of kitchan muk
 selection and arrangement of kitchan  muk selection and arrangement of kitchan  muk
selection and arrangement of kitchan muk
 
Ahmed Abdel Hady C.V 2016
Ahmed Abdel Hady C.V 2016Ahmed Abdel Hady C.V 2016
Ahmed Abdel Hady C.V 2016
 
DBE, DU MBA(BE) corporate presentation
DBE, DU MBA(BE) corporate presentationDBE, DU MBA(BE) corporate presentation
DBE, DU MBA(BE) corporate presentation
 
Tambaú docesemcalda
Tambaú docesemcaldaTambaú docesemcalda
Tambaú docesemcalda
 
Secuencia 2 tf
Secuencia 2 tfSecuencia 2 tf
Secuencia 2 tf
 
Presentation1
Presentation1Presentation1
Presentation1
 
地図で見る横須賀ヒストリー
地図で見る横須賀ヒストリー地図で見る横須賀ヒストリー
地図で見る横須賀ヒストリー
 
Facility design 5
Facility design 5Facility design 5
Facility design 5
 
Facility Design 3a
Facility Design 3aFacility Design 3a
Facility Design 3a
 
Managing revenue 1
Managing revenue  1Managing revenue  1
Managing revenue 1
 
Medicinal tea
Medicinal teaMedicinal tea
Medicinal tea
 
Food needs and yields
Food needs and yieldsFood needs and yields
Food needs and yields
 
Facility design 1
Facility design   1Facility design   1
Facility design 1
 
Integrating The Skills
Integrating The SkillsIntegrating The Skills
Integrating The Skills
 
Managing revenue 2
Managing revenue  2Managing revenue  2
Managing revenue 2
 
CE 2016 syllabus
CE 2016 syllabusCE 2016 syllabus
CE 2016 syllabus
 
Facility design 4
Facility design 4Facility design 4
Facility design 4
 
Facility design 2
Facility design   2Facility design   2
Facility design 2
 

Similar to Facility design 3b

Usakitchen basic kitchen designings
Usakitchen basic kitchen designingsUsakitchen basic kitchen designings
Usakitchen basic kitchen designings
USA Kitchen
 
Catering Service Supplies and Equipment (1).pptx
Catering Service Supplies and Equipment (1).pptxCatering Service Supplies and Equipment (1).pptx
Catering Service Supplies and Equipment (1).pptx
MaLeedelosReyes2
 
Kitchen presentation
Kitchen presentationKitchen presentation
Kitchen presentation
Manish Khatri
 
Facility planning kitchen layout and planning
Facility planning   kitchen layout and planningFacility planning   kitchen layout and planning
Facility planning kitchen layout and planning
vikesh Kashyap
 
Kitchen methodology
Kitchen methodologyKitchen methodology
Kitchen methodology
khawaaja
 
Space Planning Of Kitchen
Space Planning Of KitchenSpace Planning Of Kitchen
Space Planning Of Kitchen
Andhra University
 
Chapter 6 HFOODSAFE
Chapter 6 HFOODSAFEChapter 6 HFOODSAFE
Chapter 6 HFOODSAFE
Mervyn Maico Aldana
 
Kitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PKitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space P
MerrileeDelvalle969
 
architectural service zones
architectural service zonesarchitectural service zones
architectural service zones
EsmiMusa
 
Kitchen layouts module 9 management of food preparation & service
Kitchen layouts  module 9 management of food preparation & serviceKitchen layouts  module 9 management of food preparation & service
Kitchen layouts module 9 management of food preparation & service
Maxine Walters-Pitt
 
Kitchen Working Drawing
Kitchen Working DrawingKitchen Working Drawing
Kitchen Working Drawing
Geeva Chandana
 
kitchen-200908101834.pdf
kitchen-200908101834.pdfkitchen-200908101834.pdf
kitchen-200908101834.pdf
MONISHANAGESWARAN
 
S4O5KitchenAppliancesCulinaryAndAdvanced.ppt
S4O5KitchenAppliancesCulinaryAndAdvanced.pptS4O5KitchenAppliancesCulinaryAndAdvanced.ppt
S4O5KitchenAppliancesCulinaryAndAdvanced.ppt
VISDOWNLOAD
 
Special features on kichen tools and equipment
Special features on kichen tools and equipmentSpecial features on kichen tools and equipment
Special features on kichen tools and equipment
Maxine Walters-Pitt
 
Designing a commercial kitchen
Designing a commercial kitchenDesigning a commercial kitchen
Designing a commercial kitchenPatrick Colley
 
Residential kitchen
Residential kitchenResidential kitchen
Residential kitchen
Azra Maliha
 
CATERING-SUPPLY.pptx
CATERING-SUPPLY.pptxCATERING-SUPPLY.pptx
CATERING-SUPPLY.pptx
DwayneAshleySilvenia
 
10 chapter ten
10 chapter ten10 chapter ten
10 chapter tencheffox
 
Mach-C - Solutions for Clean Eggs, Clean Trays and Clean Pallets
Mach-C - Solutions for Clean Eggs, Clean Trays and Clean PalletsMach-C - Solutions for Clean Eggs, Clean Trays and Clean Pallets
Mach-C - Solutions for Clean Eggs, Clean Trays and Clean Pallets
Michel Meuwszen
 
Kitchen & Bar Design Essentials
Kitchen & Bar Design EssentialsKitchen & Bar Design Essentials
Kitchen & Bar Design Essentials
Profitable Hospitality
 

Similar to Facility design 3b (20)

Usakitchen basic kitchen designings
Usakitchen basic kitchen designingsUsakitchen basic kitchen designings
Usakitchen basic kitchen designings
 
Catering Service Supplies and Equipment (1).pptx
Catering Service Supplies and Equipment (1).pptxCatering Service Supplies and Equipment (1).pptx
Catering Service Supplies and Equipment (1).pptx
 
Kitchen presentation
Kitchen presentationKitchen presentation
Kitchen presentation
 
Facility planning kitchen layout and planning
Facility planning   kitchen layout and planningFacility planning   kitchen layout and planning
Facility planning kitchen layout and planning
 
Kitchen methodology
Kitchen methodologyKitchen methodology
Kitchen methodology
 
Space Planning Of Kitchen
Space Planning Of KitchenSpace Planning Of Kitchen
Space Planning Of Kitchen
 
Chapter 6 HFOODSAFE
Chapter 6 HFOODSAFEChapter 6 HFOODSAFE
Chapter 6 HFOODSAFE
 
Kitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PKitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space P
 
architectural service zones
architectural service zonesarchitectural service zones
architectural service zones
 
Kitchen layouts module 9 management of food preparation & service
Kitchen layouts  module 9 management of food preparation & serviceKitchen layouts  module 9 management of food preparation & service
Kitchen layouts module 9 management of food preparation & service
 
Kitchen Working Drawing
Kitchen Working DrawingKitchen Working Drawing
Kitchen Working Drawing
 
kitchen-200908101834.pdf
kitchen-200908101834.pdfkitchen-200908101834.pdf
kitchen-200908101834.pdf
 
S4O5KitchenAppliancesCulinaryAndAdvanced.ppt
S4O5KitchenAppliancesCulinaryAndAdvanced.pptS4O5KitchenAppliancesCulinaryAndAdvanced.ppt
S4O5KitchenAppliancesCulinaryAndAdvanced.ppt
 
Special features on kichen tools and equipment
Special features on kichen tools and equipmentSpecial features on kichen tools and equipment
Special features on kichen tools and equipment
 
Designing a commercial kitchen
Designing a commercial kitchenDesigning a commercial kitchen
Designing a commercial kitchen
 
Residential kitchen
Residential kitchenResidential kitchen
Residential kitchen
 
CATERING-SUPPLY.pptx
CATERING-SUPPLY.pptxCATERING-SUPPLY.pptx
CATERING-SUPPLY.pptx
 
10 chapter ten
10 chapter ten10 chapter ten
10 chapter ten
 
Mach-C - Solutions for Clean Eggs, Clean Trays and Clean Pallets
Mach-C - Solutions for Clean Eggs, Clean Trays and Clean PalletsMach-C - Solutions for Clean Eggs, Clean Trays and Clean Pallets
Mach-C - Solutions for Clean Eggs, Clean Trays and Clean Pallets
 
Kitchen & Bar Design Essentials
Kitchen & Bar Design EssentialsKitchen & Bar Design Essentials
Kitchen & Bar Design Essentials
 

Recently uploaded

The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 

Recently uploaded (20)

The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 

Facility design 3b

  • 1. INTERNATIONAL BASICS OF FOOD FACILITY DESIGN: MODULE 3B KITCHEN LAYOUT BEST PRACTICES Note: These slides do not have narration.
  • 2. INTERNATIONAL STORAGE ROOM PLANNING • Locate your storage rooms(s) between the receiving door and the most important points of use • Consider security, especially for meats and alcohol storage. Put locks on the door and make these rooms visible from the office! • Select adjustable shelving: – Chrome finish or wooden shelves are fine for dry storage rooms • Provide adequate lighting, shielded in case of breakage • Store all goods 6” off the floor at all times • Consider high density shelving for large operations to save on floor space
  • 3. INTERNATIONAL PLANNING WALK-IN REFRIGERATION • Walk-in refrigeration consists of insulated panels for the walls, floor and ceiling, and the refrigeration system itself • Air-cooled, top-mounted compressors will be less expensive to buy but more expensive to operate • Make sure your space has a chilled water loop before selected a water cooled compressor • If possible, plan for a depressed floor in any walk- in refrigerators • Share walls of walk-in refrigerators whenever possible • Also open walk-in freezers into refrigerators rather than directly into your kitchen
  • 4. INTERNATIONAL PREPARATION AREA PLANNING • Allow one 72” x 30” prep work area for each prep employee • Use space above and below the prep table surface for storage of utensils and pans – Drawers – Open shelves – Ceiling or wall mounted utensil racks • Include table space on both sides of prep sinks to make washing produce easier • Don’t forget garbage cans and hand sinks!
  • 5. INTERNATIONAL PRODUCTION AREA PLANNING • Consider your processes and staff use: – How many people will be working on the line at the same time? – Will you be using an expeditor? Which side of the service counter will they be working? – Will servers do any plating or garnishing of apps or desserts? – Consider making the line capable of supporting prep functions before service begins
  • 6. INTERNATIONAL PRODUCTION AREA PLANNING Put batch cooking equipment behind the à la minute line, or at either end of a single line The aisle between the line and the service counter should be 36”-42” Combine all equipment so it fits under a single ventilation hood Service counters will need heat lamps and plate storage The service wall shown here is for all your utilities and is 12” wide when you have a double-sided line like this one Put the tallest pieces of equipment at either end of the cooking line
  • 7. INTERNATIONAL PRODUCTION AREA ISSUES • Include point-of-use refrigeration for prepped items (doors or drawers) • Plan on assembly space for plating and garnishing (consider built-in cutting boards on the service counter) • Include space for mise-en-place at sauté or wok stations • Plan on space for dumping fried items (typically to the left of fryers) • You’ll want a nearby source of water for filling pots and maybe steam kettles as well as for cleaning
  • 8. INTERNATIONAL PRODUCTION AREA ISSUES • Space for mise-en-place at saute or wok stations • Space for dumping fried items (typically to the left of fryers) • Source of water for filling pots and kettles as well as cleaning
  • 9. INTERNATIONAL PRODUCTION AREA ISSUES • For safety reasons: – Fryers must be minimum 17” from an open flame – Avoid positioning fryers right next to high traffic area Too close!
  • 10. INTERNATIONAL WAREWASHING AREA PLANNING • Always keep soiled areas separate from clean areas • Keep wet areas together if possible • Include scrapping holes on soiled dishtables (above garbage cans) • Include pre-rinse facilities on your soiled dishtable • Add overshelves for glass racks to save space/speed racking
  • 11. INTERNATIONAL WAREWASHING AREA PLANNING • Provide at least 48” of clean dishtable space for cooling racks after removal from dishwasher • Provide adequate clean serviceware storage in an area that will stay clean • You will need either a 3-compartment sink or an automated pot-washer
  • 12. INTERNATIONAL WAREWASHING AREA PLANNING Make sure a hand sink is conveniently located Have some landing space on the soiled and clean ends of your pot sink The soiled dishtable should be accessible by service staff and dish staff A pre-rinse sink and faucet helps your dishmachine work more effectively Leave plenty of room for racks to cool after exiting the machine Use wall space next to and above clean areas for storage This is a warewash area for a large restaurant (250+ seats!) You may not need such a big machine but the planning principles are the same for small operations. Everything should flow from soiled areas to clean areas

Editor's Notes

  1. (c) Cornell University
  2. (c) Cornell University
  3. (c) Cornell University
  4. (c) Cornell University
  5. (c) Cornell University
  6. (c) Cornell University
  7. (c) Cornell University
  8. (c) Cornell University
  9. (c) Cornell University
  10. (c) Cornell University
  11. (c) Cornell University