5. NEW CONSTRUCTION
2000/2004
• Permits Issued 974
• Total Value $119,585,226
• Total Certificates
• of Occupancy 852
• Average Home Cost 2004 $166,200
6. PROPOSED NEW CONSTRUCTION IMPACT
• New Subdivisions: Lots Est.Children
• Twin Island Farms 15 4
• The River Club PUD 39
• Stokes Perdue 50 11
• Rivers Edge 8
• Beckwith Farms 77 16
• Sewell’s Trace 95 20
• Sarahs Cove 39 8
• Sarahs Creek 18 4
• Barrens 1200 264
• Total 1502 327
7. Upper County Proposed New
Construction Impact
• New Subdivisions Lots Est. # Children
• Pine Mill 67 14
• Riverwatch 80 10
• Town Commons 35 7
• Hutch Creek 15 3
• Robinson’s Pond 21 5
• Total 218 39
13. Elementary Available Seat
Impact
• The aggregate total is 536 available seats.
• Equivalent to one complete elementary
school or 1 and 1/2 elementary schools
with smaller populations.
• Space may well be available now to
remove all portables (trailers) and house
all the students effected within the primary
structure.
16. Elementary Schools CIP Program
• Provide for increased development of school
storage areas.
• Ensure all sinks are modern and their
stations are upgraded.
• Provide adequate parking at all facilities.
• Institute an Annual Facility External / Interior
Maintenance Program in addition to the
current CIP program initiatives.
17. Modifications Required by
School
• Abingdon: Upgrade cafeteria, provide
more safe parking, new entry way and
develop a structural design that provides
for the “Quad Classrooms” to exit their
rooms without passing through other
classrooms but still be within a structure
cover.
• T.C Walker: Move forward with renovation.
22. A Message from the Superintendent of
Gloucester County Public Schools
“Quote, There is a direct
correlation between one’s
education and his/her earnings
potential. My desire is for all
students to be successful
academically and become
responsible citizens able to
contribute to the welfare of their
community Unquote”
23. Middle School Population
Trends 1998-2004
• Year Middle School Difference
• 1998 1,709
• 1999 1,604 105
• 2000 1,554 50
• 2001 1,539 15
• 2002 1,539 0
• 2003 1,524 15
• 2004 1,558 34
•
32. Middle School
Recommendations
• Leave the Victory Academy Concept
intact at both Middle Schools.
• Have Board re-district to maximize Page
Middle enrollment.
• Ensure annual maintenance is performed
and budgeted to maintain structural
longevity.
33. • Page Middle: Requires more classrooms,
office renovation and media center.
• Ensure when all renovations are
accomplished all trailers have been
removed and students housed within main
structure.
34. SUMMARY
• Continue to upgrade Abingdon and
T. C. Walker Schools.
• Use all available classrooms at each
school to create smaller class sizes.
• Pursue re-districting for the FY
2005/06 school year.