Traffic Signal
Mast Arm
Inspections
American Public Works Association
Florida Chapter
Annual Meeting & Trade Show
Jacksonville, Florida
April 26, 2013
Reference Sources
• FHWA/FHWA/NHI Course No. 130087
• AASHTO (2010 interim)
– Standard Specifications for Structural
Supports for Highway Signs, Luminaires, and
Traffic Signals
• FDOT Bridge and Other Structure
Inspection and Reporting Procedures
• FDOT Bridge Inspectors Field Guide
Today’s Presenters
• Rick Maslyn, CBI – Ayres Associates
• Brian Schroeder, PE, CBI – Ayres Associates
• Charlie Wetzel, PE, PTOE – Seminole
County
This Session Addresses:
• What a TSMA is
• Why we should inspect TSMAs
• Who should inspect TSMAs
• Inspection procedures
• Reporting procedures
• Owner/maintainer responsibilities
TSMA Structural Components
• Foundation, including
anchor bolts/rods
• Mast/vertical member
• Arm/horizontal
member
TSMA Structural Components
• Moment Connection
Anchor Bolt and Moment
Connection Number Scheme
Foundation – Plan View Moment Connection – Front View
FDOT Intersection Layout Scheme
• Intersection layout –
plan view
FDOT Intersection Numbering
Scheme
• Example: 77M001
– “77” = FDOT BMS County No.
– “M” = Mast Arm Structure
– “001” = unique three-digit number within
county
AASHTO Loads
• Dead load
• Wind loads
• Ice load (not
applicable in
Florida)
AASHTO Forces
• Tension
• Compression
• Shear
• Moment (bending)
• Torsion
TSMA Inspection Program
FDOT TSMA Inspection Program
• Started 2008
• By FDOT Structures Maintenance Office
• Structural inspection
– not electrical or signal
• Only State-owned TSMAs
• Maintenance responsibility
– coastal vs. inland
• Reports in FDOT PONTIS
FDOT TSMA Inspection Program
• Public safety
• Protect asset/investment
• Inspection findings could lead to design
improvements
Local Government Inspection
Program
• No formal program
• Varies widely by agency
• Seminole County here today to share
information
FDOT Inspector Credentials
• Certified by the
Department
• Same certification
as bridge inspectors
• National Bridge
Inspection
Standards
Inspection Types
• Initial (construction acceptance)
• Routine (scheduled event)
• Interim (monitor suspect condition)
• Damage/emergency
Inspections
• Visual
• Physical
• Advanced (NDT)
Common Deficiencies
• Foundation below grade
• Foundation cracks and spalls
• Loose anchor bolts/leveling nuts
• Excessive anchor bolt stand-off
• Missing vermin/critter guards at base
• Grout pads and weep holes at base
Common Deficiencies
• Paint failure/corrosion on mast and arm
• Impact damage (dents) on mast
• Gaps at moment connections
• Open hand holes on mast and arm
Common Deficiencies
Common Deficiencies
Common Deficiencies
Less Common Defects
• Structural cracks in mast and arm
• Debonded/sheared anchor bolts
• Misdirected sprinklers
• Secondary projects that affect structure
such as drainage swales, sidewalks, and
road widening
Less Common Deficiencies
Less Common Deficiencies
NBI Superstructure Rating
NBI Substructure Rating
PONTIS Elements Lists
• Foundation = Ele 480
• Vertical Member _Painted = Ele 481
• Vertical Member _Galvanized = Ele 482
• Horizontal Member _Painted = Ele 484
• Horizontal Member _Galvanized = Ele 485
PONTIS Condition States
• Foundation = Choice of CS1 through CS4
• Unpainted Member = Choice of CS1
through CS4
• Painted Member = Choice of CS1 through
CS5
Preventative/Periodic
Maintenance Responsibility
Preventative/Periodic
Maintenance Responsibility
FDOT Repair Priorities
• Priority 1 (Emergency) = within 60 days *
• Priority 2 (Urgent) = within 180 days *
• Priority 3 (Routine) = within 365 days *
* Repair work to be completed
Local Agency (Seminole County)
• Overall TSMA management plan
• Manage program (field work)
• Manage program (office work)
Local Agency (Seminole County)
• Repair decision-making process
• Other public agency interaction
• Funding source(s)
This Session Addressed:
• What a TSMA is
• Why we should inspect TSMAs
• Who should inspect TSMAs
• Inspection procedures
• Reporting procedures
• Owner/maintainer responsibilities
QUESTIONS? Seminole County
Charlie Wetzel, PE, PTOE
County Traffic Engineer
cwetzel@seminolecountyfl.gov
407.665.5686
Ayres Associates
Rick Maslyn, CBI
Structural Inspection Supervisor
MaslynR@AyresAssociates.com
813.318.1577

More Related Content

Viewers also liked

Intelligent traffic signal for prioritized vehicles using wsn
Intelligent traffic signal for prioritized vehicles using wsnIntelligent traffic signal for prioritized vehicles using wsn
Intelligent traffic signal for prioritized vehicles using wsnVASISTA THITUVEEDI
 
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...Arun Chandra Babu
 
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous VehiclesThe Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous VehiclesJumpingJaq
 
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Traffic signal 32&35:DCE:FET:IIUI
Traffic signal 32&35:DCE:FET:IIUITraffic signal 32&35:DCE:FET:IIUI
Traffic signal 32&35:DCE:FET:IIUIcivilengineerf14
 
Traffic signals by Aman Rdr
Traffic signals by Aman RdrTraffic signals by Aman Rdr
Traffic signals by Aman RdrAman Sharma
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlockingsrinivas2036
 
Traffic signal-project-
Traffic signal-project-Traffic signal-project-
Traffic signal-project-Rajeev Verma
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation PptSachin Singh
 

Viewers also liked (14)

Crossing Guard Module 2 Law
Crossing Guard Module 2 LawCrossing Guard Module 2 Law
Crossing Guard Module 2 Law
 
No Signal, No Traffic Jam at Shahbag
No Signal, No Traffic Jam at ShahbagNo Signal, No Traffic Jam at Shahbag
No Signal, No Traffic Jam at Shahbag
 
Intelligent traffic signal for prioritized vehicles using wsn
Intelligent traffic signal for prioritized vehicles using wsnIntelligent traffic signal for prioritized vehicles using wsn
Intelligent traffic signal for prioritized vehicles using wsn
 
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...
 
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous VehiclesThe Future Development of Traffic Signals and the Impact of Autonomous Vehicles
The Future Development of Traffic Signals and the Impact of Autonomous Vehicles
 
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
 
Traffic signal
Traffic signalTraffic signal
Traffic signal
 
Traffic signal 32&35:DCE:FET:IIUI
Traffic signal 32&35:DCE:FET:IIUITraffic signal 32&35:DCE:FET:IIUI
Traffic signal 32&35:DCE:FET:IIUI
 
Traffic signals by Aman Rdr
Traffic signals by Aman RdrTraffic signals by Aman Rdr
Traffic signals by Aman Rdr
 
Traffic control
Traffic controlTraffic control
Traffic control
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Traffic Signs
Traffic SignsTraffic Signs
Traffic Signs
 
Traffic signal-project-
Traffic signal-project-Traffic signal-project-
Traffic signal-project-
 
railway presentation Ppt
railway presentation Pptrailway presentation Ppt
railway presentation Ppt
 

Similar to F05 traffic signal mast arm inspection-kemp

BOMA BTO Final Parking Structure Maintenance
BOMA BTO Final Parking Structure MaintenanceBOMA BTO Final Parking Structure Maintenance
BOMA BTO Final Parking Structure MaintenanceScott L Weiland PE
 
Repair methods for basic machine elements
Repair methods for basic machine elementsRepair methods for basic machine elements
Repair methods for basic machine elementsDevalakshmanperumal1991
 
Licensure as a Professional Engineer - Its Value and the Steps to Take
Licensure as a Professional Engineer - Its Value and the Steps to Take	Licensure as a Professional Engineer - Its Value and the Steps to Take
Licensure as a Professional Engineer - Its Value and the Steps to Take Career Communications Group
 
Licensure as a Professional Engineer -- Its Value and the Steps to Take
Licensure as a Professional Engineer -- Its Value and the Steps to TakeLicensure as a Professional Engineer -- Its Value and the Steps to Take
Licensure as a Professional Engineer -- Its Value and the Steps to TakeCareer Communications Group
 
2019 CISC Montreal Event - Steel: Fun is in the Details
2019 CISC Montreal Event - Steel: Fun is in the Details2019 CISC Montreal Event - Steel: Fun is in the Details
2019 CISC Montreal Event - Steel: Fun is in the DetailsTerri Meyer Boake
 
How to improve oil and gas pipe fit up
How to improve oil and gas pipe fit upHow to improve oil and gas pipe fit up
How to improve oil and gas pipe fit upDavid Gray
 
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...
108  barreras&accesos función justificaciónseleccióncomportamiento puerto...108  barreras&accesos función justificaciónseleccióncomportamiento puerto...
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...Sierra Francisco Justo
 
Bridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptxBridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptxecep nurali
 
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...University of Nebraska EWB-USA Chapter
 
Cordoba Corp: Best Practices for Security Camera Implementation
Cordoba Corp: Best  Practices for Security Camera ImplementationCordoba Corp: Best  Practices for Security Camera Implementation
Cordoba Corp: Best Practices for Security Camera ImplementationCordoba Corp
 
Career fair powerpoint
Career fair powerpointCareer fair powerpoint
Career fair powerpointBriana Allison
 

Similar to F05 traffic signal mast arm inspection-kemp (20)

Parking Structure Maintenance
Parking Structure MaintenanceParking Structure Maintenance
Parking Structure Maintenance
 
BOMA BTO Final Parking Structure Maintenance
BOMA BTO Final Parking Structure MaintenanceBOMA BTO Final Parking Structure Maintenance
BOMA BTO Final Parking Structure Maintenance
 
Parkingembedfont
ParkingembedfontParkingembedfont
Parkingembedfont
 
Repair methods for basic machine elements
Repair methods for basic machine elementsRepair methods for basic machine elements
Repair methods for basic machine elements
 
Licensure as a Professional Engineer - Its Value and the Steps to Take
Licensure as a Professional Engineer - Its Value and the Steps to Take	Licensure as a Professional Engineer - Its Value and the Steps to Take
Licensure as a Professional Engineer - Its Value and the Steps to Take
 
Licensure as a Professional Engineer -- Its Value and the Steps to Take
Licensure as a Professional Engineer -- Its Value and the Steps to TakeLicensure as a Professional Engineer -- Its Value and the Steps to Take
Licensure as a Professional Engineer -- Its Value and the Steps to Take
 
T05 pipe inspection-holdner
T05 pipe inspection-holdnerT05 pipe inspection-holdner
T05 pipe inspection-holdner
 
Guidelines for Documenting Your Design
Guidelines for Documenting Your DesignGuidelines for Documenting Your Design
Guidelines for Documenting Your Design
 
2019 CISC Montreal Event - Steel: Fun is in the Details
2019 CISC Montreal Event - Steel: Fun is in the Details2019 CISC Montreal Event - Steel: Fun is in the Details
2019 CISC Montreal Event - Steel: Fun is in the Details
 
ADA Self-Evaluation and Transition Plan
ADA Self-Evaluation and Transition PlanADA Self-Evaluation and Transition Plan
ADA Self-Evaluation and Transition Plan
 
How to improve oil and gas pipe fit up
How to improve oil and gas pipe fit upHow to improve oil and gas pipe fit up
How to improve oil and gas pipe fit up
 
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...
108  barreras&accesos función justificaciónseleccióncomportamiento puerto...108  barreras&accesos función justificaciónseleccióncomportamiento puerto...
108 barreras&accesos función justificaciónseleccióncomportamiento puerto...
 
FLC_Temp
FLC_TempFLC_Temp
FLC_Temp
 
Narrow Pavement Widening - Best Practices
Narrow Pavement Widening - Best PracticesNarrow Pavement Widening - Best Practices
Narrow Pavement Widening - Best Practices
 
Bridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptxBridge Asthetic Fundamentals.pptx
Bridge Asthetic Fundamentals.pptx
 
screws and bolts
screws and boltsscrews and bolts
screws and bolts
 
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
Ewb usa-2015-regional-conference-documenting-your-design-presentation-supplem...
 
Maintenance Plans, Reserve Studies, & Project Management
Maintenance Plans, Reserve Studies, & Project ManagementMaintenance Plans, Reserve Studies, & Project Management
Maintenance Plans, Reserve Studies, & Project Management
 
Cordoba Corp: Best Practices for Security Camera Implementation
Cordoba Corp: Best  Practices for Security Camera ImplementationCordoba Corp: Best  Practices for Security Camera Implementation
Cordoba Corp: Best Practices for Security Camera Implementation
 
Career fair powerpoint
Career fair powerpointCareer fair powerpoint
Career fair powerpoint
 

More from APWA Florida Chapter 2013 Annual Meeting and Trade Show

More from APWA Florida Chapter 2013 Annual Meeting and Trade Show (20)

W10 not every bore is boring - sciandra
W10 not every bore is boring - sciandraW10 not every bore is boring - sciandra
W10 not every bore is boring - sciandra
 
W09 contractors update fdr - mc keon
W09 contractors update fdr - mc keonW09 contractors update fdr - mc keon
W09 contractors update fdr - mc keon
 
W16 ground improvement techniques-dycus
W16 ground improvement techniques-dycusW16 ground improvement techniques-dycus
W16 ground improvement techniques-dycus
 
W13 special micro surfacing applications-proteau
W13 special micro surfacing applications-proteauW13 special micro surfacing applications-proteau
W13 special micro surfacing applications-proteau
 
W12 green door-barnes
W12 green door-barnesW12 green door-barnes
W12 green door-barnes
 
W11 span of control- lorick and thurman
W11 span of control- lorick and thurmanW11 span of control- lorick and thurman
W11 span of control- lorick and thurman
 
W08 permanent backup lift station pumps-perry
W08 permanent backup lift station pumps-perryW08 permanent backup lift station pumps-perry
W08 permanent backup lift station pumps-perry
 
W07 advocating public works-twigg
W07 advocating public works-twiggW07 advocating public works-twigg
W07 advocating public works-twigg
 
W06 siesta beach low impact development-strum
W06 siesta beach low impact development-strumW06 siesta beach low impact development-strum
W06 siesta beach low impact development-strum
 
W05 sign retroreflectivity-made_easy-norkus
W05 sign retroreflectivity-made_easy-norkusW05 sign retroreflectivity-made_easy-norkus
W05 sign retroreflectivity-made_easy-norkus
 
W04 bioremediation of a chlorinated solvents site-turner
W04 bioremediation of a chlorinated solvents site-turnerW04 bioremediation of a chlorinated solvents site-turner
W04 bioremediation of a chlorinated solvents site-turner
 
W03 mobile assest management-cook
W03 mobile assest management-cookW03 mobile assest management-cook
W03 mobile assest management-cook
 
W02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanenW02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanen
 
W01 fl scenic highway-caster
W01 fl scenic highway-casterW01 fl scenic highway-caster
W01 fl scenic highway-caster
 
T20 bottom line leadership-hadden
T20 bottom line leadership-haddenT20 bottom line leadership-hadden
T20 bottom line leadership-hadden
 
T19 chlorinated solvents-bienkowski
T19 chlorinated solvents-bienkowskiT19 chlorinated solvents-bienkowski
T19 chlorinated solvents-bienkowski
 
T18 critical quality control - siffert
T18 critical quality control - siffertT18 critical quality control - siffert
T18 critical quality control - siffert
 
T17 5 steps to safer digging-martin
T17 5 steps to safer digging-martinT17 5 steps to safer digging-martin
T17 5 steps to safer digging-martin
 
T16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouseT16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouse
 
T15 reuse water utilities-loucraft
T15 reuse water utilities-loucraftT15 reuse water utilities-loucraft
T15 reuse water utilities-loucraft
 

F05 traffic signal mast arm inspection-kemp