1. Spatial
• Assets bounded Spatially
• Radial – Fixed Assets – Facilities, Sites etc
• Non-Radial – Movable Assets – Cranes etc
Operational
• Operational Assets – Plants, Operational
Units
• Pipe Lines – Non-radial in nature (To and
From)
Functional
• Functional – That are defined by
discriminating factors
• Operationally same but performing different
functions
MRO Centric
• Repairable – Association based on
maintenance criteria
• Gasket + Fluid + aluminum bolts grouped
together as are used in scheduled
maintenance. They derived a FLC as well
Configuration Centric
Change Centric
Product Centric
Document Centric
Stake
Holders
O &M Safety, Reliability, &
Environmental
Design, Engineering & Project Management
Line configuration
Management
Product impact on
functions or
arrangement
2. Spatial
• Assets bounded Spatially
• Radial – Fixed Assets – Facilities, Sites etc
• Non-Radial – Movable Assets – Cranes etc
Operational
• Operational Assets – Plants, Operational
Units
• Pipe Lines – Non-radial in nature (To and
From)
Functional
• Functional – That are defined by
discriminating factors
• Operationally same but performing different
functions
MRO Centric
• Repairable – Association based on
maintenance criteria
• Gasket + Fluid + aluminum bolts grouped
together as are used in scheduled
maintenance. They derived a FLC as well
Configuration Centric
Change Centric
Product Centric
Document Centric
Stake
Holders
O &M Safety, Reliability, &
Environmental
Design, Engineering & Project Management