The document discusses the genesis and development of electronic voting machines (EVMs) in India. It outlines how the idea was proposed in 1977 to reduce election costs, and the challenges faced in developing a secure tamper-proof machine that would gain public trust. Two public sector companies worked to develop prototype EVMs, which were tested nationally. Concerns about security and reliability were addressed through various technical and procedural safeguards in the EVM design.