The Periodic Reporting
Exercise in support of the
implementation of the 5Cs
Strategic Objectives
From National Programmes to a World
Heritage Programming approach
Anna Sidorenko
Focal Point CESEE
Europe and North America Unit
UNESCO World Heritage Centre
Workshop of National Focal Points of Central, South-
East and Eastern European Countries
Second Cycle of the Periodic Reporting Exercise
Tbilisi, Georgia, 14 – 16 November 2012
The “5Cs” Strategic Objectives
2002
30 years anniversary of World Heritage Convention
26th session of World Heritage Committee
BUDAPEST DECLARATION
The “4 Cs” Strategic Objectives adopted by the Committee
http://whc.unesco.org/en/budapestdeclaration
2007
New Zealand’s Proposal for a ‘Fifth C’ – Communities
31th session of the World Heritage Committee
The “5th C” Strategic Objectives adopted by the Committee
• Strengthen the Credibility of the World
Heritage List.
• Ensure the effective Conservation of
World Heritage Properties.
• Promote the development of effective
Capacity building in States Parties.
• Increase public awareness, involvement
and support for World Heritage through
Communication.
• Enhance the role of Communities in the
implementation of the World Heritage
Convention.
The “5Cs” Strategic Objectives
1st C
2nd C
3rd C
4th C
5th C
The five Cs provide a general fundamental framework for the
implementation of the World Heritage Convention
Future of the Convention
2008
Process of reflection on future of the Convention
http://whc.unesco.org/en/futureoftheconvention/
Open-ended Working Group
developed overall strategy to guide implementation of Convention
2011
Strategic Action-Plan and Vision based on “the 5 Cs”
adopted by 18th General Assembly of States Parties
Strategic Action Plan
The Strategic Plan for the Implementation of the Convention
2012-2022 builds on the orientations set by the ‘5C’s’ by
identifying World Heritage Goals, Priorities and Actions
which will help to achieve these long term strategic
objectives.
The Periodic Reporting exercise – new opportunities
PR should be perceived as an opportunity:
– to implement measures towards making the World Heritage List
more representative, balanced and credible
– to gather Site Managers and national Focal Points
– to strenghten regional networks between professional actors
within the field
– to improve public awareness, involvement and support for World
Heritage through communication
– to reinforce involvement of local Communities in the
implementation of the World Heritage Convention
PR should be perceived as a tool:
– for sustainable and effective Conservation of World Heritage
properties
– A preventive monitoring tool
– An alarm mechanism
– A tool for identification of needs for assistance and
capacity-building
The Periodic Reporting Exercise
Opportunity to strengthen the
Credibility of the World Heritage List
”the
1st
C”
”the 1st C”: Key priorities
1994
Global Strategy for a Representative, Balanced and
Credible World Heritage List
Objectives:
 to ensure that the List reflects the world's cultural and natural
diversity of Outstanding Universal Value
 to encourage countries to become States Parties to the
Convention;
 to prepare Tentative Lists;
 to prepare nominations of properties from categories and
regions currently not well-represented on the World Heritage
List.
http://whc.unesco.org/en/globalstrategy
Documents: WHC-12/36.COM/9A
“Implementation of the recommendations of the evaluation of the Global Strategy”
“the 1st C”: Challenges
• Credibility
– of the List
– of the Convention : the credibility of the Convention is first and
foremost an irreproachable conservation of inscribed properties, and
that the removal (from the World Heritage List) of properties having
lost the outstanding universal value for which they had been
inscribed, can only increase this credibility.
• Imbalances within the World Heritage List.
• Public perception and maximization of the brand value of World
Heritage.
• Current focus on inscription to the detriment of conservation:
– List of WH in Danger not understood as a tool of conservation.
– WH sites should play a stewardship role as sites of best practice.
• Governance structures which are not participatory and are overloaded.
• Financing the implementation of the Convention.
“the 1st C”: Requirements
• The Identification of cultural and natural heritage
properties
 National inventories of cultural and natural heritage of
national significance form the basis for the identification
of possible World Heritage properties.
 Tentative List
- Process of preparation and revision of the Tentative List;
- Institution(s) responsible for identifying sites;
- Involvement of local authorities and local population in its
preparation
 Nominations
- analysis of the process by which the nominations are prepared;
- collaboration and co-operation with local authorities and people;
- obstacles and difficulties encountered in that process
- benefits and lessons learnt
World Heritage List
33 States
Parties
with no
World
Heritage
Properties
Regional Distribution of all World
Heritage Properties
List of World Heritage in Danger
38 properties in 30
countries
20 States with the most properties inscribed
Italy 47
Spain 44
China 43
France 38
Germany 37
Mexico 31
India 29
United Kingdom of Great Britain and Northern Ireland 28
Russian Federation 25
United States of America 21
Brazil 19
Australia 19
Greece 17
Japan 16
Canada 16
Sweden 15
Iran (Islamic Republic of) 15
Portugal 14
Poland 13
Czech Republic 12
“the 1st C” : Measures
• Re-establish the balance between different categories of
sites / Revision of Tentative Lists taking into account the
representivity of the sites that are listed at the national,
regional and international levels, and the
underrepresented categories to which they belong
• Changes to names, boundary modifications, changes to
the existing criteria
• Need for a better cooperation between the 5 sub-regions
to improve the representativity
• Preparation of nomination of transnational sites to
enhance international cooperation
”the 1th C” : Gap Analysis & Thematic Studies
States Parties are encouraged to consult the analyses of both the World
Heritage List and Tentative Lists prepared at the request of the
Committee by ICOMOS and IUCN to identify the gaps in the World
Heritage List.
These analyses could enable States Parties to compare themes,
regions, geo-cultural groupings and bio-geographic provinces for
prospective World Heritage properties.
http://whc.unesco.org/archive/2004/whc04-28com-13b1e.pdf
http://whc.unesco.org/archive/2004/whc04-28com-13b2e.pdf
The thematic studies carried out by ICOMOS and IUCN to evaluate
proposed World Heritage properties in their regional, global or thematic
context should not be confused with the comparative analysis to be
prepared by States Parties.
ICOMOS: http://www.icomos.org/studies/
IUCN: http://www.iucn.org/themes/wcpa/pubs/Worldheritage.htm
“the 1st C” : Revision of the Tentative Lists
• Operational Guidelines : Chapter II.C
• Deadline for procedures : preferably 1 year prior to the
submission of the any nomination (§65)
• Tentative List should be re-examined/re-submitted every 10
years
• Take into account the Global Strategy (OG II B), the Gap
Analysis (IUCN 2004; ICOMOS 2004 – 28 COM) and specific
thematic studies
• Cooperate with other countries on specific themes
• Review results of the Vilm meeting on Tentative Lists for
natural heritage in Eastern and SEE Europe (May 2007)
COUNTRY NUMBER OF
SITES
INSCRIBED
NUMBER OF
CULTURAL SITES ON
THE TENTATIVE LIST
NUMBER OF
NATURAL
SITES ON THE
TENTATIVE
LIST
NUMBER OF
MIXED SITES
ON THE
TENTATIVE
LIST
Czech
Republic
12 CL 16 1
Hungary 7 CL (1 TB);
1 NAT
8 2 1
Poland 12 CL (1 TB);
1 NAT (TB)
4 2
Slovakia 5 CL;
2 NAT (TB)
9 4 1
Tentative Lists in Central Europe
Tentative Lists in Eastern Europe
COUNTRY NUMBER OF
SITES INSCRIBED
NUMBER OF
CULTURAL
SITES ON THE
TENTATIVE
LIST
NUMBER OF
NATURAL SITES
ON THE
TENTATIVE LIST
NUMBER OF
MIXED SITES ON
THE TENTATIVE
LIST
Armenia 3 CL 2 2
Azerbaijan 2 CL 6 4
Belarus 3 CL (1 CL TB)
1 NAT (TB)
10 1
Georgia 3 CL
(2 CL in Danger)
11 4
Russian
Federation
15 CL (2 TB)
10 NAT (1 TB)
16 7 3
Ukraine 4 CL (1 TB)
1 NAT (1 TB)
13 1 3
COUNTRY NUMBER OF
SITES
INSCRIBED
NUMBER
OF
CULTURAL
SITES ON
THE
TENTATIVE
LIST
NUMBER OF
NATURAL
SITES ON
THE
TENTATIVE
LIST
NUMBER OF
MIXED SITES ON
THE TENTATIVE
LIST
Albania 2 CL 2 1
Bosnia &
Herzegovina
2 CL 3 1 4
Bulgaria 7 CL; 2 NAT 8 5
Croatia 6 CL; 1 NAT 13 2 1
FYROM 1 Mixed 1 2
Republic of
Moldova
1 CL (TB) 2
Montenegro 1 CL; 1 NAT 4 1
Romania 6 CL; 1 NAT 10 4
Serbia 4 CL (1 CL in
Danger)
5 5 1
Slovenia 2 CL (1 TB); 1
NAT
3
Tentative Lists in South-Eastern Europe
Other revisions & changes
Name changes
• Operational Guidelines : § 167
• Deadline for procedures : 3 months prior to the World
Heritage Committee
Changes to existing criteria
• Operational Guidelines : § 166
• Deadline for procedures : 1st February for all re-nominations
(at best 18 months procedure before Committee approval)
“Upstream Process” to nominations
Improvements to the processes and practices
prior to consideration by the World Heritage
Committee of a nomination
Document: WHC-12/36.COM/12C “Progress report on the reflection
concerning the upstream processes”
”the 1th C” : Creative approaches in the
nomination process
The Periodic Reporting Exercise
- Opportunity to enhance Conservation
- Tool for sustainable and effective Conservation
”the
2nd
C”
”the 2nd C” : Key Priority
Outstanding Universal Value of World Heritage
properties, including the conditions of integrity and/or
authenticity at the time of inscription, are sustained or
enhanced over time
This Strategic Objective is of primary importance and must
be taken into account in all the activities undertaken in the
implementation of the Convention: conservation and
modernisation of the legal framework, conservation and
socio-economic development, conservation and local
community involvement and development of their quality of
life, conservation and public awareness, conservation and
policies, conservation and regional/international cooperation,
conservation and tourism, conservation and
professionalism/professional training, etc.
All properties inscribed on the World Heritage List must have :
- adequate long-term legislative, regulatory, institutional and/or traditional
protection and management to ensure their safeguarding;
- adequately delineated boundaries for effective protection;
- appropriate management plan;
- effective management system with common elements which include:
a) a thorough shared understanding of the property by all stakeholders;
b) a cycle of planning, implementation, monitoring, evaluation and
feedback;
c) the monitoring and assessment of the impacts of trends, changes, and
of proposed interventions;
d) the involvement of partners and stakeholders;
e) the allocation of necessary resources;
f) capacity-building;
g) an accountable, transparent description of how
the management system functions
”the 2nd C” : Requirements
”the 2nd C” : Challenges
- The cultural and the natural heritage are increasingly
threatened not only by the traditional causes of decay, but also
by changing social and economic conditions
- Linkage between the conservation, use and sustainable
development
- Complexity of day-to-day on-site management
- Institutional reorganisations, instable governmental structures
- Complexity of decision-making and coordination of
stakeholders
- Lack of clear definition of the legal provision of the
management plans on all administrative levels
- Lack of clear responsibility for the effective implementation of
management plans
- Lack of understanding or interpretation of the management
plan concept
- Lack of institutional memory
- Gaps in conservation techniques and skills
”the 2nd C” : Needs
- Political commitment
- Strong political will and necessary legal and
financial support for World Heritage
- Innovative and specific solutions for
sustaining living heritage sites
- Guidelines for developers
- Developing common management approaches
by site category
”the 2nd C” : Measures
- Implement appropriate legal, administrative and financial
measures necessary for the protection of the WH properties
- Adopte new laws and regulations to strengthen heritage
protection, or ensure their more systematic application
- Establish institutional coordination system, including inter-
ministerial and interprofessional mechanism of cooperation
- Establish integrated management process for WH properties
- Establish and give legal meaning to WH Management Plans
- Ensure that Management Plans are recognised in national
and local planning laws
- Prepare or implement management plans for properties
- Secure appropriate governmental funding (through the
national budget)
- Ensure regular and systematic monitoring of the overall state
of conservation of properties
- Strengthen the consideration of OUV in development
Periodic Reporting (OG, § 199-210):
periodic report by State Parties on the implementation of the
Convention and the state of conservation of the properties
inscribed in their territories
driven by State Party
Reactive monitoring (OG, § 169-176)
reporting by the Secretariat and the Advisory Bodies on the
state of conservation of specific properties under threat, to
ensure that measures are taken to address these threats
- Possibility to inscribe on List of WH in Danger
- Possibility to delete properties from WH List
driven by WH Committee
Monitoring: at the heart of the World Heritage Convention
Since 1994, more than 2 000 reports on the state of
conservation of World Heritage properties have been
prepared and examined by the World Heritage
Committee.
Besides compiling background information on the
property and reviewing information from different
sources, these reports highlight the factors affecting
the property and its Outstanding Universal Value and
propose activities to mitigate the threats.
In some cases, they also include a set of corrective
measures and a timeframe for their implementation.
”the 2nd C” : Reactive Monitoring
Evolution of the number of state of
conservation reports from 2004 to 2012
165
137 133
161 158
177
147
169
140
0
30
60
90
120
150
180
28e
session
(Suzhou,
2004)
29e
session
(Durban,
2005)
30e
session
(Vilnius,
2006)
31e
session
(Christchurch,
2007)
32e
session
(Québec,
2008)
33e
session
(Séville,
2009)
34e
session
(Brasilia,
2010)
35e
session
(UNESCO,
2011)
36e
session
(Saint
Petersburg,
2012)
Trends
1. Paragraph 172 of the Operational Guidelines:
“States Parties to inform the Committee, via the World
Heritage Centre, of intention to undertake major restorations
or new constructions…before making decisions that would
be difficult to reverse.”
2. Information received through networks of the Advisory
Bodies or UNESCO World Heritage Centre and UNESCO
Field Offices
3. Missions by UNESCO/ World Heritage Centre and Advisory
Bodies (IUCN, ICOMOS, ICCROM)
4. Other sources of information including specialized NGOs,
individuals, press, other States Parties etc
How do sites get on to the reactive monitoring process?
• Information received by the World Heritage Centre or
Advisory Bodies;
• Comments requested from the State Party (OG, § 174) and
review by the Advisory Bodies (OG, § 175)
• Based on comments from State Party and other information,
WHC and Advisory Bodies decide whether a case requires a
SOC Report to the Committee;
• If a case is particularly urgent, a reactive monitoring mission
can be dispatched immediately by the DG, in close
consultation with State Party, including through the
“Reinforced Monitoring Mechanism” (RMM).
Steps of the Reactive Monitoring Process / 1
• If a SOC report is prepared and presented to the Committee,
the related Draft Decision may request a report from the State
Party (1 February of the following year) and / or propose a
reactive monitoring mission;
• Joint WHC (UNESCO)-IUCN/ICOMOS/ICCROM mission is
organised in consultation with State Party; Terms of Reference
(TOR) are established based on the Committee’s Decision;
• Joint mission report is prepared and shared with State Party for
comments; then, SOC Report for the Committee is drafted,
integrating comments from State Party, if any / if on time;
• Decision by the Committee in June/July (State Party informed
by letter in August/September)
Steps of the Reactive Monitoring Process / 2
ANNEX : „the 2nd C“ - Requirements § 172 OG
• Administrative status of the project
– Current status of the project
– When will planning applications be submitted?
– When will the project start?
– Who is responsible for approving project?
– Which stakeholders have been/will be consulted?
• Supporting material
– Description of the project (narrative, visual)
– Location in relation to WH property
– relevant policies in the World Heritage property’s Management Plan or
Management System
– Heritage Impact Assessment (HIA guidance by ICOMOS
International:
http://www.international.icomos.org/world_heritage/HIA_20110201.pdf
The Periodic Reporting exercise will be of benefit to all
concerned States Parties and site-managers as a tool for
sustainable management and monitoring of their World
Heritage properties.
At its 35th session (UNESCO, 2011), the World Heritage
Committee, considering the need for more systematic
monitoring of threats, called upon the States Parties to the
Convention to support the establishment of a
comprehensive "state of conservation information
system" to support analytical studies and assist all
stakeholders in site-management.
State of conservation information system developed with
support of teh Governement of Flanders is availble at
http://whc.unesco.org/en/activities/691
”the 2nd C” : Tools, Programmes, Initiatives
 Cultural Landscape
 Higher education
 Human Evolution: Adaptations, Dispersals and Social
Developments (HEADS)
 Initiative on Heritage of Religious Interest
 Managing Natural World Heritage
 Marine Programme
 Modern Heritage Programme
 World Heritage Sustainable Tourism Programme
WH Committee’s programmes and initiatives
 Astronomy and World Heritage Thematic Initiative
 Biodiversity Conservation in Regions of Armed
Conflict: Protecting World Heritage in the Democratic
Republic of the Congo
 Central Africa World Heritage Forest Initiative (CAWHFI)
 Climate Change and World Heritage
 Reducing Disasters Risks at World Heritage Properties
 Small Island Developing States Programme
 World Heritage Programme on Earthen Architecture
(WHEAP)
 World Heritage Cities ….
WH Committee’s programmes and initiatives
”the
3rd
C”
The Periodic Reporting Exercise
Focus on Capacity-Building
“the 3rd C” : Key Goals Based on the 5Cs
World Heritage Capacity Building Strategy (WHCBS)
based on “the 5 Cs” Strategic Objectives
“the 3rd C” : Importance of the Capacity-Building
Follow-up to the capacity building strategy
(see document: WHC-12/36.COM/9B)
“the 3rd C” : WHCB Programme - Key Objectives
Three objectives of the World Heritage Capacity Building
Programme based on WHCB Strategy
1. To collect and develop information and good practice for
the better conservation and management of WH properties for
use directly on sites and as a aid to better capacity building at
all levels ;
2. To strengthen existing networks and create new networks
where necessary, to promote better conservation practices
and capacity building across the World Heritage system ;
3. To provide mechanisms for the delivery of information and
capacity building across the WH system.
”the 3rd C” : Opportunities
• Opportunity for regions or sub-regions to explore specific
capacity building needs and develop relevant strategies
and programmes for meeting those needs
• Regional Strategies are to be developed using the
process and the results of the second PR cycle of
each Region
• Interested State Parties should seize the
opportunity of the PR process to develop national
capacity building strategies
“the 3rd C” : Regional Strategies - Expectations
1. The PR process and regional cooperation must achieve two
things:
– Identify a lead agency for this purpose (In some regions it is a
Category 2 Centre). Get them involved from the beginning and during
the PR process.
– Identify capacity buildings issues for all audiences at the outset and try
to reflect them when filling in the PR forms.
3. Submission
– In the year following the presentation of the final Periodic Report, the
lead organization and partners should work together to prepare a
Regional Capacity Building Strategy which should be presented to the
Committee at its next session. This Regional Strategy may have sub-
regional components as necessary.
4. ‘Action plan’
– A concrete programme or ‘Action plan’ should accompany the
Strategy, identifying specific activities, timelines, responsibilities and
necessary resources
“the 3rd C” : National Strategies - Expectations
1. Develop national capacity building strategies in order to:
– Better understand specific national and property based capacity
building needs.
– Investigate what capacity building institutions exist and can offer
support (national, regional, and international).
– Identify target audiences (stepping beyond heritage organizations
and practitioners to related institutions, networks and communities
dealing with tourism, planning, local communities etc.
2. Joining forces
– Some State Parties may want to join forces and deliver a joint
strategy
3. Support
– The World Heritage Centre, Advisory Bodies and other capacity
building providers should provide necessary technical support and
facilitation to States Parties wishing to develop national strategies.
”the
4th
C”
The Periodic Reporting Exercise
Focus on Communication
”the 4th C” : Goals for communication operations
- Communication for awareness raising of
local communities and the general public
- Communication for information-sharing
between concerned parties and the
dissemination of “best practices”
- Communication between donors for improved
coordination of activities/strategies,
communication for schools
”the 4th C” : Key Priorities
- WH Convention widely recognized as
highest standard of heritage and
Conservation
- World Heritage value, credibility and
quality understood at all levels
(international, national, local, on-site)
- Increased awareness of the need for and
benefits from conservation
- World Heritage brand quality enhanced
- Role of the civil society recognised by
the authorities
”the 4th C” : Axes of communication for the general public
1. Awareness raising concerning heritage
protection in general, its respect and the
need to become involved in safeguarding
actions
2. Awareness raising of the general public with
regard to the World Heritage Convention
itself, its objectives, principles, mechanisms,
role, obligations of governments in their role
as “States Parties” to the Convention
•
”the 4th C” : Public participation goal
”the 4th C” : Challenges
- Communication strategy should be updated to
the new challenges WH Convention faces
- WH Convention should be understood/known by
the local communities
- Lack of on-site awareness of what a WH
Convention means
- Lack of dialogue between national/local
authorities and civil society on the issue relevant
to management of World Heritage properties
- Prevent / manage on-site conflicts between
local authorities and citizens/owners
- Lack of participation of Civil society in
management process
”the 4th C” : Needs
- Shared vision and knowledge of OUV as the
basis for management
- Developing or enhancing communication skills
- Partnerships at the on-site level
- New ways to present the values
- Awareness building about the benefits and
obligations
- Developing innovative new partnerships with
tourism organisations
- Increase communication between experts, local
communities, scientists, government officials, World
Heritage specialists, etc… to encourage an improved
exchange of knowledge, experience and “best
practices”
”the 4th C” : Measures
- Develop a clear communication strategy based on
modern and traditional methods
- Develop brand strategy
- Use WH toolkits, manuals, programmes and
initiatives
- Inform the public by providing with balanced and
objective information to assist them in
understanding the problem, alternatives,
opportunities and/or solutions
- Develop networks, including network of WH sites
- Enhance the role of the media, including internet
based media
- Use information and communication technologies,
including new virtual social networks
- Build partnership with local communities
- Introduce « the celebratory aspect »
”the 4th C” : Examples of activities
• various publications, press articles,
brochures
• Internet sites,
• television and radio programmes
• school programmes
• sign-posting and information panels, press
conferences
• permanent and/or temporary itinerant
exhibitions, stamps
• celebration of special days such as the
“World Heritage Days”
• celebration of the anniversary date of
inscription of properties on the List
• translation of the “World Heritage in
Young Hands” kit, etc.
”the 4th C” : Tools, Programmes, Networks
The World Heritage Partnerships for Conservation Initiative (PACT)
operates since 2002 and aims at fostering innovative and creative
partnerships with the private sector to help the World Heritage
Convention achieve its objectives.
In order to reach the largest public possible, partners relay the message
about World Heritage values through promotion and greater visibility.
PACT objectives are:
a) to raise awareness about World Heritage; and
b) to mobilise sustainable resources for the long-term conservation of
World Heritage, addressing mutually agreed issues and problems
identified as priorities by the World Heritage Committee as a means for
implementing its strategic objectives.
The World Heritage PACT is intended to mobilize intellectual and technical
resources and to create networks of exchange and technical assistance for
World Heritage conservation and awareness raising activities
A wide range of World Heritage publications, from periodicals to
brochures and information kits, books, manuals, reports, and a map
of World Heritage sites are available in a variety of languages for
adults and young people.
”the 4th C” : World Heritage Publications
Sustainable Tourism Programme
1. Building the capacity of World Heritage site management to
deal with tourism.
2. Training local community members in tourism related activities
to participate in the industry and receive tourism's benefits.
3. Aiding communities around the sites to market their products.
4. Raising public awareness of World Heritage and building pride
with local communities and visitors through conservation
education.
5. Using tourism generated funds to supplement site conservation
and protection costs.
6. Spreading the lessons learned to other sites and protected
areas.
7. Building increased awareness of World Heritage and its
activities and policies for tourism industry officials
and their clients.
World Heritage Education Programme
Young People’s Participation in
World Heritage Promotion and Preservation
WHYH Kit 32 language versions  English (1998)
 French (1999)
 Spanish (1999; 2006)
 Arabic (2000; 2003; 2009)
 Chinese (1998)
 Russian (2000)
 Amharic (translated 2009; for
publication)
 Armenian (2002)
 Finnish (2002)
 Georgian (2001)
 German (2003)
 Hindi (2004)
 Hungarian (2006)
 Indonesian (2001)
 Italian (2002) * also in
video (2002)
 Japanese (2000)
 Khmer (2005)
 Kiswahili (2004)
 Korean (DPRK, 2003)
 Korean (ROK, 2007)
 Laotian (2001)
 Latvian (2006)
 Lithuanian (2004)
 Mongolian (2004)
 Pilipino (2004 CD-Rom)
 Portuguese (translated 2009;
for publication)
 Slovak (2002)
 Swedish (2003)
 Turkish (2002)
 Urdu (2003)
 Uzbek (2001)
 Vietnamese (2001)
World Heritage Volunteers
2008: 12 projects in 10 countries
2009: 11 projects in 10 countries
2010: 27 projects in 17 countries
2011: 28 projects in 17 countries
2012: youth projects at 40
WH sites
National WH site manager networks
”the
5th
C”
The Periodic Reporting Exercise
Opportunity to enhance the role of Communities and
reinforce their involvement in the implementation of the
World Heritage Convention
”the 5th C” : Key Priorities
- The conservation of the world's natural and cultural
heritage should, wherever possible, be done with the
active engagement of communities which have a close
relationship with the heritage in question.
- The process of community involvement should be
recognized as an integral part of understanding and
sustaining WH properties at all levels
- Local community should be recognised key actors in the
process of identification, sustainble management and
communication of the values of the WH properties
- Community interests should not ‘trump’ other strategic
goals, but rather, should be used in a complementary
manner
”the 5th C” : Requirements
- The process of community involvement
should be based on meaningful dialogue
and decision-making between all
stakholders
- Traditional menagement systems should
be recognised and enhanced through
capacity-building activities
”the 5th C” : Challenges
- Areas created in isolation of local communities in terms of their
values, participation, or sharing of benefits, and heritage protection
without community involvement and commitment risk failure
- Without the understanding and support of the public at large,
without the respect and daily care of the local communities, which
are the true custodians of World Heritage, no amount of funds will
suffice in protecting the sites.
- Lack of the community participation strategy, including
participatory planning processes involving local and national
stakeholders
- On-site conflicts due to the lack of dialogue between local
authorities and civil society communities
- Understanding of OUV and participation in the management
process
The identification of communities who have a particular interest is a
matter that will require States to develop an explicit methodology.
Within the context of the International Year for the Rapprochement of
Cultures 2010, proclaimed by the United Nations General Assembly,
this international seminar was held in Kiev (Ukraine) from 2 to 5
November 2010, under the patronage of the President of Ukraine and
UNESCO.
The main objective of the Seminar was to explore ways of establishing
a dialogue between all stakeholders, including religious communities
and to explore possible ways of encouraging and generating mutual
understanding and collaboration amongst them in the protection of
World Heritage properties of religious interest.
International Seminar « The Role of religious communities in
the management of World Heritage properties »
http://whc.unesco.org/en/religious-sacred-heritage/
•
Conference « Living with World Heritage »
Kotor, Montenegro, 7 – 8 June 2012
Presentations are available at http://www.unesco.org/venice
The Worshop was hosted by the authorities of Montenegro and co-
organized with the UNESCO Venice Office.
The main outcome of the Workshop was an increased awareness of
different aspects of community involvement, update of their implication
in day-to-day site management in SEE and more in-depth knowledge
about implementing participatory approaches in management practice.
Many innovative and pro-active actions and strategies were presented
during the Workshop.
Workshop for SEE countries “World Heritage and Sustainable Development:
the role of local communities in the management of UNESCO designated sites”
« the 5 Cs » : Specific recommandations
• Dissemination of best practice models adapted to
sites in the region;
• Programme to strengthen national legislations for the
protection of World Heritage (co-operation between
the different levels of responsible authorities);
• Integration of the World Heritage Strategic Objectives
in overall planning processes at the national level;
• Organisation of further sub-regional seminars and
workshops with specific themes and ensure funding
(extrabudgetary resources);
Thank you!

event-958-20.ppt

  • 1.
    The Periodic Reporting Exercisein support of the implementation of the 5Cs Strategic Objectives From National Programmes to a World Heritage Programming approach Anna Sidorenko Focal Point CESEE Europe and North America Unit UNESCO World Heritage Centre Workshop of National Focal Points of Central, South- East and Eastern European Countries Second Cycle of the Periodic Reporting Exercise Tbilisi, Georgia, 14 – 16 November 2012
  • 2.
    The “5Cs” StrategicObjectives 2002 30 years anniversary of World Heritage Convention 26th session of World Heritage Committee BUDAPEST DECLARATION The “4 Cs” Strategic Objectives adopted by the Committee http://whc.unesco.org/en/budapestdeclaration 2007 New Zealand’s Proposal for a ‘Fifth C’ – Communities 31th session of the World Heritage Committee The “5th C” Strategic Objectives adopted by the Committee
  • 3.
    • Strengthen theCredibility of the World Heritage List. • Ensure the effective Conservation of World Heritage Properties. • Promote the development of effective Capacity building in States Parties. • Increase public awareness, involvement and support for World Heritage through Communication. • Enhance the role of Communities in the implementation of the World Heritage Convention. The “5Cs” Strategic Objectives 1st C 2nd C 3rd C 4th C 5th C The five Cs provide a general fundamental framework for the implementation of the World Heritage Convention
  • 4.
    Future of theConvention 2008 Process of reflection on future of the Convention http://whc.unesco.org/en/futureoftheconvention/ Open-ended Working Group developed overall strategy to guide implementation of Convention 2011 Strategic Action-Plan and Vision based on “the 5 Cs” adopted by 18th General Assembly of States Parties
  • 5.
    Strategic Action Plan TheStrategic Plan for the Implementation of the Convention 2012-2022 builds on the orientations set by the ‘5C’s’ by identifying World Heritage Goals, Priorities and Actions which will help to achieve these long term strategic objectives.
  • 6.
    The Periodic Reportingexercise – new opportunities PR should be perceived as an opportunity: – to implement measures towards making the World Heritage List more representative, balanced and credible – to gather Site Managers and national Focal Points – to strenghten regional networks between professional actors within the field – to improve public awareness, involvement and support for World Heritage through communication – to reinforce involvement of local Communities in the implementation of the World Heritage Convention PR should be perceived as a tool: – for sustainable and effective Conservation of World Heritage properties – A preventive monitoring tool – An alarm mechanism – A tool for identification of needs for assistance and capacity-building
  • 7.
    The Periodic ReportingExercise Opportunity to strengthen the Credibility of the World Heritage List ”the 1st C”
  • 8.
    ”the 1st C”:Key priorities 1994 Global Strategy for a Representative, Balanced and Credible World Heritage List Objectives:  to ensure that the List reflects the world's cultural and natural diversity of Outstanding Universal Value  to encourage countries to become States Parties to the Convention;  to prepare Tentative Lists;  to prepare nominations of properties from categories and regions currently not well-represented on the World Heritage List. http://whc.unesco.org/en/globalstrategy Documents: WHC-12/36.COM/9A “Implementation of the recommendations of the evaluation of the Global Strategy”
  • 9.
    “the 1st C”:Challenges • Credibility – of the List – of the Convention : the credibility of the Convention is first and foremost an irreproachable conservation of inscribed properties, and that the removal (from the World Heritage List) of properties having lost the outstanding universal value for which they had been inscribed, can only increase this credibility. • Imbalances within the World Heritage List. • Public perception and maximization of the brand value of World Heritage. • Current focus on inscription to the detriment of conservation: – List of WH in Danger not understood as a tool of conservation. – WH sites should play a stewardship role as sites of best practice. • Governance structures which are not participatory and are overloaded. • Financing the implementation of the Convention.
  • 10.
    “the 1st C”:Requirements • The Identification of cultural and natural heritage properties  National inventories of cultural and natural heritage of national significance form the basis for the identification of possible World Heritage properties.  Tentative List - Process of preparation and revision of the Tentative List; - Institution(s) responsible for identifying sites; - Involvement of local authorities and local population in its preparation  Nominations - analysis of the process by which the nominations are prepared; - collaboration and co-operation with local authorities and people; - obstacles and difficulties encountered in that process - benefits and lessons learnt
  • 11.
    World Heritage List 33States Parties with no World Heritage Properties
  • 12.
    Regional Distribution ofall World Heritage Properties
  • 13.
    List of WorldHeritage in Danger 38 properties in 30 countries
  • 14.
    20 States withthe most properties inscribed Italy 47 Spain 44 China 43 France 38 Germany 37 Mexico 31 India 29 United Kingdom of Great Britain and Northern Ireland 28 Russian Federation 25 United States of America 21 Brazil 19 Australia 19 Greece 17 Japan 16 Canada 16 Sweden 15 Iran (Islamic Republic of) 15 Portugal 14 Poland 13 Czech Republic 12
  • 15.
    “the 1st C”: Measures • Re-establish the balance between different categories of sites / Revision of Tentative Lists taking into account the representivity of the sites that are listed at the national, regional and international levels, and the underrepresented categories to which they belong • Changes to names, boundary modifications, changes to the existing criteria • Need for a better cooperation between the 5 sub-regions to improve the representativity • Preparation of nomination of transnational sites to enhance international cooperation
  • 16.
    ”the 1th C”: Gap Analysis & Thematic Studies States Parties are encouraged to consult the analyses of both the World Heritage List and Tentative Lists prepared at the request of the Committee by ICOMOS and IUCN to identify the gaps in the World Heritage List. These analyses could enable States Parties to compare themes, regions, geo-cultural groupings and bio-geographic provinces for prospective World Heritage properties. http://whc.unesco.org/archive/2004/whc04-28com-13b1e.pdf http://whc.unesco.org/archive/2004/whc04-28com-13b2e.pdf The thematic studies carried out by ICOMOS and IUCN to evaluate proposed World Heritage properties in their regional, global or thematic context should not be confused with the comparative analysis to be prepared by States Parties. ICOMOS: http://www.icomos.org/studies/ IUCN: http://www.iucn.org/themes/wcpa/pubs/Worldheritage.htm
  • 17.
    “the 1st C”: Revision of the Tentative Lists • Operational Guidelines : Chapter II.C • Deadline for procedures : preferably 1 year prior to the submission of the any nomination (§65) • Tentative List should be re-examined/re-submitted every 10 years • Take into account the Global Strategy (OG II B), the Gap Analysis (IUCN 2004; ICOMOS 2004 – 28 COM) and specific thematic studies • Cooperate with other countries on specific themes • Review results of the Vilm meeting on Tentative Lists for natural heritage in Eastern and SEE Europe (May 2007)
  • 18.
    COUNTRY NUMBER OF SITES INSCRIBED NUMBEROF CULTURAL SITES ON THE TENTATIVE LIST NUMBER OF NATURAL SITES ON THE TENTATIVE LIST NUMBER OF MIXED SITES ON THE TENTATIVE LIST Czech Republic 12 CL 16 1 Hungary 7 CL (1 TB); 1 NAT 8 2 1 Poland 12 CL (1 TB); 1 NAT (TB) 4 2 Slovakia 5 CL; 2 NAT (TB) 9 4 1 Tentative Lists in Central Europe
  • 19.
    Tentative Lists inEastern Europe COUNTRY NUMBER OF SITES INSCRIBED NUMBER OF CULTURAL SITES ON THE TENTATIVE LIST NUMBER OF NATURAL SITES ON THE TENTATIVE LIST NUMBER OF MIXED SITES ON THE TENTATIVE LIST Armenia 3 CL 2 2 Azerbaijan 2 CL 6 4 Belarus 3 CL (1 CL TB) 1 NAT (TB) 10 1 Georgia 3 CL (2 CL in Danger) 11 4 Russian Federation 15 CL (2 TB) 10 NAT (1 TB) 16 7 3 Ukraine 4 CL (1 TB) 1 NAT (1 TB) 13 1 3
  • 20.
    COUNTRY NUMBER OF SITES INSCRIBED NUMBER OF CULTURAL SITESON THE TENTATIVE LIST NUMBER OF NATURAL SITES ON THE TENTATIVE LIST NUMBER OF MIXED SITES ON THE TENTATIVE LIST Albania 2 CL 2 1 Bosnia & Herzegovina 2 CL 3 1 4 Bulgaria 7 CL; 2 NAT 8 5 Croatia 6 CL; 1 NAT 13 2 1 FYROM 1 Mixed 1 2 Republic of Moldova 1 CL (TB) 2 Montenegro 1 CL; 1 NAT 4 1 Romania 6 CL; 1 NAT 10 4 Serbia 4 CL (1 CL in Danger) 5 5 1 Slovenia 2 CL (1 TB); 1 NAT 3 Tentative Lists in South-Eastern Europe
  • 21.
    Other revisions &changes Name changes • Operational Guidelines : § 167 • Deadline for procedures : 3 months prior to the World Heritage Committee Changes to existing criteria • Operational Guidelines : § 166 • Deadline for procedures : 1st February for all re-nominations (at best 18 months procedure before Committee approval)
  • 22.
    “Upstream Process” tonominations Improvements to the processes and practices prior to consideration by the World Heritage Committee of a nomination Document: WHC-12/36.COM/12C “Progress report on the reflection concerning the upstream processes” ”the 1th C” : Creative approaches in the nomination process
  • 23.
    The Periodic ReportingExercise - Opportunity to enhance Conservation - Tool for sustainable and effective Conservation ”the 2nd C”
  • 24.
    ”the 2nd C”: Key Priority Outstanding Universal Value of World Heritage properties, including the conditions of integrity and/or authenticity at the time of inscription, are sustained or enhanced over time This Strategic Objective is of primary importance and must be taken into account in all the activities undertaken in the implementation of the Convention: conservation and modernisation of the legal framework, conservation and socio-economic development, conservation and local community involvement and development of their quality of life, conservation and public awareness, conservation and policies, conservation and regional/international cooperation, conservation and tourism, conservation and professionalism/professional training, etc.
  • 25.
    All properties inscribedon the World Heritage List must have : - adequate long-term legislative, regulatory, institutional and/or traditional protection and management to ensure their safeguarding; - adequately delineated boundaries for effective protection; - appropriate management plan; - effective management system with common elements which include: a) a thorough shared understanding of the property by all stakeholders; b) a cycle of planning, implementation, monitoring, evaluation and feedback; c) the monitoring and assessment of the impacts of trends, changes, and of proposed interventions; d) the involvement of partners and stakeholders; e) the allocation of necessary resources; f) capacity-building; g) an accountable, transparent description of how the management system functions ”the 2nd C” : Requirements
  • 26.
    ”the 2nd C”: Challenges - The cultural and the natural heritage are increasingly threatened not only by the traditional causes of decay, but also by changing social and economic conditions - Linkage between the conservation, use and sustainable development - Complexity of day-to-day on-site management - Institutional reorganisations, instable governmental structures - Complexity of decision-making and coordination of stakeholders - Lack of clear definition of the legal provision of the management plans on all administrative levels - Lack of clear responsibility for the effective implementation of management plans - Lack of understanding or interpretation of the management plan concept - Lack of institutional memory - Gaps in conservation techniques and skills
  • 27.
    ”the 2nd C”: Needs - Political commitment - Strong political will and necessary legal and financial support for World Heritage - Innovative and specific solutions for sustaining living heritage sites - Guidelines for developers - Developing common management approaches by site category
  • 28.
    ”the 2nd C”: Measures - Implement appropriate legal, administrative and financial measures necessary for the protection of the WH properties - Adopte new laws and regulations to strengthen heritage protection, or ensure their more systematic application - Establish institutional coordination system, including inter- ministerial and interprofessional mechanism of cooperation - Establish integrated management process for WH properties - Establish and give legal meaning to WH Management Plans - Ensure that Management Plans are recognised in national and local planning laws - Prepare or implement management plans for properties - Secure appropriate governmental funding (through the national budget) - Ensure regular and systematic monitoring of the overall state of conservation of properties - Strengthen the consideration of OUV in development
  • 29.
    Periodic Reporting (OG,§ 199-210): periodic report by State Parties on the implementation of the Convention and the state of conservation of the properties inscribed in their territories driven by State Party Reactive monitoring (OG, § 169-176) reporting by the Secretariat and the Advisory Bodies on the state of conservation of specific properties under threat, to ensure that measures are taken to address these threats - Possibility to inscribe on List of WH in Danger - Possibility to delete properties from WH List driven by WH Committee Monitoring: at the heart of the World Heritage Convention
  • 30.
    Since 1994, morethan 2 000 reports on the state of conservation of World Heritage properties have been prepared and examined by the World Heritage Committee. Besides compiling background information on the property and reviewing information from different sources, these reports highlight the factors affecting the property and its Outstanding Universal Value and propose activities to mitigate the threats. In some cases, they also include a set of corrective measures and a timeframe for their implementation. ”the 2nd C” : Reactive Monitoring
  • 31.
    Evolution of thenumber of state of conservation reports from 2004 to 2012 165 137 133 161 158 177 147 169 140 0 30 60 90 120 150 180 28e session (Suzhou, 2004) 29e session (Durban, 2005) 30e session (Vilnius, 2006) 31e session (Christchurch, 2007) 32e session (Québec, 2008) 33e session (Séville, 2009) 34e session (Brasilia, 2010) 35e session (UNESCO, 2011) 36e session (Saint Petersburg, 2012)
  • 32.
  • 33.
    1. Paragraph 172of the Operational Guidelines: “States Parties to inform the Committee, via the World Heritage Centre, of intention to undertake major restorations or new constructions…before making decisions that would be difficult to reverse.” 2. Information received through networks of the Advisory Bodies or UNESCO World Heritage Centre and UNESCO Field Offices 3. Missions by UNESCO/ World Heritage Centre and Advisory Bodies (IUCN, ICOMOS, ICCROM) 4. Other sources of information including specialized NGOs, individuals, press, other States Parties etc How do sites get on to the reactive monitoring process?
  • 34.
    • Information receivedby the World Heritage Centre or Advisory Bodies; • Comments requested from the State Party (OG, § 174) and review by the Advisory Bodies (OG, § 175) • Based on comments from State Party and other information, WHC and Advisory Bodies decide whether a case requires a SOC Report to the Committee; • If a case is particularly urgent, a reactive monitoring mission can be dispatched immediately by the DG, in close consultation with State Party, including through the “Reinforced Monitoring Mechanism” (RMM). Steps of the Reactive Monitoring Process / 1
  • 35.
    • If aSOC report is prepared and presented to the Committee, the related Draft Decision may request a report from the State Party (1 February of the following year) and / or propose a reactive monitoring mission; • Joint WHC (UNESCO)-IUCN/ICOMOS/ICCROM mission is organised in consultation with State Party; Terms of Reference (TOR) are established based on the Committee’s Decision; • Joint mission report is prepared and shared with State Party for comments; then, SOC Report for the Committee is drafted, integrating comments from State Party, if any / if on time; • Decision by the Committee in June/July (State Party informed by letter in August/September) Steps of the Reactive Monitoring Process / 2
  • 36.
    ANNEX : „the2nd C“ - Requirements § 172 OG • Administrative status of the project – Current status of the project – When will planning applications be submitted? – When will the project start? – Who is responsible for approving project? – Which stakeholders have been/will be consulted? • Supporting material – Description of the project (narrative, visual) – Location in relation to WH property – relevant policies in the World Heritage property’s Management Plan or Management System – Heritage Impact Assessment (HIA guidance by ICOMOS International: http://www.international.icomos.org/world_heritage/HIA_20110201.pdf
  • 37.
    The Periodic Reportingexercise will be of benefit to all concerned States Parties and site-managers as a tool for sustainable management and monitoring of their World Heritage properties. At its 35th session (UNESCO, 2011), the World Heritage Committee, considering the need for more systematic monitoring of threats, called upon the States Parties to the Convention to support the establishment of a comprehensive "state of conservation information system" to support analytical studies and assist all stakeholders in site-management. State of conservation information system developed with support of teh Governement of Flanders is availble at http://whc.unesco.org/en/activities/691 ”the 2nd C” : Tools, Programmes, Initiatives
  • 38.
     Cultural Landscape Higher education  Human Evolution: Adaptations, Dispersals and Social Developments (HEADS)  Initiative on Heritage of Religious Interest  Managing Natural World Heritage  Marine Programme  Modern Heritage Programme  World Heritage Sustainable Tourism Programme WH Committee’s programmes and initiatives
  • 39.
     Astronomy andWorld Heritage Thematic Initiative  Biodiversity Conservation in Regions of Armed Conflict: Protecting World Heritage in the Democratic Republic of the Congo  Central Africa World Heritage Forest Initiative (CAWHFI)  Climate Change and World Heritage  Reducing Disasters Risks at World Heritage Properties  Small Island Developing States Programme  World Heritage Programme on Earthen Architecture (WHEAP)  World Heritage Cities …. WH Committee’s programmes and initiatives
  • 40.
    ”the 3rd C” The Periodic ReportingExercise Focus on Capacity-Building
  • 41.
    “the 3rd C”: Key Goals Based on the 5Cs
  • 42.
    World Heritage CapacityBuilding Strategy (WHCBS) based on “the 5 Cs” Strategic Objectives “the 3rd C” : Importance of the Capacity-Building Follow-up to the capacity building strategy (see document: WHC-12/36.COM/9B)
  • 43.
    “the 3rd C”: WHCB Programme - Key Objectives Three objectives of the World Heritage Capacity Building Programme based on WHCB Strategy 1. To collect and develop information and good practice for the better conservation and management of WH properties for use directly on sites and as a aid to better capacity building at all levels ; 2. To strengthen existing networks and create new networks where necessary, to promote better conservation practices and capacity building across the World Heritage system ; 3. To provide mechanisms for the delivery of information and capacity building across the WH system.
  • 44.
    ”the 3rd C”: Opportunities • Opportunity for regions or sub-regions to explore specific capacity building needs and develop relevant strategies and programmes for meeting those needs • Regional Strategies are to be developed using the process and the results of the second PR cycle of each Region • Interested State Parties should seize the opportunity of the PR process to develop national capacity building strategies
  • 45.
    “the 3rd C”: Regional Strategies - Expectations 1. The PR process and regional cooperation must achieve two things: – Identify a lead agency for this purpose (In some regions it is a Category 2 Centre). Get them involved from the beginning and during the PR process. – Identify capacity buildings issues for all audiences at the outset and try to reflect them when filling in the PR forms. 3. Submission – In the year following the presentation of the final Periodic Report, the lead organization and partners should work together to prepare a Regional Capacity Building Strategy which should be presented to the Committee at its next session. This Regional Strategy may have sub- regional components as necessary. 4. ‘Action plan’ – A concrete programme or ‘Action plan’ should accompany the Strategy, identifying specific activities, timelines, responsibilities and necessary resources
  • 46.
    “the 3rd C”: National Strategies - Expectations 1. Develop national capacity building strategies in order to: – Better understand specific national and property based capacity building needs. – Investigate what capacity building institutions exist and can offer support (national, regional, and international). – Identify target audiences (stepping beyond heritage organizations and practitioners to related institutions, networks and communities dealing with tourism, planning, local communities etc. 2. Joining forces – Some State Parties may want to join forces and deliver a joint strategy 3. Support – The World Heritage Centre, Advisory Bodies and other capacity building providers should provide necessary technical support and facilitation to States Parties wishing to develop national strategies.
  • 47.
    ”the 4th C” The Periodic ReportingExercise Focus on Communication
  • 48.
    ”the 4th C”: Goals for communication operations - Communication for awareness raising of local communities and the general public - Communication for information-sharing between concerned parties and the dissemination of “best practices” - Communication between donors for improved coordination of activities/strategies, communication for schools
  • 49.
    ”the 4th C”: Key Priorities - WH Convention widely recognized as highest standard of heritage and Conservation - World Heritage value, credibility and quality understood at all levels (international, national, local, on-site) - Increased awareness of the need for and benefits from conservation - World Heritage brand quality enhanced - Role of the civil society recognised by the authorities
  • 50.
    ”the 4th C”: Axes of communication for the general public 1. Awareness raising concerning heritage protection in general, its respect and the need to become involved in safeguarding actions 2. Awareness raising of the general public with regard to the World Heritage Convention itself, its objectives, principles, mechanisms, role, obligations of governments in their role as “States Parties” to the Convention
  • 51.
    • ”the 4th C”: Public participation goal
  • 52.
    ”the 4th C”: Challenges - Communication strategy should be updated to the new challenges WH Convention faces - WH Convention should be understood/known by the local communities - Lack of on-site awareness of what a WH Convention means - Lack of dialogue between national/local authorities and civil society on the issue relevant to management of World Heritage properties - Prevent / manage on-site conflicts between local authorities and citizens/owners - Lack of participation of Civil society in management process
  • 53.
    ”the 4th C”: Needs - Shared vision and knowledge of OUV as the basis for management - Developing or enhancing communication skills - Partnerships at the on-site level - New ways to present the values - Awareness building about the benefits and obligations - Developing innovative new partnerships with tourism organisations - Increase communication between experts, local communities, scientists, government officials, World Heritage specialists, etc… to encourage an improved exchange of knowledge, experience and “best practices”
  • 54.
    ”the 4th C”: Measures - Develop a clear communication strategy based on modern and traditional methods - Develop brand strategy - Use WH toolkits, manuals, programmes and initiatives - Inform the public by providing with balanced and objective information to assist them in understanding the problem, alternatives, opportunities and/or solutions - Develop networks, including network of WH sites - Enhance the role of the media, including internet based media - Use information and communication technologies, including new virtual social networks - Build partnership with local communities - Introduce « the celebratory aspect »
  • 55.
    ”the 4th C”: Examples of activities • various publications, press articles, brochures • Internet sites, • television and radio programmes • school programmes • sign-posting and information panels, press conferences • permanent and/or temporary itinerant exhibitions, stamps • celebration of special days such as the “World Heritage Days” • celebration of the anniversary date of inscription of properties on the List • translation of the “World Heritage in Young Hands” kit, etc.
  • 56.
    ”the 4th C”: Tools, Programmes, Networks The World Heritage Partnerships for Conservation Initiative (PACT) operates since 2002 and aims at fostering innovative and creative partnerships with the private sector to help the World Heritage Convention achieve its objectives. In order to reach the largest public possible, partners relay the message about World Heritage values through promotion and greater visibility. PACT objectives are: a) to raise awareness about World Heritage; and b) to mobilise sustainable resources for the long-term conservation of World Heritage, addressing mutually agreed issues and problems identified as priorities by the World Heritage Committee as a means for implementing its strategic objectives. The World Heritage PACT is intended to mobilize intellectual and technical resources and to create networks of exchange and technical assistance for World Heritage conservation and awareness raising activities
  • 57.
    A wide rangeof World Heritage publications, from periodicals to brochures and information kits, books, manuals, reports, and a map of World Heritage sites are available in a variety of languages for adults and young people. ”the 4th C” : World Heritage Publications
  • 58.
    Sustainable Tourism Programme 1.Building the capacity of World Heritage site management to deal with tourism. 2. Training local community members in tourism related activities to participate in the industry and receive tourism's benefits. 3. Aiding communities around the sites to market their products. 4. Raising public awareness of World Heritage and building pride with local communities and visitors through conservation education. 5. Using tourism generated funds to supplement site conservation and protection costs. 6. Spreading the lessons learned to other sites and protected areas. 7. Building increased awareness of World Heritage and its activities and policies for tourism industry officials and their clients.
  • 59.
    World Heritage EducationProgramme Young People’s Participation in World Heritage Promotion and Preservation
  • 60.
    WHYH Kit 32language versions  English (1998)  French (1999)  Spanish (1999; 2006)  Arabic (2000; 2003; 2009)  Chinese (1998)  Russian (2000)  Amharic (translated 2009; for publication)  Armenian (2002)  Finnish (2002)  Georgian (2001)  German (2003)  Hindi (2004)  Hungarian (2006)  Indonesian (2001)  Italian (2002) * also in video (2002)  Japanese (2000)  Khmer (2005)  Kiswahili (2004)  Korean (DPRK, 2003)  Korean (ROK, 2007)  Laotian (2001)  Latvian (2006)  Lithuanian (2004)  Mongolian (2004)  Pilipino (2004 CD-Rom)  Portuguese (translated 2009; for publication)  Slovak (2002)  Swedish (2003)  Turkish (2002)  Urdu (2003)  Uzbek (2001)  Vietnamese (2001)
  • 61.
    World Heritage Volunteers 2008:12 projects in 10 countries 2009: 11 projects in 10 countries 2010: 27 projects in 17 countries 2011: 28 projects in 17 countries 2012: youth projects at 40 WH sites
  • 62.
    National WH sitemanager networks
  • 63.
    ”the 5th C” The Periodic ReportingExercise Opportunity to enhance the role of Communities and reinforce their involvement in the implementation of the World Heritage Convention
  • 64.
    ”the 5th C”: Key Priorities - The conservation of the world's natural and cultural heritage should, wherever possible, be done with the active engagement of communities which have a close relationship with the heritage in question. - The process of community involvement should be recognized as an integral part of understanding and sustaining WH properties at all levels - Local community should be recognised key actors in the process of identification, sustainble management and communication of the values of the WH properties - Community interests should not ‘trump’ other strategic goals, but rather, should be used in a complementary manner
  • 65.
    ”the 5th C”: Requirements - The process of community involvement should be based on meaningful dialogue and decision-making between all stakholders - Traditional menagement systems should be recognised and enhanced through capacity-building activities
  • 66.
    ”the 5th C”: Challenges - Areas created in isolation of local communities in terms of their values, participation, or sharing of benefits, and heritage protection without community involvement and commitment risk failure - Without the understanding and support of the public at large, without the respect and daily care of the local communities, which are the true custodians of World Heritage, no amount of funds will suffice in protecting the sites. - Lack of the community participation strategy, including participatory planning processes involving local and national stakeholders - On-site conflicts due to the lack of dialogue between local authorities and civil society communities - Understanding of OUV and participation in the management process The identification of communities who have a particular interest is a matter that will require States to develop an explicit methodology.
  • 67.
    Within the contextof the International Year for the Rapprochement of Cultures 2010, proclaimed by the United Nations General Assembly, this international seminar was held in Kiev (Ukraine) from 2 to 5 November 2010, under the patronage of the President of Ukraine and UNESCO. The main objective of the Seminar was to explore ways of establishing a dialogue between all stakeholders, including religious communities and to explore possible ways of encouraging and generating mutual understanding and collaboration amongst them in the protection of World Heritage properties of religious interest. International Seminar « The Role of religious communities in the management of World Heritage properties » http://whc.unesco.org/en/religious-sacred-heritage/
  • 68.
    • Conference « Livingwith World Heritage »
  • 69.
    Kotor, Montenegro, 7– 8 June 2012 Presentations are available at http://www.unesco.org/venice The Worshop was hosted by the authorities of Montenegro and co- organized with the UNESCO Venice Office. The main outcome of the Workshop was an increased awareness of different aspects of community involvement, update of their implication in day-to-day site management in SEE and more in-depth knowledge about implementing participatory approaches in management practice. Many innovative and pro-active actions and strategies were presented during the Workshop. Workshop for SEE countries “World Heritage and Sustainable Development: the role of local communities in the management of UNESCO designated sites”
  • 70.
    « the 5Cs » : Specific recommandations • Dissemination of best practice models adapted to sites in the region; • Programme to strengthen national legislations for the protection of World Heritage (co-operation between the different levels of responsible authorities); • Integration of the World Heritage Strategic Objectives in overall planning processes at the national level; • Organisation of further sub-regional seminars and workshops with specific themes and ensure funding (extrabudgetary resources);
  • 71.