Evaluation and control
Presented by:-
Raksha Sharma
PQ-04
MPharm+ MBA
(NMIMS)
Pizza Hut – Stuck in the Middle
Pizza
hut was
failed
Due to
change in
industry
In 2016 they
reached 14100
locations
They had found that
there sales was
decreased by 3.5%
from previous year
There was change in
customer demand, as
they want pizza of
there choice
Way of order was
also of there
choice online or
having it there
Online and
mobile ordering
has 50% rival of
dominos
Customer
demand fresh
veggies and
gluten free and
fast service
Now people prefer
fast casual
preparation &
pizza hut kitchen
were closed
earlier
They made
several changes in
there system
considering all
parameters
After this
they decide to
remodel there
other stores
They tract the effect of
change & the system
was true evaluation
and control challenge
Determine
what to
measure
Establish
predetermined
Standards
Measure
Performance
Take
corrective
actions
Does
Performa-
nce match
standard?
Stop
Yes
No
Measuring Performance
Measuring performance conti….
• If strategic management processes were
inappropriately used then performance results are
undesirable .
• Top managers must know about undesire
performance so that they can develop new
implementation program and procedures.
• Obstacle to effective control is the difficulty in
developing appropriate measures of important
activities and control.
Measuring performance conti….
• Performance is end result of activity,
• To assess performance based on organizational unit to
be appraised and the objective to be achieved selective
measures are taken.
• The objective that were established earlier in the
strategy formulation part of strategic management
process (deals with profitability, market share, cost
reduction )is used to measure corporate performance
when the strategies are implemented.
Appropriate Measures
• Return on Investment (ROI)
• Earnings Per Share (EPS)
These measures are appropriate for evaluating a
corporation's ability to achieve a profitability objective.
As corporation’s major objective is profitability , ROI
and EPS can be calculated after profits totaled period.
Therefore a firm needs develop measures that can
predict profitability .
these are referred as steering controls because the
variable they measures influence profitability in future.
Appropriate Measures Examples
 Airlines, for example, closely monitor cost per
available seat mile (CASM). In 2002 CASM was 7.4¢
the lowest among all, contrast with US Airways 11.6¢
the highest in industry. Due to low cost southwest got
competitive advantage. The cost was raised up to
12.7¢ in 2015, just after its merger with American
Airlines. After a while it was replaced as most low-cost
airline by spirit Airlines whose CASM is 10.1¢.
 An example of a steering control used by retail stores
is the inventory turnover ratio, in which a retailer’s
cost of goods sold is divided by the average value of its
inventories. E.g:- office depot increased its inventory
turnover ratio from 6.9 to 7.5 in year.
 Another steering control is customer satisfaction.
Types Of Controls
Output Controls
•Specify what is to be accomplished
•Focus on end result of behaviors
through use of objectives and
performance targets or
milestones.
•Eg:- sales quota, specific cost
reduction, etc.
Behaviors Control
•It specifies how something is
done through policies, rules,
SOP’s and order from superior.
•Eg :- (Company monitors the
employees phone calls and PC’s,
once a supervisor caught spending
6 to 8 hrs/day in watching videos ,
job searching & downloading.)
Input Controls
Emphasize on resources ,
knowledge, skills, abilities, values,
motive of employees.
Eg:- yrs. of experience, yrs. of
education etc.
Eg:- Murlidharan and hamiltion emphasize on following stages of development in sequence.
Type of control contii..
ISO 9000 Series of Quality
Standards
•A way of objectively
documenting a company’s high-
level of quality operations
•ISO 9001 require firm to
separately document design
process and output, and verify
work.
ISO 14000 Series of Quality
Standards
•Establishes how to document
the company’s
impact on the environment
•ISO 14001 specify that
companies should establish,
maintain and continuously
improve an environmental
management system.
Solar Power and the Grid
Only electric industry is
more concerned about
established procedure
and minimizing
fluctuations in business
model
Due to storm the
power grid was
down and issue
was in
fluctuation in
power demand
For backup
they were
using
generators to
available
excess power
Solar array work
good in shining sun
even modest cloud
cause fluctuations
in output.
For duke battery
system mean
smoothing out
sudden swings
in output from
arrays heling
the grid to
recharge battery.
Aquion
batteries are
cheap, non
toxic, made of
salt water,
carbon &
MnO2.
Study shows
market of
batteries is grew
by 243% and
expect to grow
$2.5 B by 2020
Instead of chemical
reaction ultracapacitors
stored energy like electric
field, they are high power
batteries sustained for
several hours
Duke had 600
megawatts of
solar capacity
by 2016
This was good for
environment as well
good solution to
industry’s problem
Duke had partnership
with Aquion to develop
batteries with
ultracapacitor to
smooth-out fluctuation
The solar
array had
added new
wrinkle to
issue in
industry
Activity-based costing
• It allocates indirect and fixed costs to individual
product lines based on value-added activities going
into that product
• This method is used in constructing value chain
analysis of firm activities for making outsourcing
decision.
• Traditional cost accounting is use when direct labor
account for total cost and company produce very
few products.
• Allows accountants to charge costs more accurately
than traditional, since it allocates overhead more
precisely.
Example pen Manufacturing company
+
Mfg black & blue pen
Retooling machine
require 8 hrs TC= supplies (for both pen ) + DL+
FOH
OH cost includes cost
of reprogramming
If company produces 10x of black pen
than blue then the reprogramming
expense will allocate to black pen
(As per traditional costing method)
(As per Activity based costing)
Make 2 different
activities in pen mfg
Now its easy to
calculate trigger cost
of retooling
This shows that the product
carries only those cost for
which overheads are
consume
Management estimate blue
pen cost is 2X as of black
pen
Unless Company charge
higher price for blue pen they
will not get profit or unless
there is any reason for selling
company will earn
greater profit if
stop making blue
pen
Enterprise risk management
• Enterprise risk management
– Corporate-wide, integrated process for managing
uncertainties that could negatively or positively
influence the achievement of objectives.
– Previously risk was managed in fragments within
business function.
– Process risk
– Safety risk
– Insurance and financial risk
Enterprise risk management contii….
The process of rating risks involves three steps:
1. Identify the risks using scenario analysis,
brainstorming, or performing risk assessments.
2. Rank the risks, using some scale of impact and
likelihood.
3. Measure the risks using some agreed-upon standard.
Primary measures for corporate
performance
• Previously even for simple financial measures such as
ROI and EPS were used to access overall performance
of firm.
• But now analyst recommend other methods such as:-
 Stakeholder measures
 Shareholder measure
 Balanced scorecard approach.
Primary measures for corporate
performance contii…
Even tough these methods has supporters as well
detractors the recent trend is towards more complicated
financial measures.
Eg:- Research shows that companies pursuing strategies
founded on innovation and new product development
now tend to non-financial over financial measures.
Traditional Financial Measures
• Return on investment (ROI)
result of dividing net income before taxes by the total
amount invested in the company (typically measured
by total assets)
• Earnings per share (EPS)
dividing net earnings by the amount of common stock
• Return on equity (ROE)
dividing net income by total equity
Traditional Financial Measures contii..
• Operating cash flow
– the amount of money generated by a company
before the cost of financing and taxes
• Free cash flow
– the amount of money a new owner can take out of
the firm without harming the business
Non–financial Performance Measures
Used by Internet Business Ventures
• Stickiness
– length of website visit
• Eyeballs
– number of people who visit a website
• Mindshare
– brand awareness
Shareholder value
• Shareholder value can be defined as the present value
of the anticipated future stream of cash flows from the
business plus the value of the company if liquidated.
• In simple term it (SVA) is expressed as a
company's capital costs from stock and bond
issues subtracted from its net operating profit after
tax (NOPAT).
• SVA = NOPAT - Cost of Capital
• For instance, if a company's NOPAT is $200,000 and
its capital costs are $50,000, its SVA would be
$150,000 ($200,000 - $50,000 = $150,000).
Economic value-added (EVA)
Economic value added (EVA) is an internal
management performance measure that compares
net operating profit to total cost of capital,
It measures the difference between the pre-strategy
and post-strategy values for the business.
• Economic value added (EVA) is also referred to
as economic profit.
• The formula for EVA is:
• EVA = Net Operating Profit After Tax -
(Capital Invested x WACC)
Economic value-added (EVA)
contii..
• EG:- Assume that Company XYZ has the following
components to use in the EVA formula:
NOPAT = $3,380,000
Capital Investment = $1,300,000
WACC = .056 or 5.60%
• EVA = $3,380,000 - ($1,300,000 x .056) = $3,307,200
• The positive number tells Company XYZ more than
covered its cost of capital. A negative number indicates
that the project did not make enough profit to cover
the cost of doing business.
Market value-added (MVA)
It Measures difference between market value of a
corporation and capital contributed by shareholders
and lenders
• The formula used to find market value added is:
• Market Value Added = Market Value -
Capital Invested
• steps to calculate MVA
• 1. add all the capital ( shareholders and bondholders
& retained earnings)
• 2. reclassify certain accounting expense to reflect the
future earnings
• 3. Total the value of all outstanding stock adding it to
company debt .
Market value-added (MVA)
contii…
• For example, if bondholders and shareholders have
contributed $1,000,000 to form Company XYZ and
during its existence since inception and it is currently
listed on the stock exchange with a stock market
value of $2,000,000, it can be said that the MVA of the
company is $1,000,000.
The End of the Cash Register Receipt
Each yr in US
more than 9 m
trees cut down for
making cash
receipt which is
simply thrown
after sometime
In 1990’s company
started moving
towards E-receipts,
but then dot-com
brought it to
temporary end.
E-receipts
benefits was
saving printing,
landfill waste &
provide customer
with electronic
record.
For retailers cost was
saving and promotion
became easier because
they were having
customer email id’s
Most company
started switching
to ER, Walmart
had develop ER
locker app
Few companies
start using smart
receipts to provide
value to customer
Smart receipt shows
customer email id’s
and provide
information videos
about product install
or provide link.
Through links it also
provide coupons or
surveys (all information is
gather by retailer so that
you can be targeted more
precisely)
Balanced scorecard
• Balanced scorecard
– combines financial measures that tell results of
actions already taken with operational measures on
customer satisfaction, internal processes, and
corporation’s innovation and improvement
activities—the drivers of future financial
performance
Balanced Scored Card Approach
Financial
Internal
business
perspective
Customer
Innovation
and
learning
How do we
appear to
shareholde
rs?
How do
customers view
us?
What must we
excel at?
Can we
continue
to improve
and create
value?
In the balanced scorecard, management develops goals or
objectives in each of four areas:
Example: Upward Airlines
Key performance measures
• Key performance measures
– measures that are essential for achieving a desired
strategic option
• measures that are essential for achieving a desired
strategic option.
• Example :- cash flow, sales growth, conversion time,
customer turnover rate, etc.
• Is a business that chooses to use the percentage of
income it receives from its returning customers as its
KPI.
Key performance measures contii…
• 2013 global survey by bain and company reported 73%
of fortune 1000 companies in North America were
projected to use a version of balance scorecard.
• Du Pont engineering polymers division used the
balanced scorecard to align employees, business
units,& shared services around common strategy
involve productivity improvements and revenue
growth.
Evaluation of top management and board
of directors
• Through strategy audit and compensation committees,
a board of directors is charged closely evaluating job
performance of CEO and top management team.
• Recent study state that 98%of boards used financial
measures as the key criteria for CEO and top
management performance evaluation while less than
half organization look towards more qualitative
measures, such as customer satisfaction(37%) ,
innovation (24%).
Chairman-CEO Feedback Instrument
Many companies evaluate there CEO by 17-item
questionnaire.
• The questionnaire focuses on four key areas:
1.Company performance
2.Leadership of the organization.
3.Team-building and management succession.
4.Leadership of external constituencies.
Some board members had understand that CEO should
be evaluated beyond financial performance.
Chairman-CEO Feedback Instrument
contii…
• Some board members had understand that CEO
should be evaluated beyond financial performance.
• They grade them on 6 characteristics
1. Vision
2. HR
3. Proper capital allocation
4. Culture of organization
5. Decision making
6. Performance
Management audits
• Management audits
– developed to evaluate activities such as corporate
social responsibility, functional areas like the
marketing department, and divisions such as the
international division
– useful to boards of directors in evaluating
management’s handling of various corporate
activities
Strategic audits
• Strategic audits
– provides checklist of questions, by area or issue,
enabling systematic analysis of various corporate
functions and activities to be made
– useful as diagnostic tool to pinpoint corporate-wide
problem areas and to highlight organizational
strengths and weaknesses
Primary measures of Divisional and
functional performance
• Companies use various techniques to evaluate and
control performance in divisions, (SBU’s) strategic
business unit and functional areas.
• if corporation of composed of SBU’s and division units
then they use many performance measures (ROI,
EVA) & functional measures (market share &
sales/employee (marketing) unit cost and percentage
defects.
• EG:- FedEx used Enhanced Tracker Software with its
COSMOS database to track the progress of its 2.5 to
3.5 M shipments daily
Responsibility centers
• Responsibility centers
– used to isolate a unit so it can be evaluated
separately from the rest of the corporation
– has its own budget and is evaluated on its use of
budgeted resources
– headed by the manager responsible for the center’s
performance
Responsibility Centers
Investme
nt centers
• Performanc
e is
measured
in terms of
difference
between its
resources
and its
services or
products.
Profit
centers
• Performanc
e is
measured
in different
revenues
(which
measures
production)
and
expenditur
es .
Expense
centers
• Resources
measured
in dollars ,
without
considerati
on for
service or
product.
Revenue
centers
• Production
in terms of
unit or
dollar
sales, here
profits are
notconsider
sales dept
has less
influence
over cost of
product sell
cost
centers
• Used in
manufactur
ing
The result
is expected
cost of
production.
Using Benchmarking To Evaluate
Performance
• Benchmarking
– the continual process of measuring products,
services and practices against the toughest
competitors or those companies recognized as
industry leaders
Steps of benchmarking process
1. Identify area or process to be examined
2. Find behavioral and output measures
3. Select accessible set of competitors of best practices
4. Calculate differences among company’s performance
measurements and competitors; determine why
differences exist
5. Develop tactical programs for closing performance
gaps
6. Implement the programs and compare the results
Benchmarking Example
• In 2015 survey by Bain and company of companies of
various sizes across globe found that benchmarking
was second most used tool (with strategic planning).
• It can also increase sales, improve goals, boost
employee motivation
Counterfeit Goods & Pirated Software:
A Global Problem
15% to 20 % of
goods in china
counterfeit i.e,
(tide,
budwiser,
malboro)
Yamaha
estimates 5
out of every 6
bikes bearing
brand name
are fake
Fake cisco
network
router & nokia
mobile phones
are easily
found in china
market
P&G estimate
15% soap &
detergents are
china brands
costing 150$ M
loss to company
One person
disclose that he
can make 1000
Nike shoes in 10
days costing
4$/pair.
Automotive
resources market
research shows
Profit margin is
more on counterfeit
(80%) than real
(15%)
Thousands of
counterfeit are
active in china
in various
types of
factories
Also found
that factory in
donguan make
fake callaway
golf club bag
at rate of
500/week
Shipped goods
across
different
countries
According to business
software alliance & ISDC
35% of software in
computers are pirated
World cost of
software
piracy was
63$ B in 2016
21% software in
Us is pirated and
it is now 26-30%
in European
union.
Strategic Information Systems
• Before performance measures can have any impact on
strategic management, they first communicate this to
people who are responsible for formulating and
implementing strategic plans. This function is perform
by strategic information system
• It can be computer-based, manual, formal or informal.
• E.g.:- checkout registers in Walmart transmit
information hourly to computers at the company
headquarters. So that managers know every morning
that how many items sold each day, and through this
they can predict of future days.
Strategic Information Systems contii..
• Enterprise resource planning (ERP)
– unites all of a company’s major business activities,
from order processing to production, within a single
family of software modules
– provides instant access to critical information to
everyone in the organization, from the CEO to the
factory floor worker
– Three reasons of ERP fail
1. Insufficient tailoring of software to fit the
company
2. Inadequate training
3. Insufficient implementation support
Strategic Information Systems contii…
• Radio frequency identification (RFID)
– an electronic tagging technology used to improve
supply chain efficiency
• Divisional and functional strategic information
support
– used to support, reinforce, or enlarge business level
strategy throughout the decision-support system
Problems in Measuring Performance
• Lack of quantifiable objectives or performance
standards
• Inability to use information systems to provide timely
and valid information
• The act of monitoring and measuring performance
can cause side effect which interfere overall corporate
performance.
Short-Term Orientation
Long-term evaluations may not be conducted because
executives:
• Don’t realize their importance.
• Believe that short-term considerations are more
important than long-term considerations.
• Aren’t personally evaluated on a long-term basis.
• Don’t have the time to make a long-term analysis.
Short-Term Orientation contii..
• Many accounting based measures (EPS & ROI)
encourage short term orientation.
• Growth in Eps is an important driver of near term
stock price, managers are biased against investment
that might reduce short – term EPS.
• One limitation of ROI performance measure is its
short term nature, which realize short term benefits
for company.
• ROI figure can be manipulated by managers.
Short-Term Orientation Example
• HP acquire British Firm Autonomy for $11.1 B in 2011
and write down $8.8 B in 2012 as the company find
significant accounting errors. Multiple lawsuits were
filed against HP, Its officers, directors and accounting
firm involved with autonomy before acquisition, later
HP broke up into 2 companies HP enterprise was able
to use unique capabilities that autonomy owned to
dramatically pushed into cloud computing.
Goal Displacement
• Goal displacement
– confusion of means with ends
– occurs when activities originally intended to help
managers attain corporate objectives become ends
in themselves—or are adapted to meet ends other
than those for which they were intended
– behavior substitution and sub optimization
Goal Displacement contii…
• Behavior substitution
– phenomenon of pursuing substitute activities that
do not lead to goal accomplishment instead of
activities that do lead to goal accomplishment
because the wrong activities are being rewarded
– E.g.:- sears management thought they could
improve employee productivity by trying
performance reward, they paid commission to its
autoshop employees as percentage of repair bill. BS
resulted as employees altered their behavior to fit
the reward system, the results were over-billed
customers, charge for work never done, and a
scandal that tarnish sears reputation for many
years.
Behavior Sub optimization
• Refers to phenomenon of a unit optimizing its goal
accomplishment to the detriment of the organization
as a whole
• Eg:- sears in 2016 classic example of type of
dysfunction the company had spiraled downward the
hand of investor and CEO Eddie Lampert. An Ayn
Rand fan, he split the company into 30 autonomous
units , each with its own executives and board of
directors , to boost “visibility and accountability”.
Guidelines for Proper Control
1. Controls should involve only the minimum amount of
information needed to give a reliable picture of events.
2. Controls should monitor only meaningful activities and
results, regardless of measurement difficulty.
3. Controls should be timely so that corrective action can be
taken before it is too late.
4. Long-term and short-term goals should be used.
5. Controls should aim at pinpointing exceptions.
6. Emphasize the reward of meeting or exceeding standards
rather than punishment for failing to meet standards.
Approaches to Strategic Incentive
Management
Weighted-factor method
Appropriate for
measuring and
rewarding the
performance of top
SBU managers and
group level executives
when performance
vary from one unit to
other.
Long-term evaluation method
Compensates
managers for
achieving objectives
set over a multilayer
period.
Strategic funds method
Encourages
executives to look at
developmental
expenses required for
current operations.
Approaches to Strategic Incentive
Management
An effective way to achieve the desired strategic results
through a reward system is to combine the three
approaches:
1. Segregate strategic funds from short-term funds.
2. Develop a weighted factor chart for each SBU.
3. Measure performance based on pre-tax profit,
weighted factors and long-term evaluation of the
SBU’s performance.
Business Strength/Competitive Position
1. Which of the following personality characteristics are
associated with people who are likely to exhibit violent
behavior on job ?
A. Neurotic
B. Optimistic
C. Extraverted
D. Negative
2. Which of the following is categorized as indirect
payment portion of employees compensation ?
A. Wages
B. Salaries
C. Commission
D. Employer - paid Insurance
3. Operating profit held with firm after deducting cost of
capital is classified as
A. benefits added into salaries
B. investments added
C. capitals added
D. economic value added
4. In an activity based cost system; an activity/unit of
work or task with differentiated purposes will be
classified as
A. different task
B. purpose cost
C. an activity
D. an allocation cost
5. Formula to calculate return on investment, according
to profitability analysis in DuPont method is
A. return on sales * investment turnover
B. return on sales + investment turnover
C. return on sales - investment turnover
D. investment turnover + residual income
6. Which of following is an example of internal business
perspective in balanced scorecard?
A. employee turnover rates
B. operating capabilities and number of patents
C. operating income and revenue growth
D. customer satisfaction and market share
7. The manager who is responsible for only the cost of
the company is classified as?
A. cost center
B. revenue center
C. profit center
D. investment center
8. output , behavior and input control are not ---------------
?
A. Interrelated
B. Interchangeable
C. Appropriate
D. Dependent on each other
9. Among the following which is not non-financial
performance measures?
A. Operating cash flow
B. Mindshare
C. Eyeballs
D. stickiness
10. Transfer tech pricing is commonly used in
-------?
A. Horizontally integrated corporations
B. Vertically integrated corporations
C. Mutual agreement procedures
D. Advance pricing process
Evaluation and control

Evaluation and control

  • 1.
    Evaluation and control Presentedby:- Raksha Sharma PQ-04 MPharm+ MBA (NMIMS)
  • 2.
    Pizza Hut –Stuck in the Middle Pizza hut was failed Due to change in industry In 2016 they reached 14100 locations They had found that there sales was decreased by 3.5% from previous year There was change in customer demand, as they want pizza of there choice Way of order was also of there choice online or having it there Online and mobile ordering has 50% rival of dominos Customer demand fresh veggies and gluten free and fast service Now people prefer fast casual preparation & pizza hut kitchen were closed earlier They made several changes in there system considering all parameters After this they decide to remodel there other stores They tract the effect of change & the system was true evaluation and control challenge
  • 3.
  • 4.
    Measuring performance conti…. •If strategic management processes were inappropriately used then performance results are undesirable . • Top managers must know about undesire performance so that they can develop new implementation program and procedures. • Obstacle to effective control is the difficulty in developing appropriate measures of important activities and control.
  • 5.
    Measuring performance conti…. •Performance is end result of activity, • To assess performance based on organizational unit to be appraised and the objective to be achieved selective measures are taken. • The objective that were established earlier in the strategy formulation part of strategic management process (deals with profitability, market share, cost reduction )is used to measure corporate performance when the strategies are implemented.
  • 6.
    Appropriate Measures • Returnon Investment (ROI) • Earnings Per Share (EPS) These measures are appropriate for evaluating a corporation's ability to achieve a profitability objective. As corporation’s major objective is profitability , ROI and EPS can be calculated after profits totaled period. Therefore a firm needs develop measures that can predict profitability . these are referred as steering controls because the variable they measures influence profitability in future.
  • 7.
    Appropriate Measures Examples Airlines, for example, closely monitor cost per available seat mile (CASM). In 2002 CASM was 7.4¢ the lowest among all, contrast with US Airways 11.6¢ the highest in industry. Due to low cost southwest got competitive advantage. The cost was raised up to 12.7¢ in 2015, just after its merger with American Airlines. After a while it was replaced as most low-cost airline by spirit Airlines whose CASM is 10.1¢.  An example of a steering control used by retail stores is the inventory turnover ratio, in which a retailer’s cost of goods sold is divided by the average value of its inventories. E.g:- office depot increased its inventory turnover ratio from 6.9 to 7.5 in year.  Another steering control is customer satisfaction.
  • 8.
    Types Of Controls OutputControls •Specify what is to be accomplished •Focus on end result of behaviors through use of objectives and performance targets or milestones. •Eg:- sales quota, specific cost reduction, etc. Behaviors Control •It specifies how something is done through policies, rules, SOP’s and order from superior. •Eg :- (Company monitors the employees phone calls and PC’s, once a supervisor caught spending 6 to 8 hrs/day in watching videos , job searching & downloading.) Input Controls Emphasize on resources , knowledge, skills, abilities, values, motive of employees. Eg:- yrs. of experience, yrs. of education etc. Eg:- Murlidharan and hamiltion emphasize on following stages of development in sequence.
  • 9.
    Type of controlcontii.. ISO 9000 Series of Quality Standards •A way of objectively documenting a company’s high- level of quality operations •ISO 9001 require firm to separately document design process and output, and verify work. ISO 14000 Series of Quality Standards •Establishes how to document the company’s impact on the environment •ISO 14001 specify that companies should establish, maintain and continuously improve an environmental management system.
  • 10.
    Solar Power andthe Grid Only electric industry is more concerned about established procedure and minimizing fluctuations in business model Due to storm the power grid was down and issue was in fluctuation in power demand For backup they were using generators to available excess power Solar array work good in shining sun even modest cloud cause fluctuations in output. For duke battery system mean smoothing out sudden swings in output from arrays heling the grid to recharge battery. Aquion batteries are cheap, non toxic, made of salt water, carbon & MnO2. Study shows market of batteries is grew by 243% and expect to grow $2.5 B by 2020 Instead of chemical reaction ultracapacitors stored energy like electric field, they are high power batteries sustained for several hours Duke had 600 megawatts of solar capacity by 2016 This was good for environment as well good solution to industry’s problem Duke had partnership with Aquion to develop batteries with ultracapacitor to smooth-out fluctuation The solar array had added new wrinkle to issue in industry
  • 11.
    Activity-based costing • Itallocates indirect and fixed costs to individual product lines based on value-added activities going into that product • This method is used in constructing value chain analysis of firm activities for making outsourcing decision. • Traditional cost accounting is use when direct labor account for total cost and company produce very few products. • Allows accountants to charge costs more accurately than traditional, since it allocates overhead more precisely.
  • 12.
    Example pen Manufacturingcompany + Mfg black & blue pen Retooling machine require 8 hrs TC= supplies (for both pen ) + DL+ FOH OH cost includes cost of reprogramming If company produces 10x of black pen than blue then the reprogramming expense will allocate to black pen (As per traditional costing method) (As per Activity based costing) Make 2 different activities in pen mfg Now its easy to calculate trigger cost of retooling This shows that the product carries only those cost for which overheads are consume Management estimate blue pen cost is 2X as of black pen Unless Company charge higher price for blue pen they will not get profit or unless there is any reason for selling company will earn greater profit if stop making blue pen
  • 13.
    Enterprise risk management •Enterprise risk management – Corporate-wide, integrated process for managing uncertainties that could negatively or positively influence the achievement of objectives. – Previously risk was managed in fragments within business function. – Process risk – Safety risk – Insurance and financial risk
  • 14.
    Enterprise risk managementcontii…. The process of rating risks involves three steps: 1. Identify the risks using scenario analysis, brainstorming, or performing risk assessments. 2. Rank the risks, using some scale of impact and likelihood. 3. Measure the risks using some agreed-upon standard.
  • 15.
    Primary measures forcorporate performance • Previously even for simple financial measures such as ROI and EPS were used to access overall performance of firm. • But now analyst recommend other methods such as:-  Stakeholder measures  Shareholder measure  Balanced scorecard approach.
  • 16.
    Primary measures forcorporate performance contii… Even tough these methods has supporters as well detractors the recent trend is towards more complicated financial measures. Eg:- Research shows that companies pursuing strategies founded on innovation and new product development now tend to non-financial over financial measures.
  • 17.
    Traditional Financial Measures •Return on investment (ROI) result of dividing net income before taxes by the total amount invested in the company (typically measured by total assets) • Earnings per share (EPS) dividing net earnings by the amount of common stock • Return on equity (ROE) dividing net income by total equity
  • 18.
    Traditional Financial Measurescontii.. • Operating cash flow – the amount of money generated by a company before the cost of financing and taxes • Free cash flow – the amount of money a new owner can take out of the firm without harming the business
  • 19.
    Non–financial Performance Measures Usedby Internet Business Ventures • Stickiness – length of website visit • Eyeballs – number of people who visit a website • Mindshare – brand awareness
  • 20.
    Shareholder value • Shareholdervalue can be defined as the present value of the anticipated future stream of cash flows from the business plus the value of the company if liquidated. • In simple term it (SVA) is expressed as a company's capital costs from stock and bond issues subtracted from its net operating profit after tax (NOPAT). • SVA = NOPAT - Cost of Capital • For instance, if a company's NOPAT is $200,000 and its capital costs are $50,000, its SVA would be $150,000 ($200,000 - $50,000 = $150,000).
  • 21.
    Economic value-added (EVA) Economicvalue added (EVA) is an internal management performance measure that compares net operating profit to total cost of capital, It measures the difference between the pre-strategy and post-strategy values for the business. • Economic value added (EVA) is also referred to as economic profit. • The formula for EVA is: • EVA = Net Operating Profit After Tax - (Capital Invested x WACC)
  • 22.
    Economic value-added (EVA) contii.. •EG:- Assume that Company XYZ has the following components to use in the EVA formula: NOPAT = $3,380,000 Capital Investment = $1,300,000 WACC = .056 or 5.60% • EVA = $3,380,000 - ($1,300,000 x .056) = $3,307,200 • The positive number tells Company XYZ more than covered its cost of capital. A negative number indicates that the project did not make enough profit to cover the cost of doing business.
  • 23.
    Market value-added (MVA) ItMeasures difference between market value of a corporation and capital contributed by shareholders and lenders • The formula used to find market value added is: • Market Value Added = Market Value - Capital Invested • steps to calculate MVA • 1. add all the capital ( shareholders and bondholders & retained earnings) • 2. reclassify certain accounting expense to reflect the future earnings • 3. Total the value of all outstanding stock adding it to company debt .
  • 24.
    Market value-added (MVA) contii… •For example, if bondholders and shareholders have contributed $1,000,000 to form Company XYZ and during its existence since inception and it is currently listed on the stock exchange with a stock market value of $2,000,000, it can be said that the MVA of the company is $1,000,000.
  • 25.
    The End ofthe Cash Register Receipt Each yr in US more than 9 m trees cut down for making cash receipt which is simply thrown after sometime In 1990’s company started moving towards E-receipts, but then dot-com brought it to temporary end. E-receipts benefits was saving printing, landfill waste & provide customer with electronic record. For retailers cost was saving and promotion became easier because they were having customer email id’s Most company started switching to ER, Walmart had develop ER locker app Few companies start using smart receipts to provide value to customer Smart receipt shows customer email id’s and provide information videos about product install or provide link. Through links it also provide coupons or surveys (all information is gather by retailer so that you can be targeted more precisely)
  • 26.
    Balanced scorecard • Balancedscorecard – combines financial measures that tell results of actions already taken with operational measures on customer satisfaction, internal processes, and corporation’s innovation and improvement activities—the drivers of future financial performance
  • 27.
    Balanced Scored CardApproach Financial Internal business perspective Customer Innovation and learning How do we appear to shareholde rs? How do customers view us? What must we excel at? Can we continue to improve and create value? In the balanced scorecard, management develops goals or objectives in each of four areas:
  • 28.
  • 29.
    Key performance measures •Key performance measures – measures that are essential for achieving a desired strategic option • measures that are essential for achieving a desired strategic option. • Example :- cash flow, sales growth, conversion time, customer turnover rate, etc. • Is a business that chooses to use the percentage of income it receives from its returning customers as its KPI.
  • 30.
    Key performance measurescontii… • 2013 global survey by bain and company reported 73% of fortune 1000 companies in North America were projected to use a version of balance scorecard. • Du Pont engineering polymers division used the balanced scorecard to align employees, business units,& shared services around common strategy involve productivity improvements and revenue growth.
  • 31.
    Evaluation of topmanagement and board of directors • Through strategy audit and compensation committees, a board of directors is charged closely evaluating job performance of CEO and top management team. • Recent study state that 98%of boards used financial measures as the key criteria for CEO and top management performance evaluation while less than half organization look towards more qualitative measures, such as customer satisfaction(37%) , innovation (24%).
  • 32.
    Chairman-CEO Feedback Instrument Manycompanies evaluate there CEO by 17-item questionnaire. • The questionnaire focuses on four key areas: 1.Company performance 2.Leadership of the organization. 3.Team-building and management succession. 4.Leadership of external constituencies. Some board members had understand that CEO should be evaluated beyond financial performance.
  • 33.
    Chairman-CEO Feedback Instrument contii… •Some board members had understand that CEO should be evaluated beyond financial performance. • They grade them on 6 characteristics 1. Vision 2. HR 3. Proper capital allocation 4. Culture of organization 5. Decision making 6. Performance
  • 34.
    Management audits • Managementaudits – developed to evaluate activities such as corporate social responsibility, functional areas like the marketing department, and divisions such as the international division – useful to boards of directors in evaluating management’s handling of various corporate activities
  • 35.
    Strategic audits • Strategicaudits – provides checklist of questions, by area or issue, enabling systematic analysis of various corporate functions and activities to be made – useful as diagnostic tool to pinpoint corporate-wide problem areas and to highlight organizational strengths and weaknesses
  • 36.
    Primary measures ofDivisional and functional performance • Companies use various techniques to evaluate and control performance in divisions, (SBU’s) strategic business unit and functional areas. • if corporation of composed of SBU’s and division units then they use many performance measures (ROI, EVA) & functional measures (market share & sales/employee (marketing) unit cost and percentage defects. • EG:- FedEx used Enhanced Tracker Software with its COSMOS database to track the progress of its 2.5 to 3.5 M shipments daily
  • 37.
    Responsibility centers • Responsibilitycenters – used to isolate a unit so it can be evaluated separately from the rest of the corporation – has its own budget and is evaluated on its use of budgeted resources – headed by the manager responsible for the center’s performance
  • 38.
    Responsibility Centers Investme nt centers •Performanc e is measured in terms of difference between its resources and its services or products. Profit centers • Performanc e is measured in different revenues (which measures production) and expenditur es . Expense centers • Resources measured in dollars , without considerati on for service or product. Revenue centers • Production in terms of unit or dollar sales, here profits are notconsider sales dept has less influence over cost of product sell cost centers • Used in manufactur ing The result is expected cost of production.
  • 39.
    Using Benchmarking ToEvaluate Performance • Benchmarking – the continual process of measuring products, services and practices against the toughest competitors or those companies recognized as industry leaders
  • 40.
    Steps of benchmarkingprocess 1. Identify area or process to be examined 2. Find behavioral and output measures 3. Select accessible set of competitors of best practices 4. Calculate differences among company’s performance measurements and competitors; determine why differences exist 5. Develop tactical programs for closing performance gaps 6. Implement the programs and compare the results
  • 41.
    Benchmarking Example • In2015 survey by Bain and company of companies of various sizes across globe found that benchmarking was second most used tool (with strategic planning). • It can also increase sales, improve goals, boost employee motivation
  • 42.
    Counterfeit Goods &Pirated Software: A Global Problem 15% to 20 % of goods in china counterfeit i.e, (tide, budwiser, malboro) Yamaha estimates 5 out of every 6 bikes bearing brand name are fake Fake cisco network router & nokia mobile phones are easily found in china market P&G estimate 15% soap & detergents are china brands costing 150$ M loss to company One person disclose that he can make 1000 Nike shoes in 10 days costing 4$/pair. Automotive resources market research shows Profit margin is more on counterfeit (80%) than real (15%) Thousands of counterfeit are active in china in various types of factories Also found that factory in donguan make fake callaway golf club bag at rate of 500/week Shipped goods across different countries According to business software alliance & ISDC 35% of software in computers are pirated World cost of software piracy was 63$ B in 2016 21% software in Us is pirated and it is now 26-30% in European union.
  • 43.
    Strategic Information Systems •Before performance measures can have any impact on strategic management, they first communicate this to people who are responsible for formulating and implementing strategic plans. This function is perform by strategic information system • It can be computer-based, manual, formal or informal. • E.g.:- checkout registers in Walmart transmit information hourly to computers at the company headquarters. So that managers know every morning that how many items sold each day, and through this they can predict of future days.
  • 44.
    Strategic Information Systemscontii.. • Enterprise resource planning (ERP) – unites all of a company’s major business activities, from order processing to production, within a single family of software modules – provides instant access to critical information to everyone in the organization, from the CEO to the factory floor worker – Three reasons of ERP fail 1. Insufficient tailoring of software to fit the company 2. Inadequate training 3. Insufficient implementation support
  • 45.
    Strategic Information Systemscontii… • Radio frequency identification (RFID) – an electronic tagging technology used to improve supply chain efficiency • Divisional and functional strategic information support – used to support, reinforce, or enlarge business level strategy throughout the decision-support system
  • 46.
    Problems in MeasuringPerformance • Lack of quantifiable objectives or performance standards • Inability to use information systems to provide timely and valid information • The act of monitoring and measuring performance can cause side effect which interfere overall corporate performance.
  • 47.
    Short-Term Orientation Long-term evaluationsmay not be conducted because executives: • Don’t realize their importance. • Believe that short-term considerations are more important than long-term considerations. • Aren’t personally evaluated on a long-term basis. • Don’t have the time to make a long-term analysis.
  • 48.
    Short-Term Orientation contii.. •Many accounting based measures (EPS & ROI) encourage short term orientation. • Growth in Eps is an important driver of near term stock price, managers are biased against investment that might reduce short – term EPS. • One limitation of ROI performance measure is its short term nature, which realize short term benefits for company. • ROI figure can be manipulated by managers.
  • 49.
    Short-Term Orientation Example •HP acquire British Firm Autonomy for $11.1 B in 2011 and write down $8.8 B in 2012 as the company find significant accounting errors. Multiple lawsuits were filed against HP, Its officers, directors and accounting firm involved with autonomy before acquisition, later HP broke up into 2 companies HP enterprise was able to use unique capabilities that autonomy owned to dramatically pushed into cloud computing.
  • 50.
    Goal Displacement • Goaldisplacement – confusion of means with ends – occurs when activities originally intended to help managers attain corporate objectives become ends in themselves—or are adapted to meet ends other than those for which they were intended – behavior substitution and sub optimization
  • 51.
    Goal Displacement contii… •Behavior substitution – phenomenon of pursuing substitute activities that do not lead to goal accomplishment instead of activities that do lead to goal accomplishment because the wrong activities are being rewarded – E.g.:- sears management thought they could improve employee productivity by trying performance reward, they paid commission to its autoshop employees as percentage of repair bill. BS resulted as employees altered their behavior to fit the reward system, the results were over-billed customers, charge for work never done, and a scandal that tarnish sears reputation for many years.
  • 52.
    Behavior Sub optimization •Refers to phenomenon of a unit optimizing its goal accomplishment to the detriment of the organization as a whole • Eg:- sears in 2016 classic example of type of dysfunction the company had spiraled downward the hand of investor and CEO Eddie Lampert. An Ayn Rand fan, he split the company into 30 autonomous units , each with its own executives and board of directors , to boost “visibility and accountability”.
  • 53.
    Guidelines for ProperControl 1. Controls should involve only the minimum amount of information needed to give a reliable picture of events. 2. Controls should monitor only meaningful activities and results, regardless of measurement difficulty. 3. Controls should be timely so that corrective action can be taken before it is too late. 4. Long-term and short-term goals should be used. 5. Controls should aim at pinpointing exceptions. 6. Emphasize the reward of meeting or exceeding standards rather than punishment for failing to meet standards.
  • 54.
    Approaches to StrategicIncentive Management Weighted-factor method Appropriate for measuring and rewarding the performance of top SBU managers and group level executives when performance vary from one unit to other. Long-term evaluation method Compensates managers for achieving objectives set over a multilayer period. Strategic funds method Encourages executives to look at developmental expenses required for current operations.
  • 55.
    Approaches to StrategicIncentive Management An effective way to achieve the desired strategic results through a reward system is to combine the three approaches: 1. Segregate strategic funds from short-term funds. 2. Develop a weighted factor chart for each SBU. 3. Measure performance based on pre-tax profit, weighted factors and long-term evaluation of the SBU’s performance.
  • 56.
  • 58.
    1. Which ofthe following personality characteristics are associated with people who are likely to exhibit violent behavior on job ? A. Neurotic B. Optimistic C. Extraverted D. Negative
  • 59.
    2. Which ofthe following is categorized as indirect payment portion of employees compensation ? A. Wages B. Salaries C. Commission D. Employer - paid Insurance
  • 60.
    3. Operating profitheld with firm after deducting cost of capital is classified as A. benefits added into salaries B. investments added C. capitals added D. economic value added
  • 61.
    4. In anactivity based cost system; an activity/unit of work or task with differentiated purposes will be classified as A. different task B. purpose cost C. an activity D. an allocation cost
  • 62.
    5. Formula tocalculate return on investment, according to profitability analysis in DuPont method is A. return on sales * investment turnover B. return on sales + investment turnover C. return on sales - investment turnover D. investment turnover + residual income
  • 63.
    6. Which offollowing is an example of internal business perspective in balanced scorecard? A. employee turnover rates B. operating capabilities and number of patents C. operating income and revenue growth D. customer satisfaction and market share
  • 64.
    7. The managerwho is responsible for only the cost of the company is classified as? A. cost center B. revenue center C. profit center D. investment center
  • 65.
    8. output ,behavior and input control are not --------------- ? A. Interrelated B. Interchangeable C. Appropriate D. Dependent on each other
  • 66.
    9. Among thefollowing which is not non-financial performance measures? A. Operating cash flow B. Mindshare C. Eyeballs D. stickiness
  • 67.
    10. Transfer techpricing is commonly used in -------? A. Horizontally integrated corporations B. Vertically integrated corporations C. Mutual agreement procedures D. Advance pricing process

Editor's Notes

  • #57 Using portfolio analysis, one corporation’s measurements might contain the following variations: the performance of high-performing (star) SBUs is measured equally in terms of ROI, cash flow, market share, and progress on several future-oriented strategic projects; the performance of low-growth, but strong (cash cow) SBUs, in contrast, is measured in terms of ROI, market share, and cash generation; and the performance of developing question mark SBUs is measured in terms of development and market share growth with no weight on ROI or cash flow.