This document is the Oracle Essbase Database Administrator's Guide, which provides information about installing, configuring, and managing Oracle Essbase multidimensional databases. It describes Essbase components like the database server, Studio modeling tool, and APIs. The guide also covers key Essbase features such as integration with other systems, data storage and querying capabilities, calculations, security, and ease of development. Finally, it includes a case study example of designing a sample Essbase database for a beverage company.
데이타로직 PM8300 1D 무선 레이저 바코드스캐너는 선형 코드에 대한 견고한 산업용 무선 바코드스캐너입니다.
PowerScan PM8300 바코드스캐너는 기본적으로 무선모델, 디스플레이와 3키 키패드가 있는 PM8300D 모델, 디스플레이와 16키 키패드가 있는 PM8300 DK 모델로 제공됩니다.
디스플레이 타입을 사용할 경우 양방향 통신이 가능하여 공장 입출고 관리등에 주로 사용하며 방진 및 방습 IP65 / IP64 등급으로 열악한 환경에서 사용 가능합니다.
Optics available in Standard Range (contact up to 1.0 m / 3.3 ft) and Auto Range (20 cm / 8 in up to 12.5 m / 41.0 ft)
Available in 3 models: basic, with display and 3-Key keypad, with display and full alphanumeric keypad
100% Compatible with Datalogic’s STAR Cordless System™
Radio frequencies available in 433 MHz or 910 MHz
Point-to-point and multi-point transmission
Seamless roaming
Datalogic 3GL™ and loud beeper for good read feedback
User replaceable lithium-ion battery
Operates over a wide range of temperatures
Water and Particulate Sealing Rating: IP65 / IP64 (with display)
Drop resistance to 2.0 m / 6.5 ft
CODELESS COMMUNICATIONS
Datalogic STAR Cordless System™ :
Point-to-Point Configuration
Multi-Point Configuration
Effective Radiated Power: 433.92 MHz: <10 mW; 910 MHz: <1 mW
Max. Readers in Same Area: 2000 Max. Readers per Radio Receiver: 32
Radio Frequency: 433.92 MHz; 910 MHz
Radio Range (Open Air): 433.92 MHz: Up to 50 m / 164 ft
910 MHz: Up to 30 m / 98 ft
Seamless Roaming; Two Way Communications
DECODING CAPABILITY
1D / Linear Codes : Autodiscriminates all standard 1D codes including GS1 DataBar™ linear codes
Stacked Codes :
Code 16K; Code 49; GS1 DataBar Expanded Stacked; GS1 DataBar Stacked;
GS1 DataBar Stacked Omnidirectional
ELECTRICAL
Battery :
Battery Type: Li-ION 2150 mAh;
Charge Time: External Power: 4 Hours; Host Power: 10 Hours;
Reads per Charge: + 60,000
Cradle Indicator LEDs : Battery Charging (Red); Charge Completed (Green); Power/Data (Yellow)
Current : Operating (Typical): External: 1 A @ 10 V, 330 mA @ 30 V; POT: 500 mA
Input Voltage : External: 10 - 30 VDC; POT: 5 VDC +/- 10%
ENVIRONMENTAL
Ambient Light : Immune to light exposure in offices/facilities and direct exposure to sunlight
Drop Resistance : Withstands 50 drops from 2.0 m / 6.6 ft to concrete
ESD Protection (Air Discharge) : 20 kV
Humidity (Non-Cond ensing) : 90%
Particulat e and Water Sealing : PM8300: IP65; PM8300-D, PM8300-DK: IP64
Temperature :
Operating: -20 to 50 °C / -4 to 122 °F
Storage/Transport: -20 to 70 °C / -4 to 158 °F
INTERFACE
Keyboard Wedge; RS-232; RS-485 BC8060 Only; USB; Wand
SAFETY & REGULATORY
Agency Approvals :
The product meets necessary safety and regulatory approvals for its intended use.
The Quick Reference Guide for this product can be referred to for a complete list of certifications.
Environmental Compliance : Complies to EU RoHS
Laser Classification : Caution Laser Radiation - Do not stare into beam; CDRH Class II; IEC 60825-1 Class 2
>하이온아이티
주소 : 서울 금천구 가산디지털2로 165, 1304호 (백상스타타워2차)
대표번호 : 02-2038-0018 / 이메일 : hion@hionit.com
홈페이지 : http://hionsmart.com
데이타로직 PM8300 1D 무선 레이저 바코드스캐너는 선형 코드에 대한 견고한 산업용 무선 바코드스캐너입니다.
PowerScan PM8300 바코드스캐너는 기본적으로 무선모델, 디스플레이와 3키 키패드가 있는 PM8300D 모델, 디스플레이와 16키 키패드가 있는 PM8300 DK 모델로 제공됩니다.
디스플레이 타입을 사용할 경우 양방향 통신이 가능하여 공장 입출고 관리등에 주로 사용하며 방진 및 방습 IP65 / IP64 등급으로 열악한 환경에서 사용 가능합니다.
Optics available in Standard Range (contact up to 1.0 m / 3.3 ft) and Auto Range (20 cm / 8 in up to 12.5 m / 41.0 ft)
Available in 3 models: basic, with display and 3-Key keypad, with display and full alphanumeric keypad
100% Compatible with Datalogic’s STAR Cordless System™
Radio frequencies available in 433 MHz or 910 MHz
Point-to-point and multi-point transmission
Seamless roaming
Datalogic 3GL™ and loud beeper for good read feedback
User replaceable lithium-ion battery
Operates over a wide range of temperatures
Water and Particulate Sealing Rating: IP65 / IP64 (with display)
Drop resistance to 2.0 m / 6.5 ft
CODELESS COMMUNICATIONS
Datalogic STAR Cordless System™ :
Point-to-Point Configuration
Multi-Point Configuration
Effective Radiated Power: 433.92 MHz: <10 mW; 910 MHz: <1 mW
Max. Readers in Same Area: 2000 Max. Readers per Radio Receiver: 32
Radio Frequency: 433.92 MHz; 910 MHz
Radio Range (Open Air): 433.92 MHz: Up to 50 m / 164 ft
910 MHz: Up to 30 m / 98 ft
Seamless Roaming; Two Way Communications
DECODING CAPABILITY
1D / Linear Codes : Autodiscriminates all standard 1D codes including GS1 DataBar™ linear codes
Stacked Codes :
Code 16K; Code 49; GS1 DataBar Expanded Stacked; GS1 DataBar Stacked;
GS1 DataBar Stacked Omnidirectional
ELECTRICAL
Battery :
Battery Type: Li-ION 2150 mAh;
Charge Time: External Power: 4 Hours; Host Power: 10 Hours;
Reads per Charge: + 60,000
Cradle Indicator LEDs : Battery Charging (Red); Charge Completed (Green); Power/Data (Yellow)
Current : Operating (Typical): External: 1 A @ 10 V, 330 mA @ 30 V; POT: 500 mA
Input Voltage : External: 10 - 30 VDC; POT: 5 VDC +/- 10%
ENVIRONMENTAL
Ambient Light : Immune to light exposure in offices/facilities and direct exposure to sunlight
Drop Resistance : Withstands 50 drops from 2.0 m / 6.6 ft to concrete
ESD Protection (Air Discharge) : 20 kV
Humidity (Non-Cond ensing) : 90%
Particulat e and Water Sealing : PM8300: IP65; PM8300-D, PM8300-DK: IP64
Temperature :
Operating: -20 to 50 °C / -4 to 122 °F
Storage/Transport: -20 to 70 °C / -4 to 158 °F
INTERFACE
Keyboard Wedge; RS-232; RS-485 BC8060 Only; USB; Wand
SAFETY & REGULATORY
Agency Approvals :
The product meets necessary safety and regulatory approvals for its intended use.
The Quick Reference Guide for this product can be referred to for a complete list of certifications.
Environmental Compliance : Complies to EU RoHS
Laser Classification : Caution Laser Radiation - Do not stare into beam; CDRH Class II; IEC 60825-1 Class 2
>하이온아이티
주소 : 서울 금천구 가산디지털2로 165, 1304호 (백상스타타워2차)
대표번호 : 02-2038-0018 / 이메일 : hion@hionit.com
홈페이지 : http://hionsmart.com
ZebraNet Bridge Enterprise - Manual do SoftwareUseZ
Manual do Software da Zebra para configuração e gerenciamento de impressoras em rede, ZebraNet Bride Enterprise.
Para conferir outros modelos acesse: www.usez.com.br
As Europe's leading economic powerhouse and the fourth-largest hashtag#economy globally, Germany stands at the forefront of innovation and industrial might. Renowned for its precision engineering and high-tech sectors, Germany's economic structure is heavily supported by a robust service industry, accounting for approximately 68% of its GDP. This economic clout and strategic geopolitical stance position Germany as a focal point in the global cyber threat landscape.
In the face of escalating global tensions, particularly those emanating from geopolitical disputes with nations like hashtag#Russia and hashtag#China, hashtag#Germany has witnessed a significant uptick in targeted cyber operations. Our analysis indicates a marked increase in hashtag#cyberattack sophistication aimed at critical infrastructure and key industrial sectors. These attacks range from ransomware campaigns to hashtag#AdvancedPersistentThreats (hashtag#APTs), threatening national security and business integrity.
🔑 Key findings include:
🔍 Increased frequency and complexity of cyber threats.
🔍 Escalation of state-sponsored and criminally motivated cyber operations.
🔍 Active dark web exchanges of malicious tools and tactics.
Our comprehensive report delves into these challenges, using a blend of open-source and proprietary data collection techniques. By monitoring activity on critical networks and analyzing attack patterns, our team provides a detailed overview of the threats facing German entities.
This report aims to equip stakeholders across public and private sectors with the knowledge to enhance their defensive strategies, reduce exposure to cyber risks, and reinforce Germany's resilience against cyber threats.
Explore our comprehensive data analysis project presentation on predicting product ad campaign performance. Learn how data-driven insights can optimize your marketing strategies and enhance campaign effectiveness. Perfect for professionals and students looking to understand the power of data analysis in advertising. for more details visit: https://bostoninstituteofanalytics.org/data-science-and-artificial-intelligence/
Chatty Kathy - UNC Bootcamp Final Project Presentation - Final Version - 5.23...John Andrews
SlideShare Description for "Chatty Kathy - UNC Bootcamp Final Project Presentation"
Title: Chatty Kathy: Enhancing Physical Activity Among Older Adults
Description:
Discover how Chatty Kathy, an innovative project developed at the UNC Bootcamp, aims to tackle the challenge of low physical activity among older adults. Our AI-driven solution uses peer interaction to boost and sustain exercise levels, significantly improving health outcomes. This presentation covers our problem statement, the rationale behind Chatty Kathy, synthetic data and persona creation, model performance metrics, a visual demonstration of the project, and potential future developments. Join us for an insightful Q&A session to explore the potential of this groundbreaking project.
Project Team: Jay Requarth, Jana Avery, John Andrews, Dr. Dick Davis II, Nee Buntoum, Nam Yeongjin & Mat Nicholas
Show drafts
volume_up
Empowering the Data Analytics Ecosystem: A Laser Focus on Value
The data analytics ecosystem thrives when every component functions at its peak, unlocking the true potential of data. Here's a laser focus on key areas for an empowered ecosystem:
1. Democratize Access, Not Data:
Granular Access Controls: Provide users with self-service tools tailored to their specific needs, preventing data overload and misuse.
Data Catalogs: Implement robust data catalogs for easy discovery and understanding of available data sources.
2. Foster Collaboration with Clear Roles:
Data Mesh Architecture: Break down data silos by creating a distributed data ownership model with clear ownership and responsibilities.
Collaborative Workspaces: Utilize interactive platforms where data scientists, analysts, and domain experts can work seamlessly together.
3. Leverage Advanced Analytics Strategically:
AI-powered Automation: Automate repetitive tasks like data cleaning and feature engineering, freeing up data talent for higher-level analysis.
Right-Tool Selection: Strategically choose the most effective advanced analytics techniques (e.g., AI, ML) based on specific business problems.
4. Prioritize Data Quality with Automation:
Automated Data Validation: Implement automated data quality checks to identify and rectify errors at the source, minimizing downstream issues.
Data Lineage Tracking: Track the flow of data throughout the ecosystem, ensuring transparency and facilitating root cause analysis for errors.
5. Cultivate a Data-Driven Mindset:
Metrics-Driven Performance Management: Align KPIs and performance metrics with data-driven insights to ensure actionable decision making.
Data Storytelling Workshops: Equip stakeholders with the skills to translate complex data findings into compelling narratives that drive action.
Benefits of a Precise Ecosystem:
Sharpened Focus: Precise access and clear roles ensure everyone works with the most relevant data, maximizing efficiency.
Actionable Insights: Strategic analytics and automated quality checks lead to more reliable and actionable data insights.
Continuous Improvement: Data-driven performance management fosters a culture of learning and continuous improvement.
Sustainable Growth: Empowered by data, organizations can make informed decisions to drive sustainable growth and innovation.
By focusing on these precise actions, organizations can create an empowered data analytics ecosystem that delivers real value by driving data-driven decisions and maximizing the return on their data investment.
StarCompliance is a leading firm specializing in the recovery of stolen cryptocurrency. Our comprehensive services are designed to assist individuals and organizations in navigating the complex process of fraud reporting, investigation, and fund recovery. We combine cutting-edge technology with expert legal support to provide a robust solution for victims of crypto theft.
Our Services Include:
Reporting to Tracking Authorities:
We immediately notify all relevant centralized exchanges (CEX), decentralized exchanges (DEX), and wallet providers about the stolen cryptocurrency. This ensures that the stolen assets are flagged as scam transactions, making it impossible for the thief to use them.
Assistance with Filing Police Reports:
We guide you through the process of filing a valid police report. Our support team provides detailed instructions on which police department to contact and helps you complete the necessary paperwork within the critical 72-hour window.
Launching the Refund Process:
Our team of experienced lawyers can initiate lawsuits on your behalf and represent you in various jurisdictions around the world. They work diligently to recover your stolen funds and ensure that justice is served.
At StarCompliance, we understand the urgency and stress involved in dealing with cryptocurrency theft. Our dedicated team works quickly and efficiently to provide you with the support and expertise needed to recover your assets. Trust us to be your partner in navigating the complexities of the crypto world and safeguarding your investments.
Levelwise PageRank with Loop-Based Dead End Handling Strategy : SHORT REPORT ...Subhajit Sahu
Abstract — Levelwise PageRank is an alternative method of PageRank computation which decomposes the input graph into a directed acyclic block-graph of strongly connected components, and processes them in topological order, one level at a time. This enables calculation for ranks in a distributed fashion without per-iteration communication, unlike the standard method where all vertices are processed in each iteration. It however comes with a precondition of the absence of dead ends in the input graph. Here, the native non-distributed performance of Levelwise PageRank was compared against Monolithic PageRank on a CPU as well as a GPU. To ensure a fair comparison, Monolithic PageRank was also performed on a graph where vertices were split by components. Results indicate that Levelwise PageRank is about as fast as Monolithic PageRank on the CPU, but quite a bit slower on the GPU. Slowdown on the GPU is likely caused by a large submission of small workloads, and expected to be non-issue when the computation is performed on massive graphs.