SlideShare a Scribd company logo
1 of 1
Download to read offline
ESI LAND ASSESSMENTS
Phase 2 site assessments
ESI’s Phase 2 site assessments are part of our range of expert services designed specifically to help
quantify and manage geoenvironmental risk. Our Phase 2 service uses data from targeted consultations &
site investigations to evaluate potential contamination and geotechnical risks. ESI’s Phase 2 reporting will
therefore confirm the geoenvironmental risks faced and provide costed solutions for land remediation or
redevelopment. 

Features of our Phase 2 site assessments
                                                       •	 Thorough review of all relevant       •	 Range of in situ measurement
                                                          documentary information and              and testing techniques available
                                                          refinement of the conceptual site     •	 Risks to all potential
                                                          model                                    environmental receptors expertly
                                                       •	 Targeted consultation with               assessed
                                                          relevant regulators (planning         •	 Geotechnical risks and foundation
                                                          officers, contaminated land              design elements included
                                                          officers and EA technical officers)   •	 Clear comprehensive and relevant
                                                          and other third parties                  advice as standard
                                                       •	 Intrusive SI’s conducted to           •	 Options for ‘next steps’ including
                                                          highest technical standards              remedial actions fully evaluated
                                                       •	 Highly experienced field personnel
                                                          used



Benefits of ESI’s site assessments
•	 Every assessment is tailored to meet our client’s needs
•	 Cost modelling can be used to evaluate future costs and account for key
   uncertainties
•	 Comprehensive fixed price quotation
•	 Investigations conducted quickly and effectively in order to provide timely
   advice
•	 Option of ESI’s ‘Rapid SI’ service, tailored to meet the needs of the
   Financial and Property sectors. Rapid SI reports can be delivered within
   10 days of receiving instruction
•	 ESI’s excellent relationship with the Environment Agency and numerous
   Local Authorities, provides ready access to relevant information and a
   clear understanding of regulator needs
•	 Clear, well structured, and easy to understand reports
•	 Detailed recommendation, pragmatic advice and follow-on support


Dedicated points of contact:                      “I have been very impressed with the competence of the staff I have met on
                                                   a number of projects.  ESI have very good field protocols and high levels of
Andy Singleton                                       technical expertise.  I will be using your services again and you will be my
Technical Director                                                                                                       first call”
andrewsingleton@esinternational.com                                                                         Griff Dixon Associates

Lisa Murray                                       “I wish to thank ESI for their very professional approach to the project which
Project Consultant                                                                               I have been very impressed by”
lisamurray@esinternational.com                                                                 RWE npower Plc Property Services

01743 276100
                                                                                                                             Cost
                                                                                                          From £1,500 + vat
                                 Shrewsbury                                                     Subject to project requirements
                                 Reading
                                 London
                                                                                                                       Delivery
                                 esinternational.com                                                10 day Rapid SI option

More Related Content

Similar to Esi Phase 2 Site Assessments

Esi Basement Impact Assessments
Esi Basement Impact AssessmentsEsi Basement Impact Assessments
Esi Basement Impact Assessmentschrisberryman
 
OSM Engineering Informative File
OSM Engineering Informative FileOSM Engineering Informative File
OSM Engineering Informative Fileerimathome
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineermsh_shaban
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
Electrical Engineer (1)
Electrical Engineer (1)Electrical Engineer (1)
Electrical Engineer (1)msh_shaban
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentationkingk99
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012Colin Harrop
 
Grey Fox Consulting Brochure
Grey Fox Consulting BrochureGrey Fox Consulting Brochure
Grey Fox Consulting BrochureGreyfox05
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansourahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansourahmed mansour
 
4-4_4. vm consulting company_presentation
4-4_4. vm consulting company_presentation4-4_4. vm consulting company_presentation
4-4_4. vm consulting company_presentationYWPBulgaria
 
Digital Concrete Rebar Scanning Revolutionizing Construction Industry
Digital Concrete Rebar Scanning Revolutionizing Construction IndustryDigital Concrete Rebar Scanning Revolutionizing Construction Industry
Digital Concrete Rebar Scanning Revolutionizing Construction IndustryTec
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEBhauso Desai
 
Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1drottmayer
 
Dimitri's Project Portfolio
Dimitri's Project PortfolioDimitri's Project Portfolio
Dimitri's Project Portfoliodkakaletris
 

Similar to Esi Phase 2 Site Assessments (20)

Esi Basement Impact Assessments
Esi Basement Impact AssessmentsEsi Basement Impact Assessments
Esi Basement Impact Assessments
 
OSM Engineering Informative File
OSM Engineering Informative FileOSM Engineering Informative File
OSM Engineering Informative File
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
CV
CVCV
CV
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
Electrical Engineer (1)
Electrical Engineer (1)Electrical Engineer (1)
Electrical Engineer (1)
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentation
 
Essa CV-2014-2
Essa CV-2014-2Essa CV-2014-2
Essa CV-2014-2
 
NAKO_LBE_Profile_email
NAKO_LBE_Profile_emailNAKO_LBE_Profile_email
NAKO_LBE_Profile_email
 
JLL - Building Surveying 2012
JLL - Building Surveying 2012JLL - Building Surveying 2012
JLL - Building Surveying 2012
 
Grey Fox Consulting Brochure
Grey Fox Consulting BrochureGrey Fox Consulting Brochure
Grey Fox Consulting Brochure
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
4-4_4. vm consulting company_presentation
4-4_4. vm consulting company_presentation4-4_4. vm consulting company_presentation
4-4_4. vm consulting company_presentation
 
Digital Concrete Rebar Scanning Revolutionizing Construction Industry
Digital Concrete Rebar Scanning Revolutionizing Construction IndustryDigital Concrete Rebar Scanning Revolutionizing Construction Industry
Digital Concrete Rebar Scanning Revolutionizing Construction Industry
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILE
 
Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1Unicorn Communications Company Product Profile V1.1
Unicorn Communications Company Product Profile V1.1
 
Dimitri's Project Portfolio
Dimitri's Project PortfolioDimitri's Project Portfolio
Dimitri's Project Portfolio
 
Qs Approach To Project Cost
Qs Approach To Project CostQs Approach To Project Cost
Qs Approach To Project Cost
 

More from chrisberryman

Esi Water Resources Brochure
Esi Water Resources BrochureEsi Water Resources Brochure
Esi Water Resources Brochurechrisberryman
 
Esi Focus On The South East
Esi Focus On The South EastEsi Focus On The South East
Esi Focus On The South Eastchrisberryman
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochurechrisberryman
 
Esi Catchment Management
Esi Catchment ManagementEsi Catchment Management
Esi Catchment Managementchrisberryman
 
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...chrisberryman
 
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...chrisberryman
 
Geological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme FinalGeological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme Finalchrisberryman
 
CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4chrisberryman
 
CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3chrisberryman
 
CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2chrisberryman
 

More from chrisberryman (12)

Esi Year In Review
Esi Year In ReviewEsi Year In Review
Esi Year In Review
 
Esi Water Resources Brochure
Esi Water Resources BrochureEsi Water Resources Brochure
Esi Water Resources Brochure
 
Esi Focus On The South East
Esi Focus On The South EastEsi Focus On The South East
Esi Focus On The South East
 
Esi Extractive Industry Brochure
Esi Extractive Industry BrochureEsi Extractive Industry Brochure
Esi Extractive Industry Brochure
 
Esi Expert Witness
Esi Expert WitnessEsi Expert Witness
Esi Expert Witness
 
Esi Catchment Management
Esi Catchment ManagementEsi Catchment Management
Esi Catchment Management
 
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...10.11.2011   John Reynolds, The Role Of Engineering Geophysics During Economi...
10.11.2011 John Reynolds, The Role Of Engineering Geophysics During Economi...
 
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...13.10.2011   Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
13.10.2011 Trevor Jones, The Role Of The Geologist In Radioactive Waste Dis...
 
Geological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme FinalGeological Society North West Group 2011 2012 Programme Final
Geological Society North West Group 2011 2012 Programme Final
 
CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4
 
CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3CL:AIRE Research Bulletin RB3
CL:AIRE Research Bulletin RB3
 
CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2
 

Esi Phase 2 Site Assessments

  • 1. ESI LAND ASSESSMENTS Phase 2 site assessments ESI’s Phase 2 site assessments are part of our range of expert services designed specifically to help quantify and manage geoenvironmental risk. Our Phase 2 service uses data from targeted consultations & site investigations to evaluate potential contamination and geotechnical risks. ESI’s Phase 2 reporting will therefore confirm the geoenvironmental risks faced and provide costed solutions for land remediation or redevelopment.  Features of our Phase 2 site assessments • Thorough review of all relevant • Range of in situ measurement documentary information and and testing techniques available refinement of the conceptual site • Risks to all potential model environmental receptors expertly • Targeted consultation with assessed relevant regulators (planning • Geotechnical risks and foundation officers, contaminated land design elements included officers and EA technical officers) • Clear comprehensive and relevant and other third parties advice as standard • Intrusive SI’s conducted to • Options for ‘next steps’ including highest technical standards remedial actions fully evaluated • Highly experienced field personnel used Benefits of ESI’s site assessments • Every assessment is tailored to meet our client’s needs • Cost modelling can be used to evaluate future costs and account for key uncertainties • Comprehensive fixed price quotation • Investigations conducted quickly and effectively in order to provide timely advice • Option of ESI’s ‘Rapid SI’ service, tailored to meet the needs of the Financial and Property sectors. Rapid SI reports can be delivered within 10 days of receiving instruction • ESI’s excellent relationship with the Environment Agency and numerous Local Authorities, provides ready access to relevant information and a clear understanding of regulator needs • Clear, well structured, and easy to understand reports • Detailed recommendation, pragmatic advice and follow-on support Dedicated points of contact: “I have been very impressed with the competence of the staff I have met on a number of projects.  ESI have very good field protocols and high levels of Andy Singleton technical expertise.  I will be using your services again and you will be my Technical Director first call” andrewsingleton@esinternational.com Griff Dixon Associates Lisa Murray “I wish to thank ESI for their very professional approach to the project which Project Consultant I have been very impressed by” lisamurray@esinternational.com RWE npower Plc Property Services 01743 276100 Cost From £1,500 + vat Shrewsbury Subject to project requirements Reading London Delivery esinternational.com 10 day Rapid SI option