SlideShare a Scribd company logo
n°12




                              ERTMS DEPLOYMENT IN BELGIUM
Factsheets




                                   & THE NETHERLANDS
                                       CROSSING BORDERS AT HIGH SPEED

                                     Belgium and the Netherlands are two countries with a long-standing railway
                                     tradition, but which also invested massively to develop a modern High-speed
                                     rail network in recent years. In both countries, High Speed has by definition a
                                     European dimension, as lines connect Amsterdam and Brussels to London, Paris
                                     or Cologne. It also comes with a specific challenge – cross-border traffic – in
                                     which ERTMS can play a major role. It therefore does not come as a surprise that
                                     Belgium and the Netherlands were the first ones to achieve a High-speed ERTMS
                                     Level 2 cross-border connection in revenue service since the end of 2009.



             What are the main High-speed projects
             in Belgium? What is the status of ERTMS
             deployment?
             Located at the very heart of Europe, Belgium is a country of
             which invested massively in the past few years to upgrade its
             railway network. It subsequently became the first European
             country to have a complete network of High-speed lines
             from border to border in commercial service, with links to
             the UK, France, The Netherlands and Germany.

             The two most recent connections to Germany (HSL3) and           What are the main High-speed
             the Netherlands (HSL4), are already running in commercial
             service with ERTMS level 2:
                                                                             projects in the Netherlands?
                                                                             What is the status of ERTMS
             –	 HSL 3 connects the city of Liège to the German border.       deployment?
                The 56 km long line (42 km dedicated high-speed
                tracks, 14 km modernized lines) came into commercial         Like Belgium, the Netherlands has one the
                operation on the 15th June 2009. It is currently used        most densely spread railway networks in
                by international Thalys trains and ICE trains. After         Europe and a significant railway culture and
                completion of the line, the travel time between Liège        tradition. The government approved in 1997
                and Cologne has been cut to one hour, whilst Liège to        the first national High-speed rail project,
                Aachen is achieved in about 20 minutes at speeds up to       known as HSL Zuid, which links Amsterdam
                260 km/h.                                                    with the Belgian border and is viewed as a
                                                                             crucial step in linking the country to Brussels,
             –	 HSL 4 connects Antwerp to the Dutch border, where            London and Paris.
                it meets the HSL Zuid (see below). The line is 40 km
                long, and consists of a dedicated high speed track. It is    The HSL Zuid is a dedicated 125 km High-
                connected to a modernised railway line that runs from        speed rail line. It features state-of-the-art
                Brussels to Antwerp. HSL4 first opened in June 2009          ERTMS level 2 technology. Whilst the northern
                and since December 2009, Thalys trains are running           part (from Amsterdam to Rotterdam) is in
                using ERTMS Level 2. Trains are now travelling at up to      commercial service with ERTMS level 1 since
                160 km/h from Brussels to Antwerp (47 km), whilst on         September 2009 (used by TRAXX locomotives
                the “dedicated” part of the line reaching speeds up          and Thalys trains), the southern section is in
                to 300km/h. HSL 4 is currently used by Thalys and fast       commercial service with ERTMS level 2 since
                internal InterCity trains, whilst NS Hispeed trains Fyra     December 2009.
                                                                                                                                © UNIFE 2012




                are foreseen to start commercial operations in the near
                future.


                                                       Avenue Louise 221, B-1050 Brussels, Belgium
                                                       Tel: + 32 2 626 12 60, Fax: + 32 2 626 12 61, unife@unife.org
What are the benefits brought by ERTMS to passengers on
  the high-speed line crossing Belgium and the Netherlands?
  Amsterdam, Paris and Brussels are now closer than ever thanks to the new
  High-speed line linking Belgium and The Netherlands, whilst travelling
  times to Paris and Cologne have equally been reduced thanks to HSL3:
  –	 From Amsterdam, it now takes 3h18 to reach Paris (51 minutes travelling
     time reduction) and 1h54 to reach Brussels;
  –	 From Paris, travelling time to Cologne has been cut to 3h14 (36 minutes
     reduction).

  This considerable travelling time reductions bring significant benefits to
  passengers, facilitating and improving travel of both tourist and business
  travellers.

  As a side effect of railway investments, modernization and upgrade,
  Belgium now enjoys two of the most spectacular railway stations in Europe:
  the fully-renovated “Antwerpen Centraal” Station, and the scenic, futuristic
  Liège-Guillemins station, which was designed by Santiago Calatrava and
  has become the city’s landmark, known all over Europe.



                                                           Will ERTMS also benefit directly to
                                                           infrastructure managers and train
                                                           operators?
                                                           Yes - ERTMS also considerably reduces
                                                           infrastructure and maintenance costs and increases
                                                           safety, reliability, capacity and interoperability.
                                                           Once the full line from Paris to Amsterdam will be
                                                           equipped, it will also strongly reduce the number
                                                           of signalling systems required to run on this line
                                                           – from seven to one. This will greatly facilitate
                                                           operations along the lines for both existing
                                                           operators and new entrants.


          Are Belgium and the Netherlands also planning ERTMS investment on
          their freight and conventional networks?
          Yes - in addition to HSL Zuid, The Netherlands is also installing ERTMS on its freight
          network. In particular, the Betuweroute, part of the Havenspoorlijn, is now operating since
          July 2007 with ERTMS level 2 without any fallback system. The rest of the Havenspoorlijn,
          the new railway link connecting the Europoort of Rotterdam with Germany, is to be
          fitted with ERTMS level 1. The Netherlands has also opted for ERTMS to be installed in a
          commuter line: Amsterdam-Utrecht (30 km, 4-lanes). This line, which currently uses the
          legacy system “ATB”, should be operated with ERTMS level 2 by the end of the 2010.
          Lastly the new “Hanzelijn” line, connecting the cities of Lelystad and Zwolle, will be
          equipped with ERTMS level 2. It is planned for completion by the end of 2012.

          On the Belgian side, the country plans to fully equip its entire network in the long run.
          A frame contract has been signed in this respect. It has also plans to upgrade the High
          Speed connections with France and the UK to ERTMS – however final completion dates
          have not yet been provided.



S uppliers
                                                                                                                 © UNIFE 2012




Want to know more about ERTMS? Please check www.ertms.net or contact UNIFE at unife@unife.org

More Related Content

What's hot

ERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for EuropeERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for Europe
UNIFE2012
 
ERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trains
UNIFE2012
 
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
UNIFE2012
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
UNIFE2012
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
UNIFE2012
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levels
UNIFE2012
 
Rail in Europe 2020
Rail in Europe 2020Rail in Europe 2020
Rail in Europe 2020
Amadeus Rail
 
European Rail Travel Trends 2020
European Rail Travel Trends 2020European Rail Travel Trends 2020
European Rail Travel Trends 2020
Amadeus Rail
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st Century
Scott Martin, CMILT
 
Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.RollingOnRails
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentation
co1ps
 
An Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETAn Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANET
IJECEIAES
 
CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009
zjeftic
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
SYSTRA
 
ERTMS and Brexit
ERTMS and BrexitERTMS and Brexit
ERTMS and Brexit
Benjamin Edward Lander
 
PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003
Antonio Bove
 
AUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEWAUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEWDenis Volchugin
 

What's hot (20)

ERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for EuropeERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for Europe
 
ERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trains
 
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levels
 
Rail in Europe 2020
Rail in Europe 2020Rail in Europe 2020
Rail in Europe 2020
 
European Rail Travel Trends 2020
European Rail Travel Trends 2020European Rail Travel Trends 2020
European Rail Travel Trends 2020
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st Century
 
Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentation
 
An Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETAn Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANET
 
CILT Article Jul 09
CILT Article Jul 09CILT Article Jul 09
CILT Article Jul 09
 
Session 14 1 Sven-Allan Bjerkemo
Session 14 1 Sven-Allan BjerkemoSession 14 1 Sven-Allan Bjerkemo
Session 14 1 Sven-Allan Bjerkemo
 
RGIN 1410 Travelport layout final pdf
RGIN 1410 Travelport layout final pdfRGIN 1410 Travelport layout final pdf
RGIN 1410 Travelport layout final pdf
 
CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
 
ERTMS and Brexit
ERTMS and BrexitERTMS and Brexit
ERTMS and Brexit
 
PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003
 
AUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEWAUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEW
 

Similar to ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands

ICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger BazeleyICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger Bazeley
Roger Bazeley, USA
 
Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)
Amzal2012
 
Sn1049 5 Vh
Sn1049 5 VhSn1049 5 Vh
Fiche_Paris_Line_14_2012_en
Fiche_Paris_Line_14_2012_enFiche_Paris_Line_14_2012_en
Fiche_Paris_Line_14_2012_enStéphane Duboc
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014
johnrubial
 
EuroDuplex - Case Study - EN - LD
EuroDuplex - Case Study - EN - LDEuroDuplex - Case Study - EN - LD
EuroDuplex - Case Study - EN - LDNicolas Supiot
 
European Transport Networks
European Transport NetworksEuropean Transport Networks
European Transport Networkscaglarozpinar
 
Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Ibrahim Al-Hudhaif
 
ETCS
ETCSETCS
Uirr news q3 2012-final
Uirr news q3 2012-finalUirr news q3 2012-final
Uirr news q3 2012-finalCombinant nv
 
ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of Ama...
ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of  Ama...ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of  Ama...
ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of Ama...Cláudio Carneiro
 
Infrastructure (English)
Infrastructure (English)Infrastructure (English)
Infrastructure (English)
COMSA Corporación
 
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
Rail~Volution
 
Intermodal_Service_ENG
Intermodal_Service_ENGIntermodal_Service_ENG
Intermodal_Service_ENG
Transmec Group
 
Full_ Paper Utrecht University of Applied Sciences, minor railway technology
Full_ Paper Utrecht University of Applied Sciences, minor railway technologyFull_ Paper Utrecht University of Applied Sciences, minor railway technology
Full_ Paper Utrecht University of Applied Sciences, minor railway technologyAndr van Es
 
Media backgrounder suburban and regional rail
Media backgrounder suburban and regional railMedia backgrounder suburban and regional rail
Media backgrounder suburban and regional railtoyoralharam
 
Advanced intermodal freight logistics centers
Advanced intermodal freight logistics centersAdvanced intermodal freight logistics centers
Advanced intermodal freight logistics centers
Mimi0127
 
South East Europe Rail conference - Thomas Wimroither
South East Europe Rail conference -  Thomas WimroitherSouth East Europe Rail conference -  Thomas Wimroither
South East Europe Rail conference - Thomas WimroitherRussell Publishing
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONDiaa Hilal
 

Similar to ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands (20)

ICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger BazeleyICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger Bazeley
 
Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)
 
Sn1049 5 Vh
Sn1049 5 VhSn1049 5 Vh
Sn1049 5 Vh
 
Fiche_Paris_Line_14_2012_en
Fiche_Paris_Line_14_2012_enFiche_Paris_Line_14_2012_en
Fiche_Paris_Line_14_2012_en
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014
 
EuroDuplex - Case Study - EN - LD
EuroDuplex - Case Study - EN - LDEuroDuplex - Case Study - EN - LD
EuroDuplex - Case Study - EN - LD
 
European Transport Networks
European Transport NetworksEuropean Transport Networks
European Transport Networks
 
Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...
 
ETCS
ETCSETCS
ETCS
 
Uirr news q3 2012-final
Uirr news q3 2012-finalUirr news q3 2012-final
Uirr news q3 2012-final
 
ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of Ama...
ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of  Ama...ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of  Ama...
ShoreTension Safe and Easy Cost Benefits to Southern Germany Widening of Ama...
 
Infrastructure (English)
Infrastructure (English)Infrastructure (English)
Infrastructure (English)
 
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
 
Intermodal_Service_ENG
Intermodal_Service_ENGIntermodal_Service_ENG
Intermodal_Service_ENG
 
Carl bjorgan
Carl bjorganCarl bjorgan
Carl bjorgan
 
Full_ Paper Utrecht University of Applied Sciences, minor railway technology
Full_ Paper Utrecht University of Applied Sciences, minor railway technologyFull_ Paper Utrecht University of Applied Sciences, minor railway technology
Full_ Paper Utrecht University of Applied Sciences, minor railway technology
 
Media backgrounder suburban and regional rail
Media backgrounder suburban and regional railMedia backgrounder suburban and regional rail
Media backgrounder suburban and regional rail
 
Advanced intermodal freight logistics centers
Advanced intermodal freight logistics centersAdvanced intermodal freight logistics centers
Advanced intermodal freight logistics centers
 
South East Europe Rail conference - Thomas Wimroither
South East Europe Rail conference -  Thomas WimroitherSouth East Europe Rail conference -  Thomas Wimroither
South East Europe Rail conference - Thomas Wimroither
 
FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
 

Recently uploaded

chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 

Recently uploaded (20)

chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 

ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands

  • 1. n°12 ERTMS DEPLOYMENT IN BELGIUM Factsheets & THE NETHERLANDS CROSSING BORDERS AT HIGH SPEED Belgium and the Netherlands are two countries with a long-standing railway tradition, but which also invested massively to develop a modern High-speed rail network in recent years. In both countries, High Speed has by definition a European dimension, as lines connect Amsterdam and Brussels to London, Paris or Cologne. It also comes with a specific challenge – cross-border traffic – in which ERTMS can play a major role. It therefore does not come as a surprise that Belgium and the Netherlands were the first ones to achieve a High-speed ERTMS Level 2 cross-border connection in revenue service since the end of 2009. What are the main High-speed projects in Belgium? What is the status of ERTMS deployment? Located at the very heart of Europe, Belgium is a country of which invested massively in the past few years to upgrade its railway network. It subsequently became the first European country to have a complete network of High-speed lines from border to border in commercial service, with links to the UK, France, The Netherlands and Germany. The two most recent connections to Germany (HSL3) and What are the main High-speed the Netherlands (HSL4), are already running in commercial service with ERTMS level 2: projects in the Netherlands? What is the status of ERTMS – HSL 3 connects the city of Liège to the German border. deployment? The 56 km long line (42 km dedicated high-speed tracks, 14 km modernized lines) came into commercial Like Belgium, the Netherlands has one the operation on the 15th June 2009. It is currently used most densely spread railway networks in by international Thalys trains and ICE trains. After Europe and a significant railway culture and completion of the line, the travel time between Liège tradition. The government approved in 1997 and Cologne has been cut to one hour, whilst Liège to the first national High-speed rail project, Aachen is achieved in about 20 minutes at speeds up to known as HSL Zuid, which links Amsterdam 260 km/h. with the Belgian border and is viewed as a crucial step in linking the country to Brussels, – HSL 4 connects Antwerp to the Dutch border, where London and Paris. it meets the HSL Zuid (see below). The line is 40 km long, and consists of a dedicated high speed track. It is The HSL Zuid is a dedicated 125 km High- connected to a modernised railway line that runs from speed rail line. It features state-of-the-art Brussels to Antwerp. HSL4 first opened in June 2009 ERTMS level 2 technology. Whilst the northern and since December 2009, Thalys trains are running part (from Amsterdam to Rotterdam) is in using ERTMS Level 2. Trains are now travelling at up to commercial service with ERTMS level 1 since 160 km/h from Brussels to Antwerp (47 km), whilst on September 2009 (used by TRAXX locomotives the “dedicated” part of the line reaching speeds up and Thalys trains), the southern section is in to 300km/h. HSL 4 is currently used by Thalys and fast commercial service with ERTMS level 2 since internal InterCity trains, whilst NS Hispeed trains Fyra December 2009. © UNIFE 2012 are foreseen to start commercial operations in the near future. Avenue Louise 221, B-1050 Brussels, Belgium Tel: + 32 2 626 12 60, Fax: + 32 2 626 12 61, unife@unife.org
  • 2. What are the benefits brought by ERTMS to passengers on the high-speed line crossing Belgium and the Netherlands? Amsterdam, Paris and Brussels are now closer than ever thanks to the new High-speed line linking Belgium and The Netherlands, whilst travelling times to Paris and Cologne have equally been reduced thanks to HSL3: – From Amsterdam, it now takes 3h18 to reach Paris (51 minutes travelling time reduction) and 1h54 to reach Brussels; – From Paris, travelling time to Cologne has been cut to 3h14 (36 minutes reduction). This considerable travelling time reductions bring significant benefits to passengers, facilitating and improving travel of both tourist and business travellers. As a side effect of railway investments, modernization and upgrade, Belgium now enjoys two of the most spectacular railway stations in Europe: the fully-renovated “Antwerpen Centraal” Station, and the scenic, futuristic Liège-Guillemins station, which was designed by Santiago Calatrava and has become the city’s landmark, known all over Europe. Will ERTMS also benefit directly to infrastructure managers and train operators? Yes - ERTMS also considerably reduces infrastructure and maintenance costs and increases safety, reliability, capacity and interoperability. Once the full line from Paris to Amsterdam will be equipped, it will also strongly reduce the number of signalling systems required to run on this line – from seven to one. This will greatly facilitate operations along the lines for both existing operators and new entrants. Are Belgium and the Netherlands also planning ERTMS investment on their freight and conventional networks? Yes - in addition to HSL Zuid, The Netherlands is also installing ERTMS on its freight network. In particular, the Betuweroute, part of the Havenspoorlijn, is now operating since July 2007 with ERTMS level 2 without any fallback system. The rest of the Havenspoorlijn, the new railway link connecting the Europoort of Rotterdam with Germany, is to be fitted with ERTMS level 1. The Netherlands has also opted for ERTMS to be installed in a commuter line: Amsterdam-Utrecht (30 km, 4-lanes). This line, which currently uses the legacy system “ATB”, should be operated with ERTMS level 2 by the end of the 2010. Lastly the new “Hanzelijn” line, connecting the cities of Lelystad and Zwolle, will be equipped with ERTMS level 2. It is planned for completion by the end of 2012. On the Belgian side, the country plans to fully equip its entire network in the long run. A frame contract has been signed in this respect. It has also plans to upgrade the High Speed connections with France and the UK to ERTMS – however final completion dates have not yet been provided. S uppliers © UNIFE 2012 Want to know more about ERTMS? Please check www.ertms.net or contact UNIFE at unife@unife.org