SlideShare a Scribd company logo
1 of 2
Download to read offline
n°18




                           ERTMS DEPLOYMENT IN SWEDEN
Factsheets




                            The Swedish Transport Administration has a taken a cautious but measured approach to
                            the introduction of ERTMS into the national rail network. The well operating existing/
                            legacy train protection system was introduced in the 1980s and is expected to last both
                            technically and economically until around 2020. However, ambitious plans foresee the
                            gradual installation of ERTMS on the Swedish rail network.

                                            What are the main characteristics of the Swedish rail network?
                                            How many vehicles will have to be equipped with ERTMS?
                                            The rail network itself consists of 11,900 track-kilometres of which 3,700 km are
                                            either double track or multiple track and 9,800km are electrified. The Swedish
                                            vehicle fleet impacted by ERTMS introduction consists of between 800 and 1200
                                            vehicles with approximately 50 different vehicle types.

                                            What is the Swedish ERTMS implementation program?
                                            The Swedish ERTMS Implementation Plan drawn up in September 2007 clearly
                                            identified the Swedish order of priority for the introduction of ERTMS as follows:
                                            1	 New and/or essentially upgraded routes or lines
                                            2	 Routes or lines without signal plant, centralised traffic control or ATP systems
                                            3	 Routes or lines with major re-investment needs for existing signal plants
                                            4	 Routes or lines included in the corridors identified by the EU
                                            5	 The remaining parts of the routes in the Trans-European Network (TEN) and
                                               after that other parts of the railway network

                                            Level 2 technology has been chosen for the whole of Sweden, with possible
                                            exceptions of a Level 1 solution being deployed at larger stations and railway
                                            yards with extensive shunting movements. A specific ERTMS “Regional” solution
                                            will be implemented on very low traffic lines, which are currently supervised
                                            by manual operation. Most Swedish lines are expected to be equipped for full
                                            introduction of ERTMS by 2030.

             What is the status of ERTMS deployment in Sweden?
             ERTMS Level 2 is to be implemented first on the Bothnia Line, ÅdaI Line, City Tunnel and Haparanda Line.
             These are in the process of being equipped with ERTMS Level 2 and will provide key experience for the next
             phases of ERTMS introduction in Sweden:
             –	 The Bothnia Line running between Umeå and Ångerman River north of Kramfors is 190 km long and
                comprises 25 km of tunnels and no less than 140 bridges. ERTMS Level 2 was chosen for the Bothnia Line,
                and the entire line has been open for traffic since August 2010. 	
             –	 The Ådal Line carries both passenger and cargo traffic. It includes over 100 level crossings and runs between
                Sundsvall and Västeraspby. The line is 180 km long, of which 50 km are new (Härnösand – Mörtsal). ERTMS
                Level 2 has been chosen for the implementation and when the line is completed, capacity will increase
                from 8 - 10 trains per day to 50 - 60 trains per day. The completed line is expected to be open for traffic in
                2012. 	
             –	 The Haparanda Line running between Boden and Haparanda is expected to start carrying traffic in 2012.
                ERTMS Level 2 has been chosen for the line, which is 156 km long (42 km of which is new track between
                Kalix and Haparanda), comprises 17 railway bridges, 40 level crossings and is intended mainly for cargo traffic.
             –	 The City Tunnel is a 17 km long electrified rail connection running through and under the city of Malmö.
                ERTMS Level 2 has been chosen for this section and the work will also involve rebuilding Malmö Central
                                                                                                                                   © UNIFE 2012




                Station and building new stations at Triangeln and Hyllie. The section was ready for traffic in December
                2010 and the ERTMS system will be commissioned in 2014.
             Please see map for a detailed overview of the Swedish implementation plan. 	

                                                        Avenue Louise 221, B-1050 Brussels, Belgium
                                                        Tel: + 32 2 626 12 60, Fax: + 32 2 626 12 61, unife@unife.org
What is ERTMS Regional?
                    ERTMS Regional, based on the new UIC rail control specification for less intensely used
                    routes, is now being introduced in Sweden on the so-called “TAM”lines – lines that do
                    not have an Automatic Train Control (ATC) system – on which traffic control takes place
                    manually using telephone communication between local train dispatchers. Safety will
                    improve substantially when ERTMS Regional is introduced on these lines. Another benefit
                    of the new system, which will see the lines upgraded from manual to automatic control, is
                    the creation of a cost-effective alternative for lines which otherwise might face closure due
                    to the cost of maintaining manual operation or upgrading to traditional remote-controlled
                    signalling. The Västerdal Line (134 km long, 16 trains per day) is the first ERTMS Regional
                    line and was selected mainly because it is typical of its type and has no through traffic. This
                    means that a limited number of vehicles are affected and only one traffic control centre is
                    involved.


  What is the onboard procurement strategy?
  ERTMS will be introduced in accordance with the vehicle strategy, which indicates that
  the majority of the train fleet will be equipped initially, followed by a deployment
  trackside. Since the transition to ERTMS cannot take place overnight, trains must
  be able to operate on ERTMS-equipped infrastructure as well as on existing/legacy
  system lines. A Specific Transmission Module (STM) is needed to achieve this. The STM
  unit can read data from the existing trackside equipment and can convert it into a
  format that is transmittable to the new onboard system. This makes it possible for a
  train equipped with ERTMS to run on both legacy system lines and ERTMS lines, and
  the system can be introduced into the infrastructure gradually.


                    What are the benefits of ERTMS Deployment for Sweden?
                    The adoption of ERTMS marks a significant technology shift for Swedish railway
                    operators. It means that Sweden is now well positioned to gain from increased
                    competitiveness and is taking a major step towards improved cross-border operations
                    and interoperability, reduced journey times, as well as cutting Sweden’s carbon
                    footprint. Sweden also constitutes a key section of Corridor B. This section of line is
                    expected to be appropriately fitted before 2020.

                    The transport sector as a whole contributes 40% of Sweden’s greenhouse gases.
                    Sweden is justly proud of its efforts to maintain and improve the environment.
                    ERTMS not only contributes to this, but brings with it the highly important benefits
                    of rail safety and reduced costs.




S uppliers
                                                                                                                      © UNIFE 2012




Want to know more about ERTMS? Please check www.ertms.net or contact UNIFE at unife@unife.org

More Related Content

What's hot

ERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
ERTMS Fact Sheet 6 - ERTMS deployment in SwitzerlandERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
ERTMS Fact Sheet 6 - ERTMS deployment in SwitzerlandUNIFE2012
 
ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands
ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The NetherlandsERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands
ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The NetherlandsUNIFE2012
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewUNIFE2012
 
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingUNIFE2012
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsUNIFE2012
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...UNIFE2012
 
Rail in Europe 2020
Rail in Europe 2020Rail in Europe 2020
Rail in Europe 2020Amadeus Rail
 
An Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETAn Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETIJECEIAES
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentationco1ps
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyScott Martin, CMILT
 
PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003Antonio Bove
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesSYSTRA
 
Intelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsIntelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsCognizant
 
SMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and ManagementSMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and ManagementSMART Infrastructure Facility
 
Mass Transit Presentation Raj Naidu
Mass Transit Presentation Raj NaiduMass Transit Presentation Raj Naidu
Mass Transit Presentation Raj Naidurnglobalgroup
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Shyam Raman
 

What's hot (20)

ERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
ERTMS Fact Sheet 6 - ERTMS deployment in SwitzerlandERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
ERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
 
ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands
ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The NetherlandsERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands
ERTMS Fact Sheet 12 - ERTMS deployment in Belgium & The Netherlands
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
 
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levels
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
 
Rail in Europe 2020
Rail in Europe 2020Rail in Europe 2020
Rail in Europe 2020
 
An Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETAn Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANET
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentation
 
ERTMS and Brexit
ERTMS and BrexitERTMS and Brexit
ERTMS and Brexit
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st Century
 
PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003
 
velaro-Türkiye
velaro-Türkiyevelaro-Türkiye
velaro-Türkiye
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
 
Intelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail SystemsIntelligent Infrastructure for Next-Generation Rail Systems
Intelligent Infrastructure for Next-Generation Rail Systems
 
SMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and ManagementSMART Seminar Series: Railway Systems Complexity and Management
SMART Seminar Series: Railway Systems Complexity and Management
 
Bombardier
BombardierBombardier
Bombardier
 
Mass Transit Presentation Raj Naidu
Mass Transit Presentation Raj NaiduMass Transit Presentation Raj Naidu
Mass Transit Presentation Raj Naidu
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
Cisco
CiscoCisco
Cisco
 

Similar to ERTMS Fact Sheet 18 - ERTMS deployment in Sweden

The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe European GNSS Agency (GSA)
 
Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)Amzal2012
 
ICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger BazeleyICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger BazeleyRoger Bazeley, USA
 
E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1Poul Froesig
 
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónRecruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónDamien Laurelli
 
RNS2012 - Maite Cambronero Hellín
RNS2012 - Maite Cambronero HellínRNS2012 - Maite Cambronero Hellín
RNS2012 - Maite Cambronero HellínRussell Publishing
 
Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Damien Laurelli
 
communication system in railways
communication system in railwayscommunication system in railways
communication system in railwaysVikash Kumar
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014johnrubial
 
Adif. Adif's presentation for 2012 uic ertms conf v1.3
Adif. Adif's presentation for 2012 uic ertms conf v1.3Adif. Adif's presentation for 2012 uic ertms conf v1.3
Adif. Adif's presentation for 2012 uic ertms conf v1.3ADIF-DC1
 
European Rail Travel Trends 2020
European Rail Travel Trends 2020European Rail Travel Trends 2020
European Rail Travel Trends 2020Amadeus Rail
 
Vocational training presentation on Railway Communication System
Vocational training presentation on Railway Communication SystemVocational training presentation on Railway Communication System
Vocational training presentation on Railway Communication SystemAshutosh Verma
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Briefenergyvijay
 
Uirr news q3 2012-final
Uirr news q3 2012-finalUirr news q3 2012-final
Uirr news q3 2012-finalCombinant nv
 
Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Ibrahim Al-Hudhaif
 
Dense wavelength division multiplexing (DWDM): A Review
Dense wavelength division multiplexing (DWDM): A Review Dense wavelength division multiplexing (DWDM): A Review
Dense wavelength division multiplexing (DWDM): A Review Kamal Pradhan
 

Similar to ERTMS Fact Sheet 18 - ERTMS deployment in Sweden (20)

ETCS
ETCSETCS
ETCS
 
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERAThe Regulatory Perspective Towards GNSS Adoption in Rail- ERA
The Regulatory Perspective Towards GNSS Adoption in Rail- ERA
 
Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)Publicatie Railway Strategies (2011)
Publicatie Railway Strategies (2011)
 
Carl bjorgan
Carl bjorganCarl bjorgan
Carl bjorgan
 
ICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger BazeleyICE inter city express German high-speed rail network_Roger Bazeley
ICE inter city express German high-speed rail network_Roger Bazeley
 
E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1
 
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónRecruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
 
RNS2012 - Maite Cambronero Hellín
RNS2012 - Maite Cambronero HellínRNS2012 - Maite Cambronero Hellín
RNS2012 - Maite Cambronero Hellín
 
Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14
 
communication system in railways
communication system in railwayscommunication system in railways
communication system in railways
 
Sn1049 5 Vh
Sn1049 5 VhSn1049 5 Vh
Sn1049 5 Vh
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014
 
Adif. Adif's presentation for 2012 uic ertms conf v1.3
Adif. Adif's presentation for 2012 uic ertms conf v1.3Adif. Adif's presentation for 2012 uic ertms conf v1.3
Adif. Adif's presentation for 2012 uic ertms conf v1.3
 
European Rail Travel Trends 2020
European Rail Travel Trends 2020European Rail Travel Trends 2020
European Rail Travel Trends 2020
 
Vocational training presentation on Railway Communication System
Vocational training presentation on Railway Communication SystemVocational training presentation on Railway Communication System
Vocational training presentation on Railway Communication System
 
V
VV
V
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Brief
 
Uirr news q3 2012-final
Uirr news q3 2012-finalUirr news q3 2012-final
Uirr news q3 2012-final
 
Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...
 
Dense wavelength division multiplexing (DWDM): A Review
Dense wavelength division multiplexing (DWDM): A Review Dense wavelength division multiplexing (DWDM): A Review
Dense wavelength division multiplexing (DWDM): A Review
 

Recently uploaded

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 

Recently uploaded (20)

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 

ERTMS Fact Sheet 18 - ERTMS deployment in Sweden

  • 1. n°18 ERTMS DEPLOYMENT IN SWEDEN Factsheets The Swedish Transport Administration has a taken a cautious but measured approach to the introduction of ERTMS into the national rail network. The well operating existing/ legacy train protection system was introduced in the 1980s and is expected to last both technically and economically until around 2020. However, ambitious plans foresee the gradual installation of ERTMS on the Swedish rail network. What are the main characteristics of the Swedish rail network? How many vehicles will have to be equipped with ERTMS? The rail network itself consists of 11,900 track-kilometres of which 3,700 km are either double track or multiple track and 9,800km are electrified. The Swedish vehicle fleet impacted by ERTMS introduction consists of between 800 and 1200 vehicles with approximately 50 different vehicle types. What is the Swedish ERTMS implementation program? The Swedish ERTMS Implementation Plan drawn up in September 2007 clearly identified the Swedish order of priority for the introduction of ERTMS as follows: 1 New and/or essentially upgraded routes or lines 2 Routes or lines without signal plant, centralised traffic control or ATP systems 3 Routes or lines with major re-investment needs for existing signal plants 4 Routes or lines included in the corridors identified by the EU 5 The remaining parts of the routes in the Trans-European Network (TEN) and after that other parts of the railway network Level 2 technology has been chosen for the whole of Sweden, with possible exceptions of a Level 1 solution being deployed at larger stations and railway yards with extensive shunting movements. A specific ERTMS “Regional” solution will be implemented on very low traffic lines, which are currently supervised by manual operation. Most Swedish lines are expected to be equipped for full introduction of ERTMS by 2030. What is the status of ERTMS deployment in Sweden? ERTMS Level 2 is to be implemented first on the Bothnia Line, ÅdaI Line, City Tunnel and Haparanda Line. These are in the process of being equipped with ERTMS Level 2 and will provide key experience for the next phases of ERTMS introduction in Sweden: – The Bothnia Line running between Umeå and Ångerman River north of Kramfors is 190 km long and comprises 25 km of tunnels and no less than 140 bridges. ERTMS Level 2 was chosen for the Bothnia Line, and the entire line has been open for traffic since August 2010. – The Ådal Line carries both passenger and cargo traffic. It includes over 100 level crossings and runs between Sundsvall and Västeraspby. The line is 180 km long, of which 50 km are new (Härnösand – Mörtsal). ERTMS Level 2 has been chosen for the implementation and when the line is completed, capacity will increase from 8 - 10 trains per day to 50 - 60 trains per day. The completed line is expected to be open for traffic in 2012. – The Haparanda Line running between Boden and Haparanda is expected to start carrying traffic in 2012. ERTMS Level 2 has been chosen for the line, which is 156 km long (42 km of which is new track between Kalix and Haparanda), comprises 17 railway bridges, 40 level crossings and is intended mainly for cargo traffic. – The City Tunnel is a 17 km long electrified rail connection running through and under the city of Malmö. ERTMS Level 2 has been chosen for this section and the work will also involve rebuilding Malmö Central © UNIFE 2012 Station and building new stations at Triangeln and Hyllie. The section was ready for traffic in December 2010 and the ERTMS system will be commissioned in 2014. Please see map for a detailed overview of the Swedish implementation plan. Avenue Louise 221, B-1050 Brussels, Belgium Tel: + 32 2 626 12 60, Fax: + 32 2 626 12 61, unife@unife.org
  • 2. What is ERTMS Regional? ERTMS Regional, based on the new UIC rail control specification for less intensely used routes, is now being introduced in Sweden on the so-called “TAM”lines – lines that do not have an Automatic Train Control (ATC) system – on which traffic control takes place manually using telephone communication between local train dispatchers. Safety will improve substantially when ERTMS Regional is introduced on these lines. Another benefit of the new system, which will see the lines upgraded from manual to automatic control, is the creation of a cost-effective alternative for lines which otherwise might face closure due to the cost of maintaining manual operation or upgrading to traditional remote-controlled signalling. The Västerdal Line (134 km long, 16 trains per day) is the first ERTMS Regional line and was selected mainly because it is typical of its type and has no through traffic. This means that a limited number of vehicles are affected and only one traffic control centre is involved. What is the onboard procurement strategy? ERTMS will be introduced in accordance with the vehicle strategy, which indicates that the majority of the train fleet will be equipped initially, followed by a deployment trackside. Since the transition to ERTMS cannot take place overnight, trains must be able to operate on ERTMS-equipped infrastructure as well as on existing/legacy system lines. A Specific Transmission Module (STM) is needed to achieve this. The STM unit can read data from the existing trackside equipment and can convert it into a format that is transmittable to the new onboard system. This makes it possible for a train equipped with ERTMS to run on both legacy system lines and ERTMS lines, and the system can be introduced into the infrastructure gradually. What are the benefits of ERTMS Deployment for Sweden? The adoption of ERTMS marks a significant technology shift for Swedish railway operators. It means that Sweden is now well positioned to gain from increased competitiveness and is taking a major step towards improved cross-border operations and interoperability, reduced journey times, as well as cutting Sweden’s carbon footprint. Sweden also constitutes a key section of Corridor B. This section of line is expected to be appropriately fitted before 2020. The transport sector as a whole contributes 40% of Sweden’s greenhouse gases. Sweden is justly proud of its efforts to maintain and improve the environment. ERTMS not only contributes to this, but brings with it the highly important benefits of rail safety and reduced costs. S uppliers © UNIFE 2012 Want to know more about ERTMS? Please check www.ertms.net or contact UNIFE at unife@unife.org