ERP READINESS AUDIT
      IMPORTANCE IN
    ERP PROJECT SUCCESS
VELCOM ERP IT SOURCING PVT LTD
     An Independent ERP Consulting & Talent Sourcing Company




                                                  VELCOM
                                                  Exceed Expectation
ERP READINESS AUDIT - INTRODUCTION
   ERP Readiness Audit is the process used to find out the readiness level of the
    organization to execute the ERP project initiative and identify specific areas to focus on
    in its preparation process.
   It is the ideal first step for organization to take in its ERP project initiative
   This would help organization to clearly understand its current readiness level and have
    an action plan to be fully ready to implement the ERP project successfully.
   The key business users should be involved in this audit phase, so that they assume
    ownership of the ERP project initiative.
   The purpose of the Readiness Audit is to
       Evaluate the level of overall preparedness of the organization to carry out a
          successful ERP implementation.
       Assess effectively the readiness of the client employees to adapt a new ERP system
       Develop employee buy-in to the project
   Readiness Audit to gauge how prepared the organization is, has to be done with a
    minimum target score, below which the ERP implementation has to be postponed.
   The organization should then first concentrate on improving the business process,
    systems and procedures before initiating the ERP Implementation.
   Many ERP implementations fail not because of any technical defect in the software but
    because the organization is not ready for it yet.
                                                                               VELCOM
                                                                               Exceed Expectation
ERP READINESS AUDIT
   Organization structure, processes & culture impacts the ERP project success and it should
    be frequently audited & improvements areas to be identified.
   Audit should include how the enterprise is organized as well as the state of processes,
    company direction, culture, and other factors.
   Organizations make considerable investments in ERP projects and expect early stabilization
    & benefits. While the benefits exist, normally the project timelines / budget exceed target,
    as challenges / risks normally occur in any such initiative involving varied business users
    and data sources.
   This is primarily due to lack of basic preparation done prior to initiating such a crucial
    initiative.
   Organization normally under-estimate the operational groundwork that need to be done
    before starting ERP project. At a high level these include:
       What information is required?
       How will the information be retrieved?
       Who would have access to what information?
       How should the Users be prepared for usage of the new erp system?
   This is done before the ERP selection phase & so gives neutral view of the business
    requirements & project readiness. Refers to requirements identification & should be
    focused on requirement needed by business at different stages.
                                                                               VELCOM
                                                                               Exceed Expectation
ERP READINESS AUDIT
   Could be advantageous to review the business processes for rationalization, which in
    turn might refine the requirement. Some of the simple steps are:
      Identify the business functions & start from the bottom up to determine the requirements of
       the various stakeholders in each of these business functions.
      Deliberate with business users to classify requirements as ‘Mandatory’ & ‘Nice to have’
   Organizations build further on the preparation based on their business &IT maturity.
   RA designed to help objectively evaluate business operations & point out problem areas
    before implementing ERP. Audit effectively assess the client employees readiness to
    adapt the new ERP system & to develop employee buy-in to the project.
   Analyze & optimize employee acceptance and address resistance to the potential ERP
    organizational changes. The audit activities are:
      Conduct an executive survey / workshop to ensure that the project objectives are aligned with
       the enterprise strategic direction
      Facilitate formal / informal communications with the organization staff & Determine largest
       areas of organizational resistance
      Identify lessons learnt from previous relevant project initiatives & Assess employee
       competencies relative to ERP skill requirements
      Identify major organizational / job changes resulting from ERP implementation
      Provide       recommendation         regarding     organizational    change    management,
       training & communications

                                                                                    VELCOM
                                                                                    Exceed Expectation
ERP READINESS AUDIT - PURPOSE
   Help identify specific areas for the organization & Project team to focus on as they
    prepare to select & implement the ERP solution.
   RA is measurement of current processes status before starting the project. The results
    will help ensure that an ERP implementation meets or exceeds the established goals that
    have been set for the initiative.
   Involves a wide range of discussions in the following areas:
      Organizational Structure, Culture, Corporate Philosophy, Vision & Mission
      ERP Business Goals / Objectives & Functional Breakdown
      Process & Data Flows Documentation
      Existing Technical & Data Infrastructure
   RA impacts organization structure / process and the project implementation. Reasons for
    RA are:
      Better alignment between Management, Business & IT
      ERP project costs are high and need justification.
      Improve customer responsiveness
      Meeting organization growth plans & restructuring
      Enhanced process / system standardization
      Challenges in realizing Project ROI
                                                                            VELCOM
                                                                            Exceed Expectation
ERP READINESS AUDIT
   RA focuses on key processes / structures with higher priority. Strong justification is
    required for the audit to get the required participation from the stakeholders.
   Readiness audit also helps to:
      Reduce significant proportion of the resource costs & project elapsed time
      Achieve the projected benefits of ERP in a shorter timeframe
   Following improvements areas are to be identified once the current level of readiness is
    determined:
      Assess educational requirements to improve the employees understanding level
         regarding business practices
      Executive management must focus on prioritized activities that need attention
      Determine the root cause of existing challenges & Assign a realistic due date to
         overcome them
      Assign accountability & responsibility for determining the problem root cause and
         resolve them
      Monitor progress & frequently review the status




                                                                             VELCOM
                                                                             Exceed Expectation
THANK YOU!




             VELCOM
             Exceed Expectation

More Related Content

What's hot

8 Omega Business
8 Omega Business8 Omega Business
8 Omega Business
mubarak2009
 
Erp implementation checklist
Erp implementation checklistErp implementation checklist
Erp implementation checklist
Mitch Rushing
 
Top 10 Reasons for ERP Project Failure
Top 10 Reasons for ERP Project FailureTop 10 Reasons for ERP Project Failure
Top 10 Reasons for ERP Project Failure
John Paulson
 
ERP Key Success Factors Series 2
ERP Key Success Factors Series 2ERP Key Success Factors Series 2
ERP Key Success Factors Series 2
velcomerp
 
Consultants role in ERP implementations in SME
Consultants role in ERP implementations in SMEConsultants role in ERP implementations in SME
Consultants role in ERP implementations in SME
Amit Chougule
 
Protorative Methodology
Protorative MethodologyProtorative Methodology
Protorative Methodology
Yashpal Jain
 
Erp implementation-guide
Erp implementation-guideErp implementation-guide
Erp implementation-guide
GeorgeHazlewood1
 
Project organisation and erp implementation method
Project organisation and erp implementation methodProject organisation and erp implementation method
Project organisation and erp implementation method
Gaurav Kumar
 
Erp presentation
Erp presentationErp presentation
Erp presentation
Amany Faroun
 
Agile meets Enterprise ERP
Agile meets Enterprise ERPAgile meets Enterprise ERP
Agile meets Enterprise ERP
AgileSparks
 
Chapter 9 Vendors Consultants Users Alexis Leon
Chapter 9  Vendors  Consultants  Users    Alexis  LeonChapter 9  Vendors  Consultants  Users    Alexis  Leon
Chapter 9 Vendors Consultants Users Alexis Leon
Sonali Chauhan
 
Sap implementation
Sap implementationSap implementation
Sap implementation
Sanjay Vispute
 
GAP ANALYSIS
GAP ANALYSISGAP ANALYSIS
GAP ANALYSIS
Meera Merin
 
Center of Excellence Building Blocks
Center of Excellence Building BlocksCenter of Excellence Building Blocks
Center of Excellence Building Blocks
Arup Dutta
 
Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611
John Paulson
 
Best practices assessment
Best practices assessmentBest practices assessment
Best practices assessment
Pivotal CRM
 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Paula Gomes
 
Oracle TAM Services Datasheet
Oracle TAM Services DatasheetOracle TAM Services Datasheet
Oracle TAM Services Datasheet
Pierce Quek
 
Service Delivery & Support
Service Delivery & SupportService Delivery & Support
Service Delivery & Support
Anand Subramaniam
 
Best practices in ERP solutions
Best practices in ERP solutionsBest practices in ERP solutions
Best practices in ERP solutions
ADGP, Public Grivences, Bangalore
 

What's hot (20)

8 Omega Business
8 Omega Business8 Omega Business
8 Omega Business
 
Erp implementation checklist
Erp implementation checklistErp implementation checklist
Erp implementation checklist
 
Top 10 Reasons for ERP Project Failure
Top 10 Reasons for ERP Project FailureTop 10 Reasons for ERP Project Failure
Top 10 Reasons for ERP Project Failure
 
ERP Key Success Factors Series 2
ERP Key Success Factors Series 2ERP Key Success Factors Series 2
ERP Key Success Factors Series 2
 
Consultants role in ERP implementations in SME
Consultants role in ERP implementations in SMEConsultants role in ERP implementations in SME
Consultants role in ERP implementations in SME
 
Protorative Methodology
Protorative MethodologyProtorative Methodology
Protorative Methodology
 
Erp implementation-guide
Erp implementation-guideErp implementation-guide
Erp implementation-guide
 
Project organisation and erp implementation method
Project organisation and erp implementation methodProject organisation and erp implementation method
Project organisation and erp implementation method
 
Erp presentation
Erp presentationErp presentation
Erp presentation
 
Agile meets Enterprise ERP
Agile meets Enterprise ERPAgile meets Enterprise ERP
Agile meets Enterprise ERP
 
Chapter 9 Vendors Consultants Users Alexis Leon
Chapter 9  Vendors  Consultants  Users    Alexis  LeonChapter 9  Vendors  Consultants  Users    Alexis  Leon
Chapter 9 Vendors Consultants Users Alexis Leon
 
Sap implementation
Sap implementationSap implementation
Sap implementation
 
GAP ANALYSIS
GAP ANALYSISGAP ANALYSIS
GAP ANALYSIS
 
Center of Excellence Building Blocks
Center of Excellence Building BlocksCenter of Excellence Building Blocks
Center of Excellence Building Blocks
 
Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611Erp Implementation Methodology Wkshp 2.0 120611
Erp Implementation Methodology Wkshp 2.0 120611
 
Best practices assessment
Best practices assessmentBest practices assessment
Best practices assessment
 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
 
Oracle TAM Services Datasheet
Oracle TAM Services DatasheetOracle TAM Services Datasheet
Oracle TAM Services Datasheet
 
Service Delivery & Support
Service Delivery & SupportService Delivery & Support
Service Delivery & Support
 
Best practices in ERP solutions
Best practices in ERP solutionsBest practices in ERP solutions
Best practices in ERP solutions
 

Similar to ERP Readiness Audit Importance for ERP Project Success

Why ERP Projects Fail.pdf
Why ERP Projects Fail.pdfWhy ERP Projects Fail.pdf
Why ERP Projects Fail.pdf
Fiyona Nourin
 
Steps recommended ascertaining the success of ERP implementation
Steps recommended ascertaining the success of ERP implementationSteps recommended ascertaining the success of ERP implementation
Steps recommended ascertaining the success of ERP implementation
6e Technologies
 
Getting Ready for ERP Implementation
Getting Ready for ERP ImplementationGetting Ready for ERP Implementation
Getting Ready for ERP Implementation
Mauly Chandra
 
Erp post implementation audit
Erp post implementation auditErp post implementation audit
Erp post implementation audit
velcomerp
 
ERP Goal Setting & TCO
ERP Goal Setting & TCOERP Goal Setting & TCO
ERP Goal Setting & TCO
velcomerp
 
Considerations for ERP Upgrade Success..pdf
Considerations for ERP Upgrade Success..pdfConsiderations for ERP Upgrade Success..pdf
Considerations for ERP Upgrade Success..pdf
Jose thomas
 
Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)
Tej Kiran
 
Lessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP ImplementationLessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP Implementation
sbandarkar
 
Lessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar PresentationLessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar Presentation
sbandarkar
 
Erp Readiness Audit
Erp Readiness AuditErp Readiness Audit
Erp Readiness Audit
velcomerp
 
Failed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista SolutionsFailed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista Solutions
Bista Solutions
 
ERP Implementation.pdf
ERP Implementation.pdfERP Implementation.pdf
ERP Implementation.pdf
aditi1232
 
How to Turn Your ERP Implementation from Failure to Success
How to Turn Your ERP Implementation from Failure to SuccessHow to Turn Your ERP Implementation from Failure to Success
How to Turn Your ERP Implementation from Failure to Success
DataNote
 
Do you know the best practices for implementing ERPNext (1).pdf
Do you know the best practices for implementing ERPNext (1).pdfDo you know the best practices for implementing ERPNext (1).pdf
Do you know the best practices for implementing ERPNext (1).pdf
riya sen
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignore
Grant Thornton LLP
 
Concerns specific to the administration of ERP projects.pdf
Concerns specific to the administration of ERP projects.pdfConcerns specific to the administration of ERP projects.pdf
Concerns specific to the administration of ERP projects.pdf
Jose thomas
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignore
Grant Thornton LLP
 
A Guide to Delving into 5 ERP Strategies.pdf
A Guide to Delving into 5 ERP Strategies.pdfA Guide to Delving into 5 ERP Strategies.pdf
A Guide to Delving into 5 ERP Strategies.pdf
Jose thomas
 
Bharat
BharatBharat
Velcom corporate presentation
Velcom corporate presentationVelcom corporate presentation
Velcom corporate presentation
Siva Subramanian TS
 

Similar to ERP Readiness Audit Importance for ERP Project Success (20)

Why ERP Projects Fail.pdf
Why ERP Projects Fail.pdfWhy ERP Projects Fail.pdf
Why ERP Projects Fail.pdf
 
Steps recommended ascertaining the success of ERP implementation
Steps recommended ascertaining the success of ERP implementationSteps recommended ascertaining the success of ERP implementation
Steps recommended ascertaining the success of ERP implementation
 
Getting Ready for ERP Implementation
Getting Ready for ERP ImplementationGetting Ready for ERP Implementation
Getting Ready for ERP Implementation
 
Erp post implementation audit
Erp post implementation auditErp post implementation audit
Erp post implementation audit
 
ERP Goal Setting & TCO
ERP Goal Setting & TCOERP Goal Setting & TCO
ERP Goal Setting & TCO
 
Considerations for ERP Upgrade Success..pdf
Considerations for ERP Upgrade Success..pdfConsiderations for ERP Upgrade Success..pdf
Considerations for ERP Upgrade Success..pdf
 
Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)Enterprise Resource Planning(ERP)
Enterprise Resource Planning(ERP)
 
Lessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP ImplementationLessons Learned from Failed ERP Implementation
Lessons Learned from Failed ERP Implementation
 
Lessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar PresentationLessons Learned from Failed ERP Implementation - Webinar Presentation
Lessons Learned from Failed ERP Implementation - Webinar Presentation
 
Erp Readiness Audit
Erp Readiness AuditErp Readiness Audit
Erp Readiness Audit
 
Failed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista SolutionsFailed ERP lessons - Webinar Take aways by Bista Solutions
Failed ERP lessons - Webinar Take aways by Bista Solutions
 
ERP Implementation.pdf
ERP Implementation.pdfERP Implementation.pdf
ERP Implementation.pdf
 
How to Turn Your ERP Implementation from Failure to Success
How to Turn Your ERP Implementation from Failure to SuccessHow to Turn Your ERP Implementation from Failure to Success
How to Turn Your ERP Implementation from Failure to Success
 
Do you know the best practices for implementing ERPNext (1).pdf
Do you know the best practices for implementing ERPNext (1).pdfDo you know the best practices for implementing ERPNext (1).pdf
Do you know the best practices for implementing ERPNext (1).pdf
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignore
 
Concerns specific to the administration of ERP projects.pdf
Concerns specific to the administration of ERP projects.pdfConcerns specific to the administration of ERP projects.pdf
Concerns specific to the administration of ERP projects.pdf
 
The 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignoreThe 4 ERP governance best practices you can’t ignore
The 4 ERP governance best practices you can’t ignore
 
A Guide to Delving into 5 ERP Strategies.pdf
A Guide to Delving into 5 ERP Strategies.pdfA Guide to Delving into 5 ERP Strategies.pdf
A Guide to Delving into 5 ERP Strategies.pdf
 
Bharat
BharatBharat
Bharat
 
Velcom corporate presentation
Velcom corporate presentationVelcom corporate presentation
Velcom corporate presentation
 

Recently uploaded

By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 

Recently uploaded (20)

By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdfFIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
FIDO Alliance Osaka Seminar: The WebAuthn API and Discoverable Credentials.pdf
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 

ERP Readiness Audit Importance for ERP Project Success

  • 1. ERP READINESS AUDIT IMPORTANCE IN ERP PROJECT SUCCESS VELCOM ERP IT SOURCING PVT LTD An Independent ERP Consulting & Talent Sourcing Company VELCOM Exceed Expectation
  • 2. ERP READINESS AUDIT - INTRODUCTION  ERP Readiness Audit is the process used to find out the readiness level of the organization to execute the ERP project initiative and identify specific areas to focus on in its preparation process.  It is the ideal first step for organization to take in its ERP project initiative  This would help organization to clearly understand its current readiness level and have an action plan to be fully ready to implement the ERP project successfully.  The key business users should be involved in this audit phase, so that they assume ownership of the ERP project initiative.  The purpose of the Readiness Audit is to  Evaluate the level of overall preparedness of the organization to carry out a successful ERP implementation.  Assess effectively the readiness of the client employees to adapt a new ERP system  Develop employee buy-in to the project  Readiness Audit to gauge how prepared the organization is, has to be done with a minimum target score, below which the ERP implementation has to be postponed.  The organization should then first concentrate on improving the business process, systems and procedures before initiating the ERP Implementation.  Many ERP implementations fail not because of any technical defect in the software but because the organization is not ready for it yet. VELCOM Exceed Expectation
  • 3. ERP READINESS AUDIT  Organization structure, processes & culture impacts the ERP project success and it should be frequently audited & improvements areas to be identified.  Audit should include how the enterprise is organized as well as the state of processes, company direction, culture, and other factors.  Organizations make considerable investments in ERP projects and expect early stabilization & benefits. While the benefits exist, normally the project timelines / budget exceed target, as challenges / risks normally occur in any such initiative involving varied business users and data sources.  This is primarily due to lack of basic preparation done prior to initiating such a crucial initiative.  Organization normally under-estimate the operational groundwork that need to be done before starting ERP project. At a high level these include:  What information is required?  How will the information be retrieved?  Who would have access to what information?  How should the Users be prepared for usage of the new erp system?  This is done before the ERP selection phase & so gives neutral view of the business requirements & project readiness. Refers to requirements identification & should be focused on requirement needed by business at different stages. VELCOM Exceed Expectation
  • 4. ERP READINESS AUDIT  Could be advantageous to review the business processes for rationalization, which in turn might refine the requirement. Some of the simple steps are:  Identify the business functions & start from the bottom up to determine the requirements of the various stakeholders in each of these business functions.  Deliberate with business users to classify requirements as ‘Mandatory’ & ‘Nice to have’  Organizations build further on the preparation based on their business &IT maturity.  RA designed to help objectively evaluate business operations & point out problem areas before implementing ERP. Audit effectively assess the client employees readiness to adapt the new ERP system & to develop employee buy-in to the project.  Analyze & optimize employee acceptance and address resistance to the potential ERP organizational changes. The audit activities are:  Conduct an executive survey / workshop to ensure that the project objectives are aligned with the enterprise strategic direction  Facilitate formal / informal communications with the organization staff & Determine largest areas of organizational resistance  Identify lessons learnt from previous relevant project initiatives & Assess employee competencies relative to ERP skill requirements  Identify major organizational / job changes resulting from ERP implementation  Provide recommendation regarding organizational change management, training & communications VELCOM Exceed Expectation
  • 5. ERP READINESS AUDIT - PURPOSE  Help identify specific areas for the organization & Project team to focus on as they prepare to select & implement the ERP solution.  RA is measurement of current processes status before starting the project. The results will help ensure that an ERP implementation meets or exceeds the established goals that have been set for the initiative.  Involves a wide range of discussions in the following areas:  Organizational Structure, Culture, Corporate Philosophy, Vision & Mission  ERP Business Goals / Objectives & Functional Breakdown  Process & Data Flows Documentation  Existing Technical & Data Infrastructure  RA impacts organization structure / process and the project implementation. Reasons for RA are:  Better alignment between Management, Business & IT  ERP project costs are high and need justification.  Improve customer responsiveness  Meeting organization growth plans & restructuring  Enhanced process / system standardization  Challenges in realizing Project ROI VELCOM Exceed Expectation
  • 6. ERP READINESS AUDIT  RA focuses on key processes / structures with higher priority. Strong justification is required for the audit to get the required participation from the stakeholders.  Readiness audit also helps to:  Reduce significant proportion of the resource costs & project elapsed time  Achieve the projected benefits of ERP in a shorter timeframe  Following improvements areas are to be identified once the current level of readiness is determined:  Assess educational requirements to improve the employees understanding level regarding business practices  Executive management must focus on prioritized activities that need attention  Determine the root cause of existing challenges & Assign a realistic due date to overcome them  Assign accountability & responsibility for determining the problem root cause and resolve them  Monitor progress & frequently review the status VELCOM Exceed Expectation
  • 7. THANK YOU! VELCOM Exceed Expectation