Describes How a SCADAmetrics Universal Duplexer Can Assist a Metron-Farnier VNR Endpoint to Monitor a Commercial Property's Water Meter in Parallel with the Utility's AMI/AMR System without Interference.
4. Universal Duplexer is a 3-Circuit, Signal-Activated, Solid-State Switch.
Duplexer Activated by Sensitive Voltage-Detection Circuitry Monitoring the
Secondary MTU.
Activation Occurs During the Secondary MTU Read, and Halts Immediately
Following Read.
Entire Read Process Takes Approximately 0.5 second.
Universal Duplexer Operating Sequence…
5. 1 2 3 4 5 6 7 8 9 10
Customer-Owned VNR Wakes Up to Read
Meter Once Every 15 Minutes.
Read Duration ~ 0.5 sec.
Utility-Owned MTU Wakes Up to Read
Meter Once Every 15 Minutes.
Read Duration ~ 0.5 sec.
Universal Duplexer
Water Meter
Customer-Owned VNR
Utility-Owned MTU
“Normally-Connected” Circuit
“Normally-Disconnected” Circuit
When VNR is Idle (>99% of the Time),
Duplexer is De-Activated…
6. 1 2 3 4 5 6 7 8 9 10
Customer-Owned VNR Wakes Up to Read
Meter Once Every 15 Minutes.
Read Duration ~ 0.5 sec.
Utility-Owned MTU Wakes Up to Read
Meter Once Every 15 Minutes.
Read Duration ~ 0.5 sec.
Water Meter
Customer-Owned VNR
Utility-Owned MTU
“Normally-Connected” Circuit
“Normally-Disconnected” Circuit
Duplexer Activates When High-Speed
Detection Circuit Senses VNR Signal...
Universal Duplexer
7. 1 2 3 4 5 6 7 8 9 10
Customer-Owned VNR Wakes Up to Read
Meter Once Every 15 Minutes.
Read Duration ~ 0.5 sec.
Utility-Owned MTU Wakes Up to Read
Meter Once Every 15 Minutes.
Read Duration ~ 0.5 sec.
Water Meter
Customer-Owned VNR
Utility-Owned MTU
“Normally-Connected” Circuit
“Normally-Disconnected” Circuit
After VNR Read Complete (~0.5 sec),
Duplexer Deactivates...
Universal Duplexer