SlideShare a Scribd company logo
1 of 6
Page | 1
Curriculum Vitae
Eng. Ali Mohammed Elmahdy Elshamy
Personal Data:
Address KSA: Rabigh – Kingdom of Saudi Arabia
: Kom El Nour, Mit Ghamer– Egypt.
Date / Place of Birth : 01/ 10/1986 Dakahlia – Egypt
Nationality : Egyptian.
Marital Status : Married.
E-mail : eng_alielmahdy@hotmail.com
Tel : +966507887784
OBJECTIVE:
To strive for Excellence in the field of construction and engineering – with dedication,
focus, proactive approach, positive attitude and passion, and to utilize
My 7 years knowledge and skills in the best possible way for the fulfillment of
organizational goals.
I am very pleased to introduce my C.V. hoping to be one of your team.
EDUCATION:
B. SC of Civil department, Faculty of Engineering (Zagazig University).
- Graduation year 2009
- Graduation Grade: (Pass) Cumulative 63.5% & Final year 75%
Page | 2
- Graduation Project: Project of R.C. Structures (Excellent) with Percentage of 100%
COURSES:
Auto CAD
SAP & SAFE
PREMAVERA & M.S PROJECT
Microsoft Office (Word-Excel-Power Point)
LANGUAGE SKILLS
Arabic: Mother tongue
English: Fluent (Writing – speaking)
SUMMARY OF QUALIFICATIONS:
• Project Management skills (Work schedules & Update for projects)
• Full Design of reinforced concrete structures.
• Quality control.
• Site supervision.
• Regular reports for project.
• Payment certificates and letters of credit.
Work Experience
1-Kingdom of Saudi Arabia King Abdullah Economic City.
Date: 2014 until now
Page | 3
Project: Alshurooq Project
98 Residential Building, 1 Mosque, Ground Tank
Position: Site Engineer & Technical office.
Company: Rozik Elgedrawy Co.
Duties and responsibilities:
- Project activities supervision
- Quality and cost controlling
- Preparing the variation orders.
- Assign the Sub-contractor to the related jobs.
- Update schedule for project.
- Payment certificates &Work contracts.
- Preparation for the meeting of the owner.
2-Kingdom of Saudi Arabia
Date: October 2013 to May 2014
Project: Droop Elparaka
Five villa contains basement plus ground floor, 1st
floor and roof floor/ 150 m2
Position: Designer & Site Manager
Company: Shada Saudi Urban Development
Duties and responsibilities:
- Re Building Design & sketch outline designs
- use computer-aided design for detailed design, generating parts lists and
specifications
- supervise all the site activities
- control the materials consuming
- control the subcontractors
Page | 4
3. Egypt
Date: May 2012 to October 2013
Project: teba gardens
6th
October City
Position: Site Engineer
Company: El-Mahmoudia-General-Contracting.
Duties and responsibilities:
- Project activities supervision
- Assign the Sub-contractor to the related jobs.
- Control the materials consuming.
- Control the subcontractors
4. Egypt
Date: Jan. 2012 to May 2012
Project: Create Ready Concrete Factory
Minya Governorate
Position: Site Manager
Company: El-Mahmoudia-General-Contracting.
Duties and responsibilities:
- Project activities supervision
- Assign the Sub-contractor to the related jobs.
- Control the materials consuming.
- Control the subcontractors.
5. Egypt
Date: October 2010 to Jan. 2012
Project: Towers of Egyptian Ministry of Awqaf .
Minya Governorate
Five tower contains basement plus ground floor, 1st
floor and 11 typical floors/
1250 m2
Position: Site Engineer
Company: El-Mahmoudia-General-Contracting.
Duties and responsibilities:
Page | 5
- Project activities supervision.
- Re Building Design sketch outline designs
- Assign the Sub-contractor to the related jobs.
- Update schedule for project.
- Payment certificates.
- Control the materials consuming.
- Control the subcontractors.
6. Egypt
Date: June 2009 to October 2010
Project: TEPA GARGINS
6th
October City
107 Building contains basement plus ground floor, 1st
floor and 5 typical floors/
300 m2 (Part One).
Position: Site Engineer.
Company: El-Mahmoudia-General-Contracting.
Duties and responsibilities:
- Project activities supervision.
- Assign the Sub-contractor to the related jobs.
Page | 5
- Project activities supervision.
- Re Building Design sketch outline designs
- Assign the Sub-contractor to the related jobs.
- Update schedule for project.
- Payment certificates.
- Control the materials consuming.
- Control the subcontractors.
6. Egypt
Date: June 2009 to October 2010
Project: TEPA GARGINS
6th
October City
107 Building contains basement plus ground floor, 1st
floor and 5 typical floors/
300 m2 (Part One).
Position: Site Engineer.
Company: El-Mahmoudia-General-Contracting.
Duties and responsibilities:
- Project activities supervision.
- Assign the Sub-contractor to the related jobs.

More Related Content

What's hot

AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED FAGEIR
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineerHossam Yassin
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)MAHMOUD SAYED
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileHassan Al-Yami
 
ATT_lotfy farouk CV25-10-2014
ATT_lotfy farouk  CV25-10-2014ATT_lotfy farouk  CV25-10-2014
ATT_lotfy farouk CV25-10-2014LOTFY FAROUK
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa
 
Architecture Engineer C.V
Architecture Engineer C.VArchitecture Engineer C.V
Architecture Engineer C.VMohamed hany
 
Eng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CVEng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CVahmed ali
 
CV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webCV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webNader Ali
 
Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael gamal
 
CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122Abanob Edward
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016Mohammed Salah
 

What's hot (20)

CV.Mohammed
CV.MohammedCV.Mohammed
CV.Mohammed
 
AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMED
 
CURRICULAM VITAE - M
CURRICULAM VITAE - MCURRICULAM VITAE - M
CURRICULAM VITAE - M
 
my-cv
my-cvmy-cv
my-cv
 
Mahmod Abdelhamid cv
Mahmod Abdelhamid cvMahmod Abdelhamid cv
Mahmod Abdelhamid cv
 
Mostafa-Rohaem
Mostafa-RohaemMostafa-Rohaem
Mostafa-Rohaem
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineer
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
 
M.samy CV
M.samy CVM.samy CV
M.samy CV
 
ATT_lotfy farouk CV25-10-2014
ATT_lotfy farouk  CV25-10-2014ATT_lotfy farouk  CV25-10-2014
ATT_lotfy farouk CV25-10-2014
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa Resume
 
Architecture Engineer C.V
Architecture Engineer C.VArchitecture Engineer C.V
Architecture Engineer C.V
 
Eng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CVEng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CV
 
CV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webCV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover web
 
Youssef CV pdf
Youssef CV pdfYoussef CV pdf
Youssef CV pdf
 
AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMED
 
Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-Michael Gamal Fayez - C.V - 1 AUG 2015-
Michael Gamal Fayez - C.V - 1 AUG 2015-
 
CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
 

Viewers also liked (12)

Seguridad y salud laboral
Seguridad y salud laboralSeguridad y salud laboral
Seguridad y salud laboral
 
Capitulo5 seleccion de sitio
Capitulo5 seleccion de sitioCapitulo5 seleccion de sitio
Capitulo5 seleccion de sitio
 
Almoe Company Profile
Almoe Company ProfileAlmoe Company Profile
Almoe Company Profile
 
PRAKASH PPT
PRAKASH PPTPRAKASH PPT
PRAKASH PPT
 
Aasdasdas
AasdasdasAasdasdas
Aasdasdas
 
S\
 S\ S\
S\
 
Aplicacion de la redes sociales en una empresa
Aplicacion de la redes sociales en una empresaAplicacion de la redes sociales en una empresa
Aplicacion de la redes sociales en una empresa
 
Study guide
Study guideStudy guide
Study guide
 
Seguridad y salud laboral
Seguridad y salud laboralSeguridad y salud laboral
Seguridad y salud laboral
 
Proposal autosport
Proposal autosportProposal autosport
Proposal autosport
 
PLAN7614—Visual Essay—Urban Villages
PLAN7614—Visual Essay—Urban VillagesPLAN7614—Visual Essay—Urban Villages
PLAN7614—Visual Essay—Urban Villages
 
4ta clase semiología 2016 dolor y edema
4ta clase semiología 2016 dolor  y edema4ta clase semiología 2016 dolor  y edema
4ta clase semiología 2016 dolor y edema
 

Similar to civil engr Ali elmahdyC. V

HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHosam Ahmed
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
mohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed atia
 
MOHAMMAD HAMID MUSTAFA (Project Manager)
MOHAMMAD HAMID MUSTAFA  (Project Manager)MOHAMMAD HAMID MUSTAFA  (Project Manager)
MOHAMMAD HAMID MUSTAFA (Project Manager)Mouhamad Msto
 
CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017Aḿя ДTЭF
 
project engineer-planning engineer
project engineer-planning engineerproject engineer-planning engineer
project engineer-planning engineerMohammed Soliman
 
Mohammad Odeh CV Eng
Mohammad Odeh CV  EngMohammad Odeh CV  Eng
Mohammad Odeh CV EngMohammad Odeh
 
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.Hisham AlRefaey
 

Similar to civil engr Ali elmahdyC. V (20)

HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
mohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineermohamed_mahmoud_atia - Planning & Cost Control Engineer
mohamed_mahmoud_atia - Planning & Cost Control Engineer
 
MOHAMMAD HAMID MUSTAFA (Project Manager)
MOHAMMAD HAMID MUSTAFA  (Project Manager)MOHAMMAD HAMID MUSTAFA  (Project Manager)
MOHAMMAD HAMID MUSTAFA (Project Manager)
 
CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017
 
Romany cv
Romany cvRomany cv
Romany cv
 
Peter Salib CV
Peter Salib  CVPeter Salib  CV
Peter Salib CV
 
Peter Salib CV
Peter Salib  CVPeter Salib  CV
Peter Salib CV
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
 
mohamed mohsen
mohamed mohsenmohamed mohsen
mohamed mohsen
 
project engineer-planning engineer
project engineer-planning engineerproject engineer-planning engineer
project engineer-planning engineer
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Mohammad Odeh CV Eng
Mohammad Odeh CV  EngMohammad Odeh CV  Eng
Mohammad Odeh CV Eng
 
hosam cv english 1
hosam cv english 1hosam cv english 1
hosam cv english 1
 
Shawki Hamzah 2
Shawki Hamzah 2Shawki Hamzah 2
Shawki Hamzah 2
 
AbdElaziz Ibrahem c.v neeew
AbdElaziz Ibrahem c.v  neeewAbdElaziz Ibrahem c.v  neeew
AbdElaziz Ibrahem c.v neeew
 
english cv for gulf
english cv for gulfenglish cv for gulf
english cv for gulf
 
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
 
Mohamed El-Tantawy
Mohamed El-TantawyMohamed El-Tantawy
Mohamed El-Tantawy
 

civil engr Ali elmahdyC. V

  • 1. Page | 1 Curriculum Vitae Eng. Ali Mohammed Elmahdy Elshamy Personal Data: Address KSA: Rabigh – Kingdom of Saudi Arabia : Kom El Nour, Mit Ghamer– Egypt. Date / Place of Birth : 01/ 10/1986 Dakahlia – Egypt Nationality : Egyptian. Marital Status : Married. E-mail : eng_alielmahdy@hotmail.com Tel : +966507887784 OBJECTIVE: To strive for Excellence in the field of construction and engineering – with dedication, focus, proactive approach, positive attitude and passion, and to utilize My 7 years knowledge and skills in the best possible way for the fulfillment of organizational goals. I am very pleased to introduce my C.V. hoping to be one of your team. EDUCATION: B. SC of Civil department, Faculty of Engineering (Zagazig University). - Graduation year 2009 - Graduation Grade: (Pass) Cumulative 63.5% & Final year 75%
  • 2. Page | 2 - Graduation Project: Project of R.C. Structures (Excellent) with Percentage of 100% COURSES: Auto CAD SAP & SAFE PREMAVERA & M.S PROJECT Microsoft Office (Word-Excel-Power Point) LANGUAGE SKILLS Arabic: Mother tongue English: Fluent (Writing – speaking) SUMMARY OF QUALIFICATIONS: • Project Management skills (Work schedules & Update for projects) • Full Design of reinforced concrete structures. • Quality control. • Site supervision. • Regular reports for project. • Payment certificates and letters of credit. Work Experience 1-Kingdom of Saudi Arabia King Abdullah Economic City. Date: 2014 until now
  • 3. Page | 3 Project: Alshurooq Project 98 Residential Building, 1 Mosque, Ground Tank Position: Site Engineer & Technical office. Company: Rozik Elgedrawy Co. Duties and responsibilities: - Project activities supervision - Quality and cost controlling - Preparing the variation orders. - Assign the Sub-contractor to the related jobs. - Update schedule for project. - Payment certificates &Work contracts. - Preparation for the meeting of the owner. 2-Kingdom of Saudi Arabia Date: October 2013 to May 2014 Project: Droop Elparaka Five villa contains basement plus ground floor, 1st floor and roof floor/ 150 m2 Position: Designer & Site Manager Company: Shada Saudi Urban Development Duties and responsibilities: - Re Building Design & sketch outline designs - use computer-aided design for detailed design, generating parts lists and specifications - supervise all the site activities - control the materials consuming - control the subcontractors
  • 4. Page | 4 3. Egypt Date: May 2012 to October 2013 Project: teba gardens 6th October City Position: Site Engineer Company: El-Mahmoudia-General-Contracting. Duties and responsibilities: - Project activities supervision - Assign the Sub-contractor to the related jobs. - Control the materials consuming. - Control the subcontractors 4. Egypt Date: Jan. 2012 to May 2012 Project: Create Ready Concrete Factory Minya Governorate Position: Site Manager Company: El-Mahmoudia-General-Contracting. Duties and responsibilities: - Project activities supervision - Assign the Sub-contractor to the related jobs. - Control the materials consuming. - Control the subcontractors. 5. Egypt Date: October 2010 to Jan. 2012 Project: Towers of Egyptian Ministry of Awqaf . Minya Governorate Five tower contains basement plus ground floor, 1st floor and 11 typical floors/ 1250 m2 Position: Site Engineer Company: El-Mahmoudia-General-Contracting. Duties and responsibilities:
  • 5. Page | 5 - Project activities supervision. - Re Building Design sketch outline designs - Assign the Sub-contractor to the related jobs. - Update schedule for project. - Payment certificates. - Control the materials consuming. - Control the subcontractors. 6. Egypt Date: June 2009 to October 2010 Project: TEPA GARGINS 6th October City 107 Building contains basement plus ground floor, 1st floor and 5 typical floors/ 300 m2 (Part One). Position: Site Engineer. Company: El-Mahmoudia-General-Contracting. Duties and responsibilities: - Project activities supervision. - Assign the Sub-contractor to the related jobs.
  • 6. Page | 5 - Project activities supervision. - Re Building Design sketch outline designs - Assign the Sub-contractor to the related jobs. - Update schedule for project. - Payment certificates. - Control the materials consuming. - Control the subcontractors. 6. Egypt Date: June 2009 to October 2010 Project: TEPA GARGINS 6th October City 107 Building contains basement plus ground floor, 1st floor and 5 typical floors/ 300 m2 (Part One). Position: Site Engineer. Company: El-Mahmoudia-General-Contracting. Duties and responsibilities: - Project activities supervision. - Assign the Sub-contractor to the related jobs.