Master Plan
     • Master Plan elements:
       – 19 soccer fields
          • 14 lighted international play fields
          • 5 youth practice fields
       – Championship field (lighted)
          • Covered seating
       – Central concession facility with
          •   Concessions and storage
          •   Restrooms
          •   Ticket booth
          •   Referee rooms
          •   Office and conference room
          •   First aid
26
Master Plan
       –   3 restroom/vending satellite pavilions
       –   Parking for 700 cars
       –   Re-routing existing drainage channel
       –   Landscape and irrigation
       –   Irrigation pond (12 million gallon)
       –   Connector trail and loop trail
       –   Connection to Citywide & RegionalTrail Network
       –   28 Acres nature area
       –   Playground
       –   Maintenance facility
     • Future Walnut Hill Lane improvements to
       benefit park
       – Dallas County and City of Dallas
27
Proposed Walnut Hill Lane Improvements




28
BUDGET

                                Land
                                              Construction
                                Acquisition
     Phase 1                          $2.4M           $19M

     Phase 2 (finish out)                             $20M

           Total Construction                         $39M




29
Phase 1 Development
     • Components of Phase 1
       –   14 International fields
       –   5 Practice/Youth fields
       –   3 restroom/vending satellite pavilion
       –   Parking and drives
       –   Connector trail and loop trail
       –   Site grading and fill
       –   Site utilities
       –   Landscape
       –   Fencing
       –   Irrigation


30
Restroom/Vending Satellite Pavilion




31
SATELLITE PAVILION




32
33

ELM FORK ATHLECTIC COMPLEX presentation thom

  • 1.
    Elm Fork AthleticComplex Dallas Park and Recreation
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 20.
  • 21.
    (Optional) LEED CERTIFIEDDESIGN MAINTENANCE BUILDING 21
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
    Master Plan • Master Plan elements: – 19 soccer fields • 14 lighted international play fields • 5 youth practice fields – Championship field (lighted) • Covered seating – Central concession facility with • Concessions and storage • Restrooms • Ticket booth • Referee rooms • Office and conference room • First aid 26
  • 27.
    Master Plan – 3 restroom/vending satellite pavilions – Parking for 700 cars – Re-routing existing drainage channel – Landscape and irrigation – Irrigation pond (12 million gallon) – Connector trail and loop trail – Connection to Citywide & RegionalTrail Network – 28 Acres nature area – Playground – Maintenance facility • Future Walnut Hill Lane improvements to benefit park – Dallas County and City of Dallas 27
  • 28.
    Proposed Walnut HillLane Improvements 28
  • 29.
    BUDGET Land Construction Acquisition Phase 1 $2.4M $19M Phase 2 (finish out) $20M Total Construction $39M 29
  • 30.
    Phase 1 Development • Components of Phase 1 – 14 International fields – 5 Practice/Youth fields – 3 restroom/vending satellite pavilion – Parking and drives – Connector trail and loop trail – Site grading and fill – Site utilities – Landscape – Fencing – Irrigation 30