OASIS
COMMUNITY PARK
DESIGN WORKSHOP
LAGUNA RIDGE SPECIFIC PLAN
 Specific Plan completed in 2004
 16 local and 3 neighborhood parks (57 acres)
 2 community parks (55 acres)
 Parkways (40 acres)
 Total ~ $53 million in parks and parkways
LAGUNA RIDGE SPECIFIC PLAN
 Prior to 2011 – Parks were developer built
 2011 - City approves Fee Program
 Post 2011 - City/CSD plan and build parks
 2014 - Storybook Woods and Island Parks
 2015 - Horseshoe Park will begin construction in
August.
 Timing of future parks is controlled by rate of new
construction
LAGUNA RIDGE PARKS - HISTORY
HORSESHOE PARK
9 ACRES
ISLAND PARK
2.3 ACRES
STORYBOOK WOODS PARK
1.8 ACRES
OASIS COMMUNITY PARK
20 ACRES
CONSTELLATION PARK
2.3 ACRES
PARK LOCATIONS
20 ACRES
PARK SITE
PARK SITE
WE ARE HERE
PARK PLANNING PROCESS
 Master Plan/Community Outreach
 2-3 months
 Design Development & Construction Documents
 12 months
 Permits & Reviews
 2- 3 months
 Bidding
 2 -3 months
 Construction
 18 months (weather permitting)
 Establishment Period
 3-6 months
 Grand Opening
TIMELINE
Park Construction Budget = $9,440,000
FUNDING
 Current California drought is the worst in history. The
rules, regulations and restrictions regarding outdoor
water use are changing daily.
 CSD will have to assess conditions as project
progresses to determine affect on design and/or
construction.
 CSD currently designs with reduced
turf and water conservation in mind.
 If drought persists, project
construction may be delayed/
modified accordingly.
DROUGHT CONDITIONS
 CSD traditionally designed playgrounds with a
combination of rubber surfacing and wood fiber.
 Recent product failures and expensive replacement
costs have caused staff to reconsider the use of rubber
surfacing.
 Rubber surfacing is double the cost
of wood fiber.
 Both surfaces meet current standards
for playground safety.
 Wood fiber will be used at Oasis Park.
PLAYGROUND SURFACING
 OASIS PARK is defined as a community park (20-100 acres)
 COMMUNITY PARKS typically include the following amenities:
 Athletic Fields (lighted)
 Recreation Center or Preschool
 Sports Courts (Tennis, Basketball, Bocce, Volleyball etc.)
 Playgrounds for 2-5 and 5-12 age groups
 Restrooms and/or Concession Buildings
 Picnic area(s) with shade structure
 Dog Parks
 Loop Trail
 Parking
 Recreation Programming
 Security lighting
CSD PARK DESIGN PRINCIPLES
 Fields and court games should be
oriented north to south.
 Avoid field overlays.
 Allow space for buffer around
fields.
 Avoid locating near homes.
 Avoid locating near passive uses.
 Provide access to parking lot and
restrooms.
 Provide area for bleachers,
benches and concessions.
ATHLETIC FIELDS
FIELD LIGHTING
 Lighting fields offers additional
practice and play time.
 New light control technology:
Reduced spill light
Restricting and reducing glare
Minimizing sky glow
LED fixtures
 Consider field layouts
 Separate structures and areas for
2- 5 year olds
 Safety - low height, low impact
 Visibility - important for adult and
child to interact, supervision
 Creative and imaginative play
 Tactile environment
2-5 YEAR OLD PLAYGROUNDS
 Large challenging structures
 Net climbers
 Boulders and rock climbing
 Equipment with movement – Spinners
 Meeting areas and social play
 Thematic play with more complexity –
history, fossils, dinosaurs, nature, etc.
5-12 YEAR OLD PLAYGROUNDS
WATER PLAY
 Re-circulating vs. drain away
 Locate adjacent to restrooms
 Locate near the playground
 Integrate theming
 Trails or walkways
 Soft, all-weather surfaces
(ie. decomposed granite)
 Adult fitness stations
ADULT FITNESS
 Horseshoe courts
 Bocce ball
 Half-court basketball
 Putting green
 Tennis courts
 Volleyball courts
SMALL SPORT COURTS
Skateable pieces and furnishings which provide
a safe and legal place for skateboarding
SKATE ELEMENTS
NON-PROGAMMABLE OPEN SPACE
Non programmed open space areas for informal
soccer, baseball, Frisbee, free-play etc.
 Shade shelters and canopies
 Benches and picnic facilities
 Non – programmed open space
 Aesthetic surface treatments
 Sculptural features
 Interpretive signage
PICNIC AND GATHERING PLACES
 Provide 1 to 1.5 acres
 Consider separate small and
large dog areas
 Separate entrances
 Easily accessible from public
sidewalks and parking
DOG PARKS
NATURE GARDEN
PASSIVE GARDEN AREAS
Butterfly Gardens
Edible Gardens
Native Plant Gardens
 Edible gardens with fruiting trees
 Gardens with butterfly attracting plants
 Demonstration gardens with California native plants
 Drought tolerant landscaping
 Reduced lawn areas
 Naturalistic plantings
 Shade trees
 Low maintenance
 Seasonal change - flowers and
leaf color
 Mounding
LANDSCAPING
OASIS THEME
 Desert Oasis theme
 Desert-like drought tolerant plantings
 Palms as accent trees
 Illusion of water
 Faux sand dunes in the play area
BASE SHEET
Park site will include a (6000 sq. ft.) Preschool Center
Park site will include parking
(estimate 150-250 spaces dependent on programming)
Park site will include 2 multi-purpose fields
PARK DESIGN 101
Use the cut-outs to layout the elements you want in your park
Draw in walkways with dashed lines or arrows
Jot down ideas and make notes
Be creative and have fun!
Move cut-outs to best fit the site
Separate passive and active uses
Allow buffer space and circulation between all uses
Locate uses close to appropriate facilities
YOUR FINAL DESIGN!
PRESENT YOUR IDEAS TO THE GROUP!
CSD STAFF WILL DEVELOP MASTER PLAN!
CONSTRAINTS
 20 Acres
 $9.4 million construction budget
OPPORTUNITIES
 Water Play/Sprayground
 Basketball – Full and/or Half-Court
 Volleyball
 Tennis
 Skateboard Elements
 Horseshoes
 Bocce Ball
 Adult Fitness
 Putting Green
 Natural Areas
 Meditation/Passive Areas
 Jogging/Walking Trail
 Open Space
 Or other ideas?
REQUIREMENTS
 Multi-Purpose Fields (2)
 Parking Lot(s) for 150-250 cars
 6,000 s.f. Preschool Building
 2-5 year old play area
 5-12 year old play area
 Public Restrooms
 Picnic Area(s)
 Shade Structure(s)
REQUIREMENTS, CONSTRAINTS & OPPORTUNITIES
NEXT STEPS & TIMELINE
 Comment Forms – Hand in tonight or comment online at
yourcsd.com/parks/park_development.asp until
Friday, July 24th.
 Staff will post your designs on the CSD website for comment
 Staff will prepare a concept plan to present at next meeting
scheduled for September 17th at 6:30 p.m.
 Concept plan will be on the CSD website for public comment for 2
weeks in September/October.
 CSD Board Master Plan Approval – November 2015
 Construction Drawings – December 2015 – December 2016
 Project Out to Bid – Early 2017
 Construction – Spring 2017 to Summer 2018
 Park Open – Summer 2018
PORTO PARK - NEXT STEPS & TIMELINE
 Concept plan will be on the CSD website for public comment for 2
weeks.
 Comment Forms – Hand in tonight or comment online at
yourcsd.com/parks/park_development.asp until
Friday, July 24th.
 CSD Board Master Plan Approval – November 2015
 Construction Drawings – December 2015 – June 2016
 Project Out to Bid – September 2016
 Construction – Fall 2016 to Spring 2017
 Park Open – Spring/Summer 2017
Oasis-park-outreach

More Related Content

What's hot

Selected Retail Projects
Selected Retail ProjectsSelected Retail Projects
Selected Retail Projects
Perry Becker
 
Portfolio - Ravi Kholakiya
Portfolio - Ravi KholakiyaPortfolio - Ravi Kholakiya
Portfolio - Ravi Kholakiya
Ravi Kholakiya
 
Sarasota Park System
Sarasota Park SystemSarasota Park System
Sarasota Park System
Qianqian Zhao
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
Sumodhini Venkatachalam
 
Sag 2012 complete_folio_july
Sag 2012 complete_folio_julySag 2012 complete_folio_july
Sag 2012 complete_folio_july
Santosh George
 
ICI - Final Project - Brief Report
ICI - Final Project - Brief ReportICI - Final Project - Brief Report
ICI - Final Project - Brief Report
Yung Kai
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
jygwen
 
Cosumnes CSD - Sheldon Place Park Conceptual Master Plan
Cosumnes CSD - Sheldon Place Park Conceptual Master PlanCosumnes CSD - Sheldon Place Park Conceptual Master Plan
Cosumnes CSD - Sheldon Place Park Conceptual Master Plan
Cosumnes CSD
 
M3M Merlin sector 67, Gurgaon
M3M Merlin sector 67, GurgaonM3M Merlin sector 67, Gurgaon
M3M Merlin sector 67, Gurgaon
Group 3 realtors
 
Santosh george current la work 28.08.2015
Santosh george current la work 28.08.2015Santosh george current la work 28.08.2015
Santosh george current la work 28.08.2015
Santosh George
 
Indian habitat center
Indian habitat centerIndian habitat center
Indian habitat center
Pukar Bhandari
 
CASE STUDY ON RESTROBAR AND LOUNGE
CASE STUDY ON RESTROBAR AND LOUNGECASE STUDY ON RESTROBAR AND LOUNGE
CASE STUDY ON RESTROBAR AND LOUNGE
Sushil Kumar Gupta.
 
Dawn Kolb, CID professional portfolio 2020
Dawn Kolb, CID professional portfolio 2020Dawn Kolb, CID professional portfolio 2020
Dawn Kolb, CID professional portfolio 2020
Dawn Kolb
 

What's hot (13)

Selected Retail Projects
Selected Retail ProjectsSelected Retail Projects
Selected Retail Projects
 
Portfolio - Ravi Kholakiya
Portfolio - Ravi KholakiyaPortfolio - Ravi Kholakiya
Portfolio - Ravi Kholakiya
 
Sarasota Park System
Sarasota Park SystemSarasota Park System
Sarasota Park System
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
Sag 2012 complete_folio_july
Sag 2012 complete_folio_julySag 2012 complete_folio_july
Sag 2012 complete_folio_july
 
ICI - Final Project - Brief Report
ICI - Final Project - Brief ReportICI - Final Project - Brief Report
ICI - Final Project - Brief Report
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Cosumnes CSD - Sheldon Place Park Conceptual Master Plan
Cosumnes CSD - Sheldon Place Park Conceptual Master PlanCosumnes CSD - Sheldon Place Park Conceptual Master Plan
Cosumnes CSD - Sheldon Place Park Conceptual Master Plan
 
M3M Merlin sector 67, Gurgaon
M3M Merlin sector 67, GurgaonM3M Merlin sector 67, Gurgaon
M3M Merlin sector 67, Gurgaon
 
Santosh george current la work 28.08.2015
Santosh george current la work 28.08.2015Santosh george current la work 28.08.2015
Santosh george current la work 28.08.2015
 
Indian habitat center
Indian habitat centerIndian habitat center
Indian habitat center
 
CASE STUDY ON RESTROBAR AND LOUNGE
CASE STUDY ON RESTROBAR AND LOUNGECASE STUDY ON RESTROBAR AND LOUNGE
CASE STUDY ON RESTROBAR AND LOUNGE
 
Dawn Kolb, CID professional portfolio 2020
Dawn Kolb, CID professional portfolio 2020Dawn Kolb, CID professional portfolio 2020
Dawn Kolb, CID professional portfolio 2020
 

Viewers also liked

Dlaczego
DlaczegoDlaczego
Dlaczego
Grabarz Chaosu
 
Compressas frias quentes higienização bucal
Compressas frias quentes higienização bucalCompressas frias quentes higienização bucal
Compressas frias quentes higienização bucal
Wagner Lima Teixeira
 
Farmacologia geral
Farmacologia geralFarmacologia geral
Farmacologia geral
Wagner Lima Teixeira
 
CV - Mrs. Stella I. De Guzman
CV - Mrs. Stella I. De Guzman CV - Mrs. Stella I. De Guzman
CV - Mrs. Stella I. De Guzman
Stella de Guzman
 
Alimentos energéticos trabalho
Alimentos energéticos trabalhoAlimentos energéticos trabalho
Alimentos energéticos trabalho
Wagner Lima Teixeira
 
Caderneta de saúde da criança
Caderneta de saúde da criançaCaderneta de saúde da criança
Caderneta de saúde da criança
Wagner Lima Teixeira
 

Viewers also liked (7)

bearing technology
bearing technologybearing technology
bearing technology
 
Dlaczego
DlaczegoDlaczego
Dlaczego
 
Compressas frias quentes higienização bucal
Compressas frias quentes higienização bucalCompressas frias quentes higienização bucal
Compressas frias quentes higienização bucal
 
Farmacologia geral
Farmacologia geralFarmacologia geral
Farmacologia geral
 
CV - Mrs. Stella I. De Guzman
CV - Mrs. Stella I. De Guzman CV - Mrs. Stella I. De Guzman
CV - Mrs. Stella I. De Guzman
 
Alimentos energéticos trabalho
Alimentos energéticos trabalhoAlimentos energéticos trabalho
Alimentos energéticos trabalho
 
Caderneta de saúde da criança
Caderneta de saúde da criançaCaderneta de saúde da criança
Caderneta de saúde da criança
 

Similar to Oasis-park-outreach

George Park Workshop 1 - Cosumnes CSD
George Park Workshop 1 - Cosumnes CSDGeorge Park Workshop 1 - Cosumnes CSD
George Park Workshop 1 - Cosumnes CSD
Cosumnes CSD
 
George park 2nd community outreach
George park 2nd community outreachGeorge park 2nd community outreach
George park 2nd community outreach
csd15
 
Cosumnes CSD - Buscher Park Conceptual Master Plan
Cosumnes CSD - Buscher Park Conceptual Master PlanCosumnes CSD - Buscher Park Conceptual Master Plan
Cosumnes CSD - Buscher Park Conceptual Master Plan
Cosumnes CSD
 
Landscape Architecture Vision for Indian Residential Project
Landscape Architecture Vision for Indian Residential ProjectLandscape Architecture Vision for Indian Residential Project
Landscape Architecture Vision for Indian Residential Project
Amir Mueller
 
Island & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk Grove
Island & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk GroveIsland & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk Grove
Island & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk Grove
Cosumnes CSD
 
Stonelake Park Amenity Workshop - Cosumnes CSD
Stonelake Park Amenity Workshop - Cosumnes CSDStonelake Park Amenity Workshop - Cosumnes CSD
Stonelake Park Amenity Workshop - Cosumnes CSD
Cosumnes CSD
 
1893 39th Street Oakland Landscape Design Presentation
1893 39th Street Oakland Landscape Design Presentation 1893 39th Street Oakland Landscape Design Presentation
1893 39th Street Oakland Landscape Design Presentation
Hillary Huang
 
Lafayette Park & School Community Meeting (July 8, 2014)
Lafayette Park & School Community Meeting (July 8, 2014)Lafayette Park & School Community Meeting (July 8, 2014)
Lafayette Park & School Community Meeting (July 8, 2014)
DC Department of General Services
 
Edgewood Recreation Center Community Meeting (March 16, 2016)
Edgewood Recreation Center Community Meeting (March 16, 2016)Edgewood Recreation Center Community Meeting (March 16, 2016)
Edgewood Recreation Center Community Meeting (March 16, 2016)
DC Department of General Services
 
Roberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization PlanRoberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization Plan
cwestory
 
Elizabeth McCrae (Kepos St) Playground Draft Design
Elizabeth McCrae (Kepos St) Playground Draft DesignElizabeth McCrae (Kepos St) Playground Draft Design
Elizabeth McCrae (Kepos St) Playground Draft Design
communityconsultation
 
central skate park theming and ideation.pdf
central skate park theming and ideation.pdfcentral skate park theming and ideation.pdf
central skate park theming and ideation.pdf
ssuserf7ed10
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018
RamaChilamkurthy
 
Future Park System
Future Park SystemFuture Park System
Future Park System
Moreau Creative
 
Foxhall w street community meeting-10-30-2019
Foxhall w street  community meeting-10-30-2019Foxhall w street  community meeting-10-30-2019
Foxhall w street community meeting-10-30-2019
RamaChilamkurthy
 
Landscape
LandscapeLandscape
Landscape
GAW Consultants
 
LANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYLANDSCAPE CASE STUDY
LANDSCAPE CASE STUDY
RIDDHESH VARIK
 
Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
DC Department of General Services
 
Navy yards central green
Navy yards central green  Navy yards central green
Navy yards central green
MohamadSaleh30
 
LANDSCAPING TECHNIQUES AND PLANTS BY .pptx
LANDSCAPING TECHNIQUES AND PLANTS BY .pptxLANDSCAPING TECHNIQUES AND PLANTS BY .pptx
LANDSCAPING TECHNIQUES AND PLANTS BY .pptx
nihal559159
 

Similar to Oasis-park-outreach (20)

George Park Workshop 1 - Cosumnes CSD
George Park Workshop 1 - Cosumnes CSDGeorge Park Workshop 1 - Cosumnes CSD
George Park Workshop 1 - Cosumnes CSD
 
George park 2nd community outreach
George park 2nd community outreachGeorge park 2nd community outreach
George park 2nd community outreach
 
Cosumnes CSD - Buscher Park Conceptual Master Plan
Cosumnes CSD - Buscher Park Conceptual Master PlanCosumnes CSD - Buscher Park Conceptual Master Plan
Cosumnes CSD - Buscher Park Conceptual Master Plan
 
Landscape Architecture Vision for Indian Residential Project
Landscape Architecture Vision for Indian Residential ProjectLandscape Architecture Vision for Indian Residential Project
Landscape Architecture Vision for Indian Residential Project
 
Island & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk Grove
Island & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk GroveIsland & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk Grove
Island & Storybook Park - Laguna Ridge - Cosumnes CSD, City of Elk Grove
 
Stonelake Park Amenity Workshop - Cosumnes CSD
Stonelake Park Amenity Workshop - Cosumnes CSDStonelake Park Amenity Workshop - Cosumnes CSD
Stonelake Park Amenity Workshop - Cosumnes CSD
 
1893 39th Street Oakland Landscape Design Presentation
1893 39th Street Oakland Landscape Design Presentation 1893 39th Street Oakland Landscape Design Presentation
1893 39th Street Oakland Landscape Design Presentation
 
Lafayette Park & School Community Meeting (July 8, 2014)
Lafayette Park & School Community Meeting (July 8, 2014)Lafayette Park & School Community Meeting (July 8, 2014)
Lafayette Park & School Community Meeting (July 8, 2014)
 
Edgewood Recreation Center Community Meeting (March 16, 2016)
Edgewood Recreation Center Community Meeting (March 16, 2016)Edgewood Recreation Center Community Meeting (March 16, 2016)
Edgewood Recreation Center Community Meeting (March 16, 2016)
 
Roberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization PlanRoberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization Plan
 
Elizabeth McCrae (Kepos St) Playground Draft Design
Elizabeth McCrae (Kepos St) Playground Draft DesignElizabeth McCrae (Kepos St) Playground Draft Design
Elizabeth McCrae (Kepos St) Playground Draft Design
 
central skate park theming and ideation.pdf
central skate park theming and ideation.pdfcentral skate park theming and ideation.pdf
central skate park theming and ideation.pdf
 
Hearst community meeting 04.05.2018
Hearst community meeting   04.05.2018Hearst community meeting   04.05.2018
Hearst community meeting 04.05.2018
 
Future Park System
Future Park SystemFuture Park System
Future Park System
 
Foxhall w street community meeting-10-30-2019
Foxhall w street  community meeting-10-30-2019Foxhall w street  community meeting-10-30-2019
Foxhall w street community meeting-10-30-2019
 
Landscape
LandscapeLandscape
Landscape
 
LANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYLANDSCAPE CASE STUDY
LANDSCAPE CASE STUDY
 
Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
 
Navy yards central green
Navy yards central green  Navy yards central green
Navy yards central green
 
LANDSCAPING TECHNIQUES AND PLANTS BY .pptx
LANDSCAPING TECHNIQUES AND PLANTS BY .pptxLANDSCAPING TECHNIQUES AND PLANTS BY .pptx
LANDSCAPING TECHNIQUES AND PLANTS BY .pptx
 

Recently uploaded

Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
elmerdalida001
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
uu1psyf6
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
OECDregions
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Christina Parmionova
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
ssuser05e8f3
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
Texas Alliance of Groundwater Districts
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Jamesadhikaram land matter consultancy 9447464502
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
JSchaus & Associates
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
ahcitycouncil
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
pmenzies
 

Recently uploaded (20)

Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
 
加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样加急办理华威大学毕业证硕士文凭证书原版一模一样
加急办理华威大学毕业证硕士文凭证书原版一模一样
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
 
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.
 
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
Bangladesh studies presentation on Liberation War 1971 Indepence-of-Banglades...
 
Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024Texas Water Development Board Updates June 2024
Texas Water Development Board Updates June 2024
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 402024: The FAR - Federal Acquisition Regulations, Part 40
2024: The FAR - Federal Acquisition Regulations, Part 40
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)PPT Item # 7 - 231 Encino Avenue (sign. review)
PPT Item # 7 - 231 Encino Avenue (sign. review)
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
CFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon CanadaCFYT Rolling Ads Dawson City Yukon Canada
CFYT Rolling Ads Dawson City Yukon Canada
 

Oasis-park-outreach

  • 1.
  • 4.  Specific Plan completed in 2004  16 local and 3 neighborhood parks (57 acres)  2 community parks (55 acres)  Parkways (40 acres)  Total ~ $53 million in parks and parkways LAGUNA RIDGE SPECIFIC PLAN
  • 5.  Prior to 2011 – Parks were developer built  2011 - City approves Fee Program  Post 2011 - City/CSD plan and build parks  2014 - Storybook Woods and Island Parks  2015 - Horseshoe Park will begin construction in August.  Timing of future parks is controlled by rate of new construction LAGUNA RIDGE PARKS - HISTORY
  • 6. HORSESHOE PARK 9 ACRES ISLAND PARK 2.3 ACRES STORYBOOK WOODS PARK 1.8 ACRES OASIS COMMUNITY PARK 20 ACRES CONSTELLATION PARK 2.3 ACRES PARK LOCATIONS
  • 8. PARK SITE WE ARE HERE PARK PLANNING PROCESS
  • 9.  Master Plan/Community Outreach  2-3 months  Design Development & Construction Documents  12 months  Permits & Reviews  2- 3 months  Bidding  2 -3 months  Construction  18 months (weather permitting)  Establishment Period  3-6 months  Grand Opening TIMELINE
  • 10. Park Construction Budget = $9,440,000 FUNDING
  • 11.  Current California drought is the worst in history. The rules, regulations and restrictions regarding outdoor water use are changing daily.  CSD will have to assess conditions as project progresses to determine affect on design and/or construction.  CSD currently designs with reduced turf and water conservation in mind.  If drought persists, project construction may be delayed/ modified accordingly. DROUGHT CONDITIONS
  • 12.  CSD traditionally designed playgrounds with a combination of rubber surfacing and wood fiber.  Recent product failures and expensive replacement costs have caused staff to reconsider the use of rubber surfacing.  Rubber surfacing is double the cost of wood fiber.  Both surfaces meet current standards for playground safety.  Wood fiber will be used at Oasis Park. PLAYGROUND SURFACING
  • 13.  OASIS PARK is defined as a community park (20-100 acres)  COMMUNITY PARKS typically include the following amenities:  Athletic Fields (lighted)  Recreation Center or Preschool  Sports Courts (Tennis, Basketball, Bocce, Volleyball etc.)  Playgrounds for 2-5 and 5-12 age groups  Restrooms and/or Concession Buildings  Picnic area(s) with shade structure  Dog Parks  Loop Trail  Parking  Recreation Programming  Security lighting CSD PARK DESIGN PRINCIPLES
  • 14.  Fields and court games should be oriented north to south.  Avoid field overlays.  Allow space for buffer around fields.  Avoid locating near homes.  Avoid locating near passive uses.  Provide access to parking lot and restrooms.  Provide area for bleachers, benches and concessions. ATHLETIC FIELDS
  • 15. FIELD LIGHTING  Lighting fields offers additional practice and play time.  New light control technology: Reduced spill light Restricting and reducing glare Minimizing sky glow LED fixtures  Consider field layouts
  • 16.  Separate structures and areas for 2- 5 year olds  Safety - low height, low impact  Visibility - important for adult and child to interact, supervision  Creative and imaginative play  Tactile environment 2-5 YEAR OLD PLAYGROUNDS
  • 17.  Large challenging structures  Net climbers  Boulders and rock climbing  Equipment with movement – Spinners  Meeting areas and social play  Thematic play with more complexity – history, fossils, dinosaurs, nature, etc. 5-12 YEAR OLD PLAYGROUNDS
  • 18. WATER PLAY  Re-circulating vs. drain away  Locate adjacent to restrooms  Locate near the playground  Integrate theming
  • 19.  Trails or walkways  Soft, all-weather surfaces (ie. decomposed granite)  Adult fitness stations ADULT FITNESS
  • 20.  Horseshoe courts  Bocce ball  Half-court basketball  Putting green  Tennis courts  Volleyball courts SMALL SPORT COURTS
  • 21. Skateable pieces and furnishings which provide a safe and legal place for skateboarding SKATE ELEMENTS
  • 22. NON-PROGAMMABLE OPEN SPACE Non programmed open space areas for informal soccer, baseball, Frisbee, free-play etc.
  • 23.  Shade shelters and canopies  Benches and picnic facilities  Non – programmed open space  Aesthetic surface treatments  Sculptural features  Interpretive signage PICNIC AND GATHERING PLACES
  • 24.  Provide 1 to 1.5 acres  Consider separate small and large dog areas  Separate entrances  Easily accessible from public sidewalks and parking DOG PARKS
  • 25. NATURE GARDEN PASSIVE GARDEN AREAS Butterfly Gardens Edible Gardens Native Plant Gardens  Edible gardens with fruiting trees  Gardens with butterfly attracting plants  Demonstration gardens with California native plants
  • 26.  Drought tolerant landscaping  Reduced lawn areas  Naturalistic plantings  Shade trees  Low maintenance  Seasonal change - flowers and leaf color  Mounding LANDSCAPING
  • 27. OASIS THEME  Desert Oasis theme  Desert-like drought tolerant plantings  Palms as accent trees  Illusion of water  Faux sand dunes in the play area
  • 28. BASE SHEET Park site will include a (6000 sq. ft.) Preschool Center Park site will include parking (estimate 150-250 spaces dependent on programming) Park site will include 2 multi-purpose fields
  • 29. PARK DESIGN 101 Use the cut-outs to layout the elements you want in your park Draw in walkways with dashed lines or arrows Jot down ideas and make notes Be creative and have fun! Move cut-outs to best fit the site Separate passive and active uses Allow buffer space and circulation between all uses Locate uses close to appropriate facilities
  • 31. PRESENT YOUR IDEAS TO THE GROUP!
  • 32. CSD STAFF WILL DEVELOP MASTER PLAN!
  • 33. CONSTRAINTS  20 Acres  $9.4 million construction budget OPPORTUNITIES  Water Play/Sprayground  Basketball – Full and/or Half-Court  Volleyball  Tennis  Skateboard Elements  Horseshoes  Bocce Ball  Adult Fitness  Putting Green  Natural Areas  Meditation/Passive Areas  Jogging/Walking Trail  Open Space  Or other ideas? REQUIREMENTS  Multi-Purpose Fields (2)  Parking Lot(s) for 150-250 cars  6,000 s.f. Preschool Building  2-5 year old play area  5-12 year old play area  Public Restrooms  Picnic Area(s)  Shade Structure(s) REQUIREMENTS, CONSTRAINTS & OPPORTUNITIES
  • 34.
  • 35. NEXT STEPS & TIMELINE  Comment Forms – Hand in tonight or comment online at yourcsd.com/parks/park_development.asp until Friday, July 24th.  Staff will post your designs on the CSD website for comment  Staff will prepare a concept plan to present at next meeting scheduled for September 17th at 6:30 p.m.  Concept plan will be on the CSD website for public comment for 2 weeks in September/October.  CSD Board Master Plan Approval – November 2015  Construction Drawings – December 2015 – December 2016  Project Out to Bid – Early 2017  Construction – Spring 2017 to Summer 2018  Park Open – Summer 2018
  • 36.
  • 37.
  • 38. PORTO PARK - NEXT STEPS & TIMELINE  Concept plan will be on the CSD website for public comment for 2 weeks.  Comment Forms – Hand in tonight or comment online at yourcsd.com/parks/park_development.asp until Friday, July 24th.  CSD Board Master Plan Approval – November 2015  Construction Drawings – December 2015 – June 2016  Project Out to Bid – September 2016  Construction – Fall 2016 to Spring 2017  Park Open – Spring/Summer 2017