Responsibilities
• Management
• Training
• Safety
• Corrective action
• Meets code and regulations
• Employees
• Report deficiencies immediately
• Only perform work on equipment authorized / trained for
• Properly inspect all electrical equipment prior to use
Hazard Control
• Engineering Controls
• Electrical panels, breakers, disconnects, etc… are enclosed
• When required - water tight enclosures are in use
• Electrical distribution areas are properly grounded
• Clear approach of 36”side and front is maintained
• Conduit is fully supported
• All non-rigid cords have strain relief where necessary
• Administrative Controls
• Only trained & authorized employees conduct electrical repairs
• Barriers & warning signs - prevent unauthorized entry
• Lockout / tagout
• Electrical control devices properly labeled
Electrical Equipment
• Examination - free from recognized hazards
• suitability of equipment for an identified purpose
• mechanical strength and durability
• electrical insulation
• heating effects under conditions of use
• arcing effects
• classification by type, size, voltage,current capacity & use
• safeguarding of employees using or coming into contact with equipment
• Identification of Disconnecting Means & Circuits
• shall be legibly marked to indicate its purpose
• at the point where the circuit originates
• each service, feeder, and branch circuit
Personal Protective Equipment
• Shall be used when contact with exposed electrical sources are likely
• Shall be designed for the job and environment
• Shall be inspected or tested before use
• Non-conductive head PPE required where overhead or energized parts
exist.
• Eye / face PPE required when electrical arcs, flashes or flying objects
exist.
• Shall maintain insulating capabilities at all times.
• Electrically rated safety shoes / boots / gloves / head gear
• Tools properly insulated
• Electrically rated matting for all distribution panels / utility rooms
PPE Continued
• Fuse handling equipment insulated for the circuit voltage
• Ropes and other hand lines
• Portable ladders shall have non-conductive side rails
• Working on elevated platform - REQUIRES - safety watch on the ground
• Personnel working in elevated platforms must wear safety harness and
lanyard
• Lockout tagout
• Locks attached to prevent operating the disconnecting source
• Tag contain a statement prohibiting unauthorized operation
• Warning signs and barricades and or a safety attendant
Standard Operating Procedures
Electrical Pre-work Procedures
• Treat all electrical circuits as “Live”
a Obtain permission from supervisor
b Lockout / tagout at electrical power sources
c Verify de-energized conditions exist - operate controls
d Voltmeter verification at live electrical source - must be rated for voltage
e Check exposed circuits phase to ground
f No voltage in exposed circuits - it’s ok to work
g If voltage is detected - Stop - determine source & eliminate voltage
h Conduct work
i Close up exposed circuits, boxes, control panels and equipment
j Remove lock and tag
k Obtain supervisor permission to energize circuits
Standard Operating Procedures
Working on Exposed Energized Circuits
• Obtain permission from manager
• Lock out and tag out all circuits possible
• Treat all circuits as energized
• Remove all conductive clothing and jewelry
• Use all required PPE - including shields & barriers
• Inspect all overhead lines before starting
• Provide adequate lighting
• Don’t reach were you cant see
• Approach distance see chart next slide.

More Related Content

Similar to electrical safety ppt.ppt

ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptxECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptxEnocngelArcentalesVa
 
Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)
Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)
Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)Dean Jendsen
 
Electrical Safety (affected employees)
Electrical Safety (affected employees)Electrical Safety (affected employees)
Electrical Safety (affected employees)buffbuss61
 
Module 011 ElectricalSafetyAwareness.pptx
Module 011 ElectricalSafetyAwareness.pptxModule 011 ElectricalSafetyAwareness.pptx
Module 011 ElectricalSafetyAwareness.pptxRachmanLintang
 
Lock out tag out procedures
Lock out  tag out proceduresLock out  tag out procedures
Lock out tag out proceduresYAWAR HASSAN
 
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewMark Platten
 
Electrical safety ppt
Electrical safety pptElectrical safety ppt
Electrical safety pptEr Ramgarhia
 
B Part 14 Electricity
B  Part 14 ElectricityB  Part 14 Electricity
B Part 14 ElectricityJames McCann
 
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptxECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptxEnocngelArcentalesVa
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1jboullemet
 
Electrical safety ppt(1)
Electrical safety ppt(1)Electrical safety ppt(1)
Electrical safety ppt(1)Er Ramgarhia
 
electrical-safetyrev1.ppt
electrical-safetyrev1.pptelectrical-safetyrev1.ppt
electrical-safetyrev1.pptadriseptian
 
10.Electrical and Equipment Safety (1).ppt
10.Electrical and Equipment Safety (1).ppt10.Electrical and Equipment Safety (1).ppt
10.Electrical and Equipment Safety (1).pptazmatdbg3
 
10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.pptRajaMannar6
 
10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.pptanu200770
 

Similar to electrical safety ppt.ppt (20)

ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptxECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_TOSHIRO.pptx
 
Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)
Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)
Electricalsafetyaffectedemployees 131125110440-phpapp01 (1)
 
Electrical Safety (affected employees)
Electrical Safety (affected employees)Electrical Safety (affected employees)
Electrical Safety (affected employees)
 
Module 011 ElectricalSafetyAwareness.pptx
Module 011 ElectricalSafetyAwareness.pptxModule 011 ElectricalSafetyAwareness.pptx
Module 011 ElectricalSafetyAwareness.pptx
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Lock out tag out procedures
Lock out  tag out proceduresLock out  tag out procedures
Lock out tag out procedures
 
Lock out tag out procedures
Lock out  tag out proceduresLock out  tag out procedures
Lock out tag out procedures
 
Fulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For reviewFulham Reach Block G Risk Review Presentation For review
Fulham Reach Block G Risk Review Presentation For review
 
Electrical safety ppt
Electrical safety pptElectrical safety ppt
Electrical safety ppt
 
B Part 14 Electricity
B  Part 14 ElectricityB  Part 14 Electricity
B Part 14 Electricity
 
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptxECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptx
ECCU_ECCU 211_FORMATO TRABAJO FINAL_INGLÉS TÉCNICO_ANTONIO DELGADO MONCADA.pptx
 
Standards
StandardsStandards
Standards
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
 
Technician Training: Safety basics
Technician Training: Safety basicsTechnician Training: Safety basics
Technician Training: Safety basics
 
Electrical safety ppt(1)
Electrical safety ppt(1)Electrical safety ppt(1)
Electrical safety ppt(1)
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
electrical-safetyrev1.ppt
electrical-safetyrev1.pptelectrical-safetyrev1.ppt
electrical-safetyrev1.ppt
 
10.Electrical and Equipment Safety (1).ppt
10.Electrical and Equipment Safety (1).ppt10.Electrical and Equipment Safety (1).ppt
10.Electrical and Equipment Safety (1).ppt
 
10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt
 
10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt
 

Recently uploaded

Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information SystemsAnge Felix NSANZIYERA
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 

Recently uploaded (20)

Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 

electrical safety ppt.ppt

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49. Responsibilities • Management • Training • Safety • Corrective action • Meets code and regulations • Employees • Report deficiencies immediately • Only perform work on equipment authorized / trained for • Properly inspect all electrical equipment prior to use
  • 50. Hazard Control • Engineering Controls • Electrical panels, breakers, disconnects, etc… are enclosed • When required - water tight enclosures are in use • Electrical distribution areas are properly grounded • Clear approach of 36”side and front is maintained • Conduit is fully supported • All non-rigid cords have strain relief where necessary • Administrative Controls • Only trained & authorized employees conduct electrical repairs • Barriers & warning signs - prevent unauthorized entry • Lockout / tagout • Electrical control devices properly labeled
  • 51. Electrical Equipment • Examination - free from recognized hazards • suitability of equipment for an identified purpose • mechanical strength and durability • electrical insulation • heating effects under conditions of use • arcing effects • classification by type, size, voltage,current capacity & use • safeguarding of employees using or coming into contact with equipment • Identification of Disconnecting Means & Circuits • shall be legibly marked to indicate its purpose • at the point where the circuit originates • each service, feeder, and branch circuit
  • 52. Personal Protective Equipment • Shall be used when contact with exposed electrical sources are likely • Shall be designed for the job and environment • Shall be inspected or tested before use • Non-conductive head PPE required where overhead or energized parts exist. • Eye / face PPE required when electrical arcs, flashes or flying objects exist. • Shall maintain insulating capabilities at all times. • Electrically rated safety shoes / boots / gloves / head gear • Tools properly insulated • Electrically rated matting for all distribution panels / utility rooms
  • 53. PPE Continued • Fuse handling equipment insulated for the circuit voltage • Ropes and other hand lines • Portable ladders shall have non-conductive side rails • Working on elevated platform - REQUIRES - safety watch on the ground • Personnel working in elevated platforms must wear safety harness and lanyard • Lockout tagout • Locks attached to prevent operating the disconnecting source • Tag contain a statement prohibiting unauthorized operation • Warning signs and barricades and or a safety attendant
  • 54. Standard Operating Procedures Electrical Pre-work Procedures • Treat all electrical circuits as “Live” a Obtain permission from supervisor b Lockout / tagout at electrical power sources c Verify de-energized conditions exist - operate controls d Voltmeter verification at live electrical source - must be rated for voltage e Check exposed circuits phase to ground f No voltage in exposed circuits - it’s ok to work g If voltage is detected - Stop - determine source & eliminate voltage h Conduct work i Close up exposed circuits, boxes, control panels and equipment j Remove lock and tag k Obtain supervisor permission to energize circuits
  • 55. Standard Operating Procedures Working on Exposed Energized Circuits • Obtain permission from manager • Lock out and tag out all circuits possible • Treat all circuits as energized • Remove all conductive clothing and jewelry • Use all required PPE - including shields & barriers • Inspect all overhead lines before starting • Provide adequate lighting • Don’t reach were you cant see • Approach distance see chart next slide.