The Agile Project Manager 
Jose Barato, PMP®, PMI-ACPSM
2 
Jose Barato 
• PMPeople (Managing Director) 
• PMI Madrid Chapter (Director) 
• PM-IB (founder, Vice-President) 
• TALAIA, OpenPPM (Consultant) 
• Telecommunications Engineer 
• Project Manager (PMP®, PMI-ACPSM) 
• Instructor, coach 
• Speaker, author 
Consulting, Training and Tools in Project Management 
Blog: Los Hábitos de un Director de Proyectos Eficaz
3 
The Traditional Way
4 
The Traditional Way 
Milestones and Tasks
5 
The Traditional Way
6 
The Agile Way
7 
The Agile Way 
Product Backlog 
orem ipsum dolor sit amet, co nse ctetur 
orem ipsum dolor sit amet, co nse ctetur 
orem ipsum dolor sit amet, co nse ctetur 
orem ipsum dolor sit amet, co nse ctetur 
orem ipsum dolor sit amet, co nse ctetur 
Technical Team 
Stakeholders
8 
The Agile Paradigm 
Value Driven 
Plan 
Driven 
Scope 
Scope 
Schedule 
Cost 
Schedule 
Cost 
Predictive Process (Waterfall) 
Adaptive Process (Agile) 
Constraints 
Estimates
9 
Some Agile Educational Videos 
1.Agile Product Ownership in a Nutshell (16’) 
2.A dysfunctional daily stand-up (11’) 
3.I want to run an agile project part I (10’) 
4.I want to run an agile project part II (7’) 
5.Case Study Havannah (20’)
AGILE significa COLABORAR 
Product Owner = Dueño exclusivo de la pila de producto 
Product Backlog = Pila de producto = lista de requisitos actualizada
AGILE significa DEMOSTRAR
AGILE significa AUTO-ORGANIZACIÓN 
SCRUM = 
Equipo Comprometido = 
“Empujar juntos la pelota unas yardas”
13 
The Agile Manifesto (2001) 
The Manifesto’s shared value statement: 
“We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: 
Individuals & interactions 
Over 
Processes & Tools 
Working Software 
Over 
Comprehensive Documentation 
Customer Collaboration 
Over 
Contract Negotiation 
Responding to Change 
Over 
Following a Plan 
“That is, while there is value in the items on the right, we value the items on the left more.” www.agilemanifesto.org
14 
Agile Methodologies 
(Release planning, Sprint and iteration planning, daily Scrum, sprint demo and retrospective, etc.) 
(TDD, automated testing, continuous integration, refactoring, etc.) 
Strict queue limits, pull value through, make it visible. 
Agile Methods
15 
The Agile Methodology 
“Scrum” is an iterative Agile framework that is designed to deliver working software (or value) frequently.
16 
Agile Practice – Progressive Elaboration 
Release Plan 
Close Out 
Release 1 
Release 2 
Release 3 
Release 4 
iterations 
Release Plan 
Upfront 
Planning 
Close Out 
Release 2 
Release 3 
Release 4 
iterations 
completely planned 
partially planned 
partially planned 
Status Date 
Upfront 
Planning 
Status Date 
Release 1 
completely planned
17 
Agile Practice – Progressive Elaboration 
1 
Strategic Planning 
Strategic Planning by Executive Leaders 
2 
Portfolio Planning 
Portfolio Planning by Customer Unit 
Product Planning by Product Managers 
3 
Product Planning 
Release Planning by Product Owner/Team 
4 
Release Planning 
Iteration Planning by Team/PO 
5 
Iteration Planning 
6 
Daily Planning 
Daily Task Planning by Team
18 
The Agile Product Life Cycle
19 
The Agile Project Life Cycle
20 
El ciclo de vida de un Proyecto Ágil
21 
The Agile Project Manager 
Stakeholders 
Project 
Sponsor 
Product Owner 
Scrum 
Master 
Technical Team
22 
Servant Leadership 
 What is this? 
This is management
23 
Situational Adapted Leadership 
PM 
PO 
SM 
PM = PO = SM 
PM = PO + SM 
PM = PO; SM = TMi 
•IT0IT1... 
•IT2……... 
•IT3ITH...
24 
Agile Contracts

El Director de Proyectos Ágil

  • 1.
    1 The AgileProject Manager Jose Barato, PMP®, PMI-ACPSM
  • 2.
    2 Jose Barato • PMPeople (Managing Director) • PMI Madrid Chapter (Director) • PM-IB (founder, Vice-President) • TALAIA, OpenPPM (Consultant) • Telecommunications Engineer • Project Manager (PMP®, PMI-ACPSM) • Instructor, coach • Speaker, author Consulting, Training and Tools in Project Management Blog: Los Hábitos de un Director de Proyectos Eficaz
  • 3.
  • 4.
    4 The TraditionalWay Milestones and Tasks
  • 5.
  • 6.
  • 7.
    7 The AgileWay Product Backlog orem ipsum dolor sit amet, co nse ctetur orem ipsum dolor sit amet, co nse ctetur orem ipsum dolor sit amet, co nse ctetur orem ipsum dolor sit amet, co nse ctetur orem ipsum dolor sit amet, co nse ctetur Technical Team Stakeholders
  • 8.
    8 The AgileParadigm Value Driven Plan Driven Scope Scope Schedule Cost Schedule Cost Predictive Process (Waterfall) Adaptive Process (Agile) Constraints Estimates
  • 9.
    9 Some AgileEducational Videos 1.Agile Product Ownership in a Nutshell (16’) 2.A dysfunctional daily stand-up (11’) 3.I want to run an agile project part I (10’) 4.I want to run an agile project part II (7’) 5.Case Study Havannah (20’)
  • 10.
    AGILE significa COLABORAR Product Owner = Dueño exclusivo de la pila de producto Product Backlog = Pila de producto = lista de requisitos actualizada
  • 11.
  • 12.
    AGILE significa AUTO-ORGANIZACIÓN SCRUM = Equipo Comprometido = “Empujar juntos la pelota unas yardas”
  • 13.
    13 The AgileManifesto (2001) The Manifesto’s shared value statement: “We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: Individuals & interactions Over Processes & Tools Working Software Over Comprehensive Documentation Customer Collaboration Over Contract Negotiation Responding to Change Over Following a Plan “That is, while there is value in the items on the right, we value the items on the left more.” www.agilemanifesto.org
  • 14.
    14 Agile Methodologies (Release planning, Sprint and iteration planning, daily Scrum, sprint demo and retrospective, etc.) (TDD, automated testing, continuous integration, refactoring, etc.) Strict queue limits, pull value through, make it visible. Agile Methods
  • 15.
    15 The AgileMethodology “Scrum” is an iterative Agile framework that is designed to deliver working software (or value) frequently.
  • 16.
    16 Agile Practice– Progressive Elaboration Release Plan Close Out Release 1 Release 2 Release 3 Release 4 iterations Release Plan Upfront Planning Close Out Release 2 Release 3 Release 4 iterations completely planned partially planned partially planned Status Date Upfront Planning Status Date Release 1 completely planned
  • 17.
    17 Agile Practice– Progressive Elaboration 1 Strategic Planning Strategic Planning by Executive Leaders 2 Portfolio Planning Portfolio Planning by Customer Unit Product Planning by Product Managers 3 Product Planning Release Planning by Product Owner/Team 4 Release Planning Iteration Planning by Team/PO 5 Iteration Planning 6 Daily Planning Daily Task Planning by Team
  • 18.
    18 The AgileProduct Life Cycle
  • 19.
    19 The AgileProject Life Cycle
  • 20.
    20 El ciclode vida de un Proyecto Ágil
  • 21.
    21 The AgileProject Manager Stakeholders Project Sponsor Product Owner Scrum Master Technical Team
  • 22.
    22 Servant Leadership  What is this? This is management
  • 23.
    23 Situational AdaptedLeadership PM PO SM PM = PO = SM PM = PO + SM PM = PO; SM = TMi •IT0IT1... •IT2……... •IT3ITH...