The story "Drunken Muse" was audio recorded on a hidden voice recorder during the conversations about two decades ago. The story-teller didn't know or consent to the recording.
http://en.wikipedia.org/wiki/Tape_recorder
http://en.wikipedia.org/wiki/8-track_tape
http://en.wikipedia.org/wiki/Compact_Cassette
The audio tapes on compact cassettes were never used. The records were partially damaged and lost.
Realism is considered the first major movement in modernism. Its im.docxscuttsginette
Realism is considered the first major movement in modernism. It's important to note that the term Realism does not necessarily refer to a realistic style of painting or drawing (though many artists at this time did portray their subject matter realistically), it refers to showing life as it really was. No longer was the only fitting subject matter for artwork royalty, gods, or epic heroes; now artists were focused on showing us the peasants, the farmers, the prostitutes, and all the real working humans that made up most of the population. This movement overlapped both romanticism and impressionism, and many artists are claimed by multiple movements (i.e. Manet, who is categorized under both Realism and Impressionism). The defining feature of Modernism is known as "avant-garde," meaning artists were really looking to break the mold and continually reinvent themselves.
PLEASE FOLLOW the INSTRUCTION!!
For part one, I'd like you to revert to a more creative writing tone again, as you did for the Grand Tour assignment. Once again you'll be writing a letter to a friend, this time from the point of view of an aspiring artist in 1863 who has seen the show at the Salon des Refuses (don't worry, this will make sense after you read and view the material at the links below!). Tell your friend what it's like to be an artist in Paris at this time, how your own work is coming along, and what it was like to see these brand-new works from these amazing avant-garde artists. How did it feel to see Manet's
Le Déjeuner sur l'herbe?
Were you as scandalized by it as all of the critics, or did you see something new and incredible in it? Remember, you're a late-19th-century Parisian artist! No one, including you, has ever seen anything like this before!
After describing your life, the Salon des Refuses, and some of the works in general (2 paragraphs, at least 5 sentences for each paragraph), focus on one particular work that really caught your eye. For the purposes of this assignment, it does not matter if it actually appeared in the 1863 exhibition, just choose a work of realism that you'd like to do a detailed visual analysis on, describing it and telling your friend how it made you feel. Does it have the potential to influence your own work? Do you believe this movement will last, perhaps lead to something else, or will those ancient classical values keep their hold on the art world? Conclude your letter by describing your plans for your next painting, and briefly explain why you are either choosing to jump on board with this new trend of realism, or sticking with traditional styles. Be sure to INCLUDE AN IMAGE of the main work that you choose to focus on.
Start by reading and viewing the material below, and then get to writing your letters. And have fun!
http://www.theartstory.org/movement-realism.htm (be sure to click on "Read More" in the blue box titled "Most Important Art" and read about each of the paintings on that page so you get a sense of the ...
The Importance of Art Essay
The Importance of Art Essay
Reflective Essay On Art
My Experience For Art
My Favorite Art Class
Reflection About Art
What Is Modern Art? Essay
Art And Art
Descriptive Essay About Art
Art Analysis Essay
My Passion For Art Essay
Essay on Art in Society
Reflective Essay On Art Museum
The Emotional Perception of Art Essay
Persuasive Essay On The Art Of Art
Essay on The Many Forms of Art
Argumentative Essay About Art
Reflection On Veterans Art Exhibit
Descriptive Essay On Art
The Importance of Art Essay
The History of Art Essay
Reflection About Art
My Reflection Of Art
The Art Of Art And Art : Baasquiats Art
Essay on art
Essay On Why I Love Art
Essay On Art Appreciation
Me-tube is watched by the trillions of Me-fans (the psychology of self-admiration is only human in the words of the ancient philosopher).
One would never suffer from "not being able to masturbate" to a me-tube's newest release of the most watched me-video (courtesy of the phone-service, hit-counter and the subscribers, comes with the monthly service, you pay for 24 old hours use and get eternal day where your me-usic (music) and me-video is given the free promotion to first billion subscribers.)
Paul Jaisini's Portrait, Photo, Photo-Manipulation, Artwork, Manifesto, Gleitzeit-Manifesto, GIGroup 2014, Invisible Paintings, Prophecy, Prophetic, Paul Jaisini, Style, Art News, Jerry Saltz, Anthony Haden-Guest, Ellen Yustas K Gottlieb, Stelly Riesling, New York City,
Meta category: "Homage to Paul Jaisini" Art Series Collection. Gleitzeit International Group. The Ongoing art project: "ART ABOUR ART"
Category: Artwork, Painting, Photograph, Photo-Manipulation, Drawing, Mixed Technique, Etching, Print, Original,
Subcategory: Gif
Tag: Manifesto, Image, Representational, Abstract, Gleitzeit Manifesto, Words, Color, Black And White, Face, Figure, Style,
More Related Content
Similar to The Drunken Muse or return to the school after a full year suspension
Realism is considered the first major movement in modernism. Its im.docxscuttsginette
Realism is considered the first major movement in modernism. It's important to note that the term Realism does not necessarily refer to a realistic style of painting or drawing (though many artists at this time did portray their subject matter realistically), it refers to showing life as it really was. No longer was the only fitting subject matter for artwork royalty, gods, or epic heroes; now artists were focused on showing us the peasants, the farmers, the prostitutes, and all the real working humans that made up most of the population. This movement overlapped both romanticism and impressionism, and many artists are claimed by multiple movements (i.e. Manet, who is categorized under both Realism and Impressionism). The defining feature of Modernism is known as "avant-garde," meaning artists were really looking to break the mold and continually reinvent themselves.
PLEASE FOLLOW the INSTRUCTION!!
For part one, I'd like you to revert to a more creative writing tone again, as you did for the Grand Tour assignment. Once again you'll be writing a letter to a friend, this time from the point of view of an aspiring artist in 1863 who has seen the show at the Salon des Refuses (don't worry, this will make sense after you read and view the material at the links below!). Tell your friend what it's like to be an artist in Paris at this time, how your own work is coming along, and what it was like to see these brand-new works from these amazing avant-garde artists. How did it feel to see Manet's
Le Déjeuner sur l'herbe?
Were you as scandalized by it as all of the critics, or did you see something new and incredible in it? Remember, you're a late-19th-century Parisian artist! No one, including you, has ever seen anything like this before!
After describing your life, the Salon des Refuses, and some of the works in general (2 paragraphs, at least 5 sentences for each paragraph), focus on one particular work that really caught your eye. For the purposes of this assignment, it does not matter if it actually appeared in the 1863 exhibition, just choose a work of realism that you'd like to do a detailed visual analysis on, describing it and telling your friend how it made you feel. Does it have the potential to influence your own work? Do you believe this movement will last, perhaps lead to something else, or will those ancient classical values keep their hold on the art world? Conclude your letter by describing your plans for your next painting, and briefly explain why you are either choosing to jump on board with this new trend of realism, or sticking with traditional styles. Be sure to INCLUDE AN IMAGE of the main work that you choose to focus on.
Start by reading and viewing the material below, and then get to writing your letters. And have fun!
http://www.theartstory.org/movement-realism.htm (be sure to click on "Read More" in the blue box titled "Most Important Art" and read about each of the paintings on that page so you get a sense of the ...
The Importance of Art Essay
The Importance of Art Essay
Reflective Essay On Art
My Experience For Art
My Favorite Art Class
Reflection About Art
What Is Modern Art? Essay
Art And Art
Descriptive Essay About Art
Art Analysis Essay
My Passion For Art Essay
Essay on Art in Society
Reflective Essay On Art Museum
The Emotional Perception of Art Essay
Persuasive Essay On The Art Of Art
Essay on The Many Forms of Art
Argumentative Essay About Art
Reflection On Veterans Art Exhibit
Descriptive Essay On Art
The Importance of Art Essay
The History of Art Essay
Reflection About Art
My Reflection Of Art
The Art Of Art And Art : Baasquiats Art
Essay on art
Essay On Why I Love Art
Essay On Art Appreciation
Similar to The Drunken Muse or return to the school after a full year suspension (15)
Me-tube is watched by the trillions of Me-fans (the psychology of self-admiration is only human in the words of the ancient philosopher).
One would never suffer from "not being able to masturbate" to a me-tube's newest release of the most watched me-video (courtesy of the phone-service, hit-counter and the subscribers, comes with the monthly service, you pay for 24 old hours use and get eternal day where your me-usic (music) and me-video is given the free promotion to first billion subscribers.)
Paul Jaisini's Portrait, Photo, Photo-Manipulation, Artwork, Manifesto, Gleitzeit-Manifesto, GIGroup 2014, Invisible Paintings, Prophecy, Prophetic, Paul Jaisini, Style, Art News, Jerry Saltz, Anthony Haden-Guest, Ellen Yustas K Gottlieb, Stelly Riesling, New York City,
Meta category: "Homage to Paul Jaisini" Art Series Collection. Gleitzeit International Group. The Ongoing art project: "ART ABOUR ART"
Category: Artwork, Painting, Photograph, Photo-Manipulation, Drawing, Mixed Technique, Etching, Print, Original,
Subcategory: Gif
Tag: Manifesto, Image, Representational, Abstract, Gleitzeit Manifesto, Words, Color, Black And White, Face, Figure, Style,
Interview With Paul Jaisini
by Ester Ippollito
Paul Jaisini – Paul Jaisini is an artist and an occasional photographer. His invisible paintings are spectacularly ahead of our time.
Meta category: "Homage to Paul Jaisini" Art Series Collection. Gleitzeit International Group. The Ongoing art project: "ART ABOUR ART"
Category: Artwork, Painting, Photograph, Photo-Manipulation, Drawing, Mixed Technique, Etching, Print, Original,
Subcategory: Gif
Tag: Manifesto, Image, Representational, Abstract, Gleitzeit Manifesto, Words, Color, Black And White, Face, Figure, Style,
DONT NEED EYES SEE PAUL JAISINI'S INVISIBLE PAINTINGS
I'M FAKIN TRIPPIN IT'S BREATHLESS
Meta category: "Homage to Paul Jaisini" Art Series Collection. Gleitzeit International Group. The Ongoing art project: "ART ABOUR ART"
Category: Artwork, Painting, Photograph, Photo-Manipulation, Drawing, Mixed Tecnique,
Subcategory: Gif
Tag: Manifesto, Image, Representational, Abstract, Gleitzeit Manifesto, Words, Color, Black And White, Face, Figure,
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
Palestine last event orientationfvgnh .pptxRaedMohamed3
An EFL lesson about the current events in Palestine. It is intended to be for intermediate students who wish to increase their listening skills through a short lesson in power point.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
Synthetic Fiber Construction in lab .pptxPavel ( NSTU)
Synthetic fiber production is a fascinating and complex field that blends chemistry, engineering, and environmental science. By understanding these aspects, students can gain a comprehensive view of synthetic fiber production, its impact on society and the environment, and the potential for future innovations. Synthetic fibers play a crucial role in modern society, impacting various aspects of daily life, industry, and the environment. ynthetic fibers are integral to modern life, offering a range of benefits from cost-effectiveness and versatility to innovative applications and performance characteristics. While they pose environmental challenges, ongoing research and development aim to create more sustainable and eco-friendly alternatives. Understanding the importance of synthetic fibers helps in appreciating their role in the economy, industry, and daily life, while also emphasizing the need for sustainable practices and innovation.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
The Roman Empire A Historical Colossus.pdfkaushalkr1407
The Roman Empire, a vast and enduring power, stands as one of history's most remarkable civilizations, leaving an indelible imprint on the world. It emerged from the Roman Republic, transitioning into an imperial powerhouse under the leadership of Augustus Caesar in 27 BCE. This transformation marked the beginning of an era defined by unprecedented territorial expansion, architectural marvels, and profound cultural influence.
The empire's roots lie in the city of Rome, founded, according to legend, by Romulus in 753 BCE. Over centuries, Rome evolved from a small settlement to a formidable republic, characterized by a complex political system with elected officials and checks on power. However, internal strife, class conflicts, and military ambitions paved the way for the end of the Republic. Julius Caesar’s dictatorship and subsequent assassination in 44 BCE created a power vacuum, leading to a civil war. Octavian, later Augustus, emerged victorious, heralding the Roman Empire’s birth.
Under Augustus, the empire experienced the Pax Romana, a 200-year period of relative peace and stability. Augustus reformed the military, established efficient administrative systems, and initiated grand construction projects. The empire's borders expanded, encompassing territories from Britain to Egypt and from Spain to the Euphrates. Roman legions, renowned for their discipline and engineering prowess, secured and maintained these vast territories, building roads, fortifications, and cities that facilitated control and integration.
The Roman Empire’s society was hierarchical, with a rigid class system. At the top were the patricians, wealthy elites who held significant political power. Below them were the plebeians, free citizens with limited political influence, and the vast numbers of slaves who formed the backbone of the economy. The family unit was central, governed by the paterfamilias, the male head who held absolute authority.
Culturally, the Romans were eclectic, absorbing and adapting elements from the civilizations they encountered, particularly the Greeks. Roman art, literature, and philosophy reflected this synthesis, creating a rich cultural tapestry. Latin, the Roman language, became the lingua franca of the Western world, influencing numerous modern languages.
Roman architecture and engineering achievements were monumental. They perfected the arch, vault, and dome, constructing enduring structures like the Colosseum, Pantheon, and aqueducts. These engineering marvels not only showcased Roman ingenuity but also served practical purposes, from public entertainment to water supply.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
Embracing GenAI - A Strategic ImperativePeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
How to Make a Field invisible in Odoo 17Celine George
It is possible to hide or invisible some fields in odoo. Commonly using “invisible” attribute in the field definition to invisible the fields. This slide will show how to make a field invisible in odoo 17.
Biological screening of herbal drugs: Introduction and Need for
Phyto-Pharmacological Screening, New Strategies for evaluating
Natural Products, In vitro evaluation techniques for Antioxidants, Antimicrobial and Anticancer drugs. In vivo evaluation techniques
for Anti-inflammatory, Antiulcer, Anticancer, Wound healing, Antidiabetic, Hepatoprotective, Cardio protective, Diuretics and
Antifertility, Toxicity studies as per OECD guidelines
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Unit 8 - Information and Communication Technology (Paper I).pdf
The Drunken Muse or return to the school after a full year suspension
1. THE DRUNKEN MUSE
drunken-muse-140921153806-phpapp02.docPage 1 of 71 1
2. The story "Drunken Muse" was audio recorded on a hidden voice recorder during
the conversations about two decades ago. The story-teller didn't know or consent
to the recording.
http://en.wikipedia.org/wiki/Tape_recorder
http://en.wikipedia.org/wiki/8-track_tape
http://en.wikipedia.org/wiki/Compact_Cassette
The audio tapes on compact cassettes were never used. The records were partially
damaged and lost.
PAUL JAISINI VISION FUTURE GIF
drunken-muse-140921153806-phpapp02.docPage 2 of 71 2
3. https://medium.com/paul-jaisini-paints-invisible-paintings/paul-jaisini-vision-
future-c387157124d2
I am so pumped to get back to
painting as I return to the second
year of the art school after a full year
suspension. As always it is like time-travel
culturally speaking, like
walking right into the middle ages
going through the antique building’s
portal.
Art studios are the huge L-shaped
lofts with super tall ceilings 20 feet
no less with the wall to wall windows
so that sunlight illuminates the
space from south and east side
designed for the purpose so that one
could paint there from morning till
sunset.
In a studio there are classical
gypsum sculptures, expensive
copies of Venus de
Milo, David, Laocoön and the others.
drunken-muse-140921153806-phpapp02.docPage 3 of 71 3
4. In the art studio there stood the
noses, eyes, lips, feet, and palms on
the wood shelves.
Sketching the gypsum body parts
helps you to build the classic
academic base on which stands the
whole modern and contempo art.
This sort of teaching is specific for
the art schools that preserve the
traditions they had been founded on.
There is only few art schools like
this and of this caliber left now.
Could be that this is the only
legendary school that continues to
function as if nothing had changed
in the world. In the rest of the world
with billions of some art classes
nobody knows what does the old
tradition of art school is for, its
totally unfashionable.
drunken-muse-140921153806-phpapp02.docPage 4 of 71 4
5. Studying classic art
(http://en.wikipedia.org/wiki/Academic_art
) here is the foundation for creativity in
any of the art styles.
drunken-muse-140921153806-phpapp02.docPage 5 of 71 5
6. X-tasy by Stelly Riesling with added GIF effects
The smell of art is what defines the studio
but not from human presence, something
like an aroma reminiscent of the eastern
market where smoke from hookaahs mix
with the oil vapors, exotic fragrance from
candles and spices. The Art Studios were
never renovated since the times they were
built over 150 years ago. The wood floors
are saturated with art oils as if the floor is
waxed with the organic oils from nuts, linen
( linseed oil, poppy seed oil, and so forth.)
drunken-muse-140921153806-phpapp02.docPage 6 of 71 6
7. Adding to the mix the varnishes used by
painters (pine wood varnish, Dammar
varnish and others) It makes this ART
SMELL to be the most intoxicating and
ever-lasting musk.
http://en.wikipedia.org/wiki/Oil_painting
http://en.wikipedia.org/wiki/Oil_painting -
Ingredients
http://en.wikipedia.org/wiki/Studio -
Art_studio
drunken-muse-140921153806-phpapp02.docPage 7 of 71 7
8. The instance you enter the studio space you
feel the belonging to a knighthood and the
whole art history. You are the undivided
part of those people who left their creation
imprints.
Super pumped up after the long break up
with the arts after my full year of non-stop
party marathons I had returned to the
bohemian life style.
Actually my other life style wasn't any
different from the bohemian.
The only difference is that there is some
meaning in the bohemian life style,
something to create, to shape. Not just
drunken-muse-140921153806-phpapp02.docPage 8 of 71 8
9. spend time doing sports and girls but
something on a whole 'nother level only with
the same sub text and by far more
emotionally connected.
The bohemian I think is much more my
thing, that fits me as a person. Maybe
because my old man is the greatest
sculptor.
He is color blind so apparently I took up the
torch, I have a very special sense for color.
http://en.wikipedia.org/wiki/Sculpture
http://en.wikipedia.org/wiki/Bohemianism
http://en.wikipedia.org/wiki/Color_blindness
There could be an inborn human
predicament or inborn genius.
I returned into the world to kiss its ground. I
like everything about it, the babeville and
its fashion circus.
The art students are known to come up
with endless varieties of how to be stylish.
Take me for example, I am chilling in a suit
jacket. It was professionally hand-tailored
out of a denim Pajamas with stripes and
starry silk underlining.
drunken-muse-140921153806-phpapp02.docPage 9 of 71 9
10. This “look” is completed by my python
leather jeans. And over that an authentic
LONG military Germany Waffen Elite
Officer black Leather Coat from the WWII,
only it is without a Swastika.
I never part with my large portfolio and a
Field Easel.
EASEL
The artwork with gif effect in neg color version
About 700 students attend the studies. The
art school accepts only the best of best with
drunken-muse-140921153806-phpapp02.docPage 10 of 71 10
11. few exception such as the kids of celebrity
artists, writers and musicians and people
who had real power in the city.
I wasn't enrolled for money or the A-lister
parents, but for my talents. The Art specialty
(painting, drawing, sculpture) teachers here
are the world-wide recognized
contemporary artists.
In a matter of my working ethics these
important artists would point at me as the
example of how fast I work, how well I
sketch in color, how I always choose the
most unexpected and unusual angle for my
composition and so on...
http://en.wikipedia.org/wiki/Composition_(vis
ual_arts)
name banner gif
drunken-muse-140921153806-phpapp02.docPage 11 of 71 11
12. Optical illusion geometric gif
(portraiture, still-life, and landscape)
http://en.wikipedia.org/wiki/Still_life
http://en.wikipedia.org/wiki/Portrait
http://en.wikipedia.org/wiki/Landscape_painting
http://en.wikipedia.org/wiki/Figure_drawing
http://en.wikipedia.org/wiki/Figure_painting
I never work on an académie (live drawing
of a model, live painting of a model) the
given eighty -- ninety hours. My whole
process is about six -- nine hours to fully
complete the work so I get out of the studio
for some action and fun.
I’m probably the strongest in the class. My
art professors know I don’t need to be there
to distract the others.
When I’ve got nothing to do I start banging
the head against the wall. Still I am criticized
SUPER harshly for cutting the classes.
At this point I am not aware of the inner
drunken-muse-140921153806-phpapp02.docPage 12 of 71 12
13. workings of “THE SYSTEM”.
I call suitcase with a secret compartment.
At the grade shows I only see the bad
grades on my best artworks.
There is another side of the coin. It revealed
in the future when I got to befriend a
secretary at the Dean’s office. It was about
the time of my graduating year.
The art teachers actually always considered
me to be the leading artist among all
students. They would grade all my artworks
high on my personal record I knew nothing
about.
That was how the art school’s system
pushed the talented students to go further to
open up their potential. Pushing to the limits
of impossible.
drunken-muse-140921153806-phpapp02.docPage 13 of 71 13
14. Gif effect added to the artwork
I am harshly criticized for cutting a lot of
classes.
There is another side of the coin. It will be
revealed in the future when I got to befriend
a secretary at the Dean's office. It was
about the time of my graduating year.
The art teachers actually always considered
me to be the leading artist among all
drunken-muse-140921153806-phpapp02.docPage 14 of 71 14
15. students. They would grade all my artworks
high on my personal record I knew nothing
about.
That was how the art school's system
pushed the talented students to go further to
open up their potential. Pushing to the limits
of impossible.
Willing or not but the doubts get in my head.
I was thinking (rather frantically) that maybe
I’m all just misguided. I will work to beef up
my skills unable to accept that I am not
really a “genius” artist. The bad grades were
corrupting my vision.
Totally clueless that these bad grades in my
case were used as "disciplinary measures"
for my behavior of anarchy. These grades
had nothing to do with my artworks.
And yet my best drawings and paintings are
graded the lowest. At the same time the art
professors are taking my works home. I
always find empty walls where my works
were displayed for the semester shows.
drunken-muse-140921153806-phpapp02.docPage 15 of 71 15
16. Sooner or later the missing artworks got me
enraged. My classmates tell me the back
story on what REALLY had happened.
All the art professors usually go the painting
major's finals. So they just took my
artworks right off the wall.
Ever since I heard this back story I flaunt
how IDGAF to even pick up my works with
the bad grades after the finals end.
Like a bunch of some doomsday looters in
sight of an electronic store the art students
same as the teachers vultured my artworks.
drunken-muse-140921153806-phpapp02.docPage 16 of 71 16
17. Later some of my paintings and drawings
were seen at the school's museum,
especially the paintings.
drunken-muse-140921153806-phpapp02.docPage 17 of 71 17
18. The story of the artworks snatched off
my exhibit wall developed further.
In the art school the art teachers are
the privileged kind who exhibit
regularly. All are the accomplished
artists with big names.
Another thing about my artworks (no
longer mine and in someone else's
possession) is the story that involves
someone with the top art rep being the
art dynasty. Even so it happed that the
leading art professor nicknamed Molly
(for her annoying facial mole) used my
art stuff to have her son who studied
same years as me, just never expelled,
to apply to an art academy with the
highest qualification requirements.
Molly's son portfolio sucked. To get him
qualified to apply she gave her son all
of my artworks she collected.
The juice was given to me by the
reliable sources. The story was
concurred by the eye--witnesses the
students who were applying to the
same academy together with Molly's
drunken-muse-140921153806-phpapp02.docPage 18 of 71 18
19. son. Some of these students knew my
work by the style, special color palette
and the brushwork.
They all knew that Molly's son was
using my artworks. He only had to forge
his signature and remove mine.
drunken-muse-140921153806-phpapp02.docPage 19 of 71 19
20. http://en.wikipedia.org/wiki/Study_(art)
My drawings, sketches, paintings,
watercolors are in "wide" use by others.
I tell that to describe the routine of my life.
It could explain why I was expelled three
times for the chronic absence, for
sabotaging the lectures -- getting my
classmates to leave the studio and go to the
movies or to the beach.
Fast forward to that event of the breaking
point when I started to work systematically.
drunken-muse-140921153806-phpapp02.docPage 20 of 71 20
22. I was sucked into work as if a drug
addiction. I was penetrating deeper to the
very core of creativity. Reading books,
going to the museums, working in the field,
working in the museums to copy masters. I
completely forgot all about life around me.
Practically I was devoured and digested
with my nails and hair by that devil called
the academic art. It sucked out the leftovers
of my soul.
I stayed in the studio after the classes to
work. There were only few students like this,
spiritually close to me. To them it was their
life style since the day they had entered the
art school unlike me. Whenever I'd get
bored with art I'd quit working and just leave
without asking permission.
Now as if something had hit me hard and I
started to really work. Most art students
here typically come from such backgrounds
when they did their baby steps and studied
in the children's (secondary) art school from
drunken-muse-140921153806-phpapp02.docPage 22 of 71 22
23. an early age and tutored by art teachers at
home.
I had a tendency to take on a higher
complexity unprepared without the
experience of any art school training (the
eight years on a daily basic with teachers
and methodical practice.)
As long as I remember myself I was
drawing, during my school years, on the
notebooks, with chalk on the asphalt, with
stick on the sand. I did it subconsciously,
not knowing what I was doing.
drunken-muse-140921153806-phpapp02.docPage 23 of 71 23
24. IDK, could be due to the several bad bike
accidents when my head ended up hitting
the brick...
Why did my brain moved into the direction
of noticing those things that normal people
should not be noticing? That the leaves on
the trees are not at all green, but violet.
The falling shadows from the street lights
are not at all outlined by black, the contours
are the absolute blue.
The trees look like people.
There are so much more shades of colors
that language could articulate.
drunken-muse-140921153806-phpapp02.docPage 24 of 71 24
25. Stuff like this filled up my head so that there
was no place left for just a thought about
girls, more so even the thoughts to
manipulate my body functions. For instance
using the
bathroom. I almost peed my pants.
Truthfully I was on the edge of madness.
I remember how I hallucinated during my
work imagining that someone had come into
my studio and I spoke to "the guest." My
brain was ill, there was no escape from that
hell.
http://en.wikipedia.org/wiki/Violet_(color)
Once I was walking on a street without any
awareness. My mind was no longer in
command of anything accept the obsession
with my painting. As I was pushing the limits
of what was humanly possible in a matter of
progress from the previous stage when I
could draw and paint with intuitive results
now I considered as totally armature waste
of art materials. My condition would be hard
drunken-muse-140921153806-phpapp02.docPage 25 of 71 25
26. to describe since I could hardly remember
what was it like during that madly intense
period. I know that I was working non--stop
and did make some major break through. It
worked but at the same time the progress
turned its evil side, I wasn't able to stop
even for a brief moment. Something
happened to my otherwise incorruptible
memory that I could only remember few
things from that period. And one of those
things was my death walk through the city
streets on a day I was supposed to
disappear.
drunken-muse-140921153806-phpapp02.docPage 26 of 71 26
27. When I realized that I was walking
automatically, blind and incredibly
avoiding the cars, for the first time I felt the
fear of madness that can easily take my life.
It wasn't something I would fear if I was in
my other life when loosing it would be quite
an ordinary thing and not due to my lost
mind.
Whatever it was I survived with no chances
to stay alive that day. I had more chances to
live on when I was shot at execution style,
when I was drowning in bad storm, climbing
on a building like a cat, and on many others
such occasions.
Some guardian angel was looking over me
as I came to the final moment of certain
death, blind, deaf, disoriented and
dellusional.
drunken-muse-140921153806-phpapp02.docPage 27 of 71 27
28. As we finished with draperies, still life,
gypsum figures we moved on to the nude.
To draw and paint from the live sitter, male
or female model.
drunken-muse-140921153806-phpapp02.docPage 28 of 71 28
29. There comes an old fat hag to be posed
before the artists. She will be POSING
even during the breaks. She sits
professionally without a slight move of her
flab folds for us to draw her “forms”.
‘assume it was done for the boys not to get
distracted with the female anatomy.
The models with “rounded” forms were
chosen so we would study the reflects and
double reflects on a “sphere-like” and
“cylinder-like” forms.
There would be plenty of the cast shadow
(a type of shadow that is created on a
form), and a drop shadow ( below the
image).
http://en.wikipedia.org/wiki/List_of_human_p
ositions
http://en.wikipedia.org/wiki/Figure_study
drunken-muse-140921153806-phpapp02.docPage 29 of 71 29
31. The working objective was to concentrate
on the drawing’s construction.
When we’d get a young female model,
she’d be so skeletal that we studied the
skeleton . This type of models was as
unattractive as the fat ones.
The art students without an eye for a
drawing and technique produced their
works of caricature quality. With the lost
proportions the models looked like animals,
skinny chickens or fat frogs.
For me it was a serious job, body didn’t
exist. I x-rayed the flubs of fat to see the
bones to connect them to muscles , to build
a form.
http://en.wikipedia.org/wiki/Caricature
http://en.wikipedia.org/wiki/Muscle
http://en.wikipedia.org/wiki/Skeleton
http://en.wikipedia.org/wiki/Human_skeleton
drunken-muse-140921153806-phpapp02.docPage 31 of 71 31
32. The illness I call the overdose had
progressed and my end was near.
Homies who knew me used to say that I
was cracked.
When I moved from the classicism to
modern (I refused to see any modern or
contemporary art, never wanted to see it, or
ever saw it) I entered the Modern art on my
drunken-muse-140921153806-phpapp02.docPage 32 of 71 32
33. own, as my foot stepped into the forth
dimension.
I entered the world of mad pressure. Good I
stepped in it one foot yet.
I was sleeping in the studio right on the floor
near my work and placed an electric heater
near by.
It was impossible to heat up whole place
where fifty heavy-duty easels only took a
quarter of the studio space.
In the center there was a huge round stage
made from a special hard wood to hold any
number of models when needed for the
multiple human-figure compositions.
The place was full of easels, portable and
the large for the field. The chairs, tables,
palettes, boxes with paint, cases with paper
and lots of other art stuff piled up into
mountains.
The parquet floor was always covered in
fresh oil paints even though the teachers
tried in vein to prove a fact that working
neatly was by far more productive.
drunken-muse-140921153806-phpapp02.docPage 33 of 71 33
34. We had a dormitory built same year as the
art school which was 150 something years
ago.
If you stayed late in the studio that was
forbidden, you couldn't get to the dorm.
A guard at the main door was a real watch
dog, he faithfully guarded the pathway
knowing every student's face.
The dorm was occupied by those who
couldn't pay for a room or the apartment in
the city.
Ten beds were squeezed in a dorm room.
drunken-muse-140921153806-phpapp02.docPage 34 of 71 34
35. This part of the antique building was never
renovated probably b/c it was planned to be
turned into more art studios.
But since there were out of town students
who had no place to live they were given a
place in this dorm.
The beds were of a good prison-like quality
so the survival was possible. Another thing
is what was happening in the dorm.
On a typical day nobody there had any
money left after the expensive art materials.
Not a penny to get high. Alcoholic liquid
(40-60%) was soaked into the bread.
From one bite of that bread you could
instantly drop dead as if your legs got cut off
by a train.
The receptors inside the nose absorb the
fumes to hit right into the brain, this way the
booze doesn't ever enter the digestive
system and blood.
It kills or makes one go bonkers.
Some pissheads in desperation poured
vodka into a wine bottle cap to inhale it like
coke. After one cap screw it was a total
alchoholocaust.
drunken-muse-140921153806-phpapp02.docPage 35 of 71 35
36. There were many ways of economizing: to
use a medical thin rubber tube to suck the
drink very slowly, one bottle would
serve four alkies.
drunken-muse-140921153806-phpapp02.docPage 36 of 71 36
37. It was the usual schizophrenic day for me. I
had my dose of coffee and ate on a way to
the studio.
Those days I didn't miss a class afraid to
get expelled for the last and final time.
I couldn't understand this thing about my
artworks. Why did my classmates literally
begged on their knees to have the C-graded
artworks I was never satisfied with.
drunken-muse-140921153806-phpapp02.docPage 37 of 71 37
38. It became my trade mark to give away all of
my stuff left and right. I didn't know why I let
go of my drawings and paintings so easy.
Now I regret that. It would be interesting to
see the growth.
Once I happened to tell a guy from my class
who worked very hard on his drawing (he
wasn't a good draftsman): "Oh Wow! you
are doing a lot of progress, buddy,
congrats!" I looked at his portfolio and
pointed at a piece: "This drawing here is
really mature and quite interesting, you
achieved volume and air in just a linear
drawing."
drunken-muse-140921153806-phpapp02.docPage 38 of 71 38
39. The guy suddenly goes red, stares at me
wide-eyed with anger or confusion I couldn't
quite understand...
"Am I saying something wrong?" I asked.
"You're fucking dissing me!" He answered.
"Why?" I wondered.
"This is YOUR drawing," Was the answer: "I
took it, that is when I asked you and you
gave it to me, don't you remember?"
I didn't recognize, didn't see my signature,
as it was overlapping the drawing.
The guy was holding a grudge for this but it
didn't turn him into one of my enemies.
drunken-muse-140921153806-phpapp02.docPage 39 of 71 39
40. At some point I am thankful to the teachers
for their sneaky methods and experience on
how to tame the most unruly and bring them
into the art's stable. On the other hand
these people were like sadistic fascists who
used their special gases on me
experimenting, would I survive it and live on.
The bohemian hyped up life only started
after the classes at about seven in the
evening. This part of the artist's life was full
of sex, booze, and drugs, more sex booze
drugs and orgies. The art youth was
drunken-muse-140921153806-phpapp02.docPage 40 of 71 40
41. progressive, the sex - communal with the
conveniently shared girlfriends and
boyfriends.
Strangely the good times didn't concern me
anymore now.
There was a small group of idiots who
followed their criteria of achievement: to
draw and paint a vase with flowers so that it
comes to life, right out of the canvas to the
carrying hands of the one who painted it.
The flowers turned alive would be given to
the girl/boyfriend.
drunken-muse-140921153806-phpapp02.docPage 41 of 71 41
42. The madness of the 4th dimension.
The art group was lead by me and another
guy soon (one month later) to disappear
forever for the reasons unknown.
After the classes me and few others
searched for a studio. Found it. Not my
studio. Any studio with the door unlocked.
As usual I would set a still life. Take off my
nazi coat.
Set my next canvas on the easel to start
quick sketching.
Out of nowhere shows up some dude who
was a new student, he was much older,
about twenty three, somewhere from Texas
and just plain untalented.
drunken-muse-140921153806-phpapp02.docPage 42 of 71 42
43. He wanted to hang around with "the power-group"
to learn.
There were few girls with the ambition to
reach the level of a manly hand in creation.
We all usually worked in grave silence and
even a slight noise would be extremely
annoying.
If a brush would fall it seemed the atomic
bomb had exploded somewhere near. We
would exchange vicious cursing at the
jittery creaking sneezing noise maker.
drunken-muse-140921153806-phpapp02.docPage 43 of 71 43
44. When you are focusing intensely and can't
quite catch the brush stroke to complete the
shaping of a form so that the image would
turn real and come out of the flat surface the
nerves are high strung to the limit.
The last months I just never left the studio,
didn't even come outside. Slept on my
German coat in the corner. It was veiled
with the drapery. I'd wake up in the morning.
The doorman was already used to give me
the keys knowing that I sleep and work
there. It came with a warning that if I am
discovered I must tell any story and
solemnly kept the secret.
The memories from those years distract me
from telling what I want. It's about the event
that had closed for me the entry into the
forth dimension.
That day I was getting upset over some
stupid teases: "What had happened to you!"
Whether the bros wanted to elevate my
mental state, or they needed to get my
works it had really caused me distraction. I
was focusing on my work. Suddenly I hear
the sounds of music in the studio. It jumped
drunken-muse-140921153806-phpapp02.docPage 44 of 71 44
45. me: “Are you out of your fucking minds?
That asshole doorman will come here."
"No he ain’t gonna."
"Why?"
"He is passed out, we had to carry him
away." Was the answer.
"What is going down?" I worried.
"Not much, nothing is going down, we just
want some fun. The way it is on here is so
buzz-killing."
Was it some holiday, I didn’t know. Holidays
passed by me, I didn’t smoke or drink and
only worked. What they were saying didn’t
reach me.
“Shut down the music. You’re gone but I
must sleep here."
"Why must you sleep here?" Asked Lorenzo
(nick-named after his personal preferences
of the Benzos)
"Hmm, I guess there will be no way of
working today?" I asked.
"Working, way working, you gonna make
me some home works," Assured me the
dude nicknamed Kuz. "For that I will make
your sculpture complete."
drunken-muse-140921153806-phpapp02.docPage 45 of 71 45
46. As interesting as it was to play with the real
forms in sculpting I disliked dealing with the
clay. Those times I believed the painting to
be so much more in gradations, possibilities
and complexity. Now I changed my mind to
consider any art media possess the
unlimited possibilities.
drunken-muse-140921153806-phpapp02.docPage 46 of 71 46
47. I agreed. Suddenly the guys were fixing to
leave and I had to ask: "So? Who will finish
building up the sculpture if you're leaving?"
"No worries, will build it up, brb just a quick
run for some booze before the stores closed
up."
"What booze? Get out of here go to another
studio. I work, don’t mess me up."
"No biggie, son, you can rest for once."
drunken-muse-140921153806-phpapp02.docPage 47 of 71 47
48. It was pointless to argue, they'd already
been drunk and I was only getting nervous.
My work wasn’t going good at all. I have
changed the lighting set up many ways in
vein.
drunken-muse-140921153806-phpapp02.docPage 48 of 71 48
49. Suddenly, out of nowhere Muse appears. A
young, very-very attractive girl about
eighteen. The returned gang introduced her
to me:
"J-Sin, meet her... lets say Nicky."
"Eh, hello Nicky, who and what are you?"
were my greetings.
She smiled to everyone and answered: "I
will be posing for you today."
"We agreed about everything, will pay the
price,” –explained Lorenzo barely moving
his tongue, "She is gonna be happy!"
His bag full of bottles made loud clanking
noise.
drunken-muse-140921153806-phpapp02.docPage 49 of 71 49
50. When the drunks got them out I counted six.
“Yes, this is going to be a wild night.” I was
thinking what to do now. I approached the
model, took off her coat and hanged it,
removed her blouse and explained that she
can go behind the curtain.
"Hey, hey! What curtain son, what’s with
you? She is from the med school, our
people!"
I heard the Kuz's inebriated voice. "She is
THE model!"
drunken-muse-140921153806-phpapp02.docPage 50 of 71 50
51. "What -- nude?" I wondered.
"And what did you think, she'd sit covered
up in here?" They burst into laughter.
Suddenly I feel elated with the anticipation
of the new and amazing subject for the
work. I was fed up with the poor set up and
the struggle to "find" the good lighting for
the gypsum head. How wonderful it turned
out that I could make some picturesque oil
sketches.
drunken-muse-140921153806-phpapp02.docPage 51 of 71 51
52. When the model took off her bra, her young
breasts, her nipples instantly distract my
attention from work.
Shit, I couldn’t focus. Since we hadn’t a
glimpse at such models it was too
interesting. Could be that something about
this evening or the environment was
different. First time in a long while the music
was playing, the glasses jingled and filled
up with wine.
As she posed we were all doing the quick
sketching. She removed everything except
her panties.
drunken-muse-140921153806-phpapp02.docPage 52 of 71 52
53. The drunken assholes wouldn’t let me
focus.
"Let me finally have a chance to work." I
yelled getting distracted.
They seemed to try bargaining: "We brought
you the model, hey girl turn around!" Kuz
pulled up her skirt and slapped her buddy.
"Look at these buns, you've got to do
another
drawing for the semester show."
"Boys, you are so bad!" She giggled to Kuz.
"I will spank you for being soooo bad!" And
she was laughing in most contagious sexy
trills of her childish capricious voice.
drunken-muse-140921153806-phpapp02.docPage 53 of 71 53
54. I didn’t understand what these die--hard
drunks were doing at the art school, without
any talent or interest in art. My former palls
in another life that was long forgotten.
Today the serious artists who always
worked together with me had left the
moment this bad company swam by.
Now I was looking at their watery eyes
winking at the model. They caressed her
things as she reclined on the wooden stage
to rest. I wanted to figure out why did they
distract me even more now?
I was the same age as the model. I didn’t
see her body, to me now it was the model
for painting.
It was getting late when the cold winds
penetrate the place from the drafty wall size
windows. I put on my sweater in the starting
freezer. The one meter or the three feet and
33/8 inch walls are like the thermos to
absorb and hold the cool temperature. I
looked at the laughing bunch who labored
on my sculpture.
drunken-muse-140921153806-phpapp02.docPage 54 of 71 54
55. One was drawing a huge flying dick with
wings with a charcoal right on a white wall.
I had finished sketching the figure. I came
up to the stage to set up the heater. I asked
the model if she could sit some more taking
breaks whenever she needs to move.
When she looked at me she was constantly
smiling.
"Sure she’ll sit! And she'll lay, right, sweet
buns?"
I held my breath working imagining how
awesome would be to have such a model
every day. With a shaky hand I was working
fast as a machine expecting any minute
now she would say that she is too cold to sit
another minute and she leaves, its all over. I
will have to kill her and sit her lifeless body
on a chair to complete my work.
“Shit! Shit! Shit!"
The heater I placed caused the red reflexes
on the body. I was painting and had to get
the color right. So I removed the heater. The
model immediately complained about the
cold. Kuz brought her a glass of wine asking
me why did I remove the heater.
drunken-muse-140921153806-phpapp02.docPage 55 of 71 55
56. From wine her face flushed red. I tried to
adjust the color scale, laying brushstrokes
over the whole figure.
Meanwhile the music turned up it was
getting real loud.
The model took her break.
I walked after her studying her forms.
"Is something wrong?" She asked.
"Its all right, could you turn this way."
"Oh, I see. Same in our med school, the nut
cases," She openly declared to the others
when I was on a floor looking from a lower
viewpoint.
drunken-muse-140921153806-phpapp02.docPage 56 of 71 56
57. "Who is this?" She asked: "What kind of a
mental is he?"
"Its a disease, but it will pass" – was the
answer for her. "Sometimes it is terminal.
Not his tho, his will pass, he loves the young
girls very much…"
Something from the stupid jokes had
reached me.
"Hon, now he needs the medical attention.
You are the medic? We are forever in debt
to yous for allowing us come to the mortuary
and for helping with the dead bodies... What
we have here is a zombie. You are the
drunken-muse-140921153806-phpapp02.docPage 57 of 71 57
58. goddess who saves the body as your
calling."
What I heard was polluting my pure artistic
brain with that life I refused. Now I was
paying attention not to the mammary glands
but to her breasts. Her back muscles are
slightly weak. As I looked over the skeleton
the muscles slowly disappeared. No matter
how hard I tried to focus my x-rays were
weakened. Maybe the electricity turned off
inside my head.
"Pour me some," I asked.
Six months of my immaculate virginity and
celibacy was broken by a wine glass. The
red wine like the blood of innocents was
running in my throat filling up the brain that
shortly was boiling with vigor. So I said:
"Could you please remove your panties?"
"It wasn’t the deal," protested the model
with her eyes glowing like honey.
Lorenzo interrupted her:
"For god’s sake, take of your panties, what
is it to you, aren't you a medic?"
drunken-muse-140921153806-phpapp02.docPage 58 of 71 58
59. "I thought someone here was shy, as for
me" She lustfully licked her lips. "Well, of
course its nothing."
"Who is shy?" Asked someone.
"Him the weirdo!" She giggled in a very cute
bubbly little voice.
"Are you shy?"
"It seems it was me who asked her to
remove the panties." I explained.
She just jumped right out of her panties not
without pleasure it seemed.
I imagined how to position her, what pose
should she take.
drunken-muse-140921153806-phpapp02.docPage 59 of 71 59
60. "Hey!" I asked Kuz to pour me another
glass. He was cheering me on yet
reminding that I should first finish the
drawing.
"Later," I mumbled turning to the model:
"Would you please sit on a chair and spread
your pretty legs a little, as much as you
wish."
"Hey, Alex, so he is normal?" She asked.
I was far away from normality. A actual girl
weaved from the reality. But the process
was a transformation with splitting
dimensions.
drunken-muse-140921153806-phpapp02.docPage 60 of 71 60
61. She was turning more real when I touched
her to show how to position her legs.
I glimpsed at the red pubic hair seeing the
pink flesh of her vaginal lips.
I couldn't focus on my work. Could the
“female anatomy” destroy the temple of
magic I was erecting for the eight months?
I returned to my easel and continued
working. She was fidgeting changing poses
uncomfortable this something hurting that...
But it was only natural, she was sitting
naked on a plain hard wooden chair. She
was sliding from one side of the chair to
another. I was buzzed from wine and
couldn’t work, but I tried to complete my
work just to annoy these assholes who
screwed up my day. First work was washed
off with turpentine and I wiped up the
canvas dry with a rag.
I was sketching now not with a charcoal but
brushing in umber. It resulted in an
interesting tonality and I was captured
again. The model squirming on her hard
chair complained.
drunken-muse-140921153806-phpapp02.docPage 61 of 71 61
62. "Yo, why don’t you lay her down, what is
she suffering for?" Asked Alex, "Lay her the
fuck down, why not."
Right! I thought a little and told her to lay
on the stage. Underneath her I spread some
drapery.
After few wine glasses I took off my
sweater, my cheeks were on fire. Hers too. I
unbuttoned my shirt, my blood was boiling,
the body was washed with the warmth.
The heater was moved away.
"So true that wine warms you up," she said
to Alex.
drunken-muse-140921153806-phpapp02.docPage 62 of 71 62
63. "Jay, so tell me how to lay her down there.
Sit, sit, you poor thingy, I'll assist you" And
he jumped on the stage. "Do you want her
legs spread this way?" he asked opening
up her legs so that her whole anatomy was
showing.
"Is this ok for you?" He winked at me: "Is it
good?"
"Oh no, can’t show it like this at the mid-semester
show." Thinking some I added: "
Let it be, lift her leg a little higher, like this.
Turn her head down."
drunken-muse-140921153806-phpapp02.docPage 63 of 71 63
64. "Like this?" He kissed her on the lips.
"Alex, the fuck you're doing, I don’t have
any time."
"Work, keep drawing, go on!" he said. "We
won’t disturb you."
I was outraged after I just washed
everything off my canvas ready to work, but
this wasn't going anywhere. I kept asking
Alex what did he mean by not disturbing me
when he messed everything up. I heard the
girls laughing trills. "For real, he is ill!"
"The sick can be cured." Insisted Alex. "Will
hill him." He slurred.
Of course, I own them my very life. If it
weren't for them –- that’s it, finito.
Kissing her on the lips and winking at me
Alex continued bugging me: “Is this right?”
For like ten minutes I was staring in the
infinity in the emptiness… Then I yelled:
"Why are you sucking her? Get away from
her, let her lay there quietly."
Only to hear some nonsensical mumbling.
"But I want you to work on the position, is
this position right?"
drunken-muse-140921153806-phpapp02.docPage 64 of 71 64
65. "Right, just fuck off of her."
Meanwhile Kuz, I noticed, was taking off his
pants. He said: “Let him go fuck himself.
Motherfucker is gonna fuck us up today, if
he doesn’t want it, so fuck it.”
Now I thought I knew what they wanted
from me.
I saw Alex’s naked butt as he laid on the
stage, banging the girl and his ass wiggled.
I started sketching their nude asses.
My consciousness was still in the process of
transforming.
I thought of how interesting were their
drunken-muse-140921153806-phpapp02.docPage 65 of 71 65
66. poses.
Lorenzo came up to me and took the
brushes from my hands placing all in my
field easel he closed up.
"Listen, J-man, you’re being a fucking
buzzkill. Go draw some vases, fuck off to
another studio. You don’t want it. For free?"
I didn't understand him what did he mean.
He explained:
"What do you see Alex is doing right now?"
"He is fucking his girlfriend." I said.
Lorenzo continued:
drunken-muse-140921153806-phpapp02.docPage 66 of 71 66
67. "Whose girlfriend? What we have here is a
scientist, from the med school who is
helping us in our artistic quests, to
understand the core of anatomy not only
from the outside but from the inside. I
recommend you, in order to comprehend,
as you must know, you can only know the
truth from the inside, experiencing the
inside, to understand the outside. That’s
drunken-muse-140921153806-phpapp02.docPage 67 of 71 67
68. why I seize the brushes. Here is another
glass of wine. Drink!"
I looked at him as a doctor listening to his
drunken bullshit.
"The most important thing for you is to
understand from the inside. See, you can’t
understand it from the outside, it’s not how
things are done."
"Yes knowing the internal anatomy helps,
take a muscle, body doesn’t exist without
muscles." I agreed.
"Hell yeah, yeah… ha ha…that’s what I am
going about. Look how Alex is working how
he is learning."
I looked at the bare ass's motions back and
forth, at the girl who was lifting her legs and
actively moving her hips. Alex jumped off,
wiped up his cock with the drapery, he also
wiped out the girl. “Who is next?”
Kuz was kissing her from one side, when
Lorenzo said:
"He worked very hard today, he must learn
from the inside. You see, because he just
can’t break through the inside."
drunken-muse-140921153806-phpapp02.docPage 68 of 71 68
69. When Kuz was mounting her, Lorenzo
spanked him loudly:
"You can wait, the man needs the muse, get
it? Understanding the Muse comes only
from the inside.." They all bust into laughter.
Lorenzo nearly helped my cock inside the
girl cheering on: "Just do it, little one,
everything is gonna be great. Honey, turn
him back into a soldier that we've lost."
drunken-muse-140921153806-phpapp02.docPage 69 of 71 69
70. "The man is gone, the man known
yesterday is not the man you meet, forever,
around the corner, in London or in the
street..." chanted Nick appearing from
nowhere. He continued slurring his poems.
Hearing the noise I didn’t know what’s going
on as I kissed her breasts.
"Feel the forms." I heard the racket near by
as I was buzzing off the wine and licking the
girl's body. On the other side Lorenzo had
joined in groping her breasts. To be more at
ease I moved her body closer to the stage’s
edge. I was on top.
I didn't hear any sounds of music, the entry
door was covered with the draperies as the
orgy just steamed up for the whole night.
I woke up on the stage from loud knocking.
The art students asked me what happened
to the busted still life set.
I exhaled my dragon breath to hear no more
questions. Took my coat and left the
building. Walking the street I met Alex.
"Your face is not yet blushed, your eyes are
a bit foggy, can’t say anything after the
sleepless night. Like Cures Like."
drunken-muse-140921153806-phpapp02.docPage 70 of 71 70
71. He grinned getting money out of his pocket.
"Let us get some treatment."
We walked to the known spot for aching
heads gathering.
drunken-muse-140921153806-phpapp02.docPage 71 of 71 71