Vogtle 3&4 Update
David McKinney
Nuclear Development Vice President
Certain information contained in this presentation is forward-looking information based on current expectations and plans
that involve risks and uncertainties. Forward-looking information includes, among other things, statements concerning
estimated construction and other expenditures, job creation, benefits to customers and the completion of ongoing
construction projects. Georgia Power cautions that there are certain factors that can cause actual results to differ materially
from the forward-looking information that has been provided. The reader is cautioned not to put undue reliance on this
forward-looking information, which is not a guarantee of future performance and is subject to a number of uncertainties and
other factors, many of which are outside the control of Georgia Power; accordingly, there can be no assurance that such
suggested results will be realized. The following factors, in addition to those discussed in Georgia Power’s Annual Report on
Form 10-K for the year ended December 31, 2012, and subsequent securities filings, could cause actual results to differ
materially from management expectations as suggested by such forward-looking information: the impact of recent and future
federal and state regulatory changes, as well as changes in application of existing laws and regulations; current and future
litigation, regulatory investigations, proceedings, or inquiries; effects of inflation; ability to control costs and avoid cost
overruns during the development and construction of the Plant Vogtle expansion, to construct facilities in accordance with
the requirements of permits and licenses, and to satisfy any operational and environmental performance standards; state and
federal rate regulations and the impact of future rate cases and negotiations; regulatory approvals and actions related to the
Plant Vogtle expansion, including Georgia Public Service Commission approvals, Nuclear Regulatory Commission actions,
and potential U.S. Department of Energy loan guarantees; the inherent risks involved in operating and constructing nuclear
generating facilities, including environmental, health, regulatory, natural disaster, terrorism, or financial risks; the ability of
counterparties of Georgia Power to make payments as and when due and to perform as required; the direct or indirect effect
on Georgia Power’s business resulting from terrorist incidents and the threat of terrorist incidents, including cyber intrusion;
interest rate fluctuations and financial market conditions and the results of financing efforts, including Georgia Power’s
credit ratings; the impact of any potential U.S. credit rating downgrade or other sovereign financial issue, including impacts
on interest rates, access to capital markets, impacts on currency exchange rates, counterparty performance, and the
economy in general, as well as potential impacts on the availability or benefits of proposed U.S. Department of Energy loan
guarantees; and catastrophic events such as fires, earthquakes, explosions, floods, hurricanes, droughts, pandemic health
events such an influenzas, or other similar occurrences. Georgia Power expressly disclaims any obligation to update any
forward-looking information.
Forward-Looking Statement
Vogtle 3 and 4
• Two units: 1,117 MW each
• Technology: Westinghouse AP1000
• Location: Waynesboro, Ga.
• When completed, Vogtle 1-4:
– Will be the largest nuclear energy facility in U.S.
– Will power 1+ million homes and businesses
Co-Owners
Project Participants
Full Construction/Start-Up
Limited Work
AuthorityProcurement
Combined Construction/Operating License (COL) Process
Engineering, Procurement and
Construction (EPC) Contract Signed
Public Service Commission (PSC) Certification Process
Early Site Permit (ESP) Process
2006 2007 2008 2009 2010 2011 2012 20132005
Westinghouse Design Control Document (DCD)
Certification Process





Fukushima First Nuclear Concrete
Project History
NRC/Industry Response to Fukushima
• Industry took immediate actions.
• NRC took immediate actions: Near term Task Force
(NTTF).
• The NTTF recommended a series of actions to be taken
by each licensee, and provided a series of orders and
rulemaking.
• These actions were grouped into 3 Tier’s to address
immediate response and limited resources.
7
Section 7
Acknowledged the AP1000 passive
safety systems and that their
passive designs and inherent 72-
hour coping capability for core,
containment, and spent fuel pool
cooling with no operator action
required, have many of the design
features and attributes necessary to
address the Task Force
recommendations.
NRC Response to Fukushima
8
• AC power not required for safe shutdown
• Operator actions not required for 72
hours to maintain core and containment
cooling
• Designed for core to stay in reactor and
remain covered with water
• The NRC’s Fukushima 90-day Task
Force noted that the AP1000 already met
most of its recommendations
AP1000 Advanced Safety Features
Vogtle 3 and 4 Site
Vogtle Unit 3
Vogtle Unit 4
Vogtle Unit 3 NI & Cooling Tower
CA01 Module Inside Vogtle MAB
Containment Vessel Fabrication
Vogtle Unit 3 Cooling Tower
Vogtle Unit 4 Cooling Tower
Backup Slides
Fukushima Impacts to Vogtle 3&4
• With AP1000 design, Vogtle Units 3&4 were EXEMPT from some
NTTF Recommendations.
– NTTF 2.1 and 2.3 (Seismic/Flooding re-evaluations and Seismic/Flooding
walkdowns).
– NTTF 5.1 Reliable Hardened Containment Vents.
• Other NTTF Tier 1 recommendations requirements are less
intensive for Vogtle 3&4, due to the design.
• Location as well as design of Vogtle Units 3&4 are important in
considering impacts.
20
NTTF Tier 1 Activities and Status
Vogtle 3&4
• 10 CFR 50.54 (f) Letter
• 9.3 Enhanced EP Staffing and Communications
• Status – these activities are based on Vogtle 1&2 responses and due
before Fuel Load for Unit 3
• Order EA-12-049
• 4.1/4.2 Extended Station Blackout/FLEX
• Status – NRC reviewing Vogtle 3&4 response – must be closed prior to
Fuel Load for Unit 3
• Order EA-12-051
• 7.1 Spent Fuel Pool Instrumentation
• Status – Vogtle 3&4 responded and Order closed by NRC
21

More Related Content

What's hot

August 2011 Ur-Energy Corporate Presentation
August 2011 Ur-Energy Corporate PresentationAugust 2011 Ur-Energy Corporate Presentation
August 2011 Ur-Energy Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy September 2015 Corporate Presentation
Ur-Energy September 2015 Corporate PresentationUr-Energy September 2015 Corporate Presentation
Ur-Energy September 2015 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy's August 2017 Corporate Presentation
Ur-Energy's August 2017 Corporate PresentationUr-Energy's August 2017 Corporate Presentation
Ur-Energy's August 2017 Corporate Presentation
Ur-Energy
 
Ur-Energy March 2016 Corporate Presentation
Ur-Energy March 2016 Corporate PresentationUr-Energy March 2016 Corporate Presentation
Ur-Energy March 2016 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy November 2015 Corporate Presentation
Ur-Energy November 2015 Corporate PresentationUr-Energy November 2015 Corporate Presentation
Ur-Energy November 2015 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy December 2015 Corporate Presentation
Ur-Energy December 2015 Corporate PresentationUr-Energy December 2015 Corporate Presentation
Ur-Energy December 2015 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy Q2 Webcast Presentation
Ur-Energy Q2 Webcast PresentationUr-Energy Q2 Webcast Presentation
Ur-Energy Q2 Webcast Presentation
Brooke Rock
 
Legal Issues in Enforcement Slides
Legal Issues in Enforcement SlidesLegal Issues in Enforcement Slides
Legal Issues in Enforcement Slides
Raul M. Bhat
 
Ur-Energy November 2016 Corporate Presentation
Ur-Energy November 2016 Corporate PresentationUr-Energy November 2016 Corporate Presentation
Ur-Energy November 2016 Corporate Presentation
Brooke Rock
 
Ur-Energy June 2016 Corporate Presentation
Ur-Energy June 2016 Corporate PresentationUr-Energy June 2016 Corporate Presentation
Ur-Energy June 2016 Corporate Presentation
Brooke Rock
 
Ur-Energy October 2015 Corporate Presentation
Ur-Energy October 2015 Corporate PresentationUr-Energy October 2015 Corporate Presentation
Ur-Energy October 2015 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy Q3 Webcast & Teleconference Power Point
Ur-Energy Q3 Webcast & Teleconference Power PointUr-Energy Q3 Webcast & Teleconference Power Point
Ur-Energy Q3 Webcast & Teleconference Power Point
Brooke Rock
 
Ur-Energy's June 2017 Corporate Presentation
Ur-Energy's June 2017 Corporate PresentationUr-Energy's June 2017 Corporate Presentation
Ur-Energy's June 2017 Corporate Presentation
Ur-Energy
 
Ure corporate presentation 20150506 (final)
Ure corporate presentation 20150506 (final)Ure corporate presentation 20150506 (final)
Ure corporate presentation 20150506 (final)
Urenergy
 
Ur-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate PresentationUr-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
20110602 ure corporate presentation (june 2011)
20110602 ure corporate presentation (june 2011)20110602 ure corporate presentation (june 2011)
20110602 ure corporate presentation (june 2011)
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy 2015 Third Quarter Webcast and Teleconference
Ur-Energy 2015 Third Quarter Webcast and TeleconferenceUr-Energy 2015 Third Quarter Webcast and Teleconference
Ur-Energy 2015 Third Quarter Webcast and Teleconference
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
June 2015 Corporate Presentation
June 2015 Corporate PresentationJune 2015 Corporate Presentation
June 2015 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Corporate presentation jan 16, 2016
Corporate presentation   jan 16, 2016Corporate presentation   jan 16, 2016
Corporate presentation jan 16, 2016
Adnet Communications
 
Corporate presentation march 1, 2017
Corporate presentation   march 1, 2017Corporate presentation   march 1, 2017
Corporate presentation march 1, 2017
Adnet Communications
 

What's hot (20)

August 2011 Ur-Energy Corporate Presentation
August 2011 Ur-Energy Corporate PresentationAugust 2011 Ur-Energy Corporate Presentation
August 2011 Ur-Energy Corporate Presentation
 
Ur-Energy September 2015 Corporate Presentation
Ur-Energy September 2015 Corporate PresentationUr-Energy September 2015 Corporate Presentation
Ur-Energy September 2015 Corporate Presentation
 
Ur-Energy's August 2017 Corporate Presentation
Ur-Energy's August 2017 Corporate PresentationUr-Energy's August 2017 Corporate Presentation
Ur-Energy's August 2017 Corporate Presentation
 
Ur-Energy March 2016 Corporate Presentation
Ur-Energy March 2016 Corporate PresentationUr-Energy March 2016 Corporate Presentation
Ur-Energy March 2016 Corporate Presentation
 
Ur-Energy November 2015 Corporate Presentation
Ur-Energy November 2015 Corporate PresentationUr-Energy November 2015 Corporate Presentation
Ur-Energy November 2015 Corporate Presentation
 
Ur-Energy December 2015 Corporate Presentation
Ur-Energy December 2015 Corporate PresentationUr-Energy December 2015 Corporate Presentation
Ur-Energy December 2015 Corporate Presentation
 
Ur-Energy Q2 Webcast Presentation
Ur-Energy Q2 Webcast PresentationUr-Energy Q2 Webcast Presentation
Ur-Energy Q2 Webcast Presentation
 
Legal Issues in Enforcement Slides
Legal Issues in Enforcement SlidesLegal Issues in Enforcement Slides
Legal Issues in Enforcement Slides
 
Ur-Energy November 2016 Corporate Presentation
Ur-Energy November 2016 Corporate PresentationUr-Energy November 2016 Corporate Presentation
Ur-Energy November 2016 Corporate Presentation
 
Ur-Energy June 2016 Corporate Presentation
Ur-Energy June 2016 Corporate PresentationUr-Energy June 2016 Corporate Presentation
Ur-Energy June 2016 Corporate Presentation
 
Ur-Energy October 2015 Corporate Presentation
Ur-Energy October 2015 Corporate PresentationUr-Energy October 2015 Corporate Presentation
Ur-Energy October 2015 Corporate Presentation
 
Ur-Energy Q3 Webcast & Teleconference Power Point
Ur-Energy Q3 Webcast & Teleconference Power PointUr-Energy Q3 Webcast & Teleconference Power Point
Ur-Energy Q3 Webcast & Teleconference Power Point
 
Ur-Energy's June 2017 Corporate Presentation
Ur-Energy's June 2017 Corporate PresentationUr-Energy's June 2017 Corporate Presentation
Ur-Energy's June 2017 Corporate Presentation
 
Ure corporate presentation 20150506 (final)
Ure corporate presentation 20150506 (final)Ure corporate presentation 20150506 (final)
Ure corporate presentation 20150506 (final)
 
Ur-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate PresentationUr-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate Presentation
 
20110602 ure corporate presentation (june 2011)
20110602 ure corporate presentation (june 2011)20110602 ure corporate presentation (june 2011)
20110602 ure corporate presentation (june 2011)
 
Ur-Energy 2015 Third Quarter Webcast and Teleconference
Ur-Energy 2015 Third Quarter Webcast and TeleconferenceUr-Energy 2015 Third Quarter Webcast and Teleconference
Ur-Energy 2015 Third Quarter Webcast and Teleconference
 
June 2015 Corporate Presentation
June 2015 Corporate PresentationJune 2015 Corporate Presentation
June 2015 Corporate Presentation
 
Corporate presentation jan 16, 2016
Corporate presentation   jan 16, 2016Corporate presentation   jan 16, 2016
Corporate presentation jan 16, 2016
 
Corporate presentation march 1, 2017
Corporate presentation   march 1, 2017Corporate presentation   march 1, 2017
Corporate presentation march 1, 2017
 

Similar to Dlm presentation dec. 2 2014

20110427 ure 2011 agm presentation (april 2011)
20110427 ure 2011 agm presentation (april 2011)20110427 ure 2011 agm presentation (april 2011)
20110427 ure 2011 agm presentation (april 2011)
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Ur-Energy's June 2020 Corporate Presentation
Ur-Energy's June 2020 Corporate PresentationUr-Energy's June 2020 Corporate Presentation
Ur-Energy's June 2020 Corporate Presentation
Ur-Energy
 
Ur-Energy's March 2020 Corporate Presentation
Ur-Energy's March 2020 Corporate PresentationUr-Energy's March 2020 Corporate Presentation
Ur-Energy's March 2020 Corporate Presentation
Ur-Energy
 
Delay Claims Mitigation for US Nuclear Power Plant Construction
Delay Claims Mitigation for US Nuclear Power Plant ConstructionDelay Claims Mitigation for US Nuclear Power Plant Construction
Delay Claims Mitigation for US Nuclear Power Plant Construction
Charles Fournier
 
Ur-Energy's January 2021 Corporate Presentation
Ur-Energy's January 2021 Corporate PresentationUr-Energy's January 2021 Corporate Presentation
Ur-Energy's January 2021 Corporate Presentation
Ur-Energy
 
Ur-Energy's October 2020 Corporate Presentation
Ur-Energy's October 2020 Corporate PresentationUr-Energy's October 2020 Corporate Presentation
Ur-Energy's October 2020 Corporate Presentation
Ur-Energy
 
Teck Resources Q1 2018 Presentation
Teck Resources Q1 2018 Presentation Teck Resources Q1 2018 Presentation
Teck Resources Q1 2018 Presentation
TeckResourcesLtd
 
Investor Presentation - March 2015
Investor Presentation - March 2015Investor Presentation - March 2015
Investor Presentation - March 2015
RowanCompanies
 
March 2015 Investor Presentation
March 2015 Investor PresentationMarch 2015 Investor Presentation
March 2015 Investor Presentation
RowanCompanies
 
Ur-Energy's March 2021 Corporate Presentation
Ur-Energy's March 2021 Corporate PresentationUr-Energy's March 2021 Corporate Presentation
Ur-Energy's March 2021 Corporate Presentation
Ur-Energy
 
Gds Trans Actions Vol411
Gds Trans Actions Vol411Gds Trans Actions Vol411
Gds Trans Actions Vol411
Ryan C. Johnson, PE
 
Q4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation SlidesQ4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation Slides
TeckResourcesLtd
 
Ure corporate presentation 20150312 (final)
Ure corporate presentation 20150312 (final)Ure corporate presentation 20150312 (final)
Ure corporate presentation 20150312 (final)
Urenergy
 
Ure corporate presentation 20150303 (final)
Ure corporate presentation 20150303 (final)Ure corporate presentation 20150303 (final)
Ure corporate presentation 20150303 (final)
Urenergy
 
Ure corporate presentation 20150309 (final)
Ure corporate presentation 20150309 (final)Ure corporate presentation 20150309 (final)
Ure corporate presentation 20150309 (final)
Urenergy
 
Ur-Energy July 2013 Corporate Presentation
Ur-Energy July 2013 Corporate PresentationUr-Energy July 2013 Corporate Presentation
Ur-Energy July 2013 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Q1 2023 Conference Call Presentation Slides
Q1 2023 Conference Call Presentation SlidesQ1 2023 Conference Call Presentation Slides
Q1 2023 Conference Call Presentation Slides
TeckResourcesLtd
 
Ur-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and TeleconferenceUr-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and Teleconference
Rich Boberg, SHRM-SCP, SPHR, PHRca
 
Edison International February 2020 Business Update
Edison International February 2020 Business UpdateEdison International February 2020 Business Update
Edison International February 2020 Business Update
EdisonInternational
 
Ur-Energy June 2013 Corporate Presentation
Ur-Energy June 2013 Corporate PresentationUr-Energy June 2013 Corporate Presentation
Ur-Energy June 2013 Corporate Presentation
Rich Boberg, SHRM-SCP, SPHR, PHRca
 

Similar to Dlm presentation dec. 2 2014 (20)

20110427 ure 2011 agm presentation (april 2011)
20110427 ure 2011 agm presentation (april 2011)20110427 ure 2011 agm presentation (april 2011)
20110427 ure 2011 agm presentation (april 2011)
 
Ur-Energy's June 2020 Corporate Presentation
Ur-Energy's June 2020 Corporate PresentationUr-Energy's June 2020 Corporate Presentation
Ur-Energy's June 2020 Corporate Presentation
 
Ur-Energy's March 2020 Corporate Presentation
Ur-Energy's March 2020 Corporate PresentationUr-Energy's March 2020 Corporate Presentation
Ur-Energy's March 2020 Corporate Presentation
 
Delay Claims Mitigation for US Nuclear Power Plant Construction
Delay Claims Mitigation for US Nuclear Power Plant ConstructionDelay Claims Mitigation for US Nuclear Power Plant Construction
Delay Claims Mitigation for US Nuclear Power Plant Construction
 
Ur-Energy's January 2021 Corporate Presentation
Ur-Energy's January 2021 Corporate PresentationUr-Energy's January 2021 Corporate Presentation
Ur-Energy's January 2021 Corporate Presentation
 
Ur-Energy's October 2020 Corporate Presentation
Ur-Energy's October 2020 Corporate PresentationUr-Energy's October 2020 Corporate Presentation
Ur-Energy's October 2020 Corporate Presentation
 
Teck Resources Q1 2018 Presentation
Teck Resources Q1 2018 Presentation Teck Resources Q1 2018 Presentation
Teck Resources Q1 2018 Presentation
 
Investor Presentation - March 2015
Investor Presentation - March 2015Investor Presentation - March 2015
Investor Presentation - March 2015
 
March 2015 Investor Presentation
March 2015 Investor PresentationMarch 2015 Investor Presentation
March 2015 Investor Presentation
 
Ur-Energy's March 2021 Corporate Presentation
Ur-Energy's March 2021 Corporate PresentationUr-Energy's March 2021 Corporate Presentation
Ur-Energy's March 2021 Corporate Presentation
 
Gds Trans Actions Vol411
Gds Trans Actions Vol411Gds Trans Actions Vol411
Gds Trans Actions Vol411
 
Q4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation SlidesQ4 2015 Financial Report Presentation Slides
Q4 2015 Financial Report Presentation Slides
 
Ure corporate presentation 20150312 (final)
Ure corporate presentation 20150312 (final)Ure corporate presentation 20150312 (final)
Ure corporate presentation 20150312 (final)
 
Ure corporate presentation 20150303 (final)
Ure corporate presentation 20150303 (final)Ure corporate presentation 20150303 (final)
Ure corporate presentation 20150303 (final)
 
Ure corporate presentation 20150309 (final)
Ure corporate presentation 20150309 (final)Ure corporate presentation 20150309 (final)
Ure corporate presentation 20150309 (final)
 
Ur-Energy July 2013 Corporate Presentation
Ur-Energy July 2013 Corporate PresentationUr-Energy July 2013 Corporate Presentation
Ur-Energy July 2013 Corporate Presentation
 
Q1 2023 Conference Call Presentation Slides
Q1 2023 Conference Call Presentation SlidesQ1 2023 Conference Call Presentation Slides
Q1 2023 Conference Call Presentation Slides
 
Ur-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and TeleconferenceUr-Energy 2015 Year End Webcast and Teleconference
Ur-Energy 2015 Year End Webcast and Teleconference
 
Edison International February 2020 Business Update
Edison International February 2020 Business UpdateEdison International February 2020 Business Update
Edison International February 2020 Business Update
 
Ur-Energy June 2013 Corporate Presentation
Ur-Energy June 2013 Corporate PresentationUr-Energy June 2013 Corporate Presentation
Ur-Energy June 2013 Corporate Presentation
 

Recently uploaded

Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
OECD Directorate for Financial and Enterprise Affairs
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
ToshihiroIto4
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
OECD Directorate for Financial and Enterprise Affairs
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
OECD Directorate for Financial and Enterprise Affairs
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
Robin Haunschild
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
gharris9
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
Frederic Leger
 
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfWhy Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Ben Linders
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
SkillCertProExams
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
artemacademy2
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
1990 Media
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
samililja
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Rosie Wells
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
gpww3sf4
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
amekonnen
 
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 

Recently uploaded (20)

Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
 
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
Competition and Regulation in Professions and Occupations – OECD – June 2024 ...
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
 
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
 
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfWhy Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
 
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
Mastering the Concepts Tested in the Databricks Certified Data Engineer Assoc...
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
 
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
 

Dlm presentation dec. 2 2014

  • 1. Vogtle 3&4 Update David McKinney Nuclear Development Vice President
  • 2. Certain information contained in this presentation is forward-looking information based on current expectations and plans that involve risks and uncertainties. Forward-looking information includes, among other things, statements concerning estimated construction and other expenditures, job creation, benefits to customers and the completion of ongoing construction projects. Georgia Power cautions that there are certain factors that can cause actual results to differ materially from the forward-looking information that has been provided. The reader is cautioned not to put undue reliance on this forward-looking information, which is not a guarantee of future performance and is subject to a number of uncertainties and other factors, many of which are outside the control of Georgia Power; accordingly, there can be no assurance that such suggested results will be realized. The following factors, in addition to those discussed in Georgia Power’s Annual Report on Form 10-K for the year ended December 31, 2012, and subsequent securities filings, could cause actual results to differ materially from management expectations as suggested by such forward-looking information: the impact of recent and future federal and state regulatory changes, as well as changes in application of existing laws and regulations; current and future litigation, regulatory investigations, proceedings, or inquiries; effects of inflation; ability to control costs and avoid cost overruns during the development and construction of the Plant Vogtle expansion, to construct facilities in accordance with the requirements of permits and licenses, and to satisfy any operational and environmental performance standards; state and federal rate regulations and the impact of future rate cases and negotiations; regulatory approvals and actions related to the Plant Vogtle expansion, including Georgia Public Service Commission approvals, Nuclear Regulatory Commission actions, and potential U.S. Department of Energy loan guarantees; the inherent risks involved in operating and constructing nuclear generating facilities, including environmental, health, regulatory, natural disaster, terrorism, or financial risks; the ability of counterparties of Georgia Power to make payments as and when due and to perform as required; the direct or indirect effect on Georgia Power’s business resulting from terrorist incidents and the threat of terrorist incidents, including cyber intrusion; interest rate fluctuations and financial market conditions and the results of financing efforts, including Georgia Power’s credit ratings; the impact of any potential U.S. credit rating downgrade or other sovereign financial issue, including impacts on interest rates, access to capital markets, impacts on currency exchange rates, counterparty performance, and the economy in general, as well as potential impacts on the availability or benefits of proposed U.S. Department of Energy loan guarantees; and catastrophic events such as fires, earthquakes, explosions, floods, hurricanes, droughts, pandemic health events such an influenzas, or other similar occurrences. Georgia Power expressly disclaims any obligation to update any forward-looking information. Forward-Looking Statement
  • 3. Vogtle 3 and 4 • Two units: 1,117 MW each • Technology: Westinghouse AP1000 • Location: Waynesboro, Ga. • When completed, Vogtle 1-4: – Will be the largest nuclear energy facility in U.S. – Will power 1+ million homes and businesses
  • 6. Full Construction/Start-Up Limited Work AuthorityProcurement Combined Construction/Operating License (COL) Process Engineering, Procurement and Construction (EPC) Contract Signed Public Service Commission (PSC) Certification Process Early Site Permit (ESP) Process 2006 2007 2008 2009 2010 2011 2012 20132005 Westinghouse Design Control Document (DCD) Certification Process      Fukushima First Nuclear Concrete Project History
  • 7. NRC/Industry Response to Fukushima • Industry took immediate actions. • NRC took immediate actions: Near term Task Force (NTTF). • The NTTF recommended a series of actions to be taken by each licensee, and provided a series of orders and rulemaking. • These actions were grouped into 3 Tier’s to address immediate response and limited resources. 7
  • 8. Section 7 Acknowledged the AP1000 passive safety systems and that their passive designs and inherent 72- hour coping capability for core, containment, and spent fuel pool cooling with no operator action required, have many of the design features and attributes necessary to address the Task Force recommendations. NRC Response to Fukushima 8
  • 9. • AC power not required for safe shutdown • Operator actions not required for 72 hours to maintain core and containment cooling • Designed for core to stay in reactor and remain covered with water • The NRC’s Fukushima 90-day Task Force noted that the AP1000 already met most of its recommendations AP1000 Advanced Safety Features
  • 10. Vogtle 3 and 4 Site
  • 13. Vogtle Unit 3 NI & Cooling Tower
  • 14. CA01 Module Inside Vogtle MAB
  • 16. Vogtle Unit 3 Cooling Tower
  • 17. Vogtle Unit 4 Cooling Tower
  • 18.
  • 20. Fukushima Impacts to Vogtle 3&4 • With AP1000 design, Vogtle Units 3&4 were EXEMPT from some NTTF Recommendations. – NTTF 2.1 and 2.3 (Seismic/Flooding re-evaluations and Seismic/Flooding walkdowns). – NTTF 5.1 Reliable Hardened Containment Vents. • Other NTTF Tier 1 recommendations requirements are less intensive for Vogtle 3&4, due to the design. • Location as well as design of Vogtle Units 3&4 are important in considering impacts. 20
  • 21. NTTF Tier 1 Activities and Status Vogtle 3&4 • 10 CFR 50.54 (f) Letter • 9.3 Enhanced EP Staffing and Communications • Status – these activities are based on Vogtle 1&2 responses and due before Fuel Load for Unit 3 • Order EA-12-049 • 4.1/4.2 Extended Station Blackout/FLEX • Status – NRC reviewing Vogtle 3&4 response – must be closed prior to Fuel Load for Unit 3 • Order EA-12-051 • 7.1 Spent Fuel Pool Instrumentation • Status – Vogtle 3&4 responded and Order closed by NRC 21