www.infosectrain.com
DigitalForensic

Investigator
top Interview Questions & Answers
Top Interview Questions

for Digital Forensic Investigator
1 What is Digital Forensics, and why is it important?
Digital forensics entails the methodical process of gathering, safeguarding,
examining, and presenting digital evidence in a way that meets legal standards.
It is critical in various fields, such as law enforcement, cybersecurity, and
corporate investigations. Digital forensics enables investigators to retrieve and
examine data that could have been deleted or altered, helping to uncover the
truth behind cybercrimes, fraud, insider threats, and other digital-based offenses.
It also ensures that evidence is preserved in a way that it maintains its integrity
for use in legal proceedings.
2 Can you explain the different types of digital forensics?
Digital forensics can be categorized into several specialized fields:
Computer Forensics: Focuses on extracting data from computers, laptops,
and storage devices.
Network Forensics: This involves monitoring and analyzing network traffic to
detect malicious activities, network breaches, or unauthorized access.
Mobile Device Forensics: Deals with recovering and analyzing data from
smartphones, tablets, and other handheld devices, including SMS, call logs,
and app data.
Cloud Forensics: Targets the forensic analysis of data stored in the cloud,
dealing with challenges like data replication across jurisdictions.
Database Forensics: Involves the analysis of databases and their related
metadata for signs of tampering or unauthorized access. Each type of
forensics requires specific tools and methodologies tailored to the particular
nature of the data and system under investigation.
1
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
3 Describe the steps in the digital forensic investigation process.
The digital forensic process typically follows these six stages:
Identification: Recognize potential sources of digital evidence.
Preservation: Ensure that the digital evidence is preserved in its original state.
This is often done by creating forensic images.
Collection: Gather data from various sources, such as hard drives, servers,
and cloud storage, while ensuring that the evidence remains intact.
Examination: Use forensic tools to sift through the data and identify relevant
evidence.
Analysis: Reconstruct events based on the evidence collected, and draw
conclusions about what may have occurred.
Reporting: Present the findings in a clear, detailed, and legally sound report
suitable for court or internal investigations. This structured approach ensures
thoroughness and prevents evidence tampering.
4 How do you ensure the integrity of digital evidence?
Preserving the integrity of digital evidence is essential for maintaining its
credibility in legal cases. The following steps are typically taken:
Chain of Custody: Record every step of the evidence handling process from
collection to presentation. This involves recording who accessed the evidence,
when, and under what conditions.
Forensic Imaging: Create an exact bit-by-bit copy of the original data, which
preserves the original evidence for analysis without altering it.
Hashing Algorithms: Use cryptographic hashes (like MD5 or SHA-256) to
verify that the forensic image matches the original data. Any changes in the
hash value would indicate tampering. These practices ensure that evidence
can be trusted and is not altered during the investigation process.
2
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
5 What is the chain of custody in digital forensics?
The chain of custody is a sequential record or paper trail that tracks the
management and handling of evidence over time. It includes details of every
person who handled the evidence, the time and date of handling, and how it was
transported or stored. Properly maintaining the chain of custody is essential, as
any gaps or discrepancies can lead to the evidence being questioned or ruled
inadmissible in court. It ensures the integrity of the evidence from the time of
collection to its use in legal proceedings.
6 How do you deal with encrypted files in a forensic

investigation?
Dealing with encrypted files is one of the significant challenges in digital
forensics. There are several approaches:
Password Recovery Tools: Investigators may attempt to recover passwords
using tools like John the Ripper or Hashcat. These tools use techniques like
brute force or dictionary attacks to crack passwords.
Exploiting Weak Encryption: If the encryption algorithm or implementation is
weak, it might be possible to break the encryption using cryptanalysis
techniques.
Key Recovery: Investigators may look for the encryption keys stored on the
device or within other associated accounts or systems. If these methods fail,
law enforcement or legal measures may be required to compel suspects to
provide access to the encrypted data.
3
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
7 What tools do you use for digital forensic investigations?
Several specialized tools are used in digital forensics, depending on the type of
investigation:
EnCase: A comprehensive forensic tool used to collect, preserve, and analyze
digital evidence.
FTK (Forensic Toolkit): Another powerful tool for analyzing hard drives and
emails, as well as recovering deleted files.
Autopsy/Sleuth Kit: Open-source tools for analyzing hard drives and file
systems.
Cellebrite: Widely used for mobile device forensics to extract data from
smartphones, including SMS, call logs, and application data.
Wireshark: A tool for capturing and analyzing network protocol traffic. These
tools help investigators gather, analyze, and present digital evidence
efficiently.
8 How do you handle live data collection during an investigation?
Live data collection involves capturing volatile information from a running
system, such as active processes, network connections, RAM content, and
system logs. Since this data is lost once the system is powered down, it must be
captured immediately. Common tools used include:
Volatility: A memory forensics tool used to analyze RAM dumps.
Netstat: To check active network connections.
RAM Capturing Tools: Tools like FTK Imager can capture the contents of
RAM for analysis. The challenge is to perform live data collection without
altering the system’s state or affecting its integrity.
4
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
9 What is a forensic image, and why is it important?
A forensic image is a precise, bit-level duplication of a digital storage device,
such as a hard drive or the storage of a smartphone. It is important because:
Preservation of Evidence: The forensic image preserves all data, including
deleted files and unallocated space, allowing investigators to work on an
unaltered copy while keeping the original intact.
Analysis: Investigators can use forensic tools to analyze the image for
evidence, and any findings can be verified since the image is identical to the
original.
Legal Requirement: Forensic images are often required for legal proceedings
to ensure the integrity and admissibility of the evidence.
10 How do you approach investigating a cybercrime incident?
Below are the steps to investigate a cybercrime incident:
Secure the Scene: Identify and isolate the compromised systems to prevent
further damage or loss of evidence.
Preserve Volatile Data: Capture volatile data such as RAM contents, network
connections, caches, and system logs, as this information could be lost if the
system is powered off.
Collect Evidence: Create forensic images of all relevant devices and systems.
Analyze: Use specialized tools to recover deleted data, examine logs, and
trace the attacker’s activities. Look for malware, network traffic anomalies,
and other signs of a breach.
Reporting: Document findings in a detailed report, including timelines,
methods used, and conclusions. The report must be thorough and suitable for
presentation in court. This structured approach ensures all evidence is
collected, preserved, and analyzed correctly, increasing the chances of a
successful investigation.
5
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
11 What are anti-forensic techniques, and how do you counter

them?
Anti-forensic techniques are methods cybercriminals use to obscure, destroy, or
alter evidence to avoid detection. These techniques include:
File Encryption: Criminals may encrypt data to prevent access to evidence.
Data Wiping: Software is used to erase files and overwrite data permanently.
Steganography: Hiding data within other files, such as images or videos, to
make it undetectable.
Log Manipulation: Modifying system logs to hide tracks.
12 What is metadata, and how does it assist in forensic

investigations?
Metadata is information that describes and defines data. It includes details about
file creation, modification, and access, such as timestamps, file permissions, and
author information. In forensic investigations, metadata plays a crucial role:
Timeline Creation: It helps construct timelines of user activity by analyzing file
access, modification, and creation times.
User Activity Tracking: Metadata can provide insights into whether a file has
been tampered with or altered.
User Attribution: Metadata may contain information about the user who
created or modified a file, helping to attribute actions to individuals.
6
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
13 Can you explain the difference between volatile and

non-volatile data?
Volatile Data: This is temporary data stored in volatile memory (RAM), which
is lost when the system is powered off. Examples include active processes,
open network connections, and unsaved user data.
Non-Volatile Data: This data is stored on permanent storage media, like hard
drives or SSDs, and remains intact even after power is lost.
14 How do you differentiate between a malware infection and

a targeted attack?
A malware infection is typically opportunistic, where the malware spreads
automatically and affects multiple systems indiscriminately. Signs include
random file corruptions, suspicious applications running, and widespread system
slowdowns.


A targeted attack, on the other hand, is more focused and deliberate. Attackers
often target specific organizations using Advanced Persistent Threats (APTs),
which involve highly sophisticated and prolonged attacks. These cybercriminals
use tactics like tailored spear phishing emails, exploiting zero-day vulnerabilities,
and conducting stealthy data theft over long periods.
7
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
15 What steps do you take to ensure a report is admissible in

court?
Below are the steps to ensure a report is admissible in court:
Maintain Chain of Custody: Document every action taken with the evidence
from collection to presentation.
Use Standardized Methods: Ensure that all forensic tools and methodologies
adhere to accepted practices, such as the Daubert standard.
Detailed Documentation: Include detailed logs of every step of the forensic
process, the tools used, and the results obtained.
Clear and Concise Reporting: Write the report in clear, non-technical
language to ensure it is understandable to lawyers, judges, and jurors. Avoid
speculative language and stick to the facts. Consulting legal experts during
the report-writing process can also help ensure compliance with legal
standards.
16 How do you investigate mobile device forensics?
Mobile device forensics involves the extraction, preservation, and analysis of data
from smartphones, tablets, and other mobile devices.

Below are the key steps:
Device Seizure: Ensure the device is secured or placed in a Faraday bag to
prevent remote wiping.
Data Extraction: Use specialized tools like Cellebrite or Oxygen Forensics to
extract data, including contacts, SMS, call logs, GPS data, and application
data.
Memory Dumping: Perform a memory dump to capture volatile data that
might not be stored permanently.
Data Analysis: Examine the extracted data for evidence of tampering,
unauthorized access, or criminal activity, such as text messages or call
records.
8
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
17 How do you maintain objectivity during an investigation?
Maintaining objectivity is critical for the credibility of an investigation.
Following Standardized Procedures: Sticking to established forensic
procedures reduces the risk of bias influencing the investigation.
Documenting Everything: Every action taken during the investigation is
documented and supported by evidence, leaving no room for assumptions or
personal interpretation.
Peer Review: Having findings reviewed by other forensic experts ensures
that the analysis is unbiased and follows best practices.
18 Explain the concept of time stamps and how they can be

manipulated.
Time stamps are metadata elements that indicate when a file was created,
accessed, or changed. They are critical in forensic investigations to establish
timelines for user activity. However, time stamps can be manipulated through
several methods:
System Clock Modification: Changing the system clock can alter the
timestamps of files created or modified during that period.
File Manipulation Tools: Certain tools can modify a file’s metadata, including
its time stamps, without changing its content.
9
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
19 What are the legal concerns related to digital forensics?
Legal concerns in digital forensics include:
Jurisdictional Issues: In cloud environments, data may be spread across
different countries, each with its legal requirements. Investigators must
ensure they comply with local laws.
Privacy: During investigations, forensic examiners may come across personal
or confidential information unrelated to the case. It's important to minimize
data collection to only what's relevant and adhere to data privacy laws like the
GDPR.
Admissibility of Evidence: Forensic evidence must be collected using legally
sound methods to ensure it is admissible in court. Any mishandling can lead
to evidence being thrown out.
20 What is the significance of log files in an investigation?
Log files are crucial in digital forensics because they record a system’s or
application’s activities over time. They are used to:
Track User Activities: Logs show login attempts, file accesses, and system
changes, which help reconstruct user actions.
Detect Anomalies: Unusual entries in log files, such as failed login attempts
or unusual network traffic, can indicate a security breach.
Build Timelines: Logs provide timestamps that allow investigators to create
accurate timelines of events leading up to and following an incident.
10
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
Become a Digital Forensic Investigator

with InfosecTrain
Prepare to ace your interview and elevate your career as a Digital Forensic
Investigator with InfosecTrain’s
and
training. These training courses equip you with the essential skills to tackle real-
world cybercrime scenarios, giving you an edge in interviews. Mastering data
recovery, incident investigation, and forensic tools will set you apart from other
candidates. Additionally, InfosecTrain prepares you to confidently answer top
interview questions, from explaining forensic methodologies to discussing key
tools. Stand out as a knowledgeable, certified professional ready for the
challenges of digital forensics. 


Start your journey with today!
Computer Hacking Forensic Investigator 

(C|HFI) Threat Hunting with Digital Forensics & Incident Response

InfosecTrain
11
www.infosectrain.com
Interview Questions for

Digital Forensic Investigator
Contact us
sales@infosectrain.com
www.infosectrain.com
Keep Learning with
Follow us on

Digital Forensic Investigator Top Interview Questions and answers

  • 1.
  • 2.
    Top Interview Questions forDigital Forensic Investigator 1 What is Digital Forensics, and why is it important? Digital forensics entails the methodical process of gathering, safeguarding, examining, and presenting digital evidence in a way that meets legal standards. It is critical in various fields, such as law enforcement, cybersecurity, and corporate investigations. Digital forensics enables investigators to retrieve and examine data that could have been deleted or altered, helping to uncover the truth behind cybercrimes, fraud, insider threats, and other digital-based offenses. It also ensures that evidence is preserved in a way that it maintains its integrity for use in legal proceedings. 2 Can you explain the different types of digital forensics? Digital forensics can be categorized into several specialized fields: Computer Forensics: Focuses on extracting data from computers, laptops, and storage devices. Network Forensics: This involves monitoring and analyzing network traffic to detect malicious activities, network breaches, or unauthorized access. Mobile Device Forensics: Deals with recovering and analyzing data from smartphones, tablets, and other handheld devices, including SMS, call logs, and app data. Cloud Forensics: Targets the forensic analysis of data stored in the cloud, dealing with challenges like data replication across jurisdictions. Database Forensics: Involves the analysis of databases and their related metadata for signs of tampering or unauthorized access. Each type of forensics requires specific tools and methodologies tailored to the particular nature of the data and system under investigation. 1 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 3.
    3 Describe thesteps in the digital forensic investigation process. The digital forensic process typically follows these six stages: Identification: Recognize potential sources of digital evidence. Preservation: Ensure that the digital evidence is preserved in its original state. This is often done by creating forensic images. Collection: Gather data from various sources, such as hard drives, servers, and cloud storage, while ensuring that the evidence remains intact. Examination: Use forensic tools to sift through the data and identify relevant evidence. Analysis: Reconstruct events based on the evidence collected, and draw conclusions about what may have occurred. Reporting: Present the findings in a clear, detailed, and legally sound report suitable for court or internal investigations. This structured approach ensures thoroughness and prevents evidence tampering. 4 How do you ensure the integrity of digital evidence? Preserving the integrity of digital evidence is essential for maintaining its credibility in legal cases. The following steps are typically taken: Chain of Custody: Record every step of the evidence handling process from collection to presentation. This involves recording who accessed the evidence, when, and under what conditions. Forensic Imaging: Create an exact bit-by-bit copy of the original data, which preserves the original evidence for analysis without altering it. Hashing Algorithms: Use cryptographic hashes (like MD5 or SHA-256) to verify that the forensic image matches the original data. Any changes in the hash value would indicate tampering. These practices ensure that evidence can be trusted and is not altered during the investigation process. 2 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 4.
    5 What isthe chain of custody in digital forensics? The chain of custody is a sequential record or paper trail that tracks the management and handling of evidence over time. It includes details of every person who handled the evidence, the time and date of handling, and how it was transported or stored. Properly maintaining the chain of custody is essential, as any gaps or discrepancies can lead to the evidence being questioned or ruled inadmissible in court. It ensures the integrity of the evidence from the time of collection to its use in legal proceedings. 6 How do you deal with encrypted files in a forensic investigation? Dealing with encrypted files is one of the significant challenges in digital forensics. There are several approaches: Password Recovery Tools: Investigators may attempt to recover passwords using tools like John the Ripper or Hashcat. These tools use techniques like brute force or dictionary attacks to crack passwords. Exploiting Weak Encryption: If the encryption algorithm or implementation is weak, it might be possible to break the encryption using cryptanalysis techniques. Key Recovery: Investigators may look for the encryption keys stored on the device or within other associated accounts or systems. If these methods fail, law enforcement or legal measures may be required to compel suspects to provide access to the encrypted data. 3 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 5.
    7 What toolsdo you use for digital forensic investigations? Several specialized tools are used in digital forensics, depending on the type of investigation: EnCase: A comprehensive forensic tool used to collect, preserve, and analyze digital evidence. FTK (Forensic Toolkit): Another powerful tool for analyzing hard drives and emails, as well as recovering deleted files. Autopsy/Sleuth Kit: Open-source tools for analyzing hard drives and file systems. Cellebrite: Widely used for mobile device forensics to extract data from smartphones, including SMS, call logs, and application data. Wireshark: A tool for capturing and analyzing network protocol traffic. These tools help investigators gather, analyze, and present digital evidence efficiently. 8 How do you handle live data collection during an investigation? Live data collection involves capturing volatile information from a running system, such as active processes, network connections, RAM content, and system logs. Since this data is lost once the system is powered down, it must be captured immediately. Common tools used include: Volatility: A memory forensics tool used to analyze RAM dumps. Netstat: To check active network connections. RAM Capturing Tools: Tools like FTK Imager can capture the contents of RAM for analysis. The challenge is to perform live data collection without altering the system’s state or affecting its integrity. 4 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 6.
    9 What isa forensic image, and why is it important? A forensic image is a precise, bit-level duplication of a digital storage device, such as a hard drive or the storage of a smartphone. It is important because: Preservation of Evidence: The forensic image preserves all data, including deleted files and unallocated space, allowing investigators to work on an unaltered copy while keeping the original intact. Analysis: Investigators can use forensic tools to analyze the image for evidence, and any findings can be verified since the image is identical to the original. Legal Requirement: Forensic images are often required for legal proceedings to ensure the integrity and admissibility of the evidence. 10 How do you approach investigating a cybercrime incident? Below are the steps to investigate a cybercrime incident: Secure the Scene: Identify and isolate the compromised systems to prevent further damage or loss of evidence. Preserve Volatile Data: Capture volatile data such as RAM contents, network connections, caches, and system logs, as this information could be lost if the system is powered off. Collect Evidence: Create forensic images of all relevant devices and systems. Analyze: Use specialized tools to recover deleted data, examine logs, and trace the attacker’s activities. Look for malware, network traffic anomalies, and other signs of a breach. Reporting: Document findings in a detailed report, including timelines, methods used, and conclusions. The report must be thorough and suitable for presentation in court. This structured approach ensures all evidence is collected, preserved, and analyzed correctly, increasing the chances of a successful investigation. 5 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 7.
    11 What areanti-forensic techniques, and how do you counter them? Anti-forensic techniques are methods cybercriminals use to obscure, destroy, or alter evidence to avoid detection. These techniques include: File Encryption: Criminals may encrypt data to prevent access to evidence. Data Wiping: Software is used to erase files and overwrite data permanently. Steganography: Hiding data within other files, such as images or videos, to make it undetectable. Log Manipulation: Modifying system logs to hide tracks. 12 What is metadata, and how does it assist in forensic investigations? Metadata is information that describes and defines data. It includes details about file creation, modification, and access, such as timestamps, file permissions, and author information. In forensic investigations, metadata plays a crucial role: Timeline Creation: It helps construct timelines of user activity by analyzing file access, modification, and creation times. User Activity Tracking: Metadata can provide insights into whether a file has been tampered with or altered. User Attribution: Metadata may contain information about the user who created or modified a file, helping to attribute actions to individuals. 6 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 8.
    13 Can youexplain the difference between volatile and non-volatile data? Volatile Data: This is temporary data stored in volatile memory (RAM), which is lost when the system is powered off. Examples include active processes, open network connections, and unsaved user data. Non-Volatile Data: This data is stored on permanent storage media, like hard drives or SSDs, and remains intact even after power is lost. 14 How do you differentiate between a malware infection and a targeted attack? A malware infection is typically opportunistic, where the malware spreads automatically and affects multiple systems indiscriminately. Signs include random file corruptions, suspicious applications running, and widespread system slowdowns. A targeted attack, on the other hand, is more focused and deliberate. Attackers often target specific organizations using Advanced Persistent Threats (APTs), which involve highly sophisticated and prolonged attacks. These cybercriminals use tactics like tailored spear phishing emails, exploiting zero-day vulnerabilities, and conducting stealthy data theft over long periods. 7 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 9.
    15 What stepsdo you take to ensure a report is admissible in court? Below are the steps to ensure a report is admissible in court: Maintain Chain of Custody: Document every action taken with the evidence from collection to presentation. Use Standardized Methods: Ensure that all forensic tools and methodologies adhere to accepted practices, such as the Daubert standard. Detailed Documentation: Include detailed logs of every step of the forensic process, the tools used, and the results obtained. Clear and Concise Reporting: Write the report in clear, non-technical language to ensure it is understandable to lawyers, judges, and jurors. Avoid speculative language and stick to the facts. Consulting legal experts during the report-writing process can also help ensure compliance with legal standards. 16 How do you investigate mobile device forensics? Mobile device forensics involves the extraction, preservation, and analysis of data from smartphones, tablets, and other mobile devices. Below are the key steps: Device Seizure: Ensure the device is secured or placed in a Faraday bag to prevent remote wiping. Data Extraction: Use specialized tools like Cellebrite or Oxygen Forensics to extract data, including contacts, SMS, call logs, GPS data, and application data. Memory Dumping: Perform a memory dump to capture volatile data that might not be stored permanently. Data Analysis: Examine the extracted data for evidence of tampering, unauthorized access, or criminal activity, such as text messages or call records. 8 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 10.
    17 How doyou maintain objectivity during an investigation? Maintaining objectivity is critical for the credibility of an investigation. Following Standardized Procedures: Sticking to established forensic procedures reduces the risk of bias influencing the investigation. Documenting Everything: Every action taken during the investigation is documented and supported by evidence, leaving no room for assumptions or personal interpretation. Peer Review: Having findings reviewed by other forensic experts ensures that the analysis is unbiased and follows best practices. 18 Explain the concept of time stamps and how they can be manipulated. Time stamps are metadata elements that indicate when a file was created, accessed, or changed. They are critical in forensic investigations to establish timelines for user activity. However, time stamps can be manipulated through several methods: System Clock Modification: Changing the system clock can alter the timestamps of files created or modified during that period. File Manipulation Tools: Certain tools can modify a file’s metadata, including its time stamps, without changing its content. 9 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 11.
    19 What arethe legal concerns related to digital forensics? Legal concerns in digital forensics include: Jurisdictional Issues: In cloud environments, data may be spread across different countries, each with its legal requirements. Investigators must ensure they comply with local laws. Privacy: During investigations, forensic examiners may come across personal or confidential information unrelated to the case. It's important to minimize data collection to only what's relevant and adhere to data privacy laws like the GDPR. Admissibility of Evidence: Forensic evidence must be collected using legally sound methods to ensure it is admissible in court. Any mishandling can lead to evidence being thrown out. 20 What is the significance of log files in an investigation? Log files are crucial in digital forensics because they record a system’s or application’s activities over time. They are used to: Track User Activities: Logs show login attempts, file accesses, and system changes, which help reconstruct user actions. Detect Anomalies: Unusual entries in log files, such as failed login attempts or unusual network traffic, can indicate a security breach. Build Timelines: Logs provide timestamps that allow investigators to create accurate timelines of events leading up to and following an incident. 10 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 12.
    Become a DigitalForensic Investigator with InfosecTrain Prepare to ace your interview and elevate your career as a Digital Forensic Investigator with InfosecTrain’s and training. These training courses equip you with the essential skills to tackle real- world cybercrime scenarios, giving you an edge in interviews. Mastering data recovery, incident investigation, and forensic tools will set you apart from other candidates. Additionally, InfosecTrain prepares you to confidently answer top interview questions, from explaining forensic methodologies to discussing key tools. Stand out as a knowledgeable, certified professional ready for the challenges of digital forensics.  Start your journey with today! Computer Hacking Forensic Investigator (C|HFI) Threat Hunting with Digital Forensics & Incident Response InfosecTrain 11 www.infosectrain.com Interview Questions for Digital Forensic Investigator
  • 13.