DIA Holding FZCO is a subsidiary of two Turkish holding companies, IC Investment Holding and Intersun Holding. It has over 500 staff and has completed projects worth over $600 million, with an ongoing portfolio of projects worth $2.5 billion. Some of its major completed projects include the Heydar Aliyev Cultural Center in Azerbaijan and the Baku Flame Towers. It provides design, construction, investment, and facility management services.
2. ABOUT
DIA HOLDING IS A SUBSIDIARY OF TWO FOUNDER HOLDINGS :
IC Investment Intersun
Holding of Holding of
2 Turkey DubaI
IC ADDING ITS 40 YEARS ACCUMULATED
CONSTRUCTION AND INVESTMENT EXPERTISE
&
INTERSUN PROVIDING THE VITAL OPPORTUNITY OF
SETTING UP LOCAL PARTNERSHIPS
IN THE REGION
3. QUICK FACTS
ONGOING PROJECTS PORTFOLIO
• TOTAL CONTRACTED PROJECTS OF USD 2.500.000.000 AND 2.000.000 SQM CONSTRUCTION
AREA
• HI-RISE TOWERS, CULTURAL CENTER, PREMIUM VILLAS, HOTEL & SKI COMPLEXES,
INFRASTRUCTURE, HOSPITALS
COMPLETED PROJECTS PORTFOLIO
3 • TOTAL DELIVERED PROJECTS OF USD 600.000 AND 300.000 SQM CONSTRUCTION AREA
• HI-END VILLA COMPLEXES, PRESIDENTIAL PALACES, SOCIAL HOUSING
PERSONNEL
• TOTAL 500 TECHNICAL & ADMINISTRATIVE STAFF, OVER 5.000 LABOR INCL.
SUBCONTRACTORS’ PERSONNEL
600 550
CONSTRUCTION REVENUE
500
•
400 344
550 MILLION USD WITHIN 2011 282
300 238
200
100
0
Revenue by Years
4. DESIGN CAPABILITIES
• IN-HOUSE DESIGN OFFICE WITH EXPERIENCED ARCHITECTS & ENGINEERS
• DETAILED DESIGN CAPABILITY IN ENGINEERING IN ALL DISCIPLINES
• FROM CONCEPT DESIGN TO CONSTRUCTION DRAWINGS STAGE
• IN COLLABORATION WITH INTERNATIONAL & REPUTABLE DESIGN AND
CONSULTANCY FIRMS
• MAJORITY OF DIA HOLDING’S PROJECTS ARE DESIGN & BUILD
4
5. *124th Top International
Contractor
*155th Top International
Designer
Globally
5
* Engineering News Record
Ranking of 2011
6. PROCUREMENT, LOGISTICS AND ESTABLISHED FACILITIES
• PROCUREMENT TEAM OF EXPERIENCED AND SKILLED TECHNICAL PERSONNEL
• PROCUREMENT CAPABILITY INTEGRATED WITH 40 YEARS OF EXPERIENCE IN
CONSTRUCTION INDUSTRY
• STRONG PROCUREMENT & LOGISTICS SUPPORT FROM IC & INTERSUN
OFFICES AND FACILITIES WORLDWIDE
• OFFICES IN ISTANBUL & DUBAI FOR INTERNATIONAL PROCUREMENT &
SUPPLIER REACH, IN BAKU FOR LOCAL PROCUREMENT
6
• ESTABLISHED FACILITES FOR 2.500 PERSONNEL IN BAKU, FAST MOBILIZATION
TO ANYWHERE IN WORLD.
* Etsun ranks 207th In Fortune 500 In
2010 In Turkey
* OffIces in
AzerbaIjan, UAE, Iraq, Syria, Georgia, UK, Ger
many
7. OUR GROUP AS DEVELOPER, CONTRACTOR, INVESTOR &
OPERATOR
• ACT AS DEVELOPER, CONTRACTOR, INVESTOR AND OPERATOR IN MAJOR
PROJECTS
• STRONG NETWORK
• VAST CONSTRUCTION AND CONTRACTING EXPERTISE
• STRONG FINANCIAL STRUCTURE, EFFECTIVE MANAGEMENT
• SUSTAINABLE DEVELOPMENT IN MULTI-SECTORS
7
DEVELOPER
GROUP OF
CONTRACTOR INVESTOR
COMPANIES
OPERATOR
9. HEYDAR ALIYEV CULTURAL CENTER, AZERBAIJAN
• CLIENT : STATE PROPERTY COMMITTEE OF AZERBAIJAN
• CONTRACTOR : DIA HOLDING
• CONCEPT DESIGN BY : ZAHA HADID ARCHITECTS
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : OCT- 2007
• PROJECT COMPLETE : MAY-2012 (SOFT OPENING)
• PROJECT DEFINITION :
101.000 SQM OF CULTURAL CENTER AND
UNDERGROUND CARPARK
9 AUDITORIUM FOR 1.200 GUESTS, CONFERENCE HALL, LIBRARY, MUSEUM
FACILITIES
50.000 M2 ROOFING SYSTEM FORMED FROM GLASS FIBRE REINFORCED PLASTIC
(GFRP) PANELS ~A TOTAL OF 11.902 SINGLE PANEL OF DIFFERENT GEOMETRY
AND 3.149 GLASS FIBRE REINFORCED CONCRETE (GFRC) PANELS
General View General View
13. HEYDAR ALIYEV CULTURAL CENTER, AZERBAIJAN
13
Wallpaper Magazine – Design Awards 2011 – Best BuIlding Site Award
14. BAKU FLAME TOWERS PROJECT, AZERBAIJAN
• CLIENT : AZINKO MMC
• CONTRACTOR : DIA HOLDING
• CONCEPT DESIGN BY : HOK ARCHITECTS
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : MAR-2008
• PROJECT COMPLETE : AUG-2012 (EXP)
• PROJECT DEFINITION:
14 251.003 SQM CONSTRUCTION AREA OF 3 HIGH RISE TOWERS (MAX. 181 M) AND ONE RETAIL
PODIUM. TOWERS CONSIST OF A RESIDENCE, HOTEL (FAIRMONT) AND OFFICES.
TOTAL MANHOURS EXPENDED ABOVE 10 MIO. 420 000 M3 EXCAVATION, 165 000 M3 CONCRETE,
55 KM PRESTRESSED ANCHORS, 44 LIFTS
VIew From Caspian Coast Aerial View
15. BAKU FLAME TOWERS PROJECT, AZERBAIJAN
HOTEL OF 319 ROOMS OF 20 APARTMENTS, 63 SUITES AND 236 ROOMS.
PROJECT LOCATED IN ONE OF THE MOST PRESTIGIOUS SPOTS OF BAKU.
Offices of the
President
Turkish Martyrdom and
15 Azeri State Memorial Parks
Funicular Line to
the seaside
Boulvard
The Flame Towers
The National Parliament Development
of Azerbaijan
16. BAKU FLAME TOWERS PROJECT, AZERBAIJAN
16
Aerial View of Flame Towers & Baku Scene
17. BAKU FLAME TOWERS PROJECT, AZERBAIJAN
17
View From Caspian Coast Night View of Towers
Night View of Flame Towers & Baku Scene
18. BAKU FLAME TOWERS PROJECT, AZERBAIJAN
18
Night view of the Flame Towers , the towers illuminated by flag colors of Azerbaijan
19. SHAHDAG TOURISM COMPLEX PROJECT PHASE-I , AZERBAIJAN
• CLIENT : MINISTRY OF TOURISM & CULTURE OF AZERBAIJAN
• CONCEPT DESIGN BY : ILF ENGINEERS
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : DEC- 2009
• PROJECT COMPLETE : AUG 2012 (EXP)
• PROJECT DEFINITION:
74.000 SQM SUPERSTRUCTURE, ONE 4 STAR HOTEL, LIFTBASE, COGENERATION
19 TOTAL EXCAVATION: 900,000M³, TOTAL FILLING: 550,000M³
TOTAL PILES : 11.9KM, COMPLETE INFRASTRUCTURE
40 HA SLOPES & SNOW MAKING
Schematical Presentation Liftbase Building
20. SHAHDAG TOURISM COMPLEX PROJECT, QUBA , AZERBAIJAN
Infrastructure Works for Artifical Snow Making Camp Building & Facilities
20 System
Ski Slopes & Telesiege
21. SHAHDAG TOURISM COMPLEX PROJECT PHASE-I , AZERBAIJAN
PANORAMIC VIEW OF THE CONSTRUCTION SITE (PARTIAL VIEW)
21
4* HOTEL CONSTRUCTION GENERAL VIEW OF THE SLOPES
22. BILKENT HEALTH CAMPUS PROJECT (PPP), ANKARA / TURKEY
• CLIENT : MINISTRY OF HEALTH OF TURKEY, PPP ADMINIST.
• CONTRACTOR : DIA ALTYAPI YATIRIMLARI & İNŞAAT A.Ş.
• CONCEPT DESIGN BY : NBBJ ARHCITECTS
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : JAN-2013 (EXP)
• PROJECT COMPLETE : DEC-2015(EXP)
• PROJECT DEFINITION :
1.400.000 SQM CONSTRUCTION AREA, 1.000.000 SQM SITE AREA
TOTAL 3 662 BED CAPACITY
22
A TOTAL OF 8 CITY HOSPITALS, WITH ALL INTEGRATED FACILITIES,
INFRASTRUCTURE, LANDSCAPE & FFE PROVISION
SERVICES FOR 25 YEARS TO BE PROVIDED BY DIA- IC HOLDINGS
Schematical Design Schematical Design
23. ZAGULBA NEW RESIDENCE PROJECT, AZERBAIJAN
• CLIENT : PRESIDENT’S APPARATUS
• CONTRACTOR : DIA HOLDING
• CONCEPT DESIGN BY : DIA HOLDING
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : DEC- 2011
• PROJECT COMPLETE : MAY-2012
• CONSTRUCTION AREA : 10.150 SQM
IN LINE WITH THE DESIGN OF THE EXISTING RESIDENCE IN ZAGULBA REGION, A NEW TURN
23 KEY RESIDENCE TO BE BUILT.
Schematical Design Schematical Design
24. BAKU PREMIUM VILLAS PROJECT, AZERBAIJAN
• CLIENT : TAYNINQ GLOBAL
• CONTRACTOR : DIA HOLDING
• CONCEPT DESIGN BY : DIA HOLDING
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : JAN- 2008
• PROJECT COMPLETE : OCT-2011
• PROJECT DEFINITION:
24 75.000 SQM OF CONTRUCTION AREA
400.000 SQM LAND PLOT
53 DIFFERENT TYPE & DESIGN VILLAS
ALL INFRASTRUCTURE & LANDSCAPING WORKS
Completed Works Landscaping
26. BILGEH ESTATES PHASE-I , AZERBAIJAN
• CLIENT : TAYNINQ GLOBAL
• CONTRACTOR : DIA HOLDING
• PROJECT COMMENCE : APR- 2008
• PROJECT COMPLETE : SEP-2009 (PHASE 1)
• PROJECT DEFINITON :
75.000 SQM CONSTRUCTION AREA
800.000 SQM LAND PLOT
26 TOTAL OF 67 VILLAS OF 6 DIFFERENT TYPES
ALL INFRASTRUCTURE & LANDSCAPING
Satelite Image Completed Works
27. BILGEH ESTATES PHASE I, BAKU / AZERBAIJAN
Completed Works Completed Works
27
Panaromic View of Completed Works
28. BILGEH ESTATES PHASE II, AZERBAIJAN
• CLIENT : TAYNINQ GLOBAL
• CONTRACTOR : DIA HOLDING
• PROJECT COMMENCE : APR- 2010
• PROJECT COMPLETE : APR-2012
• PROJECT DEFINITION :
9.800 SQM CONSTRUCTION AREA
7 VILLAS
28
Completed Works Completed Works
29. STATE COAST FACILITIES PROJECT FRENCH
VILLA, ADMINISTRATION & OFFICE FACILITIES, AZERBAIJAN
• CLIENT : PRESIDENT’S APPARATUS
• CONTRACTOR : DIA HOLDING
• DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : DEC- 2006
• PROJECT COMPLETE : DEC-2007/ MAY-2008
• PROJECT DEFINITION :
23.000 SQM CONSTRUCTION AREA
29 ONE OFFICE, ONE RESIDENCE , ONE ADMINISTRATION BUILDING AND TWO GUEST VILLAS
Headquartes Building Residence Building
30. STATE COAST FACILITIES PROJECT FRENCH
VILLA, ADMINISTRATION & OFFICE FACILITIES, AZERBAIJAN
Guest villas
30
Headquarters
Sports facilities Residence
Layout of the Complex
31. SHAHDAG TOURISM COMPLEX PROJECT INFRASTRUCTURE
WORKS , AZERBAIJAN
• CLIENT : MINISTRY OF TOURISM & CULTURE OF AZERBAIJAN
• CONCEPT DESIGN BY : ILF ENGINEERS
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : DEC - 2010
• PROJECT COMPLETE : APR - 2011
• PROJECT DEFINITION :
INSTALLATION OF 28.725M FIBER OPTICAL CABLES, 3.500M OF POTABLE WATER
31 PIPES, BETWEEN THE CITY AND THE COMPLEX, 35.000M OF WASTE WATER PIPELINES
BETWEEN QUSAR CITY AND THE TOURISM COMPLEX & INSTALLATION OF POTABLE
WATER FILTRATION SYSTEM
Infrastructure Works (Fibreoptic Cabling) Infrastructre Works (Fibreoptic Cabling)
32. ACADEMY HOTEL PROJECT, BAKU , AZERBAIJAN
• CLIENT : SILKWAY LLC
• CONTRACTOR : DiA HOLDING
• DETAIL DESIGN BY : DIA HOLDING
• PROJECT COMMENCE : MAR - 2011
• PROJECT COMPLETE : DEC - 2011
• PROJECT DEFINITION :
6.665 SQM CONSTRUCTION AREA
MEP, FINISHING WORKS &, FAÇADE WORKS.
HOTEL HAS 92 ROOMS WITH A COMBINATION OF 84 STANDARD ROOMS AND 8
32 SUIT ROOMS.
Schematical Design Completed Project
33. AVIATION RESIDENCES, BAKU, AZERBAIJAN
• CLIENT : SILKWAY LLC
• CONTRACTOR : DiA HOLDING
• DETAIL DESIGN BY : BUTUNER
• PROJECT COMMENCE : JAN - 2011
• PROJECT COMPLETE : MAR - 2012
• PROJECT DEFINITION :
17.185 SQM CONSTRUCTION AREA
HOUSING PROJECT CONSIST OF 5 APARTEMENT BLOCKS.
33
SOIL AND SOIL IMPROVEMENT WORKS, CONCRETE & STEEL WORKS, MEP,
FINISHING WORKS, FAÇADE WORKS.
Schematical Design Schematical Design
34. BAKU APARTMENTS PROJECT, AZERBAIJAN
• CLIENT : AZERBAIJAN REPUBLIC PRESIDENTIAL PRIVATE AFFAIRS ADMINISTRATION
• CONTRACTOR : DiA HOLDING
• DETAIL DESIGN BY : SELKOM PROJE
• PROJECT COMMENCE : OCT - 2008
• PROJECT COMPLETE : DEC - 2009
• PROJECT DEFINITION :
17.497 SQM CONSTRUCTION AREA
TURNKEY CONSTRUCTION OF 90 NOS APARTMENTS INCLUDING SOIL AND SOIL IMPROVEMENT WORKS,
CONCRETE & STEEL WORKS, MEP, FINISHING WORKS, FACADE WORKS.
34
Completed Project Completed Project
35. HEIDAR ALIYEV AIRPORT CIP TERMINAL, BAKU, AZERBAIJAN
• CLIENT : SILKWAY LLC
• CONTRACTOR : DiA HOLDING
• PROJECT COMMENCE : JAN - 2011
• PROJECT COMPLETE : MAY - 2011
• PROJECT DEFINITION :
CONSTRUCTION OF HEIDAR ALIYEV AIRPORT CIP TERMINAL COMPRISING MEP,
FINISHING WORKS, FACADE WORKS, FF&E
2.500 SQM CONSTRUCTION AREA
35
Completed Building Completed Building
36. HEIDAR ALIYEV AIRPORT PROJECT, BAKU, AZERBAIJAN
• CLIENT : AZERBIJAN AIRLINES
• CONTRACTOR : DiA HOLDING
• DESIGN BY : ARUP
• PROJECT COMMENCE : FEB - 2011
• PROJECT COMPLETE : SEP - 2011
• PROJECT DEFINITION :
REINFORCED CONCRETE WORKS OF HEIDAR ALIYEV AIRPORT INTERNATIONAL
TERMINAL.
TOTAL CONSTRUCION AREA OF 57.000 SQM
36 15.400 M PILES, 65.000 M3 CONCRETE, 10.500 TONS RE-BARS
Schematical Design Construction Phase
37. BAKU PALACE PROJECT, AZERBAIJAN
• CLIENT : TAYNİNQ QLOBAL INK. MMC
• CONTRACTOR : DiA HOLDING
• DESIGN : MEDI ARCHITECTS
• PROJECT COMMENCE : JUL - 2008
• PROJECT COMPLETE : DEC - 2009
• PROJECT DEFINITION :
FINISHING THE REMAINING WORKS OF A 17 STOREY LUXURY HOUSE WITH 70
STANDARD & 6 DOUBLEX APARTEMENTS IN BAKU WHOSE FACADE & R/C WORKS
HAD ALREADY DONE.
37 16.000 SQM TOTAL CONSTRUCTION AREA
Completed Building Completed Interior Works
38. CASPIAN SHOPPING MALL PROJECT, BAKU, AZERBAIJAN
• CLIENT : MAYORITY OF BAKU
• CONTRACTOR : DiA HOLDING
• PROJECT COMMENCE : OCT - 2010
• PROJECT COMPLETE : MAY – 2011
• PROJECT DEFINITION :
FACADE RENOVATION AND REPLACEMENT OF EXISTING SHOPPING MALL
TOTAL 1.500 M2 WALL CLADDING & 4.150 M2 ROOF CLADDING
38
Completed Project Completed Project
40. EMINENT SERVICE AWARD
• IC HOLDING CHAIRMAN, MR. İBRAHIM
ÇEÇEN RECEIVED THE “EMINENT
SERVICE AWARD” AWARDED BY THE
GREAT NATIONAL ASSEMBLY OF
TURKEY (TBMM) FROM PRİME
MİNİSTER OF TURKEY ON 05.04.2007
DUE TO HIS CONTRIBUTIONS TO
EDUCATION AND THE SERVICES HE
40 RENDERED TO THE TURKISH
ECONOMY, CULTURE AND ARTS.
During Award Ceremony
41. İBRAHİM ÇEÇEN UNIVERSITY, AĞRI / TURKEY
• IN 2020, 10.000 STUDENTS AND 60.000 M2 CLOSED AREA PLANNED
• 1 MILLION M2 TOTAL AREA
• EDUCATION ONGOING SINCE 2007
• TOTAL INVESTMENT IN THE UNIVERSITY BY THE GROUP TO BE 100.000.000 USD
41
University Campus University Campus