Learning objectives
Consider options
to control
identified risks
Use selected
options to develop
an incremental
improvement plan
Implement the
improvement plan
Consider options to control identified risks
Consider range of options to control the
prioritized hazardous events. This would
document the chosen method in an improvement
plan
Improvement plan can be capital work,
operational measures, behavioral measures or
combination of measures
Consider options to control identified risks
Consider the following
• Improve existing controls (if
possible)
• Cost of the suggested options
relative to its likely effectiveness
• Most appropriate location in the
sanitation chain to control the risk
• Technical effectiveness as well as
acceptability
• Responsibility for implementing,
managing and monitoring of the
control measure
• Training, communication and
reporting needed to implement the
proposed measure
Consider options to control identified risks
Another example
Use selected options to develop incremental improvement plan
Critical for the incremental improvement plan
Determine roles and
responsibilities of the
each action in the plan
Required funding and source.
The team might select first a
more affordable interim control
measure until sufficient funding
is secured for more expensive
measure
Time line
Control measures
Assess existing control measures for their effectiveness to
mitigate risks of hazardous events (the concept of log
reduction might be used)
Identify the person or agency that is responsible for each
proposed action together with the timeframe and estimated
financial resources
Suggest improvement plan that contains a range of control
measures taking into accounts the cost, acceptability and
monitorability of the measure
Implement the improvement plan
Monitor and report on
the implementation
status of the the
improvement plan to
ensure action is taken
Continue the role play
Outputs of the Module
Implemented plan with incremental
improvements which protects all exposure
groups along the sanitation chain
Questions
Thank you.

Develop and implement an incremental improvement plan: Module Five

  • 1.
    Maha Halalsheh Wastewater treatmentexpert Develop and implement an incremental improvement plan Module Five Reference WHO SSP Manual, pages (58-67)
  • 2.
    Learning objectives Consider options tocontrol identified risks Use selected options to develop an incremental improvement plan Implement the improvement plan
  • 3.
    Consider options tocontrol identified risks Consider range of options to control the prioritized hazardous events. This would document the chosen method in an improvement plan Improvement plan can be capital work, operational measures, behavioral measures or combination of measures
  • 4.
    Consider options tocontrol identified risks Consider the following • Improve existing controls (if possible) • Cost of the suggested options relative to its likely effectiveness • Most appropriate location in the sanitation chain to control the risk • Technical effectiveness as well as acceptability • Responsibility for implementing, managing and monitoring of the control measure • Training, communication and reporting needed to implement the proposed measure
  • 5.
    Consider options tocontrol identified risks Another example
  • 6.
    Use selected optionsto develop incremental improvement plan
  • 7.
    Critical for theincremental improvement plan Determine roles and responsibilities of the each action in the plan Required funding and source. The team might select first a more affordable interim control measure until sufficient funding is secured for more expensive measure Time line
  • 8.
    Control measures Assess existingcontrol measures for their effectiveness to mitigate risks of hazardous events (the concept of log reduction might be used) Identify the person or agency that is responsible for each proposed action together with the timeframe and estimated financial resources Suggest improvement plan that contains a range of control measures taking into accounts the cost, acceptability and monitorability of the measure
  • 9.
    Implement the improvementplan Monitor and report on the implementation status of the the improvement plan to ensure action is taken
  • 10.
  • 11.
    Outputs of theModule Implemented plan with incremental improvements which protects all exposure groups along the sanitation chain
  • 12.