Connecting Places, Connecting Lives
Connects Dwarka with the NH8, the Expressway
will bring Delhi and Gurgaon closer
Only ...
Connecting Places, Connecting Lives
With Dwarka Expressway, connectivity becomes
smoother, faster and so much easier!
IGI ...
That’s How Gurgaon Will Look After That
Agent of change and development
Planned around a world of opportunities and
development
Dwarka Expressway marks the beginn...
No more toll! No more delays!
No more toll for commuters between Delhi and
Gurgaon!
No more delays and traffic jams at the...
Power cuts are history
From power-shortage to power-surplus, Haryana’s
power supply improving massively
4 new power plants...
Exciting opportunities in Education
Reputed educational institutions flocking to areas
surrounding the Expressway
MatriKir...
Boom in Healthcare
Nationally and internationally famous healthcare
organizations setting up branches around the
Dwarka Ex...
All this adds up to making the
Dwarka Expressway a new hub of
exciting developments in real estate
and the Golden Road!
The widest road in the NCR
18 kms long and 150 mtrs wide, with 60 mtrs of
greenery on both sides, the Dwarka Expressway
is...
Constructed means black-topped
and driveable

Dwarka
Expressw
ay

From
Haryan
a

From
Delhi

The double yellow
line indica...
Gurgaon - Manesar Urban Complex
- 2025 AD
The Expressway today: The
remaining 4 kms
800 mtrs handed over to Indian Railways for
construction of Rail over-bridge, wi...
The latest on the 2.5 kms under
stay order
On 30.9.2013, HUDA announced a rehabilitation
policy which was published in the...
As Per Policy Published on
30.09.13
People with built up homes / structures are being
offered alternative plots in Sectors...
As Per Policy Published on
30.09.13
Applicants had till 30.10.2013 to apply under
this policy
HUDA has received applicatio...
Actual availability of stretches
(As per Actual Site condition)
Chainage
S.No
. From

To

Length

Status
Clear
Constructed...
Chainage
S.No.

Length

Clear
Length

Status
Constructed/
NOT

Remarks

Month of
Handing Over

From

To

13

3350

3370

2...
Chainage
S.No.

Length

From

To

26

8750

8800

50

27

8800

9820

1020

28

9820

9900

80

29

9900

10800

900

30

...
Chainage
S.No.

From

To

Length

Clear
Length

Status
Constructed/
NOT

Remarks

Month of
Handing Over

Slab culvert
over...
Dwarka Expressway: The Delhi
update
Dwarka Expressway: The Delhi
update
Thanks to DDA’s efforts, all issues related to land
acquisition on Delhi side, resolve...
All obstacles soon to vanish
All land issues on Delhi side resolved
All issues pertaining to 2.5 kms on Gurgaon side
soon ...
Strike while hot!

(Average rate per sq ft)
Besides, the best developers are
building here
Some of the best and most trusted names in real
estate singling out the Dwa...
Glimpses of the Expressway
Glimpses of the Expressway
The golden road beckons

Members of:
Dwarka expressway: Road of Abundance and Opportunities
Dwarka expressway: Road of Abundance and Opportunities
Upcoming SlideShare
Loading in …5
×

Dwarka expressway: Road of Abundance and Opportunities

1,570 views

Published on

Dwarka Expressway is the road of opportunity and abundance. It has given and will give new shape not only to Gurgaon but entire Delhi-NCR. Some facts are given in this presentation.... visit us @ www.facebook.com/EthicalConsulting

Published in: Real Estate, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,570
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
23
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Dwarka expressway: Road of Abundance and Opportunities

  1. 1. Connecting Places, Connecting Lives Connects Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Only 2 roads of connects Delhi and Gurgaon-MG Road and the NH8 as of now… Not sufficient to handle heavy daily traffic between Delhi and Gurgaon
  2. 2. Connecting Places, Connecting Lives With Dwarka Expressway, connectivity becomes smoother, faster and so much easier! IGI airport - a mere 2.5 kms away Also bridges the gap between 16 new Residential Sectors
  3. 3. That’s How Gurgaon Will Look After That
  4. 4. Agent of change and development Planned around a world of opportunities and development Dwarka Expressway marks the beginning of a golden era in real estate Acts as a new channel of business and commerce between Delhi and Gurgaon World-class infrastructure and facilities to transform lives of residents and investors
  5. 5. No more toll! No more delays! No more toll for commuters between Delhi and Gurgaon! No more delays and traffic jams at the toll gate on NH8! All thanks to the toll plaza moving beyond Manesar shortly
  6. 6. Power cuts are history From power-shortage to power-surplus, Haryana’s power supply improving massively 4 new power plants have been set up by the Haryana Government Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years
  7. 7. Exciting opportunities in Education Reputed educational institutions flocking to areas surrounding the Expressway MatriKiran School under construction Modern School opening a branch in Sector 91, Gurgaon Other well-known schools of Delhi are currently looking to expand on this stretch
  8. 8. Boom in Healthcare Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment
  9. 9. All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!
  10. 10. The widest road in the NCR 18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8 14 kms out of the 18 kms is already constructed
  11. 11. Constructed means black-topped and driveable Dwarka Expressw ay From Haryan a From Delhi The double yellow line indicates the constructed expressway
  12. 12. Gurgaon - Manesar Urban Complex - 2025 AD
  13. 13. The Expressway today: The remaining 4 kms 800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months) 700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months) The balance 2.5 kms – has been resolved
  14. 14. The latest on the 2.5 kms under stay order On 30.9.2013, HUDA announced a rehabilitation policy which was published in the Times of India
  15. 15. As Per Policy Published on 30.09.13 People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C The plots on offer are of the same size as the plots being taken over HUDA has already acquired 145 acres in the above 2 Sectors for this purpose Only 15 acres required to re-settle all the petitioners
  16. 16. As Per Policy Published on 30.09.13 Applicants had till 30.10.2013 to apply under this policy HUDA has received applications from 80% of the residents on this stretch and is sorting them out All petitions expected to be resolved under this process in the next 3-4 months
  17. 17. Actual availability of stretches (As per Actual Site condition) Chainage S.No . From To Length Status Clear Constructed Length / NOT Remarks Month of Handing Over Built up Area End of Dec 11 1 2 0 468 468 750 468 282 282 Not Executed Executed 3 750 765 15 15 Executed May-13 4 765 900 135 135 Executed Dec-11 5 900 960 60 60 Executed May-13 6 7 960 2000 2000 2050 1040 50 1040 50 Executed Executed End April 11 End April 11 8 2050 2070 20 20 Executed 9 2070 2120 50 50 Clear WMM II Completed 10 2120 2170 50 Not Executed Stay on Land 11 2170 2260 90 90 Clear WMM II Completed 12 2260 3350 1090 1090 Executed Mid August 13 Mid August 13 End April 11
  18. 18. Chainage S.No. Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over From To 13 3350 3370 20 14 3370 3400 30 30 Executed 15 3400 3975 575 575 Executed 16 3975 4100 125 125 Executed 17 4100 4300 200 200 Executed 18 4300 4315 15 19 4315 4425 110 110 Executed 20 4425 4500 75 75 Executed End April 11 21 4500 6620 2120 2120 Executed End April 11 22 6620 7800 1180 23 7800 8285 485 24 8285 8345 60 25 8345 8750 405 HSIIDC drain Jan-13 Reliance SEZ land Jan-13 Feb 12 Pataudi Road Not Executed/ROB 485 Executed Not Executed 405 ROB, Padmini Factory, stay on land Executed Mid Sep 11 HUDA water sump house Mid Sep 11
  19. 19. Chainage S.No. Length From To 26 8750 8800 50 27 8800 9820 1020 28 9820 9900 80 29 9900 10800 900 30 10800 11700 31 11700 32 1020 Status Constructed/ NOT Remarks One side executed Clear Length RHS stay on land Executed Month of Handing Over Mid Oct 11 Not Executed STP Channel 900 Executed Water logged area completed 900 900 Executed end April 11 11760 60 60 Executed Mid Oct 11 11760 12850 1090 1090 Executed Mid Oct 11 33 12850 12900 50 50 Executed Feb-13 34 12900 13000 100 35 13000 13060 60 60 Executed Feb-13 36 13060 13400 340 340 Executed Nov-11 37 13400 13520 120 120 Executed Nov-11 38 13520 13650 130 130 Executed Nov-11 39 13650 13700 50 50 Clear Not Executed Last week of Jan 13 Nipon Factory Slab approach is to be coming
  20. 20. Chainage S.No. From To Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over Slab culvert over sewer Work is stopped from last channel is in 2 month i.e on 6th Sep progress by 2013 another contractor 40 13700 13780 80 41 13780 14320 540 540 Executed 42 14320 14900 580 580 Clear 43 14900 15300 400 Not Executed New Palam Vihar – R&R 44 15300 15600 300 Not Executed New Palam Vihar – R&R 45 15600 16000 400 Not Executed New Palam Vihar – R&R 46 16000 16740 740 Not Executed New Palam Vihar – R&R 47 16740 18035 1295 18035 Clear Stretch 1295 14092 WMM 1st layer completed Executed 01-Mar 14,092 mtrs.
  21. 21. Dwarka Expressway: The Delhi update
  22. 22. Dwarka Expressway: The Delhi update Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved Remaining stretch of less than a Km to be ready within the next 6 months
  23. 23. All obstacles soon to vanish All land issues on Delhi side resolved All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014) Soon, no more obstacles preventing investing in the Golden Road!
  24. 24. Strike while hot! (Average rate per sq ft)
  25. 25. Besides, the best developers are building here Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects Residential or commercial, most of these projects in full swing and nearing completion
  26. 26. Glimpses of the Expressway
  27. 27. Glimpses of the Expressway
  28. 28. The golden road beckons Members of:

×