1. DEADLINES: September: October: November: December: During September I am hoping to have started all my planning/research. Also I will be finding my cast and thinking of the visuals of my Video. I will need to send out lyrics to my performer by this point too so that they can get to know the song and the lyrics. By this stage I need to have finished all my Planning so I can then create a storyboard and select photo shoot days for my Digi pack and advert. By the end of October, I aim to have finished or nearly finished my Digi pack and advert and to start planning days to get some filming done. By this stage I plan to have all my tasks done so I can start filming, I will arrange shoots and set up costume lists and I will be directing there actions. Throughout this month it will be all filming, getting as much footage as I can. Throughout this month I will be uploading all footage and matching it to the storyboard and checking if I need to get anymore footage before editing.
2. DEADLINES: January: February: March: April: My aim for January is to get any extra bits of fottage I need that don’t look right on previous footage or that I have missed out or thought it needed something extra. This month will basically just by to tie any loose ends in my work up to now. February is the month that I will use to edit my Video to how it should be, exactly matching my storyboard.. Getting everything into place and the correct lip sinking. This month I aim to hand ALL work in for my teacher to check over, I want to hand it in a month in advance if I can that I can make any changes if necessary. Then if anything is wrong I have a month to correct anything. During April I will correct any mistakes.