ARCHWIRE
SEQUENCE
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
DAMON SYSTEM
PHASE 1: INITIAL LIGHT ROUND WIRE
Never anything larger than an .014 or .013 CuNiTi.
Goal: to initiate alignment, leveling, bite opening,
arch development, and to resolve 90% of the
rotations.
Duration: 10-20 weeks
Appointment Intervals: 10 weeks
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
Phase 1: INITIAL LIGHT ROUND WIRE
.014 Damon CuNiTi (Upper/Lower)
Main initial archwire – starts tooth movement, works on rotations,
leveling, archform, prepares for next wire
.013 Damon CuNiTi (Upper/Lower)
Use for severely crowded cases
.016 Damon CuNiTi (Upper/Lower)
Use as a secondarchwire in severely crowded cases.
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
ALWAYS CHECK THE WIRES FOR
PERMANENT DEFORMATIONS AT THE 10
WEEK APPOINTMENT!
ENGAGE ALL TEETH
NEVER START WITH AN
ARCHWIRE LARGER THAN .
014 Cu NiTi
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE
Goal: Resolve remaining rotations, begin torque
control and anterior space consolidation, and
continue/finish arch development
Average time: 20-30 weeks
Appointment interval: 8-10 weeks for first wire, 4-
6 weeks for second
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE
.014 x .025 CuNiTi – Upper/Lower
A great wire for initial rotation control and leveling
.018 x .025 CuNiTi – Upper/Lower
A great transition wire for enhanced rotation
control prior to stainless steel and sliding
mechanics.
.016 x .025 CuNiTi – Upper/Lower
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE
(case-specific alternatives)
.017 x .025 Reverse Curve Ni-Ti
Normally used with 20°anterior torque for severe Class II Division II
cases between .014 x .025 and .018 x .025 wires (If only intrusion
needed, use same size wire without 20° torque).
.019 x .025 Reverse Curve Ni-Ti
Normally used with 20°anterior torque for severe Class II Division II
cases between .014 x .025 and .018 x .025 wires (If only intrusion
needed, use same size wire without anterior torque).
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
PHASE 2: HIGH-TECH EDGEWISE
(CLASS II/2)
.017 x .025 Reverse Curve Ni-Ti
with 20°anterior (+) torque
.019 x .025 Reverse Curve Ni-Ti
with 20°anterior (+) torque
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
ONLY
IN
UPPER
ARCH
ONLY
IN
UPPER
ARCH
PHASE 2: HIGH-TECH EDGEWISE
(DEEP BITES)
.017 x .025 Reverse Curve Ni-Ti
with 20°anterior (-) torque
.019 x .025 Reverse Curve Ni-Ti
with 20°anterior (-) torque
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
ONLY
IN
LOW
ER
ARCH
ONLY
IN
LOW
ER
ARCH
G&
H
PHASE 2: HIGH-TECH EDGEWISE
(case-specific alternatives)
.017 x .025 NiTi
.019 x .025 NiTi
Used when torque desired in the anterior without the intrusive forces of
the reverse curve or for uprighting lower incisors.
with 20° anterior torque
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
AVAILABLE
UPPER ARCH
(+) TORQUE
LOWER ARCH
(-) TORQUE
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
TAKE A PANOREX BEFORE
TRANSITIONING BETWEEN LAST
HIGH TECH EDGEWISE (CU NITI)
AND STAINLESS STEEL
ARCHWIRE AND CHECK
BRACKET POSITIONING .
IMPORTANT!!!!
REBONDING APPOINTMENTREBONDING APPOINTMENT
ARCHWIRE SEQUENCE
PANOREX AND REBONDING APPOINTMENT
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
After working
last rectangular Cu
NiTi
stainless
steel
PHASE 3: MAJOR MECHANICS
(working phase of treatment)
Goal: Finish torque control, posterior space
closure, and make vertical, A.P. and bucco-
lingual corrections. Elastics.
Average time: 20 weeks
Appointment interval: 6-8 weeks
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
Phase 3: MAJOR MECHANICS
.019 x .025 SS – Upper & Lower (Pre-posted)
Excellent archwire to maintain integrity
of arch during AP correction and space closure.
Great for vertical control.
.016 x .025 SS – Lower (Pre-posted)
Used in lower arch where more play is
desired. Nice finishing wire in lower arch
if all the torques are acceptable.
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
PHASE 4: FINISHING
Goal: Make any remaining detailed
archwire bends to complete the case.
Elastics.
Average time: 10-20 weeks
Appointment interval: 4-6 weeks
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
PHASE 4: FINISHING
.019 x .025 SS Upper (pre-posted)
.016 x .025 SS Lower (pre-posted)
Most cases finished with the working archwires.
If more than minor bends and torque are required to finish, use
edgewise TMA:
.019 x .025 TMA Upper
.017 x .025 TMA Lower
Regular TMA – 3X friction SS
Honey Dew TMA – 11/2 X friction SS
Purple TMA – Same friction as SS
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
ARCHWIRE SEQUENCE
.014 CuNiTi
.016 x .025 CuNiTi
.019 x .025 S.S.
¿.019 x .025 TMA ?
INITIAL ARCHWIRES SEQUENCE
2.001
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
.014 CuNiTi
.014 x .025 CuNiTi
.018 x .025 CuNiTi
.019 x .025 S.S.
.019 x .025 TMA ?
REGULAR ARCHWIRE SEQUENCE
.017 x .025 NiTi Spee
.019 x .025 NiTi Spee
.017 x .025 N. S. T 20º
.019 x .025 N. S. T 20º
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
.013 CuNiTi
.016 CuNiTi
.016 x .025 CuNiTi
.019 x .025 S.S.
.019 x .025 TMA ?
GREAT CROWDING WIRE SEQUENCE
.014 x .025 CuNiTi
.018 x .025 CuNiTi
RAFAEL GARCIA ESPEJO
CORDOBA (SPAIN)
EUROPEAN
DAMON MASTER
SUMMARY

Damon archwire secuencing

  • 1.
    ARCHWIRE SEQUENCE RAFAEL GARCIA ESPEJO CORDOBA(SPAIN) EUROPEAN DAMON MASTER DAMON SYSTEM
  • 2.
    PHASE 1: INITIALLIGHT ROUND WIRE Never anything larger than an .014 or .013 CuNiTi. Goal: to initiate alignment, leveling, bite opening, arch development, and to resolve 90% of the rotations. Duration: 10-20 weeks Appointment Intervals: 10 weeks RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 3.
    Phase 1: INITIALLIGHT ROUND WIRE .014 Damon CuNiTi (Upper/Lower) Main initial archwire – starts tooth movement, works on rotations, leveling, archform, prepares for next wire .013 Damon CuNiTi (Upper/Lower) Use for severely crowded cases .016 Damon CuNiTi (Upper/Lower) Use as a secondarchwire in severely crowded cases. RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 4.
    ALWAYS CHECK THEWIRES FOR PERMANENT DEFORMATIONS AT THE 10 WEEK APPOINTMENT!
  • 5.
    ENGAGE ALL TEETH NEVERSTART WITH AN ARCHWIRE LARGER THAN . 014 Cu NiTi RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 6.
    PHASE 2: HIGH-TECHEDGEWISE Goal: Resolve remaining rotations, begin torque control and anterior space consolidation, and continue/finish arch development Average time: 20-30 weeks Appointment interval: 8-10 weeks for first wire, 4- 6 weeks for second RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 7.
    PHASE 2: HIGH-TECHEDGEWISE .014 x .025 CuNiTi – Upper/Lower A great wire for initial rotation control and leveling .018 x .025 CuNiTi – Upper/Lower A great transition wire for enhanced rotation control prior to stainless steel and sliding mechanics. .016 x .025 CuNiTi – Upper/Lower RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 8.
    PHASE 2: HIGH-TECHEDGEWISE (case-specific alternatives) .017 x .025 Reverse Curve Ni-Ti Normally used with 20°anterior torque for severe Class II Division II cases between .014 x .025 and .018 x .025 wires (If only intrusion needed, use same size wire without 20° torque). .019 x .025 Reverse Curve Ni-Ti Normally used with 20°anterior torque for severe Class II Division II cases between .014 x .025 and .018 x .025 wires (If only intrusion needed, use same size wire without anterior torque). RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 9.
    PHASE 2: HIGH-TECHEDGEWISE (CLASS II/2) .017 x .025 Reverse Curve Ni-Ti with 20°anterior (+) torque .019 x .025 Reverse Curve Ni-Ti with 20°anterior (+) torque RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE ONLY IN UPPER ARCH ONLY IN UPPER ARCH
  • 10.
    PHASE 2: HIGH-TECHEDGEWISE (DEEP BITES) .017 x .025 Reverse Curve Ni-Ti with 20°anterior (-) torque .019 x .025 Reverse Curve Ni-Ti with 20°anterior (-) torque RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE ONLY IN LOW ER ARCH ONLY IN LOW ER ARCH G& H
  • 11.
    PHASE 2: HIGH-TECHEDGEWISE (case-specific alternatives) .017 x .025 NiTi .019 x .025 NiTi Used when torque desired in the anterior without the intrusive forces of the reverse curve or for uprighting lower incisors. with 20° anterior torque RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 12.
    AVAILABLE UPPER ARCH (+) TORQUE LOWERARCH (-) TORQUE RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 13.
    TAKE A PANOREXBEFORE TRANSITIONING BETWEEN LAST HIGH TECH EDGEWISE (CU NITI) AND STAINLESS STEEL ARCHWIRE AND CHECK BRACKET POSITIONING . IMPORTANT!!!! REBONDING APPOINTMENTREBONDING APPOINTMENT
  • 14.
    ARCHWIRE SEQUENCE PANOREX ANDREBONDING APPOINTMENT RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER After working last rectangular Cu NiTi stainless steel
  • 15.
    PHASE 3: MAJORMECHANICS (working phase of treatment) Goal: Finish torque control, posterior space closure, and make vertical, A.P. and bucco- lingual corrections. Elastics. Average time: 20 weeks Appointment interval: 6-8 weeks RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 16.
    Phase 3: MAJORMECHANICS .019 x .025 SS – Upper & Lower (Pre-posted) Excellent archwire to maintain integrity of arch during AP correction and space closure. Great for vertical control. .016 x .025 SS – Lower (Pre-posted) Used in lower arch where more play is desired. Nice finishing wire in lower arch if all the torques are acceptable. RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 17.
    PHASE 4: FINISHING Goal:Make any remaining detailed archwire bends to complete the case. Elastics. Average time: 10-20 weeks Appointment interval: 4-6 weeks RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 18.
    PHASE 4: FINISHING .019x .025 SS Upper (pre-posted) .016 x .025 SS Lower (pre-posted) Most cases finished with the working archwires. If more than minor bends and torque are required to finish, use edgewise TMA: .019 x .025 TMA Upper .017 x .025 TMA Lower Regular TMA – 3X friction SS Honey Dew TMA – 11/2 X friction SS Purple TMA – Same friction as SS RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER ARCHWIRE SEQUENCE
  • 19.
    .014 CuNiTi .016 x.025 CuNiTi .019 x .025 S.S. ¿.019 x .025 TMA ? INITIAL ARCHWIRES SEQUENCE 2.001 RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER
  • 20.
    .014 CuNiTi .014 x.025 CuNiTi .018 x .025 CuNiTi .019 x .025 S.S. .019 x .025 TMA ? REGULAR ARCHWIRE SEQUENCE .017 x .025 NiTi Spee .019 x .025 NiTi Spee .017 x .025 N. S. T 20º .019 x .025 N. S. T 20º RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER
  • 21.
    .013 CuNiTi .016 CuNiTi .016x .025 CuNiTi .019 x .025 S.S. .019 x .025 TMA ? GREAT CROWDING WIRE SEQUENCE .014 x .025 CuNiTi .018 x .025 CuNiTi RAFAEL GARCIA ESPEJO CORDOBA (SPAIN) EUROPEAN DAMON MASTER
  • 22.

Editor's Notes

  • #5 LORENZO CANO INMACULADA