SlideShare a Scribd company logo
1 of 30
Project Selection
Strategic Planning and Project
    Selection
    Strategic planning involves determining long-
     term objectives, predicting future trends, and
     projecting the need for new products and services
    Organizations often perform a SWOT analysis
      Analyzing Strengths, Weaknesses, Opportunities, and
       Threats
    As part of strategic planning, organizations:
     Identify potential projects
     Use realistic methods to select which projects to work on
     Formalize project initiation by issuing a project charter

2
Figure 4-2: Information
Technology Planning Process




3
Methods for Selecting Projects
(Please note: The Methods are not
only meant for this ITPM Class)
Methods for Selecting Projects
     There are usually more projects than available
      time and resources to implement them
     Methods for selecting projects include:
         Focusing on broad organizational needs
         Categorizing information technology projects
         Performing net present value or other financial
          analyses
         Using a weighted scoring model
         Implementing a balanced scorecard




5
Focusing on Broad
    Organizational Needs
    It is often difficult to provide strong justification for
     many IT projects, but everyone agrees they have
     a high value
    “It is better to measure gold roughly than to count
     pennies precisely”
    Three important criteria for projects:
      There is a need for the project
      There are funds available
      There’s a strong will to make the project succeed


6
Categorizing IT Projects
    One categorization is whether the project
     addresses:
      A problem
      An opportunity
      A directive
    Another categorization is how long it will take to
     do and when it is needed
    Another is the overall priority of the project




7
Financial Analysis of Projects
    Financial considerations are often an important
     consideration in selecting projects
    Three primary methods for determining the
     projected financial value of projects
     Net present value (NPV) analysis
     Return on investment (ROI)
     Payback analysis




8
Net Present Value Analysis
Net present value (NPV) analysis is a method of
 calculating the expected net monetary gain or loss
 from a project by discounting all expected future
 cash inflows and outflows to the present point in
 time
Projects with a positive NPV should be considered
 if financial value is a key criterion
The higher the NPV, the better




9
Figure 4-3: Net Present Value
Example


                                Note that
                                totals are
                                equal, but
                                NPVs are
                                not
                                because
                                of the time
                                value of
                                money

10
Figure 4-4: JWD Consulting NPV
 Example
Multiply
by the
discount
factor each
year, then
take cum.
benefits –
costs to
get NPV




      Note: See the template called business_case_financials.xls
      Table 3-16 on pp. 118-119 lists the templates available
 11   on the companion Web site (www.course.com/mis/schwalbe5e)
NPV Calculations
 Determine estimated costs and benefits for the life
  of the project and the products it produces
 Determine the discount rate (check with your
  organization on what to use)
 Calculate the NPV (see text for details)
 Note: Some organizations consider the investment
  year as year 0, while others start in year 1; some
  people enter costs as negative numbers, while
  others do not
     Check with your organization for their preferences



12
Return on Investment
 Return on investment (ROI) is calculated by
     subtracting the project costs from the benefits and
     then dividing by the costs
      ROI = (total discounted benefits - total discounted
      costs) / discounted costs
 The higher the ROI, the better
 Many organizations have a required rate of
  return or minimum acceptable rate of return on
  investment for projects
 Internal rate of return (IRR) can by calculated by
  finding the discount rate that makes the NPV
  equal to zero
13
Payback Analysis
 Another important financial consideration is
  payback analysis
 The payback period is the amount of time it
  will take to recoup, in the form of net cash
  inflows, the total dollars invested in a project
 Payback occurs when the net cumulative
  discounted benefits equals the costs
 Many organizations want IT projects to have a
  fairly short payback period


14
Figure 4-5: Charting the Payback
Period




15
5 Minutes Class Activity
 Weighted Decision Matrix
  Suggest four or five criteria you would use to choose a roommate.
  Then choose the weight for each criterion, making sure the weights add up
   to one hundred.
  Pick four potential roommates from this class.
  Make a simple table, as shown here: Have you make your decision?

Criteria      Weight        Name1         Name2          Name3         Name4
C1            30%           100           100
C2            20%           90            100
C3            30%           40            20
C4            10%           70            10
C5            10%           50            10
Weighted                    72            58
Score
 This activity demonstrates one way to develop a weighted decision matrix for Project
 selection by finding a significant other.
Weighted Scoring Model
    A weighted scoring model is a tool that provides
     a systematic process for selecting projects based
     on many criteria
      1. Identify criteria important to the project selection
         process
      2. Assign weights (percentages) to each criterion so
         they add up to 100%
      3. Assign scores to each criterion for each project
      4. Multiply the scores by the weights and get the total
         weighted scores
    The higher the weighted score, the better


17
Figure 4-6: Sample Weighted Scoring
Model for Project Selection




18
Implementing a Balanced
 Scorecard
 Drs. Robert Kaplan and David Norton developed
  this approach to help select and manage projects
  that align with business strategy
 A balanced scorecard:
     Is a methodology that converts an organization’s value
      drivers, such as customer service, innovation,
      operational efficiency, and financial performance, to a
      series of defined metrics
 See www.balancedscorecard.org for more
     information


19
Figure 4-7: Balanced Scorecard
 Example




     Defense Finance and Accounting Service, “DFAS Strategic Plan,” Nov 2001
     (http://balancedscorecard.org/files/DFAS-strategic-plan.pdf ), p. 13.
20
Destination Diagram
A destination diagram often used to visualize
 elements that should appear at the end of a
 project
Often utilized as vision building exercise (for
 project or non project-life)
This is a richer aspect of presenting the elements
 other than Check List
My Life Dream
            20 years from today (16 Feb 2011)


                                                         Mr X
                                                                                   Darul Iman – Modernize ‘sekolah pondok’ for adults
                                                       Picture                          Location: Bandar Tasik Puteri, Rawang, Selangor
                                                                                                              Cost: RM60,000.00 / year
                                                                                                          Income: RM120,000.00 / year




 Performing 3rd Hajj
 Location: Makkah
 Cost: RM100,000.00
                                                                                                          Renowed Academician & Researcher
                                                                                                          Location: Universiti Selangor (UNISEL)
                                                                                                                 Income: RM 174,000.00 / year


                         Raised my 1 year old son
                               Cost: RM 3 million




Umrah & Tour
Location: Jordan -                                                                                                            Restoren Bawang
Turki – Egypt -                                                                                                    Location: Bandar Tasik Puteri,
Madinah - Makkah                                                                                                               Rawang, Selangor
                                                 Bungalow with swimming pool         Audi 4WD
Cost: RM100,000.00                                                                                                     Cost: RM80,000.00 / year
                                                Location: Kuala Lumpur outskirt      Cost: RM450,000.00
                                                            Cost: RM 1.5 million                                   Income: RM240,000.00 / year
$ 20,000,000




                                                               $30,000
                                          $ 200,000

          $ 30,000,000+600,000
                                                          $500,000


                                                                                $100,000


                                                                     From the second 5 years
                                               $ 80,000              until year 20th $ 450,000

 +               $ 4,000,000+600,000

                                                                      Post- DR with
                                                                           grant


                                                                      From the second 5 years
                                                                      until years 20th $ 1,500,000
                      $ 500,000+600,000
                                              $ 40,000
                                                                        PHD

My Life                                                                         $ 50,000+ grant
Dreams
                                                                                $ 10,000

                                 $ 70,000+50,000             $ 10,000
After Selecting Project
Project Charters
     After deciding what project to work on, it is
      important to let the rest of the organization know
     A project charter is a document that formally
      recognizes the existence of a project and
      provides direction on the project’s objectives and
      management
     Key project stakeholders should sign a project
      charter to acknowledge agreement on the need
      and intent of the project; a signed charter is a
      key output of project integration management


25
Table 5-2: Sample Project Charter




26
Preliminary Scope Statements
 A scope statement is a document used to
  develop and confirm a common understanding of
  the project scope
 It’s important for preventing scope creep
     The tendency for project scope to keep getting bigger
 It’s good practice to develop a preliminary or initial
     scope statement during project initiation and a
     more detailed scope statement as the project
     progresses


27
Stakeholder Analysis
 A stakeholder analysis documents important
     (often sensitive) information about stakeholders
     such as:
     Stakeholders’ names and organizations
     Roles on the project
     Unique facts about stakeholders
     Level of influence and interest in the project
     Suggestions for managing relationships




28
Table 4-2: Sample Stakeholder
Analysis




29
Chapter Summary

     Project Selection Methods
     Developing a project charter
     Developing a preliminary project scope statement
     Developing Stakeholder Analysis




30

More Related Content

What's hot

Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04Rizwan Khurram
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & EvaluationDevegowda S R
 
Getting started with flutter
Getting started with flutterGetting started with flutter
Getting started with flutterrihannakedy
 
Introducing Software Engineering
Introducing Software EngineeringIntroducing Software Engineering
Introducing Software Engineeringsommerville-videos
 
Introduction to Flutter
Introduction to FlutterIntroduction to Flutter
Introduction to FlutterApoorv Pandey
 
Project : formulation,evaluation and monitoring
Project : formulation,evaluation and monitoringProject : formulation,evaluation and monitoring
Project : formulation,evaluation and monitoringtarzan1990
 
What and Why Flutter? What is a Widget in Flutter?
What and Why Flutter? What is a Widget in Flutter?What and Why Flutter? What is a Widget in Flutter?
What and Why Flutter? What is a Widget in Flutter?MohammadHussain595488
 
Flutter Tutorial For Beginners | Edureka
Flutter Tutorial For Beginners | EdurekaFlutter Tutorial For Beginners | Edureka
Flutter Tutorial For Beginners | EdurekaEdureka!
 

What's hot (14)

Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04
 
Android studio installation
Android studio installationAndroid studio installation
Android studio installation
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Monitoring & Evaluation
Monitoring & EvaluationMonitoring & Evaluation
Monitoring & Evaluation
 
Practice exam php
Practice exam phpPractice exam php
Practice exam php
 
Project Development and Management: Justifications & Opportunitiesc
Project Development and Management: Justifications & OpportunitiescProject Development and Management: Justifications & Opportunitiesc
Project Development and Management: Justifications & Opportunitiesc
 
Getting started with flutter
Getting started with flutterGetting started with flutter
Getting started with flutter
 
chapter 2.pptx
chapter 2.pptxchapter 2.pptx
chapter 2.pptx
 
Flutter
Flutter Flutter
Flutter
 
Introducing Software Engineering
Introducing Software EngineeringIntroducing Software Engineering
Introducing Software Engineering
 
Introduction to Flutter
Introduction to FlutterIntroduction to Flutter
Introduction to Flutter
 
Project : formulation,evaluation and monitoring
Project : formulation,evaluation and monitoringProject : formulation,evaluation and monitoring
Project : formulation,evaluation and monitoring
 
What and Why Flutter? What is a Widget in Flutter?
What and Why Flutter? What is a Widget in Flutter?What and Why Flutter? What is a Widget in Flutter?
What and Why Flutter? What is a Widget in Flutter?
 
Flutter Tutorial For Beginners | Edureka
Flutter Tutorial For Beginners | EdurekaFlutter Tutorial For Beginners | Edureka
Flutter Tutorial For Beginners | Edureka
 

Viewers also liked

Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...shawncarner
 
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To GuidePreparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To GuideOAUGNJ
 
Approaches to Project Selection
Approaches to Project SelectionApproaches to Project Selection
Approaches to Project SelectionADR Nord
 
Examples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaExamples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaRicardo Viana Vargas
 
Selecting our projects
Selecting our projects Selecting our projects
Selecting our projects KentEstates
 
Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...John Thornton
 
Pm Session 2
Pm Session 2Pm Session 2
Pm Session 2dmdk12
 
Selecting Methods and Media
Selecting Methods and MediaSelecting Methods and Media
Selecting Methods and MediaSanjaya Mishra
 
Project management chapter 4 - project integration management-1
Project management   chapter 4 - project integration management-1Project management   chapter 4 - project integration management-1
Project management chapter 4 - project integration management-1Eduardo Antero
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industrynaveen_ncn
 
Project Selection
Project SelectionProject Selection
Project SelectionIan Cammack
 
Chapter 6 Selecting Methods, Media, and Materials
Chapter 6 Selecting Methods, Media, and MaterialsChapter 6 Selecting Methods, Media, and Materials
Chapter 6 Selecting Methods, Media, and MaterialsThitiporn Pinit
 
Strategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training ModuleStrategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training ModuleFrank-G. Adler
 
暴走漫画数据挖掘从0到1
暴走漫画数据挖掘从0到1暴走漫画数据挖掘从0到1
暴走漫画数据挖掘从0到1Michael Ding
 

Viewers also liked (20)

Project selection
Project selection Project selection
Project selection
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
 
project selection
project selectionproject selection
project selection
 
Project Selection
Project SelectionProject Selection
Project Selection
 
The Process of Project Selection
The Process of Project SelectionThe Process of Project Selection
The Process of Project Selection
 
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To GuidePreparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
Preparing Your Own Strategic BI Vision and Roadmap: A Practical How-To Guide
 
Approaches to Project Selection
Approaches to Project SelectionApproaches to Project Selection
Approaches to Project Selection
 
Examples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaExamples of Project Prioritization Criteria
Examples of Project Prioritization Criteria
 
Selecting our projects
Selecting our projects Selecting our projects
Selecting our projects
 
Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...Example Project: Strategic Project Selection and Accelerated Development by J...
Example Project: Strategic Project Selection and Accelerated Development by J...
 
Pm Session 2
Pm Session 2Pm Session 2
Pm Session 2
 
Selecting Methods and Media
Selecting Methods and MediaSelecting Methods and Media
Selecting Methods and Media
 
Project selection ppt
Project selection pptProject selection ppt
Project selection ppt
 
Project management chapter 4 - project integration management-1
Project management   chapter 4 - project integration management-1Project management   chapter 4 - project integration management-1
Project management chapter 4 - project integration management-1
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
Project Selection
Project SelectionProject Selection
Project Selection
 
Chapter 6 Selecting Methods, Media, and Materials
Chapter 6 Selecting Methods, Media, and MaterialsChapter 6 Selecting Methods, Media, and Materials
Chapter 6 Selecting Methods, Media, and Materials
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
Strategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training ModuleStrategy Planning and Deployment Process Training Module
Strategy Planning and Deployment Process Training Module
 
暴走漫画数据挖掘从0到1
暴走漫画数据挖掘从0到1暴走漫画数据挖掘从0到1
暴走漫画数据挖掘从0到1
 

Similar to D. strategic + project selection

Financial Tools for Product Managers
Financial Tools for Product ManagersFinancial Tools for Product Managers
Financial Tools for Product ManagersSVPMA
 
present worth analysis.ppt
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.pptashwinigupta38
 
Project_selectionProject_selectionnn.ppt
Project_selectionProject_selectionnn.pptProject_selectionProject_selectionnn.ppt
Project_selectionProject_selectionnn.pptssdongre1
 
costing
costing costing
costing EndalkA
 
Project management
Project managementProject management
Project managementAnish Jojan
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...Virtual ULI
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...Aquamarine Emerald
 
Chegg Sum Of The Parts Valuation Yields Substantial Upside
Chegg Sum Of The Parts Valuation Yields Substantial UpsideChegg Sum Of The Parts Valuation Yields Substantial Upside
Chegg Sum Of The Parts Valuation Yields Substantial UpsideHunter Diamond
 
Npv and other evaluation techniques
Npv and other evaluation techniquesNpv and other evaluation techniques
Npv and other evaluation techniquesNadia Sahar
 
Making Investment Decisions (introduction)
Making Investment Decisions (introduction)Making Investment Decisions (introduction)
Making Investment Decisions (introduction)tutor2u
 
Chapter 13 Capital Investment Decisions
Chapter 13 Capital Investment DecisionsChapter 13 Capital Investment Decisions
Chapter 13 Capital Investment DecisionsYesica Adicondro
 
Trends and local challenges in Project Management
Trends and local challenges in Project ManagementTrends and local challenges in Project Management
Trends and local challenges in Project ManagementPMILebanonChapter
 
Net Present Value - NPV
Net Present Value - NPVNet Present Value - NPV
Net Present Value - NPVASAD ALI
 

Similar to D. strategic + project selection (20)

Financial Tools for Product Managers
Financial Tools for Product ManagersFinancial Tools for Product Managers
Financial Tools for Product Managers
 
present worth analysis.ppt
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.ppt
 
Project_selectionProject_selectionnn.ppt
Project_selectionProject_selectionnn.pptProject_selectionProject_selectionnn.ppt
Project_selectionProject_selectionnn.ppt
 
costing
costing costing
costing
 
Project management
Project managementProject management
Project management
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9   lon...
PGBM01 - MBA Financial Management And Control (2015-16 Trm1 A)Lecture 9 lon...
 
Course03
Course03Course03
Course03
 
Chegg Sum Of The Parts Valuation Yields Substantial Upside
Chegg Sum Of The Parts Valuation Yields Substantial UpsideChegg Sum Of The Parts Valuation Yields Substantial Upside
Chegg Sum Of The Parts Valuation Yields Substantial Upside
 
Npv and other evaluation techniques
Npv and other evaluation techniquesNpv and other evaluation techniques
Npv and other evaluation techniques
 
Making Investment Decisions (introduction)
Making Investment Decisions (introduction)Making Investment Decisions (introduction)
Making Investment Decisions (introduction)
 
ROI, NPV and PP
ROI, NPV and PPROI, NPV and PP
ROI, NPV and PP
 
Chapter 13 Capital Investment Decisions
Chapter 13 Capital Investment DecisionsChapter 13 Capital Investment Decisions
Chapter 13 Capital Investment Decisions
 
Trends and local challenges
Trends and local challengesTrends and local challenges
Trends and local challenges
 
Trends and local challenges in Project Management
Trends and local challenges in Project ManagementTrends and local challenges in Project Management
Trends and local challenges in Project Management
 
FM presentation.pptx
FM  presentation.pptxFM  presentation.pptx
FM presentation.pptx
 
Net Present Value - NPV
Net Present Value - NPVNet Present Value - NPV
Net Present Value - NPV
 

More from Nor Fadzleen

MOBY DICK - HERMAN MELVILLE
MOBY DICK - HERMAN MELVILLEMOBY DICK - HERMAN MELVILLE
MOBY DICK - HERMAN MELVILLENor Fadzleen
 
THE DAY THE BULLDOZER CAME
THE DAY THE BULLDOZER CAME THE DAY THE BULLDOZER CAME
THE DAY THE BULLDOZER CAME Nor Fadzleen
 
I'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERS
I'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERSI'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERS
I'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERSNor Fadzleen
 
ICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONS
ICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONSICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONS
ICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONSNor Fadzleen
 
MOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLS
MOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLSMOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLS
MOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLSNor Fadzleen
 
Blue Ocean Strategy
Blue Ocean StrategyBlue Ocean Strategy
Blue Ocean StrategyNor Fadzleen
 
Blue Ocean Strategy
Blue Ocean StrategyBlue Ocean Strategy
Blue Ocean StrategyNor Fadzleen
 
Strategic Alignment
Strategic AlignmentStrategic Alignment
Strategic AlignmentNor Fadzleen
 
Balanca Score Card
Balanca Score CardBalanca Score Card
Balanca Score CardNor Fadzleen
 
C. mcm1263 assignment + projects confirmed
C. mcm1263 assignment + projects confirmedC. mcm1263 assignment + projects confirmed
C. mcm1263 assignment + projects confirmedNor Fadzleen
 
IT PROJECT MANAGEMENT
IT PROJECT MANAGEMENTIT PROJECT MANAGEMENT
IT PROJECT MANAGEMENTNor Fadzleen
 
Cambridge Placement Test
Cambridge Placement TestCambridge Placement Test
Cambridge Placement TestNor Fadzleen
 
Web 2.0 & 3.0 technologies in ELT
Web 2.0 & 3.0 technologies in ELTWeb 2.0 & 3.0 technologies in ELT
Web 2.0 & 3.0 technologies in ELTNor Fadzleen
 
I Wonder - Jeannie Kirby
I Wonder - Jeannie KirbyI Wonder - Jeannie Kirby
I Wonder - Jeannie KirbyNor Fadzleen
 
Heir Conditioning
Heir Conditioning Heir Conditioning
Heir Conditioning Nor Fadzleen
 
Around The World In 80 Days
Around The World In 80 DaysAround The World In 80 Days
Around The World In 80 DaysNor Fadzleen
 
Fruitcake Special- Frank Brennan
Fruitcake Special- Frank BrennanFruitcake Special- Frank Brennan
Fruitcake Special- Frank BrennanNor Fadzleen
 
The River by Valerie Bloom
The River by Valerie BloomThe River by Valerie Bloom
The River by Valerie BloomNor Fadzleen
 

More from Nor Fadzleen (20)

MOBY DICK - HERMAN MELVILLE
MOBY DICK - HERMAN MELVILLEMOBY DICK - HERMAN MELVILLE
MOBY DICK - HERMAN MELVILLE
 
THE DAY THE BULLDOZER CAME
THE DAY THE BULLDOZER CAME THE DAY THE BULLDOZER CAME
THE DAY THE BULLDOZER CAME
 
I'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERS
I'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERSI'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERS
I'M GAME! : ENGAGING 21ST CENTURY TEACHERS AND LEARNERS
 
ICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONS
ICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONSICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONS
ICWOAL'S NASCENT RESEARCH TRENDS IN MOOC FOR HIGHER EDUCATIONAL INSTITUTIONS
 
MOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLS
MOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLSMOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLS
MOBILE ASSISTED LANGUAGE LEARNING FOR MALAYSIAN SCHOOLS
 
Blue Ocean Strategy
Blue Ocean StrategyBlue Ocean Strategy
Blue Ocean Strategy
 
Blue Ocean Strategy
Blue Ocean StrategyBlue Ocean Strategy
Blue Ocean Strategy
 
Strategic Alignment
Strategic AlignmentStrategic Alignment
Strategic Alignment
 
Balanca Score Card
Balanca Score CardBalanca Score Card
Balanca Score Card
 
Change management
Change managementChange management
Change management
 
C. mcm1263 assignment + projects confirmed
C. mcm1263 assignment + projects confirmedC. mcm1263 assignment + projects confirmed
C. mcm1263 assignment + projects confirmed
 
IT PROJECT MANAGEMENT
IT PROJECT MANAGEMENTIT PROJECT MANAGEMENT
IT PROJECT MANAGEMENT
 
Cambridge Placement Test
Cambridge Placement TestCambridge Placement Test
Cambridge Placement Test
 
Web 2.0 & 3.0 technologies in ELT
Web 2.0 & 3.0 technologies in ELTWeb 2.0 & 3.0 technologies in ELT
Web 2.0 & 3.0 technologies in ELT
 
I Wonder - Jeannie Kirby
I Wonder - Jeannie KirbyI Wonder - Jeannie Kirby
I Wonder - Jeannie Kirby
 
Heir Conditioning
Heir Conditioning Heir Conditioning
Heir Conditioning
 
Around The World In 80 Days
Around The World In 80 DaysAround The World In 80 Days
Around The World In 80 Days
 
Mr Nobody
Mr Nobody Mr Nobody
Mr Nobody
 
Fruitcake Special- Frank Brennan
Fruitcake Special- Frank BrennanFruitcake Special- Frank Brennan
Fruitcake Special- Frank Brennan
 
The River by Valerie Bloom
The River by Valerie BloomThe River by Valerie Bloom
The River by Valerie Bloom
 

Recently uploaded

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 

Recently uploaded (20)

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 

D. strategic + project selection

  • 2. Strategic Planning and Project Selection Strategic planning involves determining long- term objectives, predicting future trends, and projecting the need for new products and services Organizations often perform a SWOT analysis Analyzing Strengths, Weaknesses, Opportunities, and Threats As part of strategic planning, organizations: Identify potential projects Use realistic methods to select which projects to work on Formalize project initiation by issuing a project charter 2
  • 4. Methods for Selecting Projects (Please note: The Methods are not only meant for this ITPM Class)
  • 5. Methods for Selecting Projects  There are usually more projects than available time and resources to implement them  Methods for selecting projects include:  Focusing on broad organizational needs  Categorizing information technology projects  Performing net present value or other financial analyses  Using a weighted scoring model  Implementing a balanced scorecard 5
  • 6. Focusing on Broad Organizational Needs It is often difficult to provide strong justification for many IT projects, but everyone agrees they have a high value “It is better to measure gold roughly than to count pennies precisely” Three important criteria for projects: There is a need for the project There are funds available There’s a strong will to make the project succeed 6
  • 7. Categorizing IT Projects One categorization is whether the project addresses: A problem An opportunity A directive Another categorization is how long it will take to do and when it is needed Another is the overall priority of the project 7
  • 8. Financial Analysis of Projects Financial considerations are often an important consideration in selecting projects Three primary methods for determining the projected financial value of projects Net present value (NPV) analysis Return on investment (ROI) Payback analysis 8
  • 9. Net Present Value Analysis Net present value (NPV) analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows and outflows to the present point in time Projects with a positive NPV should be considered if financial value is a key criterion The higher the NPV, the better 9
  • 10. Figure 4-3: Net Present Value Example Note that totals are equal, but NPVs are not because of the time value of money 10
  • 11. Figure 4-4: JWD Consulting NPV Example Multiply by the discount factor each year, then take cum. benefits – costs to get NPV Note: See the template called business_case_financials.xls Table 3-16 on pp. 118-119 lists the templates available 11 on the companion Web site (www.course.com/mis/schwalbe5e)
  • 12. NPV Calculations Determine estimated costs and benefits for the life of the project and the products it produces Determine the discount rate (check with your organization on what to use) Calculate the NPV (see text for details) Note: Some organizations consider the investment year as year 0, while others start in year 1; some people enter costs as negative numbers, while others do not Check with your organization for their preferences 12
  • 13. Return on Investment Return on investment (ROI) is calculated by subtracting the project costs from the benefits and then dividing by the costs ROI = (total discounted benefits - total discounted costs) / discounted costs The higher the ROI, the better Many organizations have a required rate of return or minimum acceptable rate of return on investment for projects Internal rate of return (IRR) can by calculated by finding the discount rate that makes the NPV equal to zero 13
  • 14. Payback Analysis Another important financial consideration is payback analysis The payback period is the amount of time it will take to recoup, in the form of net cash inflows, the total dollars invested in a project Payback occurs when the net cumulative discounted benefits equals the costs Many organizations want IT projects to have a fairly short payback period 14
  • 15. Figure 4-5: Charting the Payback Period 15
  • 16. 5 Minutes Class Activity Weighted Decision Matrix  Suggest four or five criteria you would use to choose a roommate.  Then choose the weight for each criterion, making sure the weights add up to one hundred.  Pick four potential roommates from this class.  Make a simple table, as shown here: Have you make your decision? Criteria Weight Name1 Name2 Name3 Name4 C1 30% 100 100 C2 20% 90 100 C3 30% 40 20 C4 10% 70 10 C5 10% 50 10 Weighted 72 58 Score This activity demonstrates one way to develop a weighted decision matrix for Project selection by finding a significant other.
  • 17. Weighted Scoring Model  A weighted scoring model is a tool that provides a systematic process for selecting projects based on many criteria 1. Identify criteria important to the project selection process 2. Assign weights (percentages) to each criterion so they add up to 100% 3. Assign scores to each criterion for each project 4. Multiply the scores by the weights and get the total weighted scores  The higher the weighted score, the better 17
  • 18. Figure 4-6: Sample Weighted Scoring Model for Project Selection 18
  • 19. Implementing a Balanced Scorecard Drs. Robert Kaplan and David Norton developed this approach to help select and manage projects that align with business strategy A balanced scorecard: Is a methodology that converts an organization’s value drivers, such as customer service, innovation, operational efficiency, and financial performance, to a series of defined metrics See www.balancedscorecard.org for more information 19
  • 20. Figure 4-7: Balanced Scorecard Example Defense Finance and Accounting Service, “DFAS Strategic Plan,” Nov 2001 (http://balancedscorecard.org/files/DFAS-strategic-plan.pdf ), p. 13. 20
  • 21. Destination Diagram A destination diagram often used to visualize elements that should appear at the end of a project Often utilized as vision building exercise (for project or non project-life) This is a richer aspect of presenting the elements other than Check List
  • 22. My Life Dream 20 years from today (16 Feb 2011) Mr X Darul Iman – Modernize ‘sekolah pondok’ for adults Picture Location: Bandar Tasik Puteri, Rawang, Selangor Cost: RM60,000.00 / year Income: RM120,000.00 / year Performing 3rd Hajj Location: Makkah Cost: RM100,000.00 Renowed Academician & Researcher Location: Universiti Selangor (UNISEL) Income: RM 174,000.00 / year Raised my 1 year old son Cost: RM 3 million Umrah & Tour Location: Jordan - Restoren Bawang Turki – Egypt - Location: Bandar Tasik Puteri, Madinah - Makkah Rawang, Selangor Bungalow with swimming pool Audi 4WD Cost: RM100,000.00 Cost: RM80,000.00 / year Location: Kuala Lumpur outskirt Cost: RM450,000.00 Cost: RM 1.5 million Income: RM240,000.00 / year
  • 23. $ 20,000,000 $30,000 $ 200,000 $ 30,000,000+600,000 $500,000 $100,000 From the second 5 years $ 80,000 until year 20th $ 450,000 + $ 4,000,000+600,000 Post- DR with grant From the second 5 years until years 20th $ 1,500,000 $ 500,000+600,000 $ 40,000 PHD My Life $ 50,000+ grant Dreams $ 10,000 $ 70,000+50,000 $ 10,000
  • 25. Project Charters After deciding what project to work on, it is important to let the rest of the organization know A project charter is a document that formally recognizes the existence of a project and provides direction on the project’s objectives and management Key project stakeholders should sign a project charter to acknowledge agreement on the need and intent of the project; a signed charter is a key output of project integration management 25
  • 26. Table 5-2: Sample Project Charter 26
  • 27. Preliminary Scope Statements A scope statement is a document used to develop and confirm a common understanding of the project scope It’s important for preventing scope creep The tendency for project scope to keep getting bigger It’s good practice to develop a preliminary or initial scope statement during project initiation and a more detailed scope statement as the project progresses 27
  • 28. Stakeholder Analysis A stakeholder analysis documents important (often sensitive) information about stakeholders such as: Stakeholders’ names and organizations Roles on the project Unique facts about stakeholders Level of influence and interest in the project Suggestions for managing relationships 28
  • 29. Table 4-2: Sample Stakeholder Analysis 29
  • 30. Chapter Summary Project Selection Methods Developing a project charter Developing a preliminary project scope statement Developing Stakeholder Analysis 30