Presentation on
“Project formulation,evaluation
& monitoring”
By Avinash kumar
PROJECT
Characteristics of project
1. Objectives-Every project has aimed to achieve
certain objective.
Once the objective is achieved the project is
said to be completed .
2.Life cycle- stages of Life cycle are as follows:
a.conception
b.Design
c.Implementation
d.Commissoning
3. Definite time limit
4. Uniqueness
5. Change
6. Optimality
7. Control mechanism
Classification of projects
Phases in project cycle
1.Identification
2.Formulation
3.Appraisal
4.Implementation
5.Monitoring
6.Evaluation
project cycle
TIME VALUE OF MONEY
 It involves two types of cost-
1. Compounding cost:- Future value of present
sum is known as compounding.
 Formula: A=C(1+r)n
2. Discounting cost:- Present value of future
sum is called discounting.
 Formula:Present worth=R(A)/(1+r)n
Techniques of risk analysis
Following are the popular techniques :
1. Break even analysis
2. Sensitive analysis
3. Decision tree analysis
4. Monto carlo
5. Game theory
Break even analysis
Here we can find out break even point (BEP).
* BEP refers to the level of production at which
farmer neither incurred profit nor incurred
losses .
* Its also known as no-profit no loss situation.
Break even production = fixed cost
selling price per unit - variable cost per unit
Estimation of break Even point
Costs&returns(inRs)
Q
B
K
L
M
O
X
Y
S
Quantity
Where,
SM= Total fixed cost
SL= Total cost curve
OK= Total revenue curve
B= Break Even Point
OQ=Break-Even Quantity
Zoneof loss
Zoneof profit
SENSITIVE ANALYSIS
It’s a technique that measures change in
profitability level of the project caused by a
change in factors affecting the profitability
level.
Sensitive Analysis provides answer to the
folloeing questions –
what happens to the profitability level if……
1. Demand of the product fall down.
2. If selling price of the product fall down.
3. If the level of production is declined.
Evaluation techniques for
selection of profitable
project It is nothing but benefit cost analysis of
various aspects of a project.
 These techniques are divided into two
groups:
1.Non –discounted techniques
2.Discounted techniques
Non- discounted techniques
1. Payback period (PBP)
2. Average rate of return (ARR)
3. Urgency
Payback Period (PBP)
 It is the length of period required to get back
or recover orignal investment incurred on a
project through cash inflow or income.
 Payback period=Orignal investment/Annual
cash inflow.
 Thumb rule:Project which have minimum
PBP is selected.
Average rate of return
(ARR)
 This method is obtained by the formula :
AVERAGE INFLOW
AVERAGE OUTFLOW
 Thumb rule: A project having highest ARR
value is selected
Urgency
 Urgency : In this method no formula or
method is used. Only those projects are
selected which are urgently required.
Discounted techniques
It includes :
1. Net present worth (NPW)
2. Profitability index
3. Internal rate of return (IRR)
4. Discounted benefit cost ratio
Net Present Worth (NPW)
 This is the present worth of cash flow stream.
 It is referred as Net Present Value(NPV).
 NPW=P1/(1+i)t
+P2/(1+i)t
+....+Pn/(1+i)t
-C.
 P1=Net cash flow in first year,
 i=Discount rate,
 t=Time period,
 C=Initial cost of the investment.
 Thumb rule:A Project having +ve & max
value of NPW is selected.
Profitability Index (PI)
 It is ratio of net present values of cash flows
to the initial capital expenditure.
 PI = Present value of cash inflow/Present
value of cash outflow.
 Thumb rule: A Project with highest value of
Profitability index is selected
Internal Rate of Return (IRR)
 IRR is the discounted rate which makes NPV
equal to ZERO.
 IRR is calculated by TRIAL and ERROR
method.
 IRR=(Lower discount rate)+(Diff b/w the two
discont rates)*[(Present worth of the cash
flow at the lower discount rate)/(Absolute diff
b/w the present worths of the the cash flow at
two discount rates)]
Benefit Cost Ratio
 We compare the present worth of costs with
present worth of benefits.
 B-C Ratio =Present value of cash
inflow/Present value of cash outflow.
 Thumb rule: A project with highest B-C
Ratio is selected.
NETWORK BASED SCHEDULING
 It is a technique used for planning , scheduling
and controlling of a project.
 It is represented by graphical plan which consist
of activity and event.
 ACTIVITY: Any operation which consume
resources( man, material, time),has start point
and end point.
 Activity is represented by straight arrow with
circle at two points.

TYPES OF ACTIVITIES
1. PRECEEDING ACTIVITY: Activity which
occur immediately before the succeeding
activity.
2. SUCCEEDING ACTIVITY: Activity which
cannot be started until one or more activities
are completed.
3. DUMMY ACTIVITY: Activity which does not
consume resources. It is represented by
dotted arrow.
EVENT
 They are called nodes.
 It does not consume resources and time.
 Event is the beginning and end of an activity
and is represented by a circle at specific point
of time.
TYPES OF EVENTS
1. Merge event: It represent joint completion of
more than one activity.
2. Burst event: Event which represent the
beginning of more than one activity.
3. Merge and Burst event : It is for sometime
nerge and sometime burst.
ERRORS IN DRAWING A NETWORK
1. Looping: Drawing an endless loop in a
network .
2. Dangling: to disconnect an activity before
the completion of all the activities in a
network.
3. Redundancy: inserting the dummy activity in
a network diagram.
NETWOK SCHEDULING TECHNIQUE
 CPM: (Critical path method) represent a
logical sequence of an activity and events in a
project. The duration of all these paths are
added in the total duration of the path.
 The path that has a longer duration duration
is called critical path and activities drawn in
that path are critical activities.
FORWARD PATH COMPUTATION
In this method earliest start time of all the
events is is computed which begin from initial
event and move toward the final event.
BACKWARD PATH COMPUTATION
Here we calculate the latest time. This
method is start from last event and move
toward initial event.
Slack time: It is the diff b/w latest finish time
and earliest start time.
Activity float analysis
 A study of non- critical path with regard to free
time is necessary because it help in better
control of project implementation and better
allocation of resources.
 In critical path latest finish time and earliest start
time both are equal.
 The slack of the event is given by diff b/w the TL
and TE.
 The free time available for an activity is called
“float”.
TYPES OF FLOAT
1. Total float: It represents the max time by
whhich completion of an activity can be
delayed w/o affecting the project completion
time.
Total float=[Tl of head event-Te of tail event-
Duration of activity]
2. FREE
FLOAT
 Delay that can be permitted in an activity so
that succeeding activity in the path are not
affected.
3.INDEPENDENT FLOAT
 IT is the spare time available for an activity .
Project : formulation,evaluation and monitoring

More Related Content

What's hot

Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisalHachnayen
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniquesTata Dinyuy
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Zulfiquer Ahmed Amin
 
Project identification and Project selection
Project identification and Project selectionProject identification and Project selection
Project identification and Project selectionAmandaBvera
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and AnalysisSuhail Hussain
 
Network Techniques for Project Management
Network Techniques for Project ManagementNetwork Techniques for Project Management
Network Techniques for Project ManagementIshan Gandhi
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
133761133 2-project-financing-in-india-ppt
133761133 2-project-financing-in-india-ppt133761133 2-project-financing-in-india-ppt
133761133 2-project-financing-in-india-pptAshima Thakur
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
ENVIRONMENTAL APPRAISAL OF PROJECTS
ENVIRONMENTAL  APPRAISAL OF PROJECTSENVIRONMENTAL  APPRAISAL OF PROJECTS
ENVIRONMENTAL APPRAISAL OF PROJECTSzailunnito
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
PROJECT CLASSIFICATION, IDENTIFICATION, FORMULATION
PROJECT CLASSIFICATION, IDENTIFICATION, FORMULATIONPROJECT CLASSIFICATION, IDENTIFICATION, FORMULATION
PROJECT CLASSIFICATION, IDENTIFICATION, FORMULATIONDr. RICHA SINGHAL
 

What's hot (20)

Project financing
Project financingProject financing
Project financing
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
Project identification and Project selection
Project identification and Project selectionProject identification and Project selection
Project identification and Project selection
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
 
Network Techniques for Project Management
Network Techniques for Project ManagementNetwork Techniques for Project Management
Network Techniques for Project Management
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Project selection
Project selection Project selection
Project selection
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Project cash flow
Project cash flowProject cash flow
Project cash flow
 
133761133 2-project-financing-in-india-ppt
133761133 2-project-financing-in-india-ppt133761133 2-project-financing-in-india-ppt
133761133 2-project-financing-in-india-ppt
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
ENVIRONMENTAL APPRAISAL OF PROJECTS
ENVIRONMENTAL  APPRAISAL OF PROJECTSENVIRONMENTAL  APPRAISAL OF PROJECTS
ENVIRONMENTAL APPRAISAL OF PROJECTS
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project cycle
Project cycleProject cycle
Project cycle
 
PROJECT CLASSIFICATION, IDENTIFICATION, FORMULATION
PROJECT CLASSIFICATION, IDENTIFICATION, FORMULATIONPROJECT CLASSIFICATION, IDENTIFICATION, FORMULATION
PROJECT CLASSIFICATION, IDENTIFICATION, FORMULATION
 
Project identification
Project identificationProject identification
Project identification
 

Viewers also liked

Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Projectimrohan1
 
Project formulation
Project formulationProject formulation
Project formulationyuarchu
 
Project formulation by shalini
Project formulation by shaliniProject formulation by shalini
Project formulation by shaliniDr. Shalini Pandey
 
18611 project identification
18611 project identification18611 project identification
18611 project identificationSingh Deep
 
Project_Formulation
Project_FormulationProject_Formulation
Project_Formulationjorpetit
 
Project identification
Project  identificationProject  identification
Project identificationVasanth Rvk
 
Farms loans and its procedural steps
Farms loans and its procedural steps Farms loans and its procedural steps
Farms loans and its procedural steps tarzan1990
 
Afid project monitoring and evaluation practices and lessons
Afid project monitoring and evaluation  practices and lessonsAfid project monitoring and evaluation  practices and lessons
Afid project monitoring and evaluation practices and lessonsRosemirta Birungi
 
Monitoring and evaluation (Part 1)
Monitoring and evaluation (Part 1)Monitoring and evaluation (Part 1)
Monitoring and evaluation (Part 1)Vilimaka Foliaki
 
NOMAD Project on Policy Formulation and Validation through non-moderated Crow...
NOMAD Project on Policy Formulation and Validation through non-moderated Crow...NOMAD Project on Policy Formulation and Validation through non-moderated Crow...
NOMAD Project on Policy Formulation and Validation through non-moderated Crow...Yannis Charalabidis
 

Viewers also liked (20)

Project formulation
Project formulationProject formulation
Project formulation
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
 
Project formulation and management
Project formulation and managementProject formulation and management
Project formulation and management
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
Project formulation
Project formulationProject formulation
Project formulation
 
Project formulation by shalini
Project formulation by shaliniProject formulation by shalini
Project formulation by shalini
 
18611 project identification
18611 project identification18611 project identification
18611 project identification
 
Project_Formulation
Project_FormulationProject_Formulation
Project_Formulation
 
Project identification
Project  identificationProject  identification
Project identification
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
 
Agriculture finnance
Agriculture  finnanceAgriculture  finnance
Agriculture finnance
 
Farms loans and its procedural steps
Farms loans and its procedural steps Farms loans and its procedural steps
Farms loans and its procedural steps
 
Dilli
DilliDilli
Dilli
 
Sampoorna Grameen rozgar Yojna
Sampoorna Grameen rozgar YojnaSampoorna Grameen rozgar Yojna
Sampoorna Grameen rozgar Yojna
 
Monitoring mgnrega
Monitoring mgnregaMonitoring mgnrega
Monitoring mgnrega
 
Afid project monitoring and evaluation practices and lessons
Afid project monitoring and evaluation  practices and lessonsAfid project monitoring and evaluation  practices and lessons
Afid project monitoring and evaluation practices and lessons
 
Monitoring and evaluation (Part 1)
Monitoring and evaluation (Part 1)Monitoring and evaluation (Part 1)
Monitoring and evaluation (Part 1)
 
Project Monitoring and Evaluation
Project Monitoring and EvaluationProject Monitoring and Evaluation
Project Monitoring and Evaluation
 
NOMAD Project on Policy Formulation and Validation through non-moderated Crow...
NOMAD Project on Policy Formulation and Validation through non-moderated Crow...NOMAD Project on Policy Formulation and Validation through non-moderated Crow...
NOMAD Project on Policy Formulation and Validation through non-moderated Crow...
 

Similar to Project : formulation,evaluation and monitoring

Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTS.Vijaya Bhaskar
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managersNaganna Chetty
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)Debanjan15
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxTecnicoItca
 
Critical path method & pert
Critical path method & pertCritical path method & pert
Critical path method & pertBhim Upadhyaya
 
Chapter 5-Project Management.pptx
Chapter 5-Project Management.pptxChapter 5-Project Management.pptx
Chapter 5-Project Management.pptxBahredinAbdella1
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updatedShraddha PMP
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars
 
Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 pptahsanrabbani
 
A760535773_16727_28_2018_u6.ppt
A760535773_16727_28_2018_u6.pptA760535773_16727_28_2018_u6.ppt
A760535773_16727_28_2018_u6.pptRajnikantPatel45
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisationCharul Sharma
 
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...Aravind NC
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost controlGuhan M
 
7.project costmanagement
7.project costmanagement7.project costmanagement
7.project costmanagementNiranjana K.R.
 

Similar to Project : formulation,evaluation and monitoring (20)

CPM AND PERT
CPM AND PERTCPM AND PERT
CPM AND PERT
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 
Chapter 12(cpm pert)
Chapter 12(cpm pert)Chapter 12(cpm pert)
Chapter 12(cpm pert)
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
PROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptxPROJECT-SCHEDULING-pptx.pptx
PROJECT-SCHEDULING-pptx.pptx
 
vk1
vk1vk1
vk1
 
Critical path method & pert
Critical path method & pertCritical path method & pert
Critical path method & pert
 
Chapter 5-Project Management.pptx
Chapter 5-Project Management.pptxChapter 5-Project Management.pptx
Chapter 5-Project Management.pptx
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updated
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
Top Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh MahasnehTop Pillars | Cost & Time Management by Salameh Mahasneh
Top Pillars | Cost & Time Management by Salameh Mahasneh
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 ppt
 
A760535773_16727_28_2018_u6.ppt
A760535773_16727_28_2018_u6.pptA760535773_16727_28_2018_u6.ppt
A760535773_16727_28_2018_u6.ppt
 
CPM and PERT
CPM and  PERTCPM and  PERT
CPM and PERT
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisation
 
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...MC0084 – Software Project Management & Quality Assurance - Master of Computer...
MC0084 – Software Project Management & Quality Assurance - Master of Computer...
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
7.project costmanagement
7.project costmanagement7.project costmanagement
7.project costmanagement
 

Recently uploaded

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 

Recently uploaded (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 

Project : formulation,evaluation and monitoring

  • 3. Characteristics of project 1. Objectives-Every project has aimed to achieve certain objective. Once the objective is achieved the project is said to be completed .
  • 4. 2.Life cycle- stages of Life cycle are as follows: a.conception b.Design c.Implementation d.Commissoning
  • 5. 3. Definite time limit 4. Uniqueness 5. Change 6. Optimality 7. Control mechanism
  • 7.
  • 8.
  • 9. Phases in project cycle 1.Identification 2.Formulation 3.Appraisal 4.Implementation 5.Monitoring 6.Evaluation
  • 11. TIME VALUE OF MONEY  It involves two types of cost- 1. Compounding cost:- Future value of present sum is known as compounding.  Formula: A=C(1+r)n 2. Discounting cost:- Present value of future sum is called discounting.  Formula:Present worth=R(A)/(1+r)n
  • 12. Techniques of risk analysis Following are the popular techniques : 1. Break even analysis 2. Sensitive analysis 3. Decision tree analysis 4. Monto carlo 5. Game theory
  • 13. Break even analysis Here we can find out break even point (BEP). * BEP refers to the level of production at which farmer neither incurred profit nor incurred losses . * Its also known as no-profit no loss situation. Break even production = fixed cost selling price per unit - variable cost per unit
  • 14. Estimation of break Even point Costs&returns(inRs) Q B K L M O X Y S Quantity Where, SM= Total fixed cost SL= Total cost curve OK= Total revenue curve B= Break Even Point OQ=Break-Even Quantity Zoneof loss Zoneof profit
  • 15. SENSITIVE ANALYSIS It’s a technique that measures change in profitability level of the project caused by a change in factors affecting the profitability level. Sensitive Analysis provides answer to the folloeing questions – what happens to the profitability level if…… 1. Demand of the product fall down. 2. If selling price of the product fall down. 3. If the level of production is declined.
  • 16. Evaluation techniques for selection of profitable project It is nothing but benefit cost analysis of various aspects of a project.  These techniques are divided into two groups: 1.Non –discounted techniques 2.Discounted techniques
  • 17. Non- discounted techniques 1. Payback period (PBP) 2. Average rate of return (ARR) 3. Urgency
  • 18. Payback Period (PBP)  It is the length of period required to get back or recover orignal investment incurred on a project through cash inflow or income.  Payback period=Orignal investment/Annual cash inflow.  Thumb rule:Project which have minimum PBP is selected.
  • 19. Average rate of return (ARR)  This method is obtained by the formula : AVERAGE INFLOW AVERAGE OUTFLOW  Thumb rule: A project having highest ARR value is selected
  • 20. Urgency  Urgency : In this method no formula or method is used. Only those projects are selected which are urgently required.
  • 21. Discounted techniques It includes : 1. Net present worth (NPW) 2. Profitability index 3. Internal rate of return (IRR) 4. Discounted benefit cost ratio
  • 22. Net Present Worth (NPW)  This is the present worth of cash flow stream.  It is referred as Net Present Value(NPV).  NPW=P1/(1+i)t +P2/(1+i)t +....+Pn/(1+i)t -C.  P1=Net cash flow in first year,  i=Discount rate,  t=Time period,  C=Initial cost of the investment.  Thumb rule:A Project having +ve & max value of NPW is selected.
  • 23. Profitability Index (PI)  It is ratio of net present values of cash flows to the initial capital expenditure.  PI = Present value of cash inflow/Present value of cash outflow.  Thumb rule: A Project with highest value of Profitability index is selected
  • 24. Internal Rate of Return (IRR)  IRR is the discounted rate which makes NPV equal to ZERO.  IRR is calculated by TRIAL and ERROR method.  IRR=(Lower discount rate)+(Diff b/w the two discont rates)*[(Present worth of the cash flow at the lower discount rate)/(Absolute diff b/w the present worths of the the cash flow at two discount rates)]
  • 25. Benefit Cost Ratio  We compare the present worth of costs with present worth of benefits.  B-C Ratio =Present value of cash inflow/Present value of cash outflow.  Thumb rule: A project with highest B-C Ratio is selected.
  • 26. NETWORK BASED SCHEDULING  It is a technique used for planning , scheduling and controlling of a project.  It is represented by graphical plan which consist of activity and event.  ACTIVITY: Any operation which consume resources( man, material, time),has start point and end point.  Activity is represented by straight arrow with circle at two points. 
  • 27. TYPES OF ACTIVITIES 1. PRECEEDING ACTIVITY: Activity which occur immediately before the succeeding activity. 2. SUCCEEDING ACTIVITY: Activity which cannot be started until one or more activities are completed. 3. DUMMY ACTIVITY: Activity which does not consume resources. It is represented by dotted arrow.
  • 28. EVENT  They are called nodes.  It does not consume resources and time.  Event is the beginning and end of an activity and is represented by a circle at specific point of time.
  • 29. TYPES OF EVENTS 1. Merge event: It represent joint completion of more than one activity. 2. Burst event: Event which represent the beginning of more than one activity. 3. Merge and Burst event : It is for sometime nerge and sometime burst.
  • 30. ERRORS IN DRAWING A NETWORK 1. Looping: Drawing an endless loop in a network . 2. Dangling: to disconnect an activity before the completion of all the activities in a network. 3. Redundancy: inserting the dummy activity in a network diagram.
  • 31. NETWOK SCHEDULING TECHNIQUE  CPM: (Critical path method) represent a logical sequence of an activity and events in a project. The duration of all these paths are added in the total duration of the path.  The path that has a longer duration duration is called critical path and activities drawn in that path are critical activities.
  • 32. FORWARD PATH COMPUTATION In this method earliest start time of all the events is is computed which begin from initial event and move toward the final event. BACKWARD PATH COMPUTATION Here we calculate the latest time. This method is start from last event and move toward initial event. Slack time: It is the diff b/w latest finish time and earliest start time.
  • 33. Activity float analysis  A study of non- critical path with regard to free time is necessary because it help in better control of project implementation and better allocation of resources.  In critical path latest finish time and earliest start time both are equal.  The slack of the event is given by diff b/w the TL and TE.  The free time available for an activity is called “float”.
  • 34. TYPES OF FLOAT 1. Total float: It represents the max time by whhich completion of an activity can be delayed w/o affecting the project completion time. Total float=[Tl of head event-Te of tail event- Duration of activity]
  • 35. 2. FREE FLOAT  Delay that can be permitted in an activity so that succeeding activity in the path are not affected.
  • 36. 3.INDEPENDENT FLOAT  IT is the spare time available for an activity .