1	
MOE EL TURKEY
ELECTRICAL POWER ENGINEER – RF PLANNING & OPTIMIZATION ENGINEER
– RAN INTEGRATION ENGINEER
Email: Turkey0079@gmail.com
Cell Phone:	+201010994983/+201023589999
Career objective:
Competent Electrical Engineer with over three years professional experience and a strong ability to mentor
others, leveraging my technical and field experience to drive organizational growth, performance & profitability,
Specialize in project coordination and manufacturing processes, very professional with impressive analytical and technical support
abilities.
Nationality: American
	 	
Education & Qualifications:
Graduated from (Arab Academy for Science and Technology) Class of 2009
Bachelor of science in Electronics & Communication
Individual Development:
Certified by IRICA ISO 9001 in Quality Control & Safety Certificate in business management from Elmhurst college
Certificate in managerial accounting from Elmhurst college Certificate in financial management from Elmhurst college
Technical skills:
• LTE Intermediate 4G/LTE RF planning and opti-
mization (air carrier signal).
• PCB layout design
• Semiconductor process systems
• Analog/digital modulation
• Underground electrical systems
• Performance optimization
• Power system optimization/upgrade of MCS, BSC
and BTS sites.
• Antenna CAD/simulation Matching networks,
Antenna Geometry.
• Passive/Active Antenna/System Testing.
• Microwave Antenna Design, Maximizing RF per-
formance.
• Implementation of termination and connection of
power generator sets.
• Expertise in troubleshooting [issues]
• Extensive power plant
• Creative problem solving
• Business Objects Xi2
• VHDL
• Spectrometer equipment
• HVAC design/drafting
• Design review
• Experience in Data Cabling System design and
Implementation
• Good knowledge about shell script and UNIX analy-
sis.
• Strong computer skills in Windows, Mac IOS, Mi-
crosoft Word, Excel and Power Point
Languages:
Ø Arabic: Fluent (spoken &written)
Ø English: Fluent (spoken & written)
Ø French: intermediate (spoken & written)
Associations:
Ø Licensed Member – IEEE Association for Engineers
2	
Work experience:
OCT 2014 –	Current	
MIDIS Group – MDS Holding
LAFARGE - KCML – KARBALAA CEMENT MANIFACTURING LIMITED rehabilitation – KARBALAA, IRAQ)
LAFARGE KCML Power generation facilities (22 MW PHASE-0, 44 MW PHASE-1)
Electronics engineer:
• Review the electrical power system design.
• Develop end-to-end data center electrical solutions.
• Serve as the project lead and/or contributing to a team of discipline engineers and technicians on project execution.
• Assures product quality
• Conduct site AC/DC power system Audit and Quality management.
• Supervise local engineers and contractors on site electrical and civil development and rectification works.
• Install electrical power system equipment's such as ENG/GEN control panel boards, rectifiers, battery and generator set,
ABB switchgears, ABB MCC, modifying electrical circuits to meet a specific task that the job required.
• Follow periodical maintenance and service schedule.
• Produce weekly and monthly progress report.
• Reviewing and auditing power board short circuit calculations, selectivity study and discrimination study.
• Spearhead development of Quality Control and Management Department.
• Prepare plans and layouts for equipment or system arrangements and space allocation.
• Prepare specifications of electrical systems and topographical maps to ensure that installation and operations conformed to
standard and customer requirements.
• Perform detailed calculations to establish manufacturing, construction, and installation standards and specifications, main-
taining 100% accuracy rate.
• Develop controlling system for 3-phases’ electric motor.
____________________________________________________________________________________
SEPT 2013 – SEPT 2014
Ericsson Mobile Technology Chicago, United states
RAN	Integration	Engineer	(One year contract):
• Plan the implementation of the Product Configuration.
• Execute Product Configuration.
• Execute Integration and migration work.
• Prepare System-module and acceptance test.
• Identify and drive improvements.
• Post Project activities.
• E2e technical understanding.
• Scripting & Coding.
• Lead and coordinate test execution
AUG 2011 – AUG 2013
Motorola Solutions Technology – Chicago, United States
RF Optimization and Planning:
• Analysis and optimization of substrate noise coupling in single-chip RF transceiver design.
• Design hands-on antenna working across multiple frequency bands.
• Coordinating debugging effort as cross-functional lead cross disciplines using assigned experts.
• Design Multi-Band Main-Diversity Antenna pairs - including MIMO.
• Conduct integration debug and radiated system optimization through Passive and Active OTA radiated performance metrics
and RF test measurement equipment.
• Research novel antenna designs and new RF subsystem technologies.
• Improve proper Quality-Gate testing for officials (platforms/customers) release based on found issues.
• Provide technical management of third-party designers of antenna solutions.
• Constantly look to improve RF/Antenna R&D tools, software and testing methods.
• Serve as head of R&D for the design and development of the Ethernet and the wireless system development.
3	
SEPT 2010 – JULY 2011
Siemens – Chicago, United States
Electrical-Power engineer, entry-level CME:
• Reviewed and revised electrical power system design.
• Computed BSC and BTS site electrical system load to ensure and determine the proper sizing of power cable, capacity of
generator set, capacity of rectifier, back-up battery, UPS and inverters.
• Power system Optimization and upgrade power system.
• Conducted Site AC/DC power system Audit and Quality Assurance.
• Supervised local engineers and contractors on site electrical and civil development and rectification works.
• Installed electrical power system equipment’s such as panel boards, rectifiers, battery and generator set.
• Rectified solar system BTS site relay station.
• Prepared BTS site for Pre-Acceptance activity.
• Produced Weekly and Monthly progress report.
References and Certificates available upon request

Main resume edited copy

  • 1.
    1 MOE EL TURKEY ELECTRICALPOWER ENGINEER – RF PLANNING & OPTIMIZATION ENGINEER – RAN INTEGRATION ENGINEER Email: Turkey0079@gmail.com Cell Phone: +201010994983/+201023589999 Career objective: Competent Electrical Engineer with over three years professional experience and a strong ability to mentor others, leveraging my technical and field experience to drive organizational growth, performance & profitability, Specialize in project coordination and manufacturing processes, very professional with impressive analytical and technical support abilities. Nationality: American Education & Qualifications: Graduated from (Arab Academy for Science and Technology) Class of 2009 Bachelor of science in Electronics & Communication Individual Development: Certified by IRICA ISO 9001 in Quality Control & Safety Certificate in business management from Elmhurst college Certificate in managerial accounting from Elmhurst college Certificate in financial management from Elmhurst college Technical skills: • LTE Intermediate 4G/LTE RF planning and opti- mization (air carrier signal). • PCB layout design • Semiconductor process systems • Analog/digital modulation • Underground electrical systems • Performance optimization • Power system optimization/upgrade of MCS, BSC and BTS sites. • Antenna CAD/simulation Matching networks, Antenna Geometry. • Passive/Active Antenna/System Testing. • Microwave Antenna Design, Maximizing RF per- formance. • Implementation of termination and connection of power generator sets. • Expertise in troubleshooting [issues] • Extensive power plant • Creative problem solving • Business Objects Xi2 • VHDL • Spectrometer equipment • HVAC design/drafting • Design review • Experience in Data Cabling System design and Implementation • Good knowledge about shell script and UNIX analy- sis. • Strong computer skills in Windows, Mac IOS, Mi- crosoft Word, Excel and Power Point Languages: Ø Arabic: Fluent (spoken &written) Ø English: Fluent (spoken & written) Ø French: intermediate (spoken & written) Associations: Ø Licensed Member – IEEE Association for Engineers
  • 2.
    2 Work experience: OCT 2014– Current MIDIS Group – MDS Holding LAFARGE - KCML – KARBALAA CEMENT MANIFACTURING LIMITED rehabilitation – KARBALAA, IRAQ) LAFARGE KCML Power generation facilities (22 MW PHASE-0, 44 MW PHASE-1) Electronics engineer: • Review the electrical power system design. • Develop end-to-end data center electrical solutions. • Serve as the project lead and/or contributing to a team of discipline engineers and technicians on project execution. • Assures product quality • Conduct site AC/DC power system Audit and Quality management. • Supervise local engineers and contractors on site electrical and civil development and rectification works. • Install electrical power system equipment's such as ENG/GEN control panel boards, rectifiers, battery and generator set, ABB switchgears, ABB MCC, modifying electrical circuits to meet a specific task that the job required. • Follow periodical maintenance and service schedule. • Produce weekly and monthly progress report. • Reviewing and auditing power board short circuit calculations, selectivity study and discrimination study. • Spearhead development of Quality Control and Management Department. • Prepare plans and layouts for equipment or system arrangements and space allocation. • Prepare specifications of electrical systems and topographical maps to ensure that installation and operations conformed to standard and customer requirements. • Perform detailed calculations to establish manufacturing, construction, and installation standards and specifications, main- taining 100% accuracy rate. • Develop controlling system for 3-phases’ electric motor. ____________________________________________________________________________________ SEPT 2013 – SEPT 2014 Ericsson Mobile Technology Chicago, United states RAN Integration Engineer (One year contract): • Plan the implementation of the Product Configuration. • Execute Product Configuration. • Execute Integration and migration work. • Prepare System-module and acceptance test. • Identify and drive improvements. • Post Project activities. • E2e technical understanding. • Scripting & Coding. • Lead and coordinate test execution AUG 2011 – AUG 2013 Motorola Solutions Technology – Chicago, United States RF Optimization and Planning: • Analysis and optimization of substrate noise coupling in single-chip RF transceiver design. • Design hands-on antenna working across multiple frequency bands. • Coordinating debugging effort as cross-functional lead cross disciplines using assigned experts. • Design Multi-Band Main-Diversity Antenna pairs - including MIMO. • Conduct integration debug and radiated system optimization through Passive and Active OTA radiated performance metrics and RF test measurement equipment. • Research novel antenna designs and new RF subsystem technologies. • Improve proper Quality-Gate testing for officials (platforms/customers) release based on found issues. • Provide technical management of third-party designers of antenna solutions. • Constantly look to improve RF/Antenna R&D tools, software and testing methods. • Serve as head of R&D for the design and development of the Ethernet and the wireless system development.
  • 3.
    3 SEPT 2010 –JULY 2011 Siemens – Chicago, United States Electrical-Power engineer, entry-level CME: • Reviewed and revised electrical power system design. • Computed BSC and BTS site electrical system load to ensure and determine the proper sizing of power cable, capacity of generator set, capacity of rectifier, back-up battery, UPS and inverters. • Power system Optimization and upgrade power system. • Conducted Site AC/DC power system Audit and Quality Assurance. • Supervised local engineers and contractors on site electrical and civil development and rectification works. • Installed electrical power system equipment’s such as panel boards, rectifiers, battery and generator set. • Rectified solar system BTS site relay station. • Prepared BTS site for Pre-Acceptance activity. • Produced Weekly and Monthly progress report. References and Certificates available upon request