SlideShare a Scribd company logo
ENG MURTAZA ASAD, murtaza.asad@yahoo.com , + 971588915630
BE, MBA
Specialist Design Planner ,FTTH, CCTV,IPVPN,3G,4G Fiber Backhaul wireless System
working in , GIS .civil works ,Planner FTTH,GSM ,3G,4G Backhaul for wireless system
design and develop Outside Plant networkinstallations, modifications, and upgrades.
Design & Plan the Project with detail Drawings,Fiber Management, Preparation of BOQ for individual Estimate,
submitthe requirement and obtain authority permissionsif any,updatingRecord/documenta tion on completion
of work GIS, GPON Network, DSR, as builtdrawings etc.
Installation of OLT shelf with boards.
Roding & roping shall berequired, where there is no rope exists in the duct.
Check NOC for Villas,buildings,complex,high risebuilding,shoppingmalls ,Hospital,and warehouse, factories.
To install/Pull an underground Fiber Optic cable(>600F) insidea duct from Exchange to Exchange and or Exchange
to FDH and or up to the point of termination).
Draw cable(fiber , Copper) in duct or replacecable, the activity involves labeling,coiling, with supply & install of
Draw rope etc
Installation or Recovery of FDH /ODF cabinet in Indoor includingcollection fromstoreand return with packing.
Pulling/Layingof drop Cablefrom Telecom Room (i.e. ODF/FDH/FDB) to Customer premises (up to the point of
termination ) includingtermination atboth ends and rosette with recovery of damaged/faulty fiber. Including
supply of Materials.
1) Fixingthe ONT directly to the wall as per company standard installation procedures and guidelines.
2) Connecting the fiber drop cableto the ONT inputand powering ON the ONT.
3) Coordinatewith ISO Team, provide the ONT Serial Number and confirmthat the ONT has been registered as
active/installed in the PMS.
4) Patch cord installation up to 5 meter is partof the respective installation or faultdockets clearance.
Civil works.
Layingof 100 mm (D 54) PVC duct or equivalent in open trench includingsupply of Ducts and Accessories.
Construct castin situ or provideprecastjointbox type-JRC4 (with supply/providingand fixingof frame & cover
with required furniture, duct connectivity,poke out, as per drawingetc.).
Work Experience 17 Years in telecom Specialist Design Planner Costing in Fiber,FTTH, Backhaul wireless
System Projects
Level I &IIDesign Planner Costing in
Fiber,FTTH,GSM Backhaul wireless System
Projects 2001 TO 2008 ETISALAT GROUPIN PAKISTAN
Level II Design Planner Costing in
Fiber,FTTH,GSM,3G Backhaul wireless
System Projects
2008 TO 2012 ETISALAT IN UAE
Specialist Design Planner Costing in
Fiber,FTTH, 3G,4G ,CCTV,Backhaul wireless
System Projects
2012 TO 2016 ETISALAT GROUPIN PAKISTAN
Specialist Design Planner Costing in
Fiber,FTTH, 3G,4G,CCTV Backhaul wireless
System Projects 2017 TO TILL
DATE
ETISALAT PROJECT WITH Xad
COMPANY IN UAE
Level I &II Design Planner Costing in Fiber,FTTH,GSM Backhaul wireless System Projects
LevelI &II 2001 TO2008
Engineer - Optical Fiber Access Network OSP / ISP, Multimedia & Broadband.
 Working in planningdepartment Fiber GSM.
 KPI of GPON Operation and Maintenance.
 GPON migration project.
 Maintenance of Optical fiber Access Network, ONU (Optical Network Units).
 Installation and maintenanceof, ISDN/BRI, ISDN/PRI, DXX, DSL and other corporateservices.
 To providethe ADSL serviceto the existingPTCL/ PSTN customers.
 Co-ordinate with Optical Fiber Network department to enable the ONU for
provision of DSL service(ADSL cards 16 ports)
 planner
Level II Design Planner Costing in Fiber,FTTH,3G,4G,CCTV Backhaul wireless System Projects
 Etisalat ,Abu-Dhabi , UAE………………………………….(2008-2012)
 Planner FTTX/OSP
Workingin Access Network Project
 Planningfor GPON, GSM sites,IP-VPN, etc on GIS system.
 Feasibility and Costingfor Recharge Estimates for IPVPN (Main & Backup Links), Site Offices etc.
 Issuanceof Projects.
 Feasibility & Site Survey for projects.
 Project Implementation under PMI guidelines.
 Deployment within timeline and under cost baseline.
 Project planner FTTX/OSP/PON / ENGINEER
 PlanningDesigningof fiber connectivity for GPON FTTx projects PlanningDesigningof fiber connectivity for
GPON FTTx projects
 Level II Design Planner Costing in Fiber,FTTH, Backhaul wireless System Projects
 March 2008 to 2012
 National Bank of Abu Dhabi - IPVPN Connectivity , Backup Links , and Disaster Recovery Links.
 EtisalatGSM 3G & 4G (LTE) Project
 Planner FTTX/OSP/PON
 Level II Design Planner Costing in Fiber,FTTH, Backhaul wireless System Projects
 January 2011 to 2012
 MobileAccess network Modernization
 Planner ENGINEER
 MobileAccess network Modernization for more than 3500 GSM sites in Abu Dhabi.
 Planner FTTX/OSP/
 Telecom Engineer in Telephone Exchange Karachi)(2004-2008)
 Look after the expansion (CAPEX) work in Telephone Exchange
 Preparation of Detail Estimates (Estimation Form (Cabinet Area Wise) including”Cabinets,Tail Joints of
Primary / Secondary Cables,Secondary Cables,DPs, Sub-loops,Customer Premises’Termination”).
 CarryoutMaintenance/Renovation of Access Network, i.e. Primary cables,Cross Connection cabinets,
secondary cables,Distribution PairBoxes,Customer loop renovation etc.
 Maintenance of Optical fiber Access Network, ONU (Optical Network Units).
 Coordination with the staff to rectify the faults on FaultManagement System.
Specialist Design Planner Costing in Fiber,FTTH, 3G,4G,CCTV Backhaul wireless System Projects
 2012 to 2016 Etisalat group PTCL,and Etisalat project with Xad company 2017 to till date
 Eng Design PlanningCosting project
 Design & Plan the Project with detail Drawings,Fiber Management, Preparation of BOQ for individual
Estimate, submitthe requirement and obtain authority permissions if any,updatingRecord/documentation on
completion of work GIS, GPON Network, DSR, as builtdrawings etc.
 Objective

Currently lookingfor a challengingnew position,one which will make best use of existingskillsand
experience, whilstenablingfurther personal and professional development and increased responsibility.

 Summary

 A hard-working,determined and dedicated individual,who is passionateaboutdeliveringexceptional
customer servicestandards whilstensuringthe achievement of demanding targets and business objectives.
 Quick to grasp new ideas and concepts, always keen to develop new skills and expertiseand is ableto
demonstrate a logical and analytical approach to solvingcomplex problems and issues.Ableto work
effectively on own initiative,demonstratingthe motivation,organization and time management skills
required to complete all tasks on time and to the required quality standard.Works with both safety and
quality in mind,ensuringthat neither factor is compromised whilecompleting work responsibilities.
 Articulateand approachable,possesses excellentinterpersonal and communication skillsand the ability
to develop positiveworkingrelationshipsboth internally and externally.Enjoys beingpartof a successful
and productive team and thives in highly pressurized and challengingworkingenvironments.
Education
MBA, marketing (2 years)
Bachelor of Engineering (2001)(Electronics)
NED University of Engineering and Technology Karachi (4 years)
Skills & Expertise
 Planner FTTX/OSP/PON ENGINEER
Fiber Optics,Telecommunications,Network Design, GPON, Project Planning,
Optical Fiber,OSP, Access Networks, FTTx, NMS,GIS
ro,iWx4x

More Related Content

What's hot

Training for 5G Positioning and Location Services - Tonex Training
Training for 5G Positioning and Location Services - Tonex TrainingTraining for 5G Positioning and Location Services - Tonex Training
Training for 5G Positioning and Location Services - Tonex Training
Bryan Len
 

What's hot (20)

Ericsson 5G Radio Dot Infographic
Ericsson 5G Radio Dot InfographicEricsson 5G Radio Dot Infographic
Ericsson 5G Radio Dot Infographic
 
Ericsson Technology Review: Meeting 5G latency requirements with inactive state
Ericsson Technology Review: Meeting 5G latency requirements with inactive stateEricsson Technology Review: Meeting 5G latency requirements with inactive state
Ericsson Technology Review: Meeting 5G latency requirements with inactive state
 
Ericsson Technology Review - Issue 2, 2018
Ericsson Technology Review - Issue 2, 2018Ericsson Technology Review - Issue 2, 2018
Ericsson Technology Review - Issue 2, 2018
 
Private 5G Networks and Vendor Diversification
Private 5G Networks and Vendor DiversificationPrivate 5G Networks and Vendor Diversification
Private 5G Networks and Vendor Diversification
 
Broadband Internet & digital TV networks for megacities
Broadband Internet & digital TV networks for megacitiesBroadband Internet & digital TV networks for megacities
Broadband Internet & digital TV networks for megacities
 
Ericsson transports 5G
Ericsson transports 5GEricsson transports 5G
Ericsson transports 5G
 
Broadband World Forum 2012 Highlights
Broadband World Forum 2012 HighlightsBroadband World Forum 2012 Highlights
Broadband World Forum 2012 Highlights
 
Training for 5G Positioning and Location Services - Tonex Training
Training for 5G Positioning and Location Services - Tonex TrainingTraining for 5G Positioning and Location Services - Tonex Training
Training for 5G Positioning and Location Services - Tonex Training
 
Ericsson Technology Review: 5G network programmability for mission-critical a...
Ericsson Technology Review: 5G network programmability for mission-critical a...Ericsson Technology Review: 5G network programmability for mission-critical a...
Ericsson Technology Review: 5G network programmability for mission-critical a...
 
Fiberstore white paper-delivering gigabit ethernet with g.fast
Fiberstore white paper-delivering gigabit ethernet with g.fastFiberstore white paper-delivering gigabit ethernet with g.fast
Fiberstore white paper-delivering gigabit ethernet with g.fast
 
IT Proposal
IT ProposalIT Proposal
IT Proposal
 
Ericsson Technology Review: Versatile Video Coding explained – the future of ...
Ericsson Technology Review: Versatile Video Coding explained – the future of ...Ericsson Technology Review: Versatile Video Coding explained – the future of ...
Ericsson Technology Review: Versatile Video Coding explained – the future of ...
 
Ericsson 5G Radio Dot Infographic
Ericsson 5G Radio Dot InfographicEricsson 5G Radio Dot Infographic
Ericsson 5G Radio Dot Infographic
 
Smart Grid With I Pv6 For India
Smart Grid With I Pv6 For IndiaSmart Grid With I Pv6 For India
Smart Grid With I Pv6 For India
 
4 gip webinar dic 2013
4 gip webinar dic 20134 gip webinar dic 2013
4 gip webinar dic 2013
 
Steve Lincoln CV
Steve Lincoln CVSteve Lincoln CV
Steve Lincoln CV
 
Vectra
Vectra Vectra
Vectra
 
Automation of GIS for FTTx Networks
Automation of GIS for  FTTx NetworksAutomation of GIS for  FTTx Networks
Automation of GIS for FTTx Networks
 
apidays LIVE Helsinki - 5G Edge and APIs - Case Safe Cruising by Merja Kajava
apidays LIVE Helsinki - 5G Edge and APIs - Case Safe Cruising by Merja Kajavaapidays LIVE Helsinki - 5G Edge and APIs - Case Safe Cruising by Merja Kajava
apidays LIVE Helsinki - 5G Edge and APIs - Case Safe Cruising by Merja Kajava
 
Ericsson Distributed Cloud
Ericsson Distributed CloudEricsson Distributed Cloud
Ericsson Distributed Cloud
 

Similar to Cv for specialist design planner costing in fiber,ftth, backhaul wireless system projects (1)

Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
Ahmed Osama,PMP
 
Prasanth Kochiyathil Gopi CV
Prasanth Kochiyathil Gopi CVPrasanth Kochiyathil Gopi CV
Prasanth Kochiyathil Gopi CV
PRASANTH GOPI
 
Wied Resume 2016
Wied  Resume 2016Wied  Resume 2016
Wied Resume 2016
papagitta
 

Similar to Cv for specialist design planner costing in fiber,ftth, backhaul wireless system projects (1) (20)

Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016 Ahmed Osama Resume05-02-2016
Ahmed Osama Resume05-02-2016
 
vimal resume
vimal resumevimal resume
vimal resume
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
resume
resumeresume
resume
 
Cv Project manager & solution architect ftth
Cv Project manager & solution architect ftthCv Project manager & solution architect ftth
Cv Project manager & solution architect ftth
 
Sandeep resume
Sandeep resumeSandeep resume
Sandeep resume
 
Prasanth Kochiyathil Gopi CV
Prasanth Kochiyathil Gopi CVPrasanth Kochiyathil Gopi CV
Prasanth Kochiyathil Gopi CV
 
shashank3
shashank3shashank3
shashank3
 
shailesh
shaileshshailesh
shailesh
 
B Mahendar- CV
B Mahendar- CVB Mahendar- CV
B Mahendar- CV
 
Tanveer HFC CV 1.1
Tanveer HFC CV 1.1Tanveer HFC CV 1.1
Tanveer HFC CV 1.1
 
5G and the National 5G Testbed for Small Businesses to be Located in Brighton
5G and the National 5G Testbed for Small Businesses to be Located in Brighton5G and the National 5G Testbed for Small Businesses to be Located in Brighton
5G and the National 5G Testbed for Small Businesses to be Located in Brighton
 
Fiber to Home, Smart Home, Smart Cities
Fiber to Home, Smart Home, Smart Cities Fiber to Home, Smart Home, Smart Cities
Fiber to Home, Smart Home, Smart Cities
 
Wied Resume 2016
Wied  Resume 2016Wied  Resume 2016
Wied Resume 2016
 
Mamdouh C.V NEW
Mamdouh C.V NEWMamdouh C.V NEW
Mamdouh C.V NEW
 
mohammed iftequar hussain Telecom
mohammed iftequar hussain Telecommohammed iftequar hussain Telecom
mohammed iftequar hussain Telecom
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 

Recently uploaded

power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 

Cv for specialist design planner costing in fiber,ftth, backhaul wireless system projects (1)

  • 1. ENG MURTAZA ASAD, murtaza.asad@yahoo.com , + 971588915630 BE, MBA Specialist Design Planner ,FTTH, CCTV,IPVPN,3G,4G Fiber Backhaul wireless System working in , GIS .civil works ,Planner FTTH,GSM ,3G,4G Backhaul for wireless system design and develop Outside Plant networkinstallations, modifications, and upgrades. Design & Plan the Project with detail Drawings,Fiber Management, Preparation of BOQ for individual Estimate, submitthe requirement and obtain authority permissionsif any,updatingRecord/documenta tion on completion of work GIS, GPON Network, DSR, as builtdrawings etc. Installation of OLT shelf with boards. Roding & roping shall berequired, where there is no rope exists in the duct. Check NOC for Villas,buildings,complex,high risebuilding,shoppingmalls ,Hospital,and warehouse, factories. To install/Pull an underground Fiber Optic cable(>600F) insidea duct from Exchange to Exchange and or Exchange to FDH and or up to the point of termination). Draw cable(fiber , Copper) in duct or replacecable, the activity involves labeling,coiling, with supply & install of Draw rope etc Installation or Recovery of FDH /ODF cabinet in Indoor includingcollection fromstoreand return with packing. Pulling/Layingof drop Cablefrom Telecom Room (i.e. ODF/FDH/FDB) to Customer premises (up to the point of termination ) includingtermination atboth ends and rosette with recovery of damaged/faulty fiber. Including supply of Materials. 1) Fixingthe ONT directly to the wall as per company standard installation procedures and guidelines. 2) Connecting the fiber drop cableto the ONT inputand powering ON the ONT. 3) Coordinatewith ISO Team, provide the ONT Serial Number and confirmthat the ONT has been registered as active/installed in the PMS. 4) Patch cord installation up to 5 meter is partof the respective installation or faultdockets clearance. Civil works. Layingof 100 mm (D 54) PVC duct or equivalent in open trench includingsupply of Ducts and Accessories. Construct castin situ or provideprecastjointbox type-JRC4 (with supply/providingand fixingof frame & cover with required furniture, duct connectivity,poke out, as per drawingetc.). Work Experience 17 Years in telecom Specialist Design Planner Costing in Fiber,FTTH, Backhaul wireless System Projects Level I &IIDesign Planner Costing in Fiber,FTTH,GSM Backhaul wireless System Projects 2001 TO 2008 ETISALAT GROUPIN PAKISTAN Level II Design Planner Costing in Fiber,FTTH,GSM,3G Backhaul wireless System Projects 2008 TO 2012 ETISALAT IN UAE Specialist Design Planner Costing in Fiber,FTTH, 3G,4G ,CCTV,Backhaul wireless System Projects 2012 TO 2016 ETISALAT GROUPIN PAKISTAN Specialist Design Planner Costing in Fiber,FTTH, 3G,4G,CCTV Backhaul wireless System Projects 2017 TO TILL DATE ETISALAT PROJECT WITH Xad COMPANY IN UAE
  • 2. Level I &II Design Planner Costing in Fiber,FTTH,GSM Backhaul wireless System Projects LevelI &II 2001 TO2008 Engineer - Optical Fiber Access Network OSP / ISP, Multimedia & Broadband.  Working in planningdepartment Fiber GSM.  KPI of GPON Operation and Maintenance.  GPON migration project.  Maintenance of Optical fiber Access Network, ONU (Optical Network Units).  Installation and maintenanceof, ISDN/BRI, ISDN/PRI, DXX, DSL and other corporateservices.  To providethe ADSL serviceto the existingPTCL/ PSTN customers.  Co-ordinate with Optical Fiber Network department to enable the ONU for provision of DSL service(ADSL cards 16 ports)  planner Level II Design Planner Costing in Fiber,FTTH,3G,4G,CCTV Backhaul wireless System Projects  Etisalat ,Abu-Dhabi , UAE………………………………….(2008-2012)  Planner FTTX/OSP Workingin Access Network Project  Planningfor GPON, GSM sites,IP-VPN, etc on GIS system.  Feasibility and Costingfor Recharge Estimates for IPVPN (Main & Backup Links), Site Offices etc.  Issuanceof Projects.  Feasibility & Site Survey for projects.  Project Implementation under PMI guidelines.  Deployment within timeline and under cost baseline.  Project planner FTTX/OSP/PON / ENGINEER  PlanningDesigningof fiber connectivity for GPON FTTx projects PlanningDesigningof fiber connectivity for GPON FTTx projects  Level II Design Planner Costing in Fiber,FTTH, Backhaul wireless System Projects  March 2008 to 2012  National Bank of Abu Dhabi - IPVPN Connectivity , Backup Links , and Disaster Recovery Links.  EtisalatGSM 3G & 4G (LTE) Project  Planner FTTX/OSP/PON  Level II Design Planner Costing in Fiber,FTTH, Backhaul wireless System Projects  January 2011 to 2012  MobileAccess network Modernization  Planner ENGINEER  MobileAccess network Modernization for more than 3500 GSM sites in Abu Dhabi.  Planner FTTX/OSP/  Telecom Engineer in Telephone Exchange Karachi)(2004-2008)  Look after the expansion (CAPEX) work in Telephone Exchange
  • 3.  Preparation of Detail Estimates (Estimation Form (Cabinet Area Wise) including”Cabinets,Tail Joints of Primary / Secondary Cables,Secondary Cables,DPs, Sub-loops,Customer Premises’Termination”).  CarryoutMaintenance/Renovation of Access Network, i.e. Primary cables,Cross Connection cabinets, secondary cables,Distribution PairBoxes,Customer loop renovation etc.  Maintenance of Optical fiber Access Network, ONU (Optical Network Units).  Coordination with the staff to rectify the faults on FaultManagement System. Specialist Design Planner Costing in Fiber,FTTH, 3G,4G,CCTV Backhaul wireless System Projects  2012 to 2016 Etisalat group PTCL,and Etisalat project with Xad company 2017 to till date  Eng Design PlanningCosting project  Design & Plan the Project with detail Drawings,Fiber Management, Preparation of BOQ for individual Estimate, submitthe requirement and obtain authority permissions if any,updatingRecord/documentation on completion of work GIS, GPON Network, DSR, as builtdrawings etc.  Objective  Currently lookingfor a challengingnew position,one which will make best use of existingskillsand experience, whilstenablingfurther personal and professional development and increased responsibility.   Summary   A hard-working,determined and dedicated individual,who is passionateaboutdeliveringexceptional customer servicestandards whilstensuringthe achievement of demanding targets and business objectives.  Quick to grasp new ideas and concepts, always keen to develop new skills and expertiseand is ableto demonstrate a logical and analytical approach to solvingcomplex problems and issues.Ableto work effectively on own initiative,demonstratingthe motivation,organization and time management skills required to complete all tasks on time and to the required quality standard.Works with both safety and quality in mind,ensuringthat neither factor is compromised whilecompleting work responsibilities.  Articulateand approachable,possesses excellentinterpersonal and communication skillsand the ability to develop positiveworkingrelationshipsboth internally and externally.Enjoys beingpartof a successful and productive team and thives in highly pressurized and challengingworkingenvironments. Education MBA, marketing (2 years) Bachelor of Engineering (2001)(Electronics) NED University of Engineering and Technology Karachi (4 years) Skills & Expertise  Planner FTTX/OSP/PON ENGINEER Fiber Optics,Telecommunications,Network Design, GPON, Project Planning, Optical Fiber,OSP, Access Networks, FTTx, NMS,GIS