SlideShare a Scribd company logo
ANKUR RAMWALA
Contact: +919879101587, E-Mail: ankurramwala@gmail.com
MIDDLE MANAGEMENT PROFESSIONAL
SUPPLY CHAIN MANAGEMENT - PRODUCTION PLANNING AND LOGISTICS
Career Abstract
Proven record in Business Process improvement by practically implementing the principals of Total Quality
Management that foster cost savings and improve productivity.
Experience of handling contrasting assignments in the different phases of the Career in a Steel Plant.
Honesty, Enthusiasm, Assertiveness and Innovativeness are the underlined qualities of my Personality
Professional Qualifications
Board / University Degree Branch Grade
Year of
Pass out
Symbiosis University, PUNE MBA Supply Chain Management Distinction 2010
Technical Education Board, Gujarat DIPLOMA Mechanical Engineering First Class 1996
Gujarat Higher Secondary Education Board 12th
Science Pass 1994
Gujarat Secondary Education Board 10th
Science Distinction 1991
Job Details
Organization: Essar Steel India Limited Since June' 1996
Position: Manager, Steel Making Plant
Profile Period Assignments Interactions with
Major
Achievements
Steel Making Plant
Shift Manager
Dec.
2014
to
Till Date
Responsible for
Achievement of
Production
Target for
CSP Mill Rolling /
Slab Casting
Shift In charges (ConArc, LF, VD/VCD, CSP
Caster, Slab Caster, F.A. Store) all across the
SMP.
Took Individual
charge in this new
area within 3
months of joining
and successfully
handling this task
in the difficult
phase of supply
quality and critical
customer grade
requirements.
Shift in charges and their escalation of all
supply Departments of Iron Making Zone
(BF, COREX, HBI/DRI) and supply
departments (RMHS, HMM).
CSP Mill Shift In charge and their
escalations
DCM/SCM shift In charges and their
escalations
Profile Period Assignments Interactions with Major Achievements
Operation
coordinator
to Technical
Cell for Slab
Caster
Aug. 2013
to
Nov. 2014
Conduct training
programs for Slab
Caster operation
personnel
All Engineers and
Associates
(Timberman,
Mouldman,
Riggers, Crane
Operators, Lancers,
Scarfers, Gas
Cutters, Tundish
area and Yard
Supervisors) of Slab
Caster
Conducted training programs on various
Customer complaints and created good
awareness towards them.
Preparation and
Modification in SOP of
Casting Parameters
for Quality
improvement
Prepared SOP for best combination of
Casting Parameters (Speed, Mould
water, Spray Pattern, Casting Powder,
Tundish covering powder etc. for Each
Steel Grade (170 nos).
Documentation for
ISO and IMS
Prepared HIRAC for pre-heating Tundish
with CO. Also established SOP for safe
material movement in Slabyard.
Addressing the
customer complaints
for resolving them at
source
For Plate mill grade, UT failure
complaints; established the cause of
failure with statistics.
Tundish Area
In charge of
Slab Caster
Supply of Tundish as
per production plan
Mechanical and
Electrical
Department
Created space and ease of movement in
Tundish preparation area by
implementing 5 S principals.
Slab Yard In
charge
1. Responsible for
Safety in the area.
2. Responsible for
defect free supply of
slabs to rolling Mills
(Plate Mill and Hot
Strip Mill)
3. Management of
Inventory (Slabs,
Equipment,
Machines).
4. Operation and
condition monitoring
and adhering to the
maintenance
schedule.
Production
Planning
Department,
Material Handling
and also IT
Department.
By correcting the methods and
establishing the path of process,
Achieved double Dispatch (3000 Tons /
Day) for Plate Mill alone and
maintained it.
Production and
TCGs of various
rolling department
(Hot Strip Mill,
Plate Mill, CSP Mill)
and QA / QC
departments.
Positive Action award for preparation
of cover for transporting VHC grade (for
eliminating chances of rejection) slabs
from Plant B to Plant A.
Profile Period Assignments Interactions with Major Achievements
5S area
lead of Slab
Yard
Aug.
2008
to
July 2013
Representative of the area;
Facing the external and
internal Audits.
Engineers as well as
Associates of the area
Penetration of the principles of
5 S in the minds and behavior of
the members.
Plate Mill
Dispatcher
Sep.
2012
to
July 2013
Carry out the Parting of
every slab to facilitate the
dimensions convenient for
Plate Mill rolling adhering to
the customer requirements
External logistics team
for Locomotive
(Railway) and Trailer
(Road) dispatch
Development of methods to
improve productivity continually
Gas cutting, Scarfing
technicians, Their
supervisors, Riggers
and Crane Operators
Data entry in IMPS (ORACLE
based system) and in MES
(JAVA based) and also in SAP
(MB51, MB1B, MSC2N etc.)
SCM and Plate Mill
operations
Slabyard
Shift In
charge
Apr 2000
to
Jan 2008
and
Aug.
2008
to
July 2013
Safety and House Keeping in
the Yard
Quality Control
Department
Designed and prepared
(individually) special blooms for
Scarfing / Slitting bed so that
cleaning cycle time reduced to 8
hours (from 24 hours initially)
Continued flaw of
Production of CCP and HSM
Rolling Mill and SCM
personnel
Designed and prepared
(individually) special cooling
strips for slab cooling (for
readiness for manual inspection
and conditioning) and reduced
the time to 4 hours (from 16
hours initially)
Providing defect free Slabs
to HSM w. r. t. dimensions,
profile and surface quality
Associate Supervisors
and Technicians of
Scarfing, Gas cutting,
Lancing along with
Associate Riggers and
Crane Operators
With effective planning of
logistics achieved 100 slabs / 8
hour conditioning (repetitive
record)
Profile Period Assignments
Interactions
with
Major Achievements
Plant Safety
Captain of
Steel Making
Plant
Feb. 2008
to
Jul. 2008
Reporting directly to Head
Steel Making Plant
All the section
heads.
Recognized as the best Safety Captain
Responsible for all the
incidents in the Steel
Making Plant related to
Safety
Nominated
Safety
Champions
from all the
sections
working round
the clock
Safety incident (Near Miss / SAM )
reporting system implemented and
achieved reporting of average 05
incidents / day
Lead the cross functional team for the
First ever FMEA on Safety (Safe working
of EAF Slag door cleaning forklifts) and
won the best FMEA of the month award.
Procurement function for
Safety
All the
Contractors
and their
Safety
supervisors.
Successfully arranged auditorium level
Safety Time Out functions for Employees
/ Associates every week outside their
working hours.
Evaluation of Contractors
on their Safety
Performance every Month
Brought down the FAC / MTC / LTI / PD
and 100% Plant Safety index for 3
consecutive months
Profile Period Assignments
Interactions
with
Major Achievements
Slab Caster 24
KARAT Steel
Quality
Member
Jun 1996
to
Mar 2000
Feedback Regarding quality of
Concast slabs w.r.t. Profile,
Temperature passing through
different zones of Caster and
Surface quality.
Caster
Operation
crew
Played a role as a team member in
establishment of cooling curves for
various grades for surface quality
improvement of Cast Slabs.
Slabyard Shift
Engineer
Dispatch of Slabs as raw
material for 24 X 7 Hot Strip
Mill Production
Rolling Mill
and SCM
personnel
Regarded as the swiftest schedule
maker with least re-logistics
Data entry in IMPS (ORACLE
based system)
Associate
Riggers and
Crane
Operators
Awards on two occasions in 1997 and
2004 for operating 4 motion (3 levers)
EOT cranes and continuing production
of Steel Making Plant and Hot Strip
Mill during Crane Operators' Strike.
Personal Details
Date of Birth: July 19th
, 1976
Contact Address: B-13, Govardhan Row House
Near Florence Hospital, Balaji Hero showroom Lane,
VNSG University road, Vesu,
Surat-395007.,
Gujarat, India.
Languages Known: English, Hindi, Gujarati (R/W/S)
Hobbies: Teaching
Singing and listening to All kind of music
Skills: Proficiency in MS Excel (applying logical formulas), Power point, Word etc.
Also able to operate various modules like SAP (PP), ORACLE (IMPS), JAVA (MES)
Good at process development and improvements
TQM including 5 S and Safety
Location Preference: Open for Assignments across the Globe.

More Related Content

What's hot

SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1Prasad naik
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
Muhammad MuhdKhairul
 
Resume of sadiq nawaz
Resume of sadiq nawazResume of sadiq nawaz
Resume of sadiq nawazSadiq Khan
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
GOPAKUMAR BALAKRISHNA PILLAI
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Black_resume 201601
Black_resume 201601Black_resume 201601
Black_resume 201601Neal Black
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resumeiminneedofu
 
mp singh 20 04 15satyam
mp singh 20 04 15satyammp singh 20 04 15satyam
mp singh 20 04 15satyamManindra Singh
 

What's hot (17)

Ejike's CV
Ejike's CVEjike's CV
Ejike's CV
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
loizou[1] - Copy
loizou[1] - Copyloizou[1] - Copy
loizou[1] - Copy
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
 
MohammadShafique (1)
MohammadShafique (1)MohammadShafique (1)
MohammadShafique (1)
 
Resume of sadiq nawaz
Resume of sadiq nawazResume of sadiq nawaz
Resume of sadiq nawaz
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
Sundar Resume
Sundar ResumeSundar Resume
Sundar Resume
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
KASHF ALI
KASHF ALIKASHF ALI
KASHF ALI
 
C.V
C.VC.V
C.V
 
Black_resume 201601
Black_resume 201601Black_resume 201601
Black_resume 201601
 
Paul vanson-resume
Paul vanson-resumePaul vanson-resume
Paul vanson-resume
 
mp singh 20 04 15satyam
mp singh 20 04 15satyammp singh 20 04 15satyam
mp singh 20 04 15satyam
 

Viewers also liked

Boon 52 Not Out
Boon 52 Not OutBoon 52 Not Out
Boon 52 Not Out
Team Eleven
 
Училище за благочестие том 1
Училище за благочестие   том 1Училище за благочестие   том 1
Училище за благочестие том 1
Petar Vasilev
 
1.5 models of health car..
1.5 models of health car..1.5 models of health car..
1.5 models of health car..sanjnu
 
Actividad pag 29 desarrolla competencias personales
Actividad pag 29 desarrolla competencias personalesActividad pag 29 desarrolla competencias personales
Actividad pag 29 desarrolla competencias personalesValentina Salazar Aguirre
 
guadalaviar
guadalaviarguadalaviar
guadalaviar
carmelapadilla
 
MHP Investor Deck 3-24-15
MHP Investor Deck 3-24-15MHP Investor Deck 3-24-15
MHP Investor Deck 3-24-15David Carlos
 
Pivotal HAWQ - High Availability (2014)
Pivotal HAWQ - High Availability (2014)Pivotal HAWQ - High Availability (2014)
Pivotal HAWQ - High Availability (2014)
saravana krishnamurthy
 
Javaone報告会2016
Javaone報告会2016Javaone報告会2016
Javaone報告会2016
yuki shiroma
 
Album estudiantes x tinaquillo mayo 2008 faceb
Album estudiantes x tinaquillo mayo 2008   facebAlbum estudiantes x tinaquillo mayo 2008   faceb
Album estudiantes x tinaquillo mayo 2008 facebgrubatex
 
Juan ramón jiménez
Juan ramón jiménezJuan ramón jiménez
Juan ramón jiménez
tropeda
 
XI Targi eHandlu - Unified Factory S.A. - Karol Dudij
XI Targi eHandlu - Unified Factory S.A. - Karol DudijXI Targi eHandlu - Unified Factory S.A. - Karol Dudij
XI Targi eHandlu - Unified Factory S.A. - Karol Dudij
ecommerce poland expo
 
U2T4 - Pruebas del Software
U2T4 - Pruebas del SoftwareU2T4 - Pruebas del Software
U2T4 - Pruebas del Software
Luis Eduardo Pelaez Valencia
 
SEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. Marcos
SEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. MarcosSEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. Marcos
SEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. Marcos
Ana Belen Tutora
 
project on vb.net in BCA food distribution Management system
project on vb.net in BCA food distribution Management systemproject on vb.net in BCA food distribution Management system
project on vb.net in BCA food distribution Management system
Amit P
 
Українська мова. 4 клас. Особливості організації та проведення уроків з украї...
Українська мова. 4 клас. Особливості організації та проведення уроків з украї...Українська мова. 4 клас. Особливості організації та проведення уроків з украї...
Українська мова. 4 клас. Особливості організації та проведення уроків з украї...
Електронні книги Ранок
 
How to Make Business Care about Social Media
How to Make Business Care about Social MediaHow to Make Business Care about Social Media
How to Make Business Care about Social Media
Spoken About
 

Viewers also liked (20)

Boon 52 Not Out
Boon 52 Not OutBoon 52 Not Out
Boon 52 Not Out
 
Училище за благочестие том 1
Училище за благочестие   том 1Училище за благочестие   том 1
Училище за благочестие том 1
 
Amicus General Portfolio
Amicus General PortfolioAmicus General Portfolio
Amicus General Portfolio
 
1.5 models of health car..
1.5 models of health car..1.5 models of health car..
1.5 models of health car..
 
Actividad pag 29 desarrolla competencias personales
Actividad pag 29 desarrolla competencias personalesActividad pag 29 desarrolla competencias personales
Actividad pag 29 desarrolla competencias personales
 
Amistad
AmistadAmistad
Amistad
 
guadalaviar
guadalaviarguadalaviar
guadalaviar
 
MHP Investor Deck 3-24-15
MHP Investor Deck 3-24-15MHP Investor Deck 3-24-15
MHP Investor Deck 3-24-15
 
Pivotal HAWQ - High Availability (2014)
Pivotal HAWQ - High Availability (2014)Pivotal HAWQ - High Availability (2014)
Pivotal HAWQ - High Availability (2014)
 
Javaone報告会2016
Javaone報告会2016Javaone報告会2016
Javaone報告会2016
 
My Resume-no pic-mn
My Resume-no pic-mnMy Resume-no pic-mn
My Resume-no pic-mn
 
Album estudiantes x tinaquillo mayo 2008 faceb
Album estudiantes x tinaquillo mayo 2008   facebAlbum estudiantes x tinaquillo mayo 2008   faceb
Album estudiantes x tinaquillo mayo 2008 faceb
 
Juan ramón jiménez
Juan ramón jiménezJuan ramón jiménez
Juan ramón jiménez
 
XI Targi eHandlu - Unified Factory S.A. - Karol Dudij
XI Targi eHandlu - Unified Factory S.A. - Karol DudijXI Targi eHandlu - Unified Factory S.A. - Karol Dudij
XI Targi eHandlu - Unified Factory S.A. - Karol Dudij
 
U2T4 - Pruebas del Software
U2T4 - Pruebas del SoftwareU2T4 - Pruebas del Software
U2T4 - Pruebas del Software
 
SEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. Marcos
SEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. MarcosSEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. Marcos
SEGUNDEROS VIAJEROS DESDE CASTILLA Y LEÓN. Marcos
 
Amiloidosis Dr Loredo
Amiloidosis Dr LoredoAmiloidosis Dr Loredo
Amiloidosis Dr Loredo
 
project on vb.net in BCA food distribution Management system
project on vb.net in BCA food distribution Management systemproject on vb.net in BCA food distribution Management system
project on vb.net in BCA food distribution Management system
 
Українська мова. 4 клас. Особливості організації та проведення уроків з украї...
Українська мова. 4 клас. Особливості організації та проведення уроків з украї...Українська мова. 4 клас. Особливості організації та проведення уроків з украї...
Українська мова. 4 клас. Особливості організації та проведення уроків з украї...
 
How to Make Business Care about Social Media
How to Make Business Care about Social MediaHow to Make Business Care about Social Media
How to Make Business Care about Social Media
 

Similar to CV ANKUR RAMWALA

Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Dane Wise
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEStefanus Tanaya
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEStefanus Tanaya
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEStefanus Tanaya
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEStefanus Tanaya
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEStefanus Tanaya
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEStefanus Tanaya
 

Similar to CV ANKUR RAMWALA (20)

resume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shineresume_Prasanna_-2_by_shine
resume_Prasanna_-2_by_shine
 
Dino_with_photodoc1
Dino_with_photodoc1Dino_with_photodoc1
Dino_with_photodoc1
 
Resume -S DAS -F
Resume -S DAS -FResume -S DAS -F
Resume -S DAS -F
 
Emad Mohammed CV
Emad Mohammed CVEmad Mohammed CV
Emad Mohammed CV
 
Project engineer C.V.
Project engineer C.V.Project engineer C.V.
Project engineer C.V.
 
resume
resumeresume
resume
 
manoj cv planning
manoj cv planningmanoj cv planning
manoj cv planning
 
Engr,imran cv.cement.
Engr,imran cv.cement.Engr,imran cv.cement.
Engr,imran cv.cement.
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
mhk master cv
mhk master cvmhk master cv
mhk master cv
 
mhk master cv
mhk master cvmhk master cv
mhk master cv
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 
Manufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUMEManufacturing Engineer S-TANAYA RESUME
Manufacturing Engineer S-TANAYA RESUME
 

CV ANKUR RAMWALA

  • 1. ANKUR RAMWALA Contact: +919879101587, E-Mail: ankurramwala@gmail.com MIDDLE MANAGEMENT PROFESSIONAL SUPPLY CHAIN MANAGEMENT - PRODUCTION PLANNING AND LOGISTICS Career Abstract Proven record in Business Process improvement by practically implementing the principals of Total Quality Management that foster cost savings and improve productivity. Experience of handling contrasting assignments in the different phases of the Career in a Steel Plant. Honesty, Enthusiasm, Assertiveness and Innovativeness are the underlined qualities of my Personality Professional Qualifications Board / University Degree Branch Grade Year of Pass out Symbiosis University, PUNE MBA Supply Chain Management Distinction 2010 Technical Education Board, Gujarat DIPLOMA Mechanical Engineering First Class 1996 Gujarat Higher Secondary Education Board 12th Science Pass 1994 Gujarat Secondary Education Board 10th Science Distinction 1991 Job Details Organization: Essar Steel India Limited Since June' 1996 Position: Manager, Steel Making Plant Profile Period Assignments Interactions with Major Achievements Steel Making Plant Shift Manager Dec. 2014 to Till Date Responsible for Achievement of Production Target for CSP Mill Rolling / Slab Casting Shift In charges (ConArc, LF, VD/VCD, CSP Caster, Slab Caster, F.A. Store) all across the SMP. Took Individual charge in this new area within 3 months of joining and successfully handling this task in the difficult phase of supply quality and critical customer grade requirements. Shift in charges and their escalation of all supply Departments of Iron Making Zone (BF, COREX, HBI/DRI) and supply departments (RMHS, HMM). CSP Mill Shift In charge and their escalations DCM/SCM shift In charges and their escalations
  • 2. Profile Period Assignments Interactions with Major Achievements Operation coordinator to Technical Cell for Slab Caster Aug. 2013 to Nov. 2014 Conduct training programs for Slab Caster operation personnel All Engineers and Associates (Timberman, Mouldman, Riggers, Crane Operators, Lancers, Scarfers, Gas Cutters, Tundish area and Yard Supervisors) of Slab Caster Conducted training programs on various Customer complaints and created good awareness towards them. Preparation and Modification in SOP of Casting Parameters for Quality improvement Prepared SOP for best combination of Casting Parameters (Speed, Mould water, Spray Pattern, Casting Powder, Tundish covering powder etc. for Each Steel Grade (170 nos). Documentation for ISO and IMS Prepared HIRAC for pre-heating Tundish with CO. Also established SOP for safe material movement in Slabyard. Addressing the customer complaints for resolving them at source For Plate mill grade, UT failure complaints; established the cause of failure with statistics. Tundish Area In charge of Slab Caster Supply of Tundish as per production plan Mechanical and Electrical Department Created space and ease of movement in Tundish preparation area by implementing 5 S principals. Slab Yard In charge 1. Responsible for Safety in the area. 2. Responsible for defect free supply of slabs to rolling Mills (Plate Mill and Hot Strip Mill) 3. Management of Inventory (Slabs, Equipment, Machines). 4. Operation and condition monitoring and adhering to the maintenance schedule. Production Planning Department, Material Handling and also IT Department. By correcting the methods and establishing the path of process, Achieved double Dispatch (3000 Tons / Day) for Plate Mill alone and maintained it. Production and TCGs of various rolling department (Hot Strip Mill, Plate Mill, CSP Mill) and QA / QC departments. Positive Action award for preparation of cover for transporting VHC grade (for eliminating chances of rejection) slabs from Plant B to Plant A.
  • 3. Profile Period Assignments Interactions with Major Achievements 5S area lead of Slab Yard Aug. 2008 to July 2013 Representative of the area; Facing the external and internal Audits. Engineers as well as Associates of the area Penetration of the principles of 5 S in the minds and behavior of the members. Plate Mill Dispatcher Sep. 2012 to July 2013 Carry out the Parting of every slab to facilitate the dimensions convenient for Plate Mill rolling adhering to the customer requirements External logistics team for Locomotive (Railway) and Trailer (Road) dispatch Development of methods to improve productivity continually Gas cutting, Scarfing technicians, Their supervisors, Riggers and Crane Operators Data entry in IMPS (ORACLE based system) and in MES (JAVA based) and also in SAP (MB51, MB1B, MSC2N etc.) SCM and Plate Mill operations Slabyard Shift In charge Apr 2000 to Jan 2008 and Aug. 2008 to July 2013 Safety and House Keeping in the Yard Quality Control Department Designed and prepared (individually) special blooms for Scarfing / Slitting bed so that cleaning cycle time reduced to 8 hours (from 24 hours initially) Continued flaw of Production of CCP and HSM Rolling Mill and SCM personnel Designed and prepared (individually) special cooling strips for slab cooling (for readiness for manual inspection and conditioning) and reduced the time to 4 hours (from 16 hours initially) Providing defect free Slabs to HSM w. r. t. dimensions, profile and surface quality Associate Supervisors and Technicians of Scarfing, Gas cutting, Lancing along with Associate Riggers and Crane Operators With effective planning of logistics achieved 100 slabs / 8 hour conditioning (repetitive record)
  • 4. Profile Period Assignments Interactions with Major Achievements Plant Safety Captain of Steel Making Plant Feb. 2008 to Jul. 2008 Reporting directly to Head Steel Making Plant All the section heads. Recognized as the best Safety Captain Responsible for all the incidents in the Steel Making Plant related to Safety Nominated Safety Champions from all the sections working round the clock Safety incident (Near Miss / SAM ) reporting system implemented and achieved reporting of average 05 incidents / day Lead the cross functional team for the First ever FMEA on Safety (Safe working of EAF Slag door cleaning forklifts) and won the best FMEA of the month award. Procurement function for Safety All the Contractors and their Safety supervisors. Successfully arranged auditorium level Safety Time Out functions for Employees / Associates every week outside their working hours. Evaluation of Contractors on their Safety Performance every Month Brought down the FAC / MTC / LTI / PD and 100% Plant Safety index for 3 consecutive months Profile Period Assignments Interactions with Major Achievements Slab Caster 24 KARAT Steel Quality Member Jun 1996 to Mar 2000 Feedback Regarding quality of Concast slabs w.r.t. Profile, Temperature passing through different zones of Caster and Surface quality. Caster Operation crew Played a role as a team member in establishment of cooling curves for various grades for surface quality improvement of Cast Slabs. Slabyard Shift Engineer Dispatch of Slabs as raw material for 24 X 7 Hot Strip Mill Production Rolling Mill and SCM personnel Regarded as the swiftest schedule maker with least re-logistics Data entry in IMPS (ORACLE based system) Associate Riggers and Crane Operators Awards on two occasions in 1997 and 2004 for operating 4 motion (3 levers) EOT cranes and continuing production of Steel Making Plant and Hot Strip Mill during Crane Operators' Strike.
  • 5. Personal Details Date of Birth: July 19th , 1976 Contact Address: B-13, Govardhan Row House Near Florence Hospital, Balaji Hero showroom Lane, VNSG University road, Vesu, Surat-395007., Gujarat, India. Languages Known: English, Hindi, Gujarati (R/W/S) Hobbies: Teaching Singing and listening to All kind of music Skills: Proficiency in MS Excel (applying logical formulas), Power point, Word etc. Also able to operate various modules like SAP (PP), ORACLE (IMPS), JAVA (MES) Good at process development and improvements TQM including 5 S and Safety Location Preference: Open for Assignments across the Globe.