SlideShare a Scribd company logo
1 of 13
Cost & Management Accounting (EDL 305)-
Semester III
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes
1st Module Assessment
Case Study
The general meaning of material is all commodities physical objects used to make the final
product. It may be direct or indirect.
(i) Direct Materials: Materials, cost of which can be directly attributable to the end product for
which it is being used, in an economically feasible way.
(ii) Indirect Materials: The materials which are not directly attributable to a particular final
product.
Material Control is the systematic control over the procurement, storage and usage of materials
to maintain even flow of materials and avoiding at the same time excessive investment in
inventories.
Illustration:- From the details given below, calculate:
(i) Re-ordering level
(ii) Maximum level
(iii) Minimum level
(iv) Danger level.
Re-ordering quantity is to be calculated on the basis of following information:
• Cost of placing a purchase order is INR. 20
• Number of units to be purchased during the year is 5,000
• Purchase price per unit inclusive of transportation cost is INR. 50
• Annual cost of storage per units is INR. 5.
Details of lead time: Average- 10 days, Maximum- 15 days, Minimum-5 days.
For emergency purchases- 4 days.
Rate of consumption: Average: 15 units per day,
Maximum: 20 units per day.
Question 1. As per given information, Re-ordering level is …………
a. 300 units
b. 400 units
c. 200 units
d. 250 units
Question 2. Continuous stock taking is a part of
a. Annual stock taking
b. Perpetual inventory
c. ABC analysis
d. Bin Cards
Question 3. Danger level is ……………
a. 60 units
b. 90 units
c. 100 units
d. 10 units
Question 4. Direct material can be classified as
a. Variable cost
b. Fixed cost
c. Semi-variable cost
d. Prime Cost
Question 5. In most of the industries, the most important element of cost is
a. Material
b. Labour
c. Overheads
d. Administration Cost
Question 6. Maximum level is …………..
a. 400 units
b. 300 units
c. 250 units
d. 450 units
Question 7. Minimum level is ……………….
a. 250 units
b. 150 units
c. 350 units
d. 50 units
Question 8. What is the Minimum rate of consumption per day ?
a. 20 units per day
b. 10 units per day
c. 30 units per day
d. 25 units per day
Question 9. What is the Re-order Quantity (ROQ)?
a. 200 units
b. 250 units
c. 100 units
d. 300 units
Question 10. Which of the following is considered to be the normal loss of materials?
a. Loss due to accidents
b. Pilferage
c. Loss due to breaking the bulk
d. Loss due to careless handling of materials
10 on 10 
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes
2nd Module Assessment
Case Study
Labour cost is a very important constituent of total cost of any product/services. It is very
necessary to account for labour cost properly so that we may able to analyze it and control the
avoidable part of labour cost.
The management objective of keeping labour cost as low as possible is achieved by balancing
productivity with wages. Low wages do not necessarily mean low labour cost. Low labour cost is
possible by giving substantial increase in wages against corresponding increase in productivity.
Overheads are the expenditure which cannot be conveniently traced to or identified with any
particular cost unit. Such expenses are incurred for output generally and not for a particular work
order e.g., wages paid to watch and ward staff, heating and lighting expenses of factory etc.
Question-1: "Fixed overhead costs are not affected in monetary terms during a given period by a
change in output". But this statement holds good provided
a. Increase in output is not substantial
b. Increase in output is substantial
c. Both (a) and (b)
d. None of the above
Question 2. Abnormal cost is the cost:
a. Cost normally incurred at a given level of output
b. Cost not normally incurred at a given level of output
c. Cost which is charged to customer
d. Cost which is included in the cost of the product
Question 3. Identify among the following a scientific and accurate method of factory overhead
absorption
a. Percentage of direct material cost method
b. Percentage of direct labour cost method
c. Percentage of prime cost method
d. Machine hour rate method
Question 4. Identify among the following a scientific and accurate method of factory overhead
absorption
a. Percentage of direct material cost method
b. Percentage of direct labour cost method
c. Percentage of prime cost method
d. Machine hour rate method
Question 5. Labour turnover means:
a. Turnover generated by labour
b. Rate of change in composition of labour force during a specified period
c. Either of the above
d. Both of the above
Question 6. Overhead refers to:
a. Direct or Prime Cost
b. All Indirect costs
c. only Factory indirect costs
d. Only expenses
Question 7. The allotment of whole items of cost to cost centres or cost units is called
a. Overhead absorption
b. Cost apportionment
c. Cost allocation
d. None of the above
Question 8. The concept of ‘idle capacity of plant' as used in cost accounting is its
a. Best capacity for normal production
b. Capacity used for standard setting
c. Theoretical maximum capacity
d. Capacity below which production should not fall
Question 9. The difference between actual factory overhead and absorbed factory overhead will
be usually at the minimum level, provided pre- determined overhead rate is based on
a. Maximum capacity
b. Direct labour hours(wrong)
c. Machine hours
d. Normal capacity
Question 10. Which of the following is not an avoidable cause of labour turnover:
a. Dissatisfaction with Job
b. Lack of training facilities
c. Low wages and allowances
d. Disability, making a worker unfit for work
10 on 10 
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes
3rd Module Assessment
Case Study
Marginal costing is not a distinct method of ascertainment of cost but it is a technique which
applies existing methods in a particular manner so that the relationship between profit & the
volume of output can be clearly brought out. It is an accounting system where only variable cost
or direct cost will be charged to the cost units. It concentrates on the controllable aspects of
business by separating fixed and variable costs.
Marginal costing is not a separate costing. It is only a technique used by accountants to aid
management decision. It is also called as “Direct Costing” in U.S.A. This technique of costing is
also known as “Variable Costing”, “Differential Costing” or “Out-of-pocket” costing.
Management Information and Reporting System
Today's computer age, management information system (i.e. MIS) is becoming popular in the
corporate circle for giving quick information to the management. The purpose of MIS is
reporting and is to provide the necessary information to managers and supervisors at various
levels to help them to discharge their functions of organising, planning, control and decision
making.
MIS is a scientific way of collecting; processing, storing and communicating information
relating to the various activities of an organisation to the various levels of management so that
management may be facilitated in discharging its functions efficiently and run the organisation in
an efficient way for the betterment of all.
Question-1: Following information is available of XYZ Limited for quarter ended June, 2013
Fixed cost Rs. 5,00,000; Variable cost Rs. 10 per unit; Selling price Rs. 15 per unit; Output level
1,50,000 units. What will be amount of profit earned during the quarter using the marginal
costing technique?
a. Rs. 2,50,000
b. Rs. 10,00,000
c. Rs. 5,00,000
d. Rs. 17,50,000
Question 2. Management accounting is applicable to
a. Service entities
b. Manufacturing entities
c. Non profit entities
d. All of these
Question 3. Managerial accounting information is generally prepared for …………………
a. Shareholders
b. Creditors
c. Managers
d. Regulatory agencies
Question 4. Period costs are
a. Variable costs
b. Fixed costs
c. Prime costs
d. Overheads costs
Question 5. The main difference between marginal costing and absorption costing is regarding
the treatment of
a. Prime cost
b. Fixed overheads
c. Direct materials
d. Variable overheads
Question 6. Under marginal costing the cost of product includes
a. Prime costs only
b. Price costs and variable overheads
c. Prime costs and fixed overheads
d. Prime costs and factory overheads
Question 7. under marginal costing:
a. All costs are classified into two groups - variable and fixed
b. Variable costs form part of the product cost and inventory valuation
c. Fixed costs are treated as period costs
d. All of the above
Question 8. When sales and production (in units) are same then profit under
a. Marginal costing is higher than that of absorption costing
b. Marginal costing is lower than that of absorption costing
c. Marginal costing is equal to that of absorption costing
d. None of the above
Question 9. When sales exceed production (in units) then profit under
a. Marginal costing is higher than that of absorption costing
b. Marginal costing is lower than that of absorption costing
c. Marginal costing is equal than that of absorption costing
d. None of above
Question 10. Which of the following is not an internal user of management information?
a. Creditor
b. Department manager
c. Controller
d. Treasurer
10 on 10 
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes
4th Module Assessment
CASE STUDY-
Organisations, who do not wish to know how much it costs to make a product with precise
accuracy, may be happy with traditional costing system. Others however fix their price on cost
and need to be able to determine it with reasonable accuracy. The latter organisations have been
greatly benefitted from the development of activity based costing (ABC), which is more a
modern absorption costing method, and was evolved to give more accurate product costs.
Activity Based Costing is an accounting methodology that assigns costs to activities rather than
products or services. This enables resources & overhead costs to be more accurately assigned to
products & services that consume them. ABC is a technique which involves identification of cost
with each cost driving activity and making it as the basis for apportionment of costs over
different cost objects/ jobs/ products/ customersor services.
Question-1: A cost driver is:
a. An item of production overheads
b. A common cost which is shared over cost centres
c. Any cost relating to transport
d. An activity which generates costs
Question 2. A cost driver:
a. Is a force behind the overhead cost
b. Is an allocation base
c. Is a transaction that is a significant determinant of cost
d. All of the above
Question 3. In activity based costing, costs are accumulated by activity using:
a. Cost drivers
b. Cost objects
c. Cost pools
d. Cost benefit analysis
Question 4. In an activity based cost system; an activity/unit of work or task with differentiated
purposes will be classified as
a. different task
b. purpose cost
c. an activity
d. an allocation cost
Question 5. Steps in ABC include:
a. Identification of activities and their respective costs
b. "Identification of cost driver of each activity and computation of an allocation rate per
activity"
c. Allocation of overhead cost to products/ services based on the activities involved
d. All of the above
Question 6. The key elements of activity based budgeting are:
a. Type of activity to be performed
b. Quantity of activity to be performed
c. Cost of activity to be performed
d. All of the above
Question 7. The steps involved for installation of ABC in a manufacturing company include the
following except:
a. Borrowing fund
b. Feasibility study
c. Building up necessary IT infrastructure and training of line employees
d. Strategy and value chain analysis
Question 8. Transactions undertaken by support department personnel are the appropriate cost
drivers. They are:
a. The number of purchase, supplies and customers' orders drives the cost associated with new
material inventory, work-in-progress and finished goods inventory
b. The number of production runs undertaken drives production scheduling, inspection and
material handling
c. The quality of raw material issued drives the cost of receiving department costs
d. The number of packing orders drives the packing costs
Question 9. Which of the following is not a benefit of ABC?
a. Accurate cost allocation
b. Improved decision making
c. Better control on activity and costs
d. Reduction of prime cost
Question 10. Which of the following statements are true: (1) Activity based Management
involves activity analysis and performance measurement. (2) Activity based costing serves as a
major source of information in ABM.
a. (1) True; (2) False
b. (1) True; (2) True
c. (1) False; (2) True
d. (1) False; (2) False
10 on 10 
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes
5th Module Assessment
CASE STUDY-
Budgetary control and standard costing systems are two essential tools frequently used by
business executives for the purpose of planning and control. In the case of budgetary control, the
entire exercise starts with the setting up of budgets or targets and ends with the taking of an
action, in case the actual figures differ with the budgetary ones.
A factory which expects to operate 7,000 hours, i.e., at 70% level of activity, furnishes details of
expenses as under:
Variable expenses - INR. 1,260
Semi-variable expenses - INR. 1,200
Fixed expenses - INR. 1,800
The semi-variable expenses go up by 10% between 85% and 95% activity and by 20% above
95% activity. Construct a flexible budget for 80, 90 and 100 per cent activities.
Question-1: "A favourable budget variance is always an indication of efficient performance". Do
you agree, give reason?
a. A favourable variance indicates, saving on the part of the organization hence it indicates
efficient performance of the organization.
b. "Under all situations, a favourable variance of an organization speaks about its efficient
performance."
c. "A favourable variance does not necessarily indicate efficient performance, because such a
variance might have been arrived at by not carrying out the expenses mentioned in the budget."
d. None of the above
Question 2. If a company wishes to establish a factory overhead budget system in which
estimated costs can be derived directly from estimates of activity levels, it should prepare a
a. Master budget
b. Cash budget
c. Flexible budget
d. Fixed budget
Question 3.The budget control organization is usually headed by a top executive who is known
as
a. General manager
b. Budget director/budget controller
c. Accountant of the organization
d. None of the above
Question 4. The classification of fixed and variable cost is useful for the preparation of
a. Master budget
b. Flexible budget
c. Cash budget
d. Capital budget
Question 5. What are the Fixed Expenses at 90% level of activity?
a. INR. 1900
b. INR. 1800
c. INR. 2000
d. INR. 1500
Question 6. What are the Semi-Veriable Expenses at 90% level of activity?
a. INR. 1320
b. INR. 1200
c. INR. 1440
d. INR. 1300
Question 7. What are the Total Expenses at 70% level of activity?
a. 4,260
b. 5,000
c. 5430
d. 4,000
Question 8. What are the Total Expenses at 80% level of activity?
a. 4,100
b. 4,440
c. 4,200
d. 4,900
Question 9. What are the Total Expenses at 90% level of activity?
a. 4,500
b. 4,320
c. 4,740
d. 4,533
Question 10. What are the Veriable Expenses for 80% level of activity?
a. INR. 1260
b. INR. 1440
c. INR. 1800
d. INR. 1900
10 on 10 
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes
Assignment 2
CASE STUDY-
Management of an organisation uses standard costing as a controlling tool for cost control and
performance evaluation. Controlling is a principal function of management alongwith planning,
directing and staffing. Every organisation sets a goal and to achieve it management of the
organisation make plans, get these plans executed and monitor the work for any deviation from
the plan. Please note the word deviation.
Deviation means the amount by which a single measurement differs from a fixed value such as
the mean or standard (here it is used in the context of cost accounting).Deviation is measured by
comparing actual figure with the standard figure.
Standard Costing is a method of costing which measures the performance or an activity by
comparing actual cost with standard cost, analyse the variances (deviations) and reporting of
variances for investigation and appropriate action.
ILLUSTRATION- NXE Manufacturing Concern furnishes the following information:
Standard: Material for 70 kg finished products 100 kg.
Standard: Price of material INR. 1 per kg.
Actual: Output 2,10,000 kg.
Actual: Material used 2,80,000 kg.
Actual: Cost of Materials INR. 2,52,000
Calculate: (a) Material usage variance, (b) Material price variance, (c) Material cost variance.
Question 1. As per given illustration, what is the Standard Quantity of input for actual output?
a. 3,30,000 kg.
b. 3,00,000 kg.
c. 4,00,000 kg.
d. 2,00,000 kg.
Question 2. The deviations between actual and standard cost is known as
a. Multiple analysis
b. Variable cost analysis
c. Variance analysis
d. Linear trend analysis
Question 3. The standard most suitable from cost control point of view is
a. Normal standard
b. Theoretical standard
c. Expected standard
d. Basic standard
Question 4. The standard which is attainable under favourable conditions is
a. Theoretical standard
b. Expected standard
c. Normal standard
d. Basic standard
Question 5. Under standard cost system the cost of the product determined at the beginning of
production is its:
a. Direct cost
b. Pre-determined cost
c. Historical cost
d. Actual cost
Question 6. What is the actual price of material?
a. INR. 0.90 per kg.
b. INR. 0.50 per kg.
c. INR. 0.30 per kg.
d. INR. 1.20 per kg.
Question 7. What is the value of Material Cost Variance?
a. INR. 50,000 (F)
b. INR. 48, 000 (F)
c. INR. 45,000 (F)
d. INR. 40,000 (F)
Question 8. What is the value of Material Price Variance?
a. INR. 25,000 (F)
b. INR. 20,000 (F)
c. INR. 30,000 (F)
d. INR. 28, 000 (F)
Question 9. What is the value of Material Usage Variance?
a. INR. 30,000 (F)
b. INR. 10,000 (F)
c. INR. 20,000 (F)
d. INR. 25,000 (F)
Question 10. Which of the following variance arises when more than one material is used in the
manufacture of a product
a. Material price variance
b. Material usage variance
c. Material yield variance
d. Material mix variance
10 on 10 
We Also Provide SYNOPSIS AND PROJECT.
Contact www.kimsharma.co.in for best and lowest cost solution or
Email: amitymbaassignment@gmail.com
Call/what’s app: +91 8290772200
Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project,
Study Material, Exam Notes

More Related Content

What's hot

Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...ShreyasKhandekar2
 
Elements of cost sheet
Elements of cost sheetElements of cost sheet
Elements of cost sheetAnshuman Singh
 
“Activity based costing ' a project report @doms
“Activity based costing ' a project report @doms “Activity based costing ' a project report @doms
“Activity based costing ' a project report @doms Babasab Patil
 
Cost Allocation Method
Cost Allocation MethodCost Allocation Method
Cost Allocation MethodMaliha Jahan
 
glossary Cost accounting.docx
 glossary Cost accounting.docx glossary Cost accounting.docx
glossary Cost accounting.docxTasnim Haque
 
Basic concepte of cost
Basic concepte of costBasic concepte of cost
Basic concepte of costPraveen Ojha
 
Module 1 lesson 1 cost term, concepts and classifications
Module 1 lesson 1 cost term, concepts and classificationsModule 1 lesson 1 cost term, concepts and classifications
Module 1 lesson 1 cost term, concepts and classificationsPamantasan Ng Lungsod Ng Pasig
 
Activity based management (theory)
Activity based management (theory)Activity based management (theory)
Activity based management (theory)Ivan Shamaev
 

What's hot (12)

costsheet
costsheetcostsheet
costsheet
 
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
Hotel accounting hotel cost accounting - cost sheet problems & elements of co...
 
Elements of cost sheet
Elements of cost sheetElements of cost sheet
Elements of cost sheet
 
Basics
BasicsBasics
Basics
 
“Activity based costing ' a project report @doms
“Activity based costing ' a project report @doms “Activity based costing ' a project report @doms
“Activity based costing ' a project report @doms
 
Cost Allocation Method
Cost Allocation MethodCost Allocation Method
Cost Allocation Method
 
Cost sheet
Cost sheetCost sheet
Cost sheet
 
glossary Cost accounting.docx
 glossary Cost accounting.docx glossary Cost accounting.docx
glossary Cost accounting.docx
 
Basic concepte of cost
Basic concepte of costBasic concepte of cost
Basic concepte of cost
 
Module 1 lesson 1 cost term, concepts and classifications
Module 1 lesson 1 cost term, concepts and classificationsModule 1 lesson 1 cost term, concepts and classifications
Module 1 lesson 1 cost term, concepts and classifications
 
Cost sheet
Cost sheetCost sheet
Cost sheet
 
Activity based management (theory)
Activity based management (theory)Activity based management (theory)
Activity based management (theory)
 

Similar to Cost & Management Accounting

Bu330 accounting for managers exam part 1
Bu330 accounting for managers exam part 1Bu330 accounting for managers exam part 1
Bu330 accounting for managers exam part 1homeworkecrater
 
A PROCESS COST SYSTEM WOULD BE USED FOR
A PROCESS COST SYSTEM WOULD BE USED FORA PROCESS COST SYSTEM WOULD BE USED FOR
A PROCESS COST SYSTEM WOULD BE USED FORSophiaMorgans
 
MAS compilation of questions
MAS compilation of questionsMAS compilation of questions
MAS compilation of questionsacctg2012
 
Cost Accounting meaning and objective...
Cost Accounting meaning and objective...Cost Accounting meaning and objective...
Cost Accounting meaning and objective...kunusaini5556
 
Introduction to cost accounting - MBA 1sem
Introduction to cost accounting - MBA 1semIntroduction to cost accounting - MBA 1sem
Introduction to cost accounting - MBA 1semgindu3009
 
1. What does the following formula compute Beginning Work I.docx
1. What does the following formula compute Beginning Work I.docx1. What does the following formula compute Beginning Work I.docx
1. What does the following formula compute Beginning Work I.docxpaynetawnya
 
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...butest
 
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...butest
 
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...butest
 
A225 final-exam-practice-key
A225 final-exam-practice-keyA225 final-exam-practice-key
A225 final-exam-practice-keyQuangAdam
 
LO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docx
LO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docxLO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docx
LO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docxSHIVA101531
 
Answers mocktest unit4
Answers mocktest unit4Answers mocktest unit4
Answers mocktest unit4PRAKASH RANJAN
 
managerial Economics
 managerial Economics managerial Economics
managerial EconomicsBabasab Patil
 

Similar to Cost & Management Accounting (20)

Bu330 accounting for managers exam part 1
Bu330 accounting for managers exam part 1Bu330 accounting for managers exam part 1
Bu330 accounting for managers exam part 1
 
Summarised theory
Summarised theorySummarised theory
Summarised theory
 
Summarised theory
Summarised theorySummarised theory
Summarised theory
 
A PROCESS COST SYSTEM WOULD BE USED FOR
A PROCESS COST SYSTEM WOULD BE USED FORA PROCESS COST SYSTEM WOULD BE USED FOR
A PROCESS COST SYSTEM WOULD BE USED FOR
 
MAS compilation of questions
MAS compilation of questionsMAS compilation of questions
MAS compilation of questions
 
Cost Accounting meaning and objective...
Cost Accounting meaning and objective...Cost Accounting meaning and objective...
Cost Accounting meaning and objective...
 
Introduction to cost accounting - MBA 1sem
Introduction to cost accounting - MBA 1semIntroduction to cost accounting - MBA 1sem
Introduction to cost accounting - MBA 1sem
 
1. What does the following formula compute Beginning Work I.docx
1. What does the following formula compute Beginning Work I.docx1. What does the following formula compute Beginning Work I.docx
1. What does the following formula compute Beginning Work I.docx
 
Costing MIS
Costing MISCosting MIS
Costing MIS
 
cc.ppt
cc.pptcc.ppt
cc.ppt
 
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
 
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
 
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
Comprehensive Final Exam Accounting 3300 Fall 2009 Prof. Richard ...
 
Intro to cost accounting
Intro to cost accountingIntro to cost accounting
Intro to cost accounting
 
PPT on PM_Unit 1 .pptx.
PPT                  on PM_Unit 1 .pptx.PPT                  on PM_Unit 1 .pptx.
PPT on PM_Unit 1 .pptx.
 
A225 final-exam-practice-key
A225 final-exam-practice-keyA225 final-exam-practice-key
A225 final-exam-practice-key
 
Mgt information, Business and Finance, ICAB
Mgt information, Business and Finance, ICABMgt information, Business and Finance, ICAB
Mgt information, Business and Finance, ICAB
 
LO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docx
LO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docxLO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docx
LO16-1 through LO16-5EXERCISE 16.1Accounting TerminologyLi.docx
 
Answers mocktest unit4
Answers mocktest unit4Answers mocktest unit4
Answers mocktest unit4
 
managerial Economics
 managerial Economics managerial Economics
managerial Economics
 

Recently uploaded

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Recently uploaded (20)

Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 

Cost & Management Accounting

  • 1. Cost & Management Accounting (EDL 305)- Semester III We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes 1st Module Assessment Case Study The general meaning of material is all commodities physical objects used to make the final product. It may be direct or indirect. (i) Direct Materials: Materials, cost of which can be directly attributable to the end product for which it is being used, in an economically feasible way. (ii) Indirect Materials: The materials which are not directly attributable to a particular final product. Material Control is the systematic control over the procurement, storage and usage of materials to maintain even flow of materials and avoiding at the same time excessive investment in inventories. Illustration:- From the details given below, calculate: (i) Re-ordering level (ii) Maximum level (iii) Minimum level (iv) Danger level. Re-ordering quantity is to be calculated on the basis of following information: • Cost of placing a purchase order is INR. 20 • Number of units to be purchased during the year is 5,000 • Purchase price per unit inclusive of transportation cost is INR. 50 • Annual cost of storage per units is INR. 5. Details of lead time: Average- 10 days, Maximum- 15 days, Minimum-5 days. For emergency purchases- 4 days. Rate of consumption: Average: 15 units per day, Maximum: 20 units per day. Question 1. As per given information, Re-ordering level is ………… a. 300 units b. 400 units
  • 2. c. 200 units d. 250 units Question 2. Continuous stock taking is a part of a. Annual stock taking b. Perpetual inventory c. ABC analysis d. Bin Cards Question 3. Danger level is …………… a. 60 units b. 90 units c. 100 units d. 10 units Question 4. Direct material can be classified as a. Variable cost b. Fixed cost c. Semi-variable cost d. Prime Cost Question 5. In most of the industries, the most important element of cost is a. Material b. Labour c. Overheads d. Administration Cost Question 6. Maximum level is ………….. a. 400 units b. 300 units c. 250 units d. 450 units Question 7. Minimum level is ………………. a. 250 units b. 150 units c. 350 units d. 50 units Question 8. What is the Minimum rate of consumption per day ? a. 20 units per day b. 10 units per day c. 30 units per day d. 25 units per day Question 9. What is the Re-order Quantity (ROQ)? a. 200 units b. 250 units c. 100 units d. 300 units Question 10. Which of the following is considered to be the normal loss of materials? a. Loss due to accidents b. Pilferage c. Loss due to breaking the bulk
  • 3. d. Loss due to careless handling of materials 10 on 10  We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes 2nd Module Assessment Case Study Labour cost is a very important constituent of total cost of any product/services. It is very necessary to account for labour cost properly so that we may able to analyze it and control the avoidable part of labour cost. The management objective of keeping labour cost as low as possible is achieved by balancing productivity with wages. Low wages do not necessarily mean low labour cost. Low labour cost is possible by giving substantial increase in wages against corresponding increase in productivity. Overheads are the expenditure which cannot be conveniently traced to or identified with any particular cost unit. Such expenses are incurred for output generally and not for a particular work order e.g., wages paid to watch and ward staff, heating and lighting expenses of factory etc. Question-1: "Fixed overhead costs are not affected in monetary terms during a given period by a change in output". But this statement holds good provided a. Increase in output is not substantial b. Increase in output is substantial c. Both (a) and (b) d. None of the above Question 2. Abnormal cost is the cost: a. Cost normally incurred at a given level of output b. Cost not normally incurred at a given level of output c. Cost which is charged to customer d. Cost which is included in the cost of the product Question 3. Identify among the following a scientific and accurate method of factory overhead absorption a. Percentage of direct material cost method b. Percentage of direct labour cost method c. Percentage of prime cost method d. Machine hour rate method
  • 4. Question 4. Identify among the following a scientific and accurate method of factory overhead absorption a. Percentage of direct material cost method b. Percentage of direct labour cost method c. Percentage of prime cost method d. Machine hour rate method Question 5. Labour turnover means: a. Turnover generated by labour b. Rate of change in composition of labour force during a specified period c. Either of the above d. Both of the above Question 6. Overhead refers to: a. Direct or Prime Cost b. All Indirect costs c. only Factory indirect costs d. Only expenses Question 7. The allotment of whole items of cost to cost centres or cost units is called a. Overhead absorption b. Cost apportionment c. Cost allocation d. None of the above Question 8. The concept of ‘idle capacity of plant' as used in cost accounting is its a. Best capacity for normal production b. Capacity used for standard setting c. Theoretical maximum capacity d. Capacity below which production should not fall Question 9. The difference between actual factory overhead and absorbed factory overhead will be usually at the minimum level, provided pre- determined overhead rate is based on a. Maximum capacity b. Direct labour hours(wrong) c. Machine hours d. Normal capacity Question 10. Which of the following is not an avoidable cause of labour turnover: a. Dissatisfaction with Job b. Lack of training facilities c. Low wages and allowances d. Disability, making a worker unfit for work 10 on 10 
  • 5. We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes 3rd Module Assessment Case Study Marginal costing is not a distinct method of ascertainment of cost but it is a technique which applies existing methods in a particular manner so that the relationship between profit & the volume of output can be clearly brought out. It is an accounting system where only variable cost or direct cost will be charged to the cost units. It concentrates on the controllable aspects of business by separating fixed and variable costs. Marginal costing is not a separate costing. It is only a technique used by accountants to aid management decision. It is also called as “Direct Costing” in U.S.A. This technique of costing is also known as “Variable Costing”, “Differential Costing” or “Out-of-pocket” costing. Management Information and Reporting System Today's computer age, management information system (i.e. MIS) is becoming popular in the corporate circle for giving quick information to the management. The purpose of MIS is reporting and is to provide the necessary information to managers and supervisors at various levels to help them to discharge their functions of organising, planning, control and decision making. MIS is a scientific way of collecting; processing, storing and communicating information relating to the various activities of an organisation to the various levels of management so that management may be facilitated in discharging its functions efficiently and run the organisation in an efficient way for the betterment of all. Question-1: Following information is available of XYZ Limited for quarter ended June, 2013 Fixed cost Rs. 5,00,000; Variable cost Rs. 10 per unit; Selling price Rs. 15 per unit; Output level 1,50,000 units. What will be amount of profit earned during the quarter using the marginal costing technique? a. Rs. 2,50,000 b. Rs. 10,00,000 c. Rs. 5,00,000 d. Rs. 17,50,000
  • 6. Question 2. Management accounting is applicable to a. Service entities b. Manufacturing entities c. Non profit entities d. All of these Question 3. Managerial accounting information is generally prepared for ………………… a. Shareholders b. Creditors c. Managers d. Regulatory agencies Question 4. Period costs are a. Variable costs b. Fixed costs c. Prime costs d. Overheads costs Question 5. The main difference between marginal costing and absorption costing is regarding the treatment of a. Prime cost b. Fixed overheads c. Direct materials d. Variable overheads Question 6. Under marginal costing the cost of product includes a. Prime costs only b. Price costs and variable overheads c. Prime costs and fixed overheads d. Prime costs and factory overheads Question 7. under marginal costing: a. All costs are classified into two groups - variable and fixed b. Variable costs form part of the product cost and inventory valuation c. Fixed costs are treated as period costs d. All of the above Question 8. When sales and production (in units) are same then profit under a. Marginal costing is higher than that of absorption costing b. Marginal costing is lower than that of absorption costing c. Marginal costing is equal to that of absorption costing d. None of the above Question 9. When sales exceed production (in units) then profit under a. Marginal costing is higher than that of absorption costing
  • 7. b. Marginal costing is lower than that of absorption costing c. Marginal costing is equal than that of absorption costing d. None of above Question 10. Which of the following is not an internal user of management information? a. Creditor b. Department manager c. Controller d. Treasurer 10 on 10  We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes 4th Module Assessment CASE STUDY- Organisations, who do not wish to know how much it costs to make a product with precise accuracy, may be happy with traditional costing system. Others however fix their price on cost and need to be able to determine it with reasonable accuracy. The latter organisations have been greatly benefitted from the development of activity based costing (ABC), which is more a modern absorption costing method, and was evolved to give more accurate product costs. Activity Based Costing is an accounting methodology that assigns costs to activities rather than products or services. This enables resources & overhead costs to be more accurately assigned to products & services that consume them. ABC is a technique which involves identification of cost with each cost driving activity and making it as the basis for apportionment of costs over different cost objects/ jobs/ products/ customersor services. Question-1: A cost driver is: a. An item of production overheads b. A common cost which is shared over cost centres c. Any cost relating to transport d. An activity which generates costs Question 2. A cost driver:
  • 8. a. Is a force behind the overhead cost b. Is an allocation base c. Is a transaction that is a significant determinant of cost d. All of the above Question 3. In activity based costing, costs are accumulated by activity using: a. Cost drivers b. Cost objects c. Cost pools d. Cost benefit analysis Question 4. In an activity based cost system; an activity/unit of work or task with differentiated purposes will be classified as a. different task b. purpose cost c. an activity d. an allocation cost Question 5. Steps in ABC include: a. Identification of activities and their respective costs b. "Identification of cost driver of each activity and computation of an allocation rate per activity" c. Allocation of overhead cost to products/ services based on the activities involved d. All of the above Question 6. The key elements of activity based budgeting are: a. Type of activity to be performed b. Quantity of activity to be performed c. Cost of activity to be performed d. All of the above Question 7. The steps involved for installation of ABC in a manufacturing company include the following except: a. Borrowing fund b. Feasibility study c. Building up necessary IT infrastructure and training of line employees d. Strategy and value chain analysis Question 8. Transactions undertaken by support department personnel are the appropriate cost drivers. They are: a. The number of purchase, supplies and customers' orders drives the cost associated with new material inventory, work-in-progress and finished goods inventory b. The number of production runs undertaken drives production scheduling, inspection and material handling c. The quality of raw material issued drives the cost of receiving department costs
  • 9. d. The number of packing orders drives the packing costs Question 9. Which of the following is not a benefit of ABC? a. Accurate cost allocation b. Improved decision making c. Better control on activity and costs d. Reduction of prime cost Question 10. Which of the following statements are true: (1) Activity based Management involves activity analysis and performance measurement. (2) Activity based costing serves as a major source of information in ABM. a. (1) True; (2) False b. (1) True; (2) True c. (1) False; (2) True d. (1) False; (2) False 10 on 10  We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes 5th Module Assessment CASE STUDY- Budgetary control and standard costing systems are two essential tools frequently used by business executives for the purpose of planning and control. In the case of budgetary control, the entire exercise starts with the setting up of budgets or targets and ends with the taking of an action, in case the actual figures differ with the budgetary ones. A factory which expects to operate 7,000 hours, i.e., at 70% level of activity, furnishes details of expenses as under: Variable expenses - INR. 1,260 Semi-variable expenses - INR. 1,200 Fixed expenses - INR. 1,800 The semi-variable expenses go up by 10% between 85% and 95% activity and by 20% above 95% activity. Construct a flexible budget for 80, 90 and 100 per cent activities. Question-1: "A favourable budget variance is always an indication of efficient performance". Do you agree, give reason?
  • 10. a. A favourable variance indicates, saving on the part of the organization hence it indicates efficient performance of the organization. b. "Under all situations, a favourable variance of an organization speaks about its efficient performance." c. "A favourable variance does not necessarily indicate efficient performance, because such a variance might have been arrived at by not carrying out the expenses mentioned in the budget." d. None of the above Question 2. If a company wishes to establish a factory overhead budget system in which estimated costs can be derived directly from estimates of activity levels, it should prepare a a. Master budget b. Cash budget c. Flexible budget d. Fixed budget Question 3.The budget control organization is usually headed by a top executive who is known as a. General manager b. Budget director/budget controller c. Accountant of the organization d. None of the above Question 4. The classification of fixed and variable cost is useful for the preparation of a. Master budget b. Flexible budget c. Cash budget d. Capital budget Question 5. What are the Fixed Expenses at 90% level of activity? a. INR. 1900 b. INR. 1800 c. INR. 2000 d. INR. 1500 Question 6. What are the Semi-Veriable Expenses at 90% level of activity? a. INR. 1320 b. INR. 1200 c. INR. 1440 d. INR. 1300 Question 7. What are the Total Expenses at 70% level of activity? a. 4,260 b. 5,000 c. 5430 d. 4,000
  • 11. Question 8. What are the Total Expenses at 80% level of activity? a. 4,100 b. 4,440 c. 4,200 d. 4,900 Question 9. What are the Total Expenses at 90% level of activity? a. 4,500 b. 4,320 c. 4,740 d. 4,533 Question 10. What are the Veriable Expenses for 80% level of activity? a. INR. 1260 b. INR. 1440 c. INR. 1800 d. INR. 1900 10 on 10  We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes Assignment 2 CASE STUDY- Management of an organisation uses standard costing as a controlling tool for cost control and performance evaluation. Controlling is a principal function of management alongwith planning, directing and staffing. Every organisation sets a goal and to achieve it management of the organisation make plans, get these plans executed and monitor the work for any deviation from the plan. Please note the word deviation. Deviation means the amount by which a single measurement differs from a fixed value such as the mean or standard (here it is used in the context of cost accounting).Deviation is measured by comparing actual figure with the standard figure. Standard Costing is a method of costing which measures the performance or an activity by comparing actual cost with standard cost, analyse the variances (deviations) and reporting of variances for investigation and appropriate action. ILLUSTRATION- NXE Manufacturing Concern furnishes the following information: Standard: Material for 70 kg finished products 100 kg. Standard: Price of material INR. 1 per kg.
  • 12. Actual: Output 2,10,000 kg. Actual: Material used 2,80,000 kg. Actual: Cost of Materials INR. 2,52,000 Calculate: (a) Material usage variance, (b) Material price variance, (c) Material cost variance. Question 1. As per given illustration, what is the Standard Quantity of input for actual output? a. 3,30,000 kg. b. 3,00,000 kg. c. 4,00,000 kg. d. 2,00,000 kg. Question 2. The deviations between actual and standard cost is known as a. Multiple analysis b. Variable cost analysis c. Variance analysis d. Linear trend analysis Question 3. The standard most suitable from cost control point of view is a. Normal standard b. Theoretical standard c. Expected standard d. Basic standard Question 4. The standard which is attainable under favourable conditions is a. Theoretical standard b. Expected standard c. Normal standard d. Basic standard Question 5. Under standard cost system the cost of the product determined at the beginning of production is its: a. Direct cost b. Pre-determined cost c. Historical cost d. Actual cost Question 6. What is the actual price of material? a. INR. 0.90 per kg. b. INR. 0.50 per kg. c. INR. 0.30 per kg. d. INR. 1.20 per kg. Question 7. What is the value of Material Cost Variance? a. INR. 50,000 (F) b. INR. 48, 000 (F)
  • 13. c. INR. 45,000 (F) d. INR. 40,000 (F) Question 8. What is the value of Material Price Variance? a. INR. 25,000 (F) b. INR. 20,000 (F) c. INR. 30,000 (F) d. INR. 28, 000 (F) Question 9. What is the value of Material Usage Variance? a. INR. 30,000 (F) b. INR. 10,000 (F) c. INR. 20,000 (F) d. INR. 25,000 (F) Question 10. Which of the following variance arises when more than one material is used in the manufacture of a product a. Material price variance b. Material usage variance c. Material yield variance d. Material mix variance 10 on 10  We Also Provide SYNOPSIS AND PROJECT. Contact www.kimsharma.co.in for best and lowest cost solution or Email: amitymbaassignment@gmail.com Call/what’s app: +91 8290772200 Assignment solution help, assignment answers help, Assignment Help, Synopsis and Project, Study Material, Exam Notes