INDIA | UNITED STATES

Creating Value through Innovation
CORPORATE PRESENTATION
Case Studies 9
1
Clientele

Sigma At a Glance
2

8

Domain Expertise
3

Service Offerings

SCHEDULE MAP
4
Why Sigma

Service Models

7

Sigma Squad 6

5

Technology Expertise
SIGMA INFOSOLUTIONS – At a Glance
Subsidiary of Sigma Group, an Indian conglomerate with more than 4
decades of experience in Mining, Chemicals Manufacturing & Export, etc.
A leading provider of customized software solutions
TUV Certified ISO 9001:2008 & ISO 27001:2005 Company
Headquartered in Irvine, CA and footprints in USA and India
Successful customer partnerships – FORTUNE 500 companies
Open Source Technology Specialists
Technology Partnership – Microsoft Silver Application Development
Competency, Pentaho System Integrator, EPiServer Solution Partner &
Openbravo Certified Partner
State of art 20,000 sq ft development centre
SIGMA INFOSOLUTIONS – At its Core
DNA: INNOVATION, INTEGRITY, and FUN
MISSION: Satisfied Customers, Innovative Solutions, Fun filled Families
VISION for Year 2015-16:
To be one among Top 100 Globally Admired Companies
in ITeS
To contribute 500 hours of effort per year in socially
responsible causes
To achieve USD 20 Million in revenue

CORE VALUES:

Accountability
Respect
Integrity
Solidarity
Excellence

[ARISE]
DOMAIN EXPERTISE

BFSI
TELECOM
AUTOMOBILES

ENGINEERING
MOBILE ENGINEERING

RETAIL/INTERNET RETAIL
DISTRIBUTION

MANUFACTURING
IT
BUSINESS SERVICES
SERVICE OFFERINGS
Delivering Intelligent and Reliable IT solutions through our unique
‘EXECUTION ORIENTED’ methodology

APPLICATION DEVELOPMENT

PORTAL & eCommerce

BUSINESS INTELLIGENCE &
REPORTING

APPLICATION MAINTENANCE
& MIGRATION

MOBILE ENGINEERING

TESTING & QA

CRM & ERP
APPLICATION DEVELOPMENT

PHASE BASED APPROACH
Requirement
Gathering &
Analysis

Prototyping

Architecture & Design

System
Verification
Construction

TRACKING AND MONITORING

Testing

Implemen
-tation
APPLICATION MAINTENANCE

METHODOLOGY
PLANNING

Global
Delivery
Model

24X7 Production Support
Enhancement Request Mgmt.
SLA Mgmt.
Problem Mgmt.
Change Request Mgmt.
Root cause Analysis

- Analysis
- Milestones
- Metric & Tracker
- Project Plan

TRANSITION
- Knowledge Transfer
- Documentation
- Observe & Learn
- Hand Holding
- Infrastructure +Resources
setup

STEADY STATE
- Process Enhancements
- Technical & Functional
enhancements
APPLICATION MIGRATION

Migration to
Code reRePlatform
structuring Documentation Transitions client/ server
and web

Porting and
Data
Migration

Language
Legacy
Systems & Conversion
Application
Reengineering
BUSINESS INTELLIGENCE
OFFERINGS

Reports
Dashboards
Analytics
Data Mining
Data Merging & Migration
Data Extraction
Transformation and Load
Data Marts & Data
Warehouse

TECHNOLOGY
EXPERTISE
Open Source BI Tools –
Pentaho
Jasper Reports
BIRT
Crystal Reports

BEST
PRACTICES
Agile SDLC
Certified BI Professionals,
virtuous domain knowledge
Strong focus in data
Profiling & Data
governance
Establish robust KPI as the
framework to build BI
strategy
Rapid development using
predefined industryspecific KPI repositories
TESTING & QA
Black Box, White Box, Grey Box Testing

BFSI
Automobiles
Engineering
Government
Retail
Manufacturing
IT
Healthcare
e-Commerce
Real Estate
Legal

Exploratory, Ad-Hoc Testing
PORTAL SOLUTIONS
PHP based
websites
with Wiki
based
support
area

CMS based
websites
with
collaboration
tools

Websites
with small
applications

Portals

Dedicated Team having expertise in the areas of Flash Animations, 2D & 3D
Modeling, Imaging, UI Designing and Usability Analysis
Extensive experience in the area of developing scalable applications, portals,
e-commerce solutions etc. using Drupal, Joomla, Magento, etc.
Expertise in creating Web 2.0 Interfaces, Integration with tools like Wiki,
Visitor Tracking, eCRM, Rich Internet Applications etc.
Success stories which talk about our level of engagement with customers
SERVICE MODELS
Fixed
Price
Solutions
Independent quality solutions,
which focus on lowest cycle
time and thus ensuring cost
effectiveness

FLEXIBILITY
AGILITY

Component
Based
Solutions

QUALITY
Development and
implementation of modules
working along with other
solution providers, which
maybe even geographically
separated

End-to-End
Solutions

Turnkey projects that comprehensively cover
conceptualization, requirement analysis, high
level design, low-level design, coding, testing
and support
TECHNOLOGY EXPERTISE
eCommerce Systems

Tools and Framework

Magento, Ubercart, XCART, Zen Cart,
GoodBarry, Satchmo, etc.

Grails, Spring, Hibernate,
Zend, Seam, Eclipse,
JavaScript, Seam, django,
XHTML, XML, Ajax,
Continuum, FI, CVS,
HUDSON, J-Builder, XHTML,
JavaScript, etc.

CMS
Drupal, Joomla, Dotnetnuke, etc.

Languages
Business Intelligence & ERP
Pentaho, JasperReports, BIRT,
Crystal Reports, Openbravo,etc.

PHP, HTML, J2EE, ASP.NET,
C#, Python, C++, Wed 2.0,
Java, etc.

OS and Servers
Mobile Apps
iOS, Android, BlackBerry

Integration
Facebook, Twitter, Google API’s,
RSS, Kayako, etc.

Linux, Windows, Apache
Tomcat, Jboss, Oracle,
MySQL, JRUN4, etc.

PM Tools
Xplanner, ActiTIME, dot
Project, OpenProj, etc.
TEAM SIGMA
73%- Development

6% - Marketing

6%
Support

8% QA

7% Fin/HR

DEPARTMENT BASED CLASSIFICATION
66% - Engineering

18% - MBA

7%
Others

9%
MS

QUALIFICATION BASED CLASSIFICATION
36% - 3 to 5 yrs

19% - 1 to 3 yrs

20% - 5 to 10 yrs 13% - >10yrs 12% - <1yr

WORK EXPERIENCE BASED CLASSIFICATION

Presently 170 people team
Projected to grow to 250 people team by Dec’ 2013
SIGMA – DIFFERENTIATING FACTORS

100% customer satisfaction with IT
Product Companies

Experienced and certified
professionals and SMEs

Customer centric company

Ability to undertake Integration
with existing solutions, Training
& Implementation and Post GoLive Support

Deliver higher ROI for every dollar
invested

Proven management team
Process driven company to
ensure quality & predictability of
deliveries

Expertise in open source
technologies to minimize the
total cost of project
CLIENTS

72% Business Comes from Repeat Clients
CLIENT SPEAK

“
“

Overall Sigma Infosolutions is a
great contractor with lots of
talented programmers and project
managers.
- Daniel Schreck, Founder, Vayam
LLC, Texas, USA

It's been a great experience working
with Sigma. They were quick, efficient.
We're very happy with the work they've
done for us and definitely plan to work
with them on future projects.
- Kelly Howell, Owner, Ashland, USA

“

“

Sigma is a very professionally run organization that makes
the processes of offshore development as easy and
efficient as it can be. They have very high quality talent
that are able to deliver quality meeting our tough
standards. The relationship with sigma has enabled us to
cost effectively expand our resource pool and bring our
product to market faster and with a more complete user
experience.
- Erik Hogan, Director-Product Management, Attributor
Corporation, Redwood City, USA

“

Capable team. Will use again for Jaspersoft server
implementation
- Samuel Gray, Erniegray.com, USA

Sigma Infosolutions undertook to learn our complex requirements, document them, engineer and code according to
our requests. The company delivered remarkable results given the aggressive time constraints we faced. They
understood how to interpret our vague requirements and generate outstanding results. We are grateful to have
found Sigma to work with as a trusted advisor. I will not hesitate to leverage their outstanding design and coding
skills as we move forward with our visualization and Java requirements
- Mike McGonigal, Exsalgo Corp., USA
CASE STUDY: Product Engineering
Client

Client provides complete personalized health and wellness experience to their customers
(large corporations in the US) and their employees on a single platform. Client is based out
of Southern California.

Summary

Client envisioned building a portal which will offer Health Risk Assessments (HRA),
Specialty labs, professional consultations, automated self-management tools, access to
high quality nutraceuticals, managing personal health documents and records, and
participation in community discussions, interest groups, an on-line store, and blogs. Client
will offer complementary educational services to the public upon registering (visitors), and
wellness self-management, premium health services & monitoring tools to paying
customers (members). The services are deployed on a SAAS model.

Solution

Technology

Sigma Infosolutions developed the portal solution with the following sub-systems:
o An online portal for end-user public information, user dashboards. The online portal
comprises end-user portal views and a portal backend server.
o A Transitory Server (was co-located initially on the same physical server as the portal
sever) that acts as a proxy for getting 3rd party health risk assessment (HRA) service
providers data for end users. This data is cached by transitory server for portal users for
performance and ease of availability. User data was encrypted in observance of HIPAA
security and privacy regulations.
o Developed a tool for client component for deployment as part of end-user portal. This
component would interface with backend and application server via web services API
interfaces. The portal has both online and offline access capabilities.
Drupal 7.0 along with 3rd party custom plugins, PHP 5, MySQL ,
AJAX, jQuery, Java script, HTML, CSS, Development IDE- Netbeans
CASE STUDY: eCommerce Implementation
Client

Summary

Solution

Technology

Client provides services that is dedicated to enriching lives by enhancing media
consumption and language learning solutions. The Client is head quartered in New Jersey
and operates from 6 countries worldwide.

Client had a vision to develop a comprehensive solution with an easy user interface for
their existing eStore. The present eStore was built on a custom .Net platform which had
challenges with navigation, interface, integrations, SEO friendliness and managing content,
promotions and upgrades. Client wanted to restructure their eStore that can leverage the
evolving and innovative global ebusiness models. The solution was developed to achieve
maximum operational efficiencies, reduce costs, and increase return on investment. Sigma
Infosolutions used open source Magento e-commerce platform to build the eStore from
scratch, a CMS based portal using Joomla and integrated the two platforms.

Sigma Infosolutions’ Magento team successfully created an effective eCommerce
application for the client. The web store was integrated with the Client's eBook reader
device to interface with server-side web services. Key Modules Developed: Extending base
features of Magento, Integration with fulfillment platform, auto fulfillment, extending
PayPal payment module, Custom Reports, Integration with Marketing Platforms,
Integration with 3rd party plugins and developing custom plugins.
Magento, Joomla, MySQL, Pentaho Data Integration (PDI), Linux
CASE STUDY: Product Engineering
Client
Client

Summary
Summary

Solution
Solution

Technology
Technology

The Client serves foreign language programs in universities by connecting foreign
The Client serves foreign language programs in universities by connecting foreign
language students worldwide. The Client is based out of Portland.
language students worldwide. The Client is based out of Portland.

The Client aims to create mutually beneficial relationships between students with
The Client aims to create mutually beneficial relationships between students with
similar academic schedules with the language pairings of English/ Spanish, and
similar academic schedules with the language pairings of English/ Spanish, and
English/French, etc. The Client wanted to develop a solutions for easy adoption of
English/French, etc. The Client wanted to develop a solutions for easy adoption of
existing course curricula, where students will apply what they have learned in the
existing course curricula, where students will apply what they have learned in the
classroom to most practical scenarios. A framework for professor feedback and
classroom to most practical scenarios. A framework for professor feedback and
evaluation of student conversations was to be built to enhance the student
evaluation of student conversations was to be built to enhance the student
experience and participation.
experience and participation.
Key Modules Developed
Key Modules Developed
o Custom video and audio chat module
o Custom video and audio chat module
o Media Server integration
o Media Server integration
o Calendar & Scheduling Conversation Appointments
o Calendar & Scheduling Conversation Appointments
o Conversation Recordings
o Conversation Recordings
o Grade Book Functionality from a Professor Perspective
o Grade Book Functionality from a Professor Perspective
o Custom calibration on recording mixture component
o Custom calibration on recording mixture component

The team used tools and platforms like Drupal, PHP 5,
The team used tools and platforms like Drupal, PHP 5,
Flash, Wowza Media Server to develop the application
Flash, Wowza Media Server to develop the application
CASE STUDY: Mobile App to Capture and Share Videos
Client
Client

Client provides solutions that helps users tell stories with short video clips and allows
Client provides solutions that helps users tell stories with short video clips and allows
sharing videos privately and even broadcast them, Client is based out of New York.
sharing videos privately and even broadcast them, Client is based out of New York.

Summary
Summary

We built a robust back-end solution which could stich and stream videos, intelligent
We built a robust back-end solution which could stich and stream videos, intelligent
enough to read the bandwidth at the mobile client-end and pick up either low or high bit
enough to read the bandwidth at the mobile client-end and pick up either low or high bit
rate streams and render the same in the client application along with the api server. A
rate streams and render the same in the client application along with the api server. A
custom video player has been designed to meet specific needs of this application. This
custom video player has been designed to meet specific needs of this application. This
application is being built for iOS as well as web version. This app would hit the app store
application is being built for iOS as well as web version. This app would hit the app store
by mid March 2013.
by mid March 2013.

Solution
Solution

Sigma Infosolutions have built apple streaming solution HLS (( HTTP Live Streaming) along
Sigma Infosolutions have built apple streaming solution HLS HTTP Live Streaming) along
with adaptive bit rate implementation for streaming videos to the mobile devices.
with adaptive bit rate implementation for streaming videos to the mobile devices.
Multiple short videos will be encoded in the backend to a standard size which gets
Multiple short videos will be encoded in the backend to a standard size which gets
stitched and the user can see multiple short clips as one single channel. User can now
stitched and the user can see multiple short clips as one single channel. User can now
create, share number of channels, mark them private/ public.
create, share number of channels, mark them private/ public.
Sigma Infosolutions also built the web application where the users can watch all their
Sigma Infosolutions also built the web application where the users can watch all their
stitched video channels in a bigger screen.
stitched video channels in a bigger screen.

Technology
Technology

Java/J2EE, MySQL (Amazon RDS database), Shell scripts for the backend, Objective C,
Java/J2EE, MySQL (Amazon RDS database), Shell scripts for the backend, Objective C,
Javascript, JSP, HTML5, jwplayer for building the web application
Javascript, JSP, HTML5, jwplayer for building the web application
CASE STUDY: One of the top 10 reviewed app in 2012
Client
Client

Client helps homeowners with services to choose between moving or remodeling their
Client helps homeowners with services to choose between moving or remodeling their
house. Client is base out of CA.
house. Client is base out of CA.

Summary
Summary

Sigma was approached to build iPhone and Android applications to leverage client’s
Sigma was approached to build iPhone and Android applications to leverage client’s
existing website and web applications. The api's were provided by the client and we built
existing website and web applications. The api's were provided by the client and we built
the mobile apps that will help end users to select their remodeling ideas for their house
the mobile apps that will help end users to select their remodeling ideas for their house
e.g. interiors including kitchens, bedrooms etc. and store the same as their idea file.
e.g. interiors including kitchens, bedrooms etc. and store the same as their idea file.
They can pick and choose the color combination, type of material etc. and send a request
They can pick and choose the color combination, type of material etc. and send a request
for quote to our client.
for quote to our client.

Solution
Solution

Sigma Infosolutions mobile development team built the iPhone and Android applications.
Sigma Infosolutions mobile development team built the iPhone and Android applications.
We had built intelligent algorithms that pulls images using Bing search and render the
We had built intelligent algorithms that pulls images using Bing search and render the
same in the application for the different types of user request. When auser submits a
same in the application for the different types of user request. When auser submits a
search request, Bing api's are used to get the results based on several criteria and results
search request, Bing api's are used to get the results based on several criteria and results
are paginated. The user can browse through the endless results and can chose whatever
are paginated. The user can browse through the endless results and can chose whatever
that suits him and create his own idea file containing his remodel ideas for each and
that suits him and create his own idea file containing his remodel ideas for each and
every room.
every room.
  
This smartphone app was recognized as one of the best reviewed apps in Dec’ 2012.
This smartphone app was recognized as one of the best reviewed apps in Dec’ 2012.
 Since this announcement this app has got 1000+ downloads a day...
 Since this announcement this app has got 1000+ downloads a day...

Technology
Technology

Android and iOS native application
Android and iOS native application
Corporate Presentation Sigma Infosolutions

Corporate Presentation Sigma Infosolutions

  • 1.
    INDIA | UNITEDSTATES Creating Value through Innovation CORPORATE PRESENTATION
  • 2.
    Case Studies 9 1 Clientele SigmaAt a Glance 2 8 Domain Expertise 3 Service Offerings SCHEDULE MAP 4 Why Sigma Service Models 7 Sigma Squad 6 5 Technology Expertise
  • 3.
    SIGMA INFOSOLUTIONS –At a Glance Subsidiary of Sigma Group, an Indian conglomerate with more than 4 decades of experience in Mining, Chemicals Manufacturing & Export, etc. A leading provider of customized software solutions TUV Certified ISO 9001:2008 & ISO 27001:2005 Company Headquartered in Irvine, CA and footprints in USA and India Successful customer partnerships – FORTUNE 500 companies Open Source Technology Specialists Technology Partnership – Microsoft Silver Application Development Competency, Pentaho System Integrator, EPiServer Solution Partner & Openbravo Certified Partner State of art 20,000 sq ft development centre
  • 4.
    SIGMA INFOSOLUTIONS –At its Core DNA: INNOVATION, INTEGRITY, and FUN MISSION: Satisfied Customers, Innovative Solutions, Fun filled Families VISION for Year 2015-16: To be one among Top 100 Globally Admired Companies in ITeS To contribute 500 hours of effort per year in socially responsible causes To achieve USD 20 Million in revenue CORE VALUES: Accountability Respect Integrity Solidarity Excellence [ARISE]
  • 5.
  • 6.
    SERVICE OFFERINGS Delivering Intelligentand Reliable IT solutions through our unique ‘EXECUTION ORIENTED’ methodology APPLICATION DEVELOPMENT PORTAL & eCommerce BUSINESS INTELLIGENCE & REPORTING APPLICATION MAINTENANCE & MIGRATION MOBILE ENGINEERING TESTING & QA CRM & ERP
  • 7.
    APPLICATION DEVELOPMENT PHASE BASEDAPPROACH Requirement Gathering & Analysis Prototyping Architecture & Design System Verification Construction TRACKING AND MONITORING Testing Implemen -tation
  • 8.
    APPLICATION MAINTENANCE METHODOLOGY PLANNING Global Delivery Model 24X7 ProductionSupport Enhancement Request Mgmt. SLA Mgmt. Problem Mgmt. Change Request Mgmt. Root cause Analysis - Analysis - Milestones - Metric & Tracker - Project Plan TRANSITION - Knowledge Transfer - Documentation - Observe & Learn - Hand Holding - Infrastructure +Resources setup STEADY STATE - Process Enhancements - Technical & Functional enhancements
  • 9.
    APPLICATION MIGRATION Migration to CodereRePlatform structuring Documentation Transitions client/ server and web Porting and Data Migration Language Legacy Systems & Conversion Application Reengineering
  • 10.
    BUSINESS INTELLIGENCE OFFERINGS Reports Dashboards Analytics Data Mining DataMerging & Migration Data Extraction Transformation and Load Data Marts & Data Warehouse TECHNOLOGY EXPERTISE Open Source BI Tools – Pentaho Jasper Reports BIRT Crystal Reports BEST PRACTICES Agile SDLC Certified BI Professionals, virtuous domain knowledge Strong focus in data Profiling & Data governance Establish robust KPI as the framework to build BI strategy Rapid development using predefined industryspecific KPI repositories
  • 11.
    TESTING & QA BlackBox, White Box, Grey Box Testing BFSI Automobiles Engineering Government Retail Manufacturing IT Healthcare e-Commerce Real Estate Legal Exploratory, Ad-Hoc Testing
  • 12.
    PORTAL SOLUTIONS PHP based websites withWiki based support area CMS based websites with collaboration tools Websites with small applications Portals Dedicated Team having expertise in the areas of Flash Animations, 2D & 3D Modeling, Imaging, UI Designing and Usability Analysis Extensive experience in the area of developing scalable applications, portals, e-commerce solutions etc. using Drupal, Joomla, Magento, etc. Expertise in creating Web 2.0 Interfaces, Integration with tools like Wiki, Visitor Tracking, eCRM, Rich Internet Applications etc. Success stories which talk about our level of engagement with customers
  • 13.
    SERVICE MODELS Fixed Price Solutions Independent qualitysolutions, which focus on lowest cycle time and thus ensuring cost effectiveness FLEXIBILITY AGILITY Component Based Solutions QUALITY Development and implementation of modules working along with other solution providers, which maybe even geographically separated End-to-End Solutions Turnkey projects that comprehensively cover conceptualization, requirement analysis, high level design, low-level design, coding, testing and support
  • 14.
    TECHNOLOGY EXPERTISE eCommerce Systems Toolsand Framework Magento, Ubercart, XCART, Zen Cart, GoodBarry, Satchmo, etc. Grails, Spring, Hibernate, Zend, Seam, Eclipse, JavaScript, Seam, django, XHTML, XML, Ajax, Continuum, FI, CVS, HUDSON, J-Builder, XHTML, JavaScript, etc. CMS Drupal, Joomla, Dotnetnuke, etc. Languages Business Intelligence & ERP Pentaho, JasperReports, BIRT, Crystal Reports, Openbravo,etc. PHP, HTML, J2EE, ASP.NET, C#, Python, C++, Wed 2.0, Java, etc. OS and Servers Mobile Apps iOS, Android, BlackBerry Integration Facebook, Twitter, Google API’s, RSS, Kayako, etc. Linux, Windows, Apache Tomcat, Jboss, Oracle, MySQL, JRUN4, etc. PM Tools Xplanner, ActiTIME, dot Project, OpenProj, etc.
  • 15.
    TEAM SIGMA 73%- Development 6%- Marketing 6% Support 8% QA 7% Fin/HR DEPARTMENT BASED CLASSIFICATION 66% - Engineering 18% - MBA 7% Others 9% MS QUALIFICATION BASED CLASSIFICATION 36% - 3 to 5 yrs 19% - 1 to 3 yrs 20% - 5 to 10 yrs 13% - >10yrs 12% - <1yr WORK EXPERIENCE BASED CLASSIFICATION Presently 170 people team Projected to grow to 250 people team by Dec’ 2013
  • 16.
    SIGMA – DIFFERENTIATINGFACTORS 100% customer satisfaction with IT Product Companies Experienced and certified professionals and SMEs Customer centric company Ability to undertake Integration with existing solutions, Training & Implementation and Post GoLive Support Deliver higher ROI for every dollar invested Proven management team Process driven company to ensure quality & predictability of deliveries Expertise in open source technologies to minimize the total cost of project
  • 17.
    CLIENTS 72% Business Comesfrom Repeat Clients
  • 18.
    CLIENT SPEAK “ “ Overall SigmaInfosolutions is a great contractor with lots of talented programmers and project managers. - Daniel Schreck, Founder, Vayam LLC, Texas, USA It's been a great experience working with Sigma. They were quick, efficient. We're very happy with the work they've done for us and definitely plan to work with them on future projects. - Kelly Howell, Owner, Ashland, USA “ “ Sigma is a very professionally run organization that makes the processes of offshore development as easy and efficient as it can be. They have very high quality talent that are able to deliver quality meeting our tough standards. The relationship with sigma has enabled us to cost effectively expand our resource pool and bring our product to market faster and with a more complete user experience. - Erik Hogan, Director-Product Management, Attributor Corporation, Redwood City, USA “ Capable team. Will use again for Jaspersoft server implementation - Samuel Gray, Erniegray.com, USA Sigma Infosolutions undertook to learn our complex requirements, document them, engineer and code according to our requests. The company delivered remarkable results given the aggressive time constraints we faced. They understood how to interpret our vague requirements and generate outstanding results. We are grateful to have found Sigma to work with as a trusted advisor. I will not hesitate to leverage their outstanding design and coding skills as we move forward with our visualization and Java requirements - Mike McGonigal, Exsalgo Corp., USA
  • 19.
    CASE STUDY: ProductEngineering Client Client provides complete personalized health and wellness experience to their customers (large corporations in the US) and their employees on a single platform. Client is based out of Southern California. Summary Client envisioned building a portal which will offer Health Risk Assessments (HRA), Specialty labs, professional consultations, automated self-management tools, access to high quality nutraceuticals, managing personal health documents and records, and participation in community discussions, interest groups, an on-line store, and blogs. Client will offer complementary educational services to the public upon registering (visitors), and wellness self-management, premium health services & monitoring tools to paying customers (members). The services are deployed on a SAAS model. Solution Technology Sigma Infosolutions developed the portal solution with the following sub-systems: o An online portal for end-user public information, user dashboards. The online portal comprises end-user portal views and a portal backend server. o A Transitory Server (was co-located initially on the same physical server as the portal sever) that acts as a proxy for getting 3rd party health risk assessment (HRA) service providers data for end users. This data is cached by transitory server for portal users for performance and ease of availability. User data was encrypted in observance of HIPAA security and privacy regulations. o Developed a tool for client component for deployment as part of end-user portal. This component would interface with backend and application server via web services API interfaces. The portal has both online and offline access capabilities. Drupal 7.0 along with 3rd party custom plugins, PHP 5, MySQL , AJAX, jQuery, Java script, HTML, CSS, Development IDE- Netbeans
  • 20.
    CASE STUDY: eCommerceImplementation Client Summary Solution Technology Client provides services that is dedicated to enriching lives by enhancing media consumption and language learning solutions. The Client is head quartered in New Jersey and operates from 6 countries worldwide. Client had a vision to develop a comprehensive solution with an easy user interface for their existing eStore. The present eStore was built on a custom .Net platform which had challenges with navigation, interface, integrations, SEO friendliness and managing content, promotions and upgrades. Client wanted to restructure their eStore that can leverage the evolving and innovative global ebusiness models. The solution was developed to achieve maximum operational efficiencies, reduce costs, and increase return on investment. Sigma Infosolutions used open source Magento e-commerce platform to build the eStore from scratch, a CMS based portal using Joomla and integrated the two platforms. Sigma Infosolutions’ Magento team successfully created an effective eCommerce application for the client. The web store was integrated with the Client's eBook reader device to interface with server-side web services. Key Modules Developed: Extending base features of Magento, Integration with fulfillment platform, auto fulfillment, extending PayPal payment module, Custom Reports, Integration with Marketing Platforms, Integration with 3rd party plugins and developing custom plugins. Magento, Joomla, MySQL, Pentaho Data Integration (PDI), Linux
  • 21.
    CASE STUDY: ProductEngineering Client Client Summary Summary Solution Solution Technology Technology The Client serves foreign language programs in universities by connecting foreign The Client serves foreign language programs in universities by connecting foreign language students worldwide. The Client is based out of Portland. language students worldwide. The Client is based out of Portland. The Client aims to create mutually beneficial relationships between students with The Client aims to create mutually beneficial relationships between students with similar academic schedules with the language pairings of English/ Spanish, and similar academic schedules with the language pairings of English/ Spanish, and English/French, etc. The Client wanted to develop a solutions for easy adoption of English/French, etc. The Client wanted to develop a solutions for easy adoption of existing course curricula, where students will apply what they have learned in the existing course curricula, where students will apply what they have learned in the classroom to most practical scenarios. A framework for professor feedback and classroom to most practical scenarios. A framework for professor feedback and evaluation of student conversations was to be built to enhance the student evaluation of student conversations was to be built to enhance the student experience and participation. experience and participation. Key Modules Developed Key Modules Developed o Custom video and audio chat module o Custom video and audio chat module o Media Server integration o Media Server integration o Calendar & Scheduling Conversation Appointments o Calendar & Scheduling Conversation Appointments o Conversation Recordings o Conversation Recordings o Grade Book Functionality from a Professor Perspective o Grade Book Functionality from a Professor Perspective o Custom calibration on recording mixture component o Custom calibration on recording mixture component The team used tools and platforms like Drupal, PHP 5, The team used tools and platforms like Drupal, PHP 5, Flash, Wowza Media Server to develop the application Flash, Wowza Media Server to develop the application
  • 22.
    CASE STUDY: MobileApp to Capture and Share Videos Client Client Client provides solutions that helps users tell stories with short video clips and allows Client provides solutions that helps users tell stories with short video clips and allows sharing videos privately and even broadcast them, Client is based out of New York. sharing videos privately and even broadcast them, Client is based out of New York. Summary Summary We built a robust back-end solution which could stich and stream videos, intelligent We built a robust back-end solution which could stich and stream videos, intelligent enough to read the bandwidth at the mobile client-end and pick up either low or high bit enough to read the bandwidth at the mobile client-end and pick up either low or high bit rate streams and render the same in the client application along with the api server. A rate streams and render the same in the client application along with the api server. A custom video player has been designed to meet specific needs of this application. This custom video player has been designed to meet specific needs of this application. This application is being built for iOS as well as web version. This app would hit the app store application is being built for iOS as well as web version. This app would hit the app store by mid March 2013. by mid March 2013. Solution Solution Sigma Infosolutions have built apple streaming solution HLS (( HTTP Live Streaming) along Sigma Infosolutions have built apple streaming solution HLS HTTP Live Streaming) along with adaptive bit rate implementation for streaming videos to the mobile devices. with adaptive bit rate implementation for streaming videos to the mobile devices. Multiple short videos will be encoded in the backend to a standard size which gets Multiple short videos will be encoded in the backend to a standard size which gets stitched and the user can see multiple short clips as one single channel. User can now stitched and the user can see multiple short clips as one single channel. User can now create, share number of channels, mark them private/ public. create, share number of channels, mark them private/ public. Sigma Infosolutions also built the web application where the users can watch all their Sigma Infosolutions also built the web application where the users can watch all their stitched video channels in a bigger screen. stitched video channels in a bigger screen. Technology Technology Java/J2EE, MySQL (Amazon RDS database), Shell scripts for the backend, Objective C, Java/J2EE, MySQL (Amazon RDS database), Shell scripts for the backend, Objective C, Javascript, JSP, HTML5, jwplayer for building the web application Javascript, JSP, HTML5, jwplayer for building the web application
  • 23.
    CASE STUDY: Oneof the top 10 reviewed app in 2012 Client Client Client helps homeowners with services to choose between moving or remodeling their Client helps homeowners with services to choose between moving or remodeling their house. Client is base out of CA. house. Client is base out of CA. Summary Summary Sigma was approached to build iPhone and Android applications to leverage client’s Sigma was approached to build iPhone and Android applications to leverage client’s existing website and web applications. The api's were provided by the client and we built existing website and web applications. The api's were provided by the client and we built the mobile apps that will help end users to select their remodeling ideas for their house the mobile apps that will help end users to select their remodeling ideas for their house e.g. interiors including kitchens, bedrooms etc. and store the same as their idea file. e.g. interiors including kitchens, bedrooms etc. and store the same as their idea file. They can pick and choose the color combination, type of material etc. and send a request They can pick and choose the color combination, type of material etc. and send a request for quote to our client. for quote to our client. Solution Solution Sigma Infosolutions mobile development team built the iPhone and Android applications. Sigma Infosolutions mobile development team built the iPhone and Android applications. We had built intelligent algorithms that pulls images using Bing search and render the We had built intelligent algorithms that pulls images using Bing search and render the same in the application for the different types of user request. When auser submits a same in the application for the different types of user request. When auser submits a search request, Bing api's are used to get the results based on several criteria and results search request, Bing api's are used to get the results based on several criteria and results are paginated. The user can browse through the endless results and can chose whatever are paginated. The user can browse through the endless results and can chose whatever that suits him and create his own idea file containing his remodel ideas for each and that suits him and create his own idea file containing his remodel ideas for each and every room. every room.    This smartphone app was recognized as one of the best reviewed apps in Dec’ 2012. This smartphone app was recognized as one of the best reviewed apps in Dec’ 2012.  Since this announcement this app has got 1000+ downloads a day...  Since this announcement this app has got 1000+ downloads a day... Technology Technology Android and iOS native application Android and iOS native application

Editor's Notes