SlideShare a Scribd company logo
1 of 50
Wynn Everett
Transportation Plan
June 20, 2014
Overview
2
Ideal Location in
Regional Transportation Network
3
Holistic, Multi-Modal, Sustainable
Transportation Strategy
Rail
Buses
Bikes
Cars
Boats
Walking
4
Wynn
Everett
MEPA TimeLine
• Expanded Environmental Notification Form
(EENF), filed May 31, 2013
• Secretary’s Certificate on EENF and scope of DEIR,
issued on July 26, 2013
• Draft Environmental Impact Report (DEIR),
filed December 16, 2013
• Secretary’s Certificate on DEIR and scope of FEIR,
issued on February 21, 2014
• FEIR filing June 30th—Secretary’s Certificate
anticipated by August 15, 2014
EENF DEIR Certificate FEIRCertificate Certificate
5
• President, The Dirigo Group
– International consulting practice focused on management of large capital projects
– Example projects in Boston, Abu Dhabi, Saudi Arabia
• Senior Lecturer – Massachusetts Institute of Technology and Harvard Business School
– 22 years of graduate school teaching on project delivery and development
– Additional teaching in China, Argentina, UK, Peru, UAE
• Role on Wynn Everett Project
– Development Manager – responsible for all aspects of onsite development
• Experience
– Nearly 30 years of managing complex capital projects
– Chief Operating Officer for Allston Development Group, the real estate development arm
of Harvard University
– Director of Capital Programs and Logan Modernization for the Massachusetts Port
Authority
– Consulting work throughout the world
Chris Gordon, P.E.
6
• Education
– Masters Degree in Civil Engineering, MIT
– Bachelors Degree in Civil Engineering, University of Maine
– Licensed Professional Engineer
• Awards & Recognition
– 2001 Person of the Year for the Construction Management Association of America for
both the New England region and the country
– 2000 Government Engineer of the Year by the Boston Society of Civil Engineers
– 2003 Manuel Carballo Governor’s Award for Excellence in Public Service
– Governor appointee as Co-Chair of the Special Commission on Public Construction
Reform that, in 2004, resulted in landmark reform of all public construction laws in
the Commonwealth.
– Board member of the National Research Council’s Board on Infrastructure and the
Built Environment
– Trustee of the Engineering Center Education Trust, a corresponding editor of the
American Society of Civil Engineers Engineering Management Journal, and has been a
speaker at numerous conferences.
Chris Gordon, P.E. (cont.)
7
Summary of Qualifications
• B.S. in Civil Engineering, Rensselaer Polytechnic Institute, 1993
• Registered Professional Engineer in MA, CT, NY, RI, NH, NC
• Certified Professional Traffic Operations Engineer (PTOE) by the Institute of
Transportation Engineers (ITE)
• Over 21 years’ experience in traffic engineering and transportation planning
Representative Project Experience
• Seaport Square in South Boston
• Bulfinch Triangle development parcels, Boston
• Residences @ Malden Station, Malden
• East Milton Square Parking and Access Study, Milton
• EMC Westborough-Southborough Campus*
• Water Street Mills, Stonington, CT*
• I-93/I-95 Interchange Transportation Study, Woburn/Reading/Stoneham*
*completed while at another firm
Keri Pyke, P.E., PTOE
8
Transportation Analysis
9
Transportation Analysis
• Traffic impact analysis focuses
on intersections; they are the
most constrained element of
the transportation system
• Primary measure of
effectiveness (MOE) = Level of
Service (LOS)
• In urban areas, LOS D is
considered acceptable.
10
Transportation Analysis Steps
11
Existing
Conditions No-Build
Conditions Build
Conditions• Collect traffic data
• Analyze
intersections
• Analyze transit
services
• Review safety
• Project to horizon year
• Add background growth
rate
• Add other
projects’ trips
• Re-analyze
intersections/transit
• Add Project’s trips to
No-Build volumes
• Re-analyze
intersections/transit
Build Mitigated Conditions
• Propose mitigation for locations with impact
• Re-analyze intersections/transit to demonstrate that
impact is mitigated
• Mitigate to No-Build condition (LOS)
Trip Assignment Process
12
Trip Generation
• ITE’s Trip Generation Manual, 9th edition, 2012
• Trips generated based on land use, usually floor area, can also
be rooms/units or employees
• Trip rates vary by time period (daily, peak hour)
• No ITE data for gaming component; collected data at 6 other
gaming facilities
• For a multi-use development, determine “captured” trips
• Credit for “pass-by” trips
• Sum all land uses to determine total vehicle trips
Trip Assignment Process
13
Trip Generation Mode
Split
• Disaggregates vehicle trips to person trips
• VOR varies by type of trip (work, home, recreation,
etc.) and by vehicle type
• Apply VOR to unadjusted vehicle trips
• Apply percentage by mode (auto/taxi, transit, tour
bus, walk/bike, water shuttle, etc.)
• Mode split percentages based on U.S. Census data
and TMG market analysis
• For modes that use autos or other non-transit
vehicles, divide by VOR to convert person trips back
to vehicle trips
(total vehicle trips) x (VOR) x mode split (%) = person trips by mode
person trips /VOR = adjusted vehicle trips
Trip Assignment Process
14
Trip Generation Mode
Split
Trip
Distribution/
Assignment
• Assigns vehicle trips to the roadway network
• For patrons, based on TMG market study
• Patron trips assigned to Project site garage
• For employees, based on city/town populations
within one hour’s drive of the site
• Employee trips assigned to three off-site parking
locations
Trip Assignment Process
15
Trip Generation Mode
Split
Trip
Distribution/
Assignment
Project-
generated Trips=
MEPA
MA Environmental Protection Act
• Requires that state agencies and major projects involving state
agencies study the environmental consequences of their actions.
• “Use all practicable means and measures to minimize damage to
the environment," by studying alternatives to the proposed
project, and developing enforceable mitigation commitments,
which will become conditions for the project if and when they are
permitted.
• It is NOT a permitting process
• It DOES include significant public participation, seeking comment
from citizens, state, regional and local agencies.
16
EENF Transportation Analysis
• Evaluated existing traffic volumes at 5 locations
• Summarized existing pedestrian, bicycle, and transit
facilities
• Summarized future conditions analysis in DEIR
– Future background traffic growth
– Permitted projects to be included in No- Build case
– Other transportation network improvements
• Initial estimates of project trip generation
• Proposed study area for DEIR (43 locations)
• Proposed recommended access to Project site
• Proposed TDM measures to reduce auto trips
• Proposed transportation mitigation
17
EENF Study
Area
18
EENF – Proposed DEIR Study Area
19
DEIR Study Area
20
32
DEIR Transportation Analysis
• Analyzed intersection capacity at
57 locations (7 cities)
• Analyzed transit capacity for MBTA Orange Line
and local bus service
• Prepared detailed Project trip generation
• Prepared detailed Project trip distribution
• Proposed recommended access to Project site
• Proposed TDM measures to reduce auto trips
• Proposed transportation mitigation
21
DEIR – Comparison of Roadway and
Resort Friday Peak Hours
22
Trip Distribution – Patrons
23
Trip Distribution – Employees
24
DEIR and FEIR Travel Mode Shares
25
DEIR FEIR
Travel Mode Patrons Employees Patrons Employees
Automobile
Park on-site 69% 0% 63% 0%
Taxi 8% 0% 8% 0%
Park remotely (connect to employee shuttle) 0% 44% 0% 41%
Subtotal 77% 44% 71% 41%
Public Transportation
Orange Line (connect to transit shuttle) 10% 20% 10% 20%
Local bus 0% 10% 0% 10%
Water transportation 3% 3% 6% 3%
Subtotal 13% 33% 16% 33%
Tour Bus 10% 0% 10% 0%
Premium Park and Ride 0% 0% 3% 3%
Walk/Bicycle 0% 3% 0% 3%
Neighborhood Employee Shuttle 0% 20% 0% 20%
Total 100% 100% 100% 100%
DEIR and FEIR Trip Summaries
26
DEIR FEIR
Patron
Vehicle
Trips
Employee
Vehicle
Trips
Total
Vehicle
Trips
Patron
Vehicle
Trips
Employee
Vehicle
Trips
Total
Vehicle
Trips
Friday Daily (vpd) In 8,983 1,793 10,776 8,289 1,459 9,748
Out 8,983 1,793 10,776 8,289 1,459 9,748
Total 17,966 3,586 21,552 16,578 2,918 19,496
Friday p.m. Peak
Hour (vph)
In 745 126 871 723 12 735
Out 703 169 872 672 12 684
Total 1,448 295 1,743 1,395 24 1,419
Saturday Daily (vpd) In 10,656 2,072 12,728 10,354 1,817 12,171
Out 10,656 2,072 12,728 10,354 1,817 12,171
Total 21,312 4,144 25,456 20,708 3,634 24,342
Saturday Afternoon
Peak Hour (vph)
In 880 148 1,028 880 135 1,015
Out 836 177 1,013 824 114 938
Total 1,716 325 2,041 1,704 249 1,953
Change in Friday p.m. Peak Hour Volumes
Location
Existing
(2013)
Volume
(vph)
No-Build
(2023)
Volume
(vph)
Project-
generated
Trips (vph)
Build
(2023)
Volume
(vph)
Change in
Volume
Build to
No-Build
(%)
Alford Street (Route 99) Bridge,
Charlestown
2,702 3,220 540 3,760 17%
Rutherford Avenue (Route 99), north of
City Square, Charlestown
2,814 2,955 197 3,152 7%
Mystic Valley Parkway (Route 16), east of
Wellington Circle, Medford
5,778 6,764 105 6,869 2%
Revere Beach Parkway (Route 16), east of
Sweetser Circle, Everett
4,886 5,417 112 5,529 2%
Note: Friday p.m. peak hour of roadways is 4:30-5:30 p.m.
Wynn’s peak hour occurs between 9:00-10:00 p.m. on a Friday night.
27
Transportation Plan
• Rail Connections
• MBTA Subway Connections
• Water Transportation
• Premium Park and Ride
• MBTA Local Bus
• Pedestrians and Cyclists
• Off-site Employee Parking
• Improved Roadway Network
• Transportation Demand Management (TDM)
28
Rail Connections
29
30
MBTA Subway Connections
Water Transportation
31
Premium Park and Ride
32
MBTA Local Bus
33
Pedestrians and Cyclists
34
Off-site Employee Parking
35
Malden
Center
Wellington
Station
Lower Broadway/
Beacham Street area
Improved Roadway Network
36
Wynn’s Proposed Transportation Improvement Plan
$50 Million
37
Wellington Circle, Medford
– widening, signal timing
improvements
Santilli Circle, Everett –
flyover, widening, signal
improvements
Sweetser Circle, Everett–
pavement markings, signing
improvements
Sullivan Square and Cambridge
Street, Boston – widening,
signal upgrades
Lower Broadway, Everett –
widening, signal timing and
streetscape improvements
Comparison of Transportation Mitigation
among Large Projects in the Commonwealth
38
*Amount includes improvements to utility infrastructure and open space
Location
Development
Area
(million square
feet)
Developer's
Transportation
Mitigation
($ Millions)
Public
Expenditure
($ Millions)
Seaport Square, South Boston 6.3 31 0
Assembly Row, Somerville 5.7 20 (100)
NorthPoint, Cambridge 5.2 1 (120)
Wynn Everett 2.6 50 0
Station Landing, Medford* 1.1 5 0
Lower Broadway Improvements
39
40
Lower Broadway Improvements
Preferred Site Access Plan
41
Lower Broadway Improvements
Alternate Site Access Plan
42
Lower Broadway Improvements
43
Lower Broadway Improvements
44
Santilli Circle Improvements
45
Sweetser Circle
Improvements
46
Wellington Circle Improvements
47Sullivan Square Improvements
48
Truck Loop - Everett
Transportation Demand Management
• Transportation coordinator on-site
• Guaranteed ride home
• Ride sharing program
• MBTA Charlie Cards provided for employees
and sold on-site for guests
• Provide information regarding public transportation services to employees
and guests
• ZipCar on-site
• Hubway bike share on-site
• Covered, secure bicycle parking in parking garage
• Electric vehicle charging stations in parking garage
• Employee and patron shuttles to Malden and Wellington stations
• Water shuttle to downtown Boston
• Aggressive marketing and incentive plans
49
Summary
• Comprehensive, exhaustive analysis
• Holistic, multi-modal approach
• All impacts mitigated
• On-going monitoring and refinements
• High performing transportation network
50

More Related Content

What's hot

Advance road transportation system ppt
Advance road transportation system pptAdvance road transportation system ppt
Advance road transportation system pptAbdul Aziz
 
Organic Urbanism: human-oriented design for metropolises
Organic Urbanism: human-oriented design for metropolisesOrganic Urbanism: human-oriented design for metropolises
Organic Urbanism: human-oriented design for metropolisesOleksandr Galychyn
 
Peoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 SlidesPeoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 Slidesrtspincog
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic charactersticsAnkit Patel
 
Eetp 170900713008 2721307_bhavya
Eetp 170900713008 2721307_bhavyaEetp 170900713008 2721307_bhavya
Eetp 170900713008 2721307_bhavyaBhavya Patel
 
Transportation planning
Transportation planningTransportation planning
Transportation planningTousif Jaman
 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planningDhwani Shah
 
Public Vs Private Transportation Systems
Public Vs Private Transportation SystemsPublic Vs Private Transportation Systems
Public Vs Private Transportation Systemssdeep20
 
The Role of Highway Engineering Standards in the U.S.
The Role of Highway Engineering Standards in the U.S.The Role of Highway Engineering Standards in the U.S.
The Role of Highway Engineering Standards in the U.S.AASHTO
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Lost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and SafetyLost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and SafetyPaul Schumann
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTPSatyam Rai
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj Bharadwaj B
 

What's hot (20)

Advance road transportation system ppt
Advance road transportation system pptAdvance road transportation system ppt
Advance road transportation system ppt
 
Organic Urbanism: human-oriented design for metropolises
Organic Urbanism: human-oriented design for metropolisesOrganic Urbanism: human-oriented design for metropolises
Organic Urbanism: human-oriented design for metropolises
 
Peoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 SlidesPeoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 Slides
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic characterstics
 
Eetp 170900713008 2721307_bhavya
Eetp 170900713008 2721307_bhavyaEetp 170900713008 2721307_bhavya
Eetp 170900713008 2721307_bhavya
 
Transportation planning
Transportation planningTransportation planning
Transportation planning
 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planning
 
Public Vs Private Transportation Systems
Public Vs Private Transportation SystemsPublic Vs Private Transportation Systems
Public Vs Private Transportation Systems
 
The Role of Highway Engineering Standards in the U.S.
The Role of Highway Engineering Standards in the U.S.The Role of Highway Engineering Standards in the U.S.
The Role of Highway Engineering Standards in the U.S.
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
WV DOT GTI: GIS Update (3 Nov 2011)
WV DOT GTI: GIS Update (3 Nov 2011)WV DOT GTI: GIS Update (3 Nov 2011)
WV DOT GTI: GIS Update (3 Nov 2011)
 
Lost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and SafetyLost Creek Blvd.: Security and Safety
Lost Creek Blvd.: Security and Safety
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Regional tranport system RTP
Regional tranport system RTPRegional tranport system RTP
Regional tranport system RTP
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Level of Service F for Grade A Streets
Level of Service F for Grade A StreetsLevel of Service F for Grade A Streets
Level of Service F for Grade A Streets
 

Similar to Wynn Transportation Plan

Maumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewMaumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewRPO America
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay Adina Levin
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019E'ville Eye
 
Review of need for grade separations five locations - statement of work
Review of need for grade separations   five locations - statement of workReview of need for grade separations   five locations - statement of work
Review of need for grade separations five locations - statement of workStittsvilleCentral.ca
 
Session 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPBSession 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPBSharon Roerty
 
RV 2014: Innovative Partnerships- Silo Hopping to Engage Communities
RV 2014: Innovative Partnerships- Silo Hopping to Engage CommunitiesRV 2014: Innovative Partnerships- Silo Hopping to Engage Communities
RV 2014: Innovative Partnerships- Silo Hopping to Engage CommunitiesRail~Volution
 
2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdfUGPTI
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxNURSUHANABINTIBORHAN
 
Traffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & ProceduresTraffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & Proceduresgscplanning
 
Reston Bike Share Feasibility Study: Public Open House
Reston Bike Share Feasibility Study: Public Open HouseReston Bike Share Feasibility Study: Public Open House
Reston Bike Share Feasibility Study: Public Open HouseFairfax County
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentationRPO America
 
UGPTI Overview of Programs and Activities
UGPTI Overview of Programs and ActivitiesUGPTI Overview of Programs and Activities
UGPTI Overview of Programs and ActivitiesUGPTI
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentationbunthy sros
 

Similar to Wynn Transportation Plan (20)

dr. cal
dr. caldr. cal
dr. cal
 
Safer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
Safer People, Safer Streets, and Safer Policies at USDOT--Dan GoodmanSafer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
Safer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
 
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
Maumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewMaumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning Overview
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019
 
Review of need for grade separations five locations - statement of work
Review of need for grade separations   five locations - statement of workReview of need for grade separations   five locations - statement of work
Review of need for grade separations five locations - statement of work
 
Session 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPBSession 34: Rec Trails California (Haynes)-PWPB
Session 34: Rec Trails California (Haynes)-PWPB
 
June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop June 15, 2021 BPAC Virtual Workshop
June 15, 2021 BPAC Virtual Workshop
 
RV 2014: Innovative Partnerships- Silo Hopping to Engage Communities
RV 2014: Innovative Partnerships- Silo Hopping to Engage CommunitiesRV 2014: Innovative Partnerships- Silo Hopping to Engage Communities
RV 2014: Innovative Partnerships- Silo Hopping to Engage Communities
 
Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf2022-10_advisory-council-program-update.pdf
2022-10_advisory-council-program-update.pdf
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
 
Traffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & ProceduresTraffic Access and Impact Study Guidelines & Procedures
Traffic Access and Impact Study Guidelines & Procedures
 
Reston Bike Share Feasibility Study: Public Open House
Reston Bike Share Feasibility Study: Public Open HouseReston Bike Share Feasibility Study: Public Open House
Reston Bike Share Feasibility Study: Public Open House
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
UGPTI Overview of Programs and Activities
UGPTI Overview of Programs and ActivitiesUGPTI Overview of Programs and Activities
UGPTI Overview of Programs and Activities
 
Concept to-completion-presentation
Concept to-completion-presentationConcept to-completion-presentation
Concept to-completion-presentation
 

Recently uploaded

Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSebastiano Panichella
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfakankshagupta7348026
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 

Recently uploaded (20)

Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation TrackSBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
SBFT Tool Competition 2024 - CPS-UAV Test Case Generation Track
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdf
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 

Wynn Transportation Plan

  • 3. Ideal Location in Regional Transportation Network 3
  • 4. Holistic, Multi-Modal, Sustainable Transportation Strategy Rail Buses Bikes Cars Boats Walking 4 Wynn Everett
  • 5. MEPA TimeLine • Expanded Environmental Notification Form (EENF), filed May 31, 2013 • Secretary’s Certificate on EENF and scope of DEIR, issued on July 26, 2013 • Draft Environmental Impact Report (DEIR), filed December 16, 2013 • Secretary’s Certificate on DEIR and scope of FEIR, issued on February 21, 2014 • FEIR filing June 30th—Secretary’s Certificate anticipated by August 15, 2014 EENF DEIR Certificate FEIRCertificate Certificate 5
  • 6. • President, The Dirigo Group – International consulting practice focused on management of large capital projects – Example projects in Boston, Abu Dhabi, Saudi Arabia • Senior Lecturer – Massachusetts Institute of Technology and Harvard Business School – 22 years of graduate school teaching on project delivery and development – Additional teaching in China, Argentina, UK, Peru, UAE • Role on Wynn Everett Project – Development Manager – responsible for all aspects of onsite development • Experience – Nearly 30 years of managing complex capital projects – Chief Operating Officer for Allston Development Group, the real estate development arm of Harvard University – Director of Capital Programs and Logan Modernization for the Massachusetts Port Authority – Consulting work throughout the world Chris Gordon, P.E. 6
  • 7. • Education – Masters Degree in Civil Engineering, MIT – Bachelors Degree in Civil Engineering, University of Maine – Licensed Professional Engineer • Awards & Recognition – 2001 Person of the Year for the Construction Management Association of America for both the New England region and the country – 2000 Government Engineer of the Year by the Boston Society of Civil Engineers – 2003 Manuel Carballo Governor’s Award for Excellence in Public Service – Governor appointee as Co-Chair of the Special Commission on Public Construction Reform that, in 2004, resulted in landmark reform of all public construction laws in the Commonwealth. – Board member of the National Research Council’s Board on Infrastructure and the Built Environment – Trustee of the Engineering Center Education Trust, a corresponding editor of the American Society of Civil Engineers Engineering Management Journal, and has been a speaker at numerous conferences. Chris Gordon, P.E. (cont.) 7
  • 8. Summary of Qualifications • B.S. in Civil Engineering, Rensselaer Polytechnic Institute, 1993 • Registered Professional Engineer in MA, CT, NY, RI, NH, NC • Certified Professional Traffic Operations Engineer (PTOE) by the Institute of Transportation Engineers (ITE) • Over 21 years’ experience in traffic engineering and transportation planning Representative Project Experience • Seaport Square in South Boston • Bulfinch Triangle development parcels, Boston • Residences @ Malden Station, Malden • East Milton Square Parking and Access Study, Milton • EMC Westborough-Southborough Campus* • Water Street Mills, Stonington, CT* • I-93/I-95 Interchange Transportation Study, Woburn/Reading/Stoneham* *completed while at another firm Keri Pyke, P.E., PTOE 8
  • 10. Transportation Analysis • Traffic impact analysis focuses on intersections; they are the most constrained element of the transportation system • Primary measure of effectiveness (MOE) = Level of Service (LOS) • In urban areas, LOS D is considered acceptable. 10
  • 11. Transportation Analysis Steps 11 Existing Conditions No-Build Conditions Build Conditions• Collect traffic data • Analyze intersections • Analyze transit services • Review safety • Project to horizon year • Add background growth rate • Add other projects’ trips • Re-analyze intersections/transit • Add Project’s trips to No-Build volumes • Re-analyze intersections/transit Build Mitigated Conditions • Propose mitigation for locations with impact • Re-analyze intersections/transit to demonstrate that impact is mitigated • Mitigate to No-Build condition (LOS)
  • 12. Trip Assignment Process 12 Trip Generation • ITE’s Trip Generation Manual, 9th edition, 2012 • Trips generated based on land use, usually floor area, can also be rooms/units or employees • Trip rates vary by time period (daily, peak hour) • No ITE data for gaming component; collected data at 6 other gaming facilities • For a multi-use development, determine “captured” trips • Credit for “pass-by” trips • Sum all land uses to determine total vehicle trips
  • 13. Trip Assignment Process 13 Trip Generation Mode Split • Disaggregates vehicle trips to person trips • VOR varies by type of trip (work, home, recreation, etc.) and by vehicle type • Apply VOR to unadjusted vehicle trips • Apply percentage by mode (auto/taxi, transit, tour bus, walk/bike, water shuttle, etc.) • Mode split percentages based on U.S. Census data and TMG market analysis • For modes that use autos or other non-transit vehicles, divide by VOR to convert person trips back to vehicle trips (total vehicle trips) x (VOR) x mode split (%) = person trips by mode person trips /VOR = adjusted vehicle trips
  • 14. Trip Assignment Process 14 Trip Generation Mode Split Trip Distribution/ Assignment • Assigns vehicle trips to the roadway network • For patrons, based on TMG market study • Patron trips assigned to Project site garage • For employees, based on city/town populations within one hour’s drive of the site • Employee trips assigned to three off-site parking locations
  • 15. Trip Assignment Process 15 Trip Generation Mode Split Trip Distribution/ Assignment Project- generated Trips=
  • 16. MEPA MA Environmental Protection Act • Requires that state agencies and major projects involving state agencies study the environmental consequences of their actions. • “Use all practicable means and measures to minimize damage to the environment," by studying alternatives to the proposed project, and developing enforceable mitigation commitments, which will become conditions for the project if and when they are permitted. • It is NOT a permitting process • It DOES include significant public participation, seeking comment from citizens, state, regional and local agencies. 16
  • 17. EENF Transportation Analysis • Evaluated existing traffic volumes at 5 locations • Summarized existing pedestrian, bicycle, and transit facilities • Summarized future conditions analysis in DEIR – Future background traffic growth – Permitted projects to be included in No- Build case – Other transportation network improvements • Initial estimates of project trip generation • Proposed study area for DEIR (43 locations) • Proposed recommended access to Project site • Proposed TDM measures to reduce auto trips • Proposed transportation mitigation 17
  • 19. EENF – Proposed DEIR Study Area 19
  • 21. DEIR Transportation Analysis • Analyzed intersection capacity at 57 locations (7 cities) • Analyzed transit capacity for MBTA Orange Line and local bus service • Prepared detailed Project trip generation • Prepared detailed Project trip distribution • Proposed recommended access to Project site • Proposed TDM measures to reduce auto trips • Proposed transportation mitigation 21
  • 22. DEIR – Comparison of Roadway and Resort Friday Peak Hours 22
  • 23. Trip Distribution – Patrons 23
  • 24. Trip Distribution – Employees 24
  • 25. DEIR and FEIR Travel Mode Shares 25 DEIR FEIR Travel Mode Patrons Employees Patrons Employees Automobile Park on-site 69% 0% 63% 0% Taxi 8% 0% 8% 0% Park remotely (connect to employee shuttle) 0% 44% 0% 41% Subtotal 77% 44% 71% 41% Public Transportation Orange Line (connect to transit shuttle) 10% 20% 10% 20% Local bus 0% 10% 0% 10% Water transportation 3% 3% 6% 3% Subtotal 13% 33% 16% 33% Tour Bus 10% 0% 10% 0% Premium Park and Ride 0% 0% 3% 3% Walk/Bicycle 0% 3% 0% 3% Neighborhood Employee Shuttle 0% 20% 0% 20% Total 100% 100% 100% 100%
  • 26. DEIR and FEIR Trip Summaries 26 DEIR FEIR Patron Vehicle Trips Employee Vehicle Trips Total Vehicle Trips Patron Vehicle Trips Employee Vehicle Trips Total Vehicle Trips Friday Daily (vpd) In 8,983 1,793 10,776 8,289 1,459 9,748 Out 8,983 1,793 10,776 8,289 1,459 9,748 Total 17,966 3,586 21,552 16,578 2,918 19,496 Friday p.m. Peak Hour (vph) In 745 126 871 723 12 735 Out 703 169 872 672 12 684 Total 1,448 295 1,743 1,395 24 1,419 Saturday Daily (vpd) In 10,656 2,072 12,728 10,354 1,817 12,171 Out 10,656 2,072 12,728 10,354 1,817 12,171 Total 21,312 4,144 25,456 20,708 3,634 24,342 Saturday Afternoon Peak Hour (vph) In 880 148 1,028 880 135 1,015 Out 836 177 1,013 824 114 938 Total 1,716 325 2,041 1,704 249 1,953
  • 27. Change in Friday p.m. Peak Hour Volumes Location Existing (2013) Volume (vph) No-Build (2023) Volume (vph) Project- generated Trips (vph) Build (2023) Volume (vph) Change in Volume Build to No-Build (%) Alford Street (Route 99) Bridge, Charlestown 2,702 3,220 540 3,760 17% Rutherford Avenue (Route 99), north of City Square, Charlestown 2,814 2,955 197 3,152 7% Mystic Valley Parkway (Route 16), east of Wellington Circle, Medford 5,778 6,764 105 6,869 2% Revere Beach Parkway (Route 16), east of Sweetser Circle, Everett 4,886 5,417 112 5,529 2% Note: Friday p.m. peak hour of roadways is 4:30-5:30 p.m. Wynn’s peak hour occurs between 9:00-10:00 p.m. on a Friday night. 27
  • 28. Transportation Plan • Rail Connections • MBTA Subway Connections • Water Transportation • Premium Park and Ride • MBTA Local Bus • Pedestrians and Cyclists • Off-site Employee Parking • Improved Roadway Network • Transportation Demand Management (TDM) 28
  • 32. Premium Park and Ride 32
  • 37. Wynn’s Proposed Transportation Improvement Plan $50 Million 37 Wellington Circle, Medford – widening, signal timing improvements Santilli Circle, Everett – flyover, widening, signal improvements Sweetser Circle, Everett– pavement markings, signing improvements Sullivan Square and Cambridge Street, Boston – widening, signal upgrades Lower Broadway, Everett – widening, signal timing and streetscape improvements
  • 38. Comparison of Transportation Mitigation among Large Projects in the Commonwealth 38 *Amount includes improvements to utility infrastructure and open space Location Development Area (million square feet) Developer's Transportation Mitigation ($ Millions) Public Expenditure ($ Millions) Seaport Square, South Boston 6.3 31 0 Assembly Row, Somerville 5.7 20 (100) NorthPoint, Cambridge 5.2 1 (120) Wynn Everett 2.6 50 0 Station Landing, Medford* 1.1 5 0
  • 48. 48 Truck Loop - Everett
  • 49. Transportation Demand Management • Transportation coordinator on-site • Guaranteed ride home • Ride sharing program • MBTA Charlie Cards provided for employees and sold on-site for guests • Provide information regarding public transportation services to employees and guests • ZipCar on-site • Hubway bike share on-site • Covered, secure bicycle parking in parking garage • Electric vehicle charging stations in parking garage • Employee and patron shuttles to Malden and Wellington stations • Water shuttle to downtown Boston • Aggressive marketing and incentive plans 49
  • 50. Summary • Comprehensive, exhaustive analysis • Holistic, multi-modal approach • All impacts mitigated • On-going monitoring and refinements • High performing transportation network 50