The document discusses several mechanical projects completed by GÖNKA A.S., including:
1) Olympic training complexes in BÝlesuvar, Göyçay, and Hövsan finished in 2002.
2) Mechanical work for the Baku Administration of the National Archive Building finished in 2002.
3) Mechanical systems for hospitals and clinics in Baku and Azerbaijan including the Hb Clinique Baku in 2002, Baku Ministry of Health Topçubaþov Hospital in 2008, and Azerbaijan Military Hospital 300 Bed in 2007.
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
Reversible air/water heat pump for outdoor installation. Suitable for air-conditioning and heating, and the production of domestic hot water for small/medium services.
Cooling capacity: 8.81 ÷ 14.12 kW
Heating capacity: 11.04 ÷ 16.88 kW
R410A refrigerant
Cooling and heating
DHW
Scroll compressor
Axial fan
Plate exchanger
Pump kit (Option)
Water tank (Option)
Network operation (Option)
Compatible with ModBus protocol (Option)
Compatible with VMF system (Variable Multi Flow) (Option)
Internet connection (Option)
For two pipes plants
This presentation by David Sylvester of the Mircom Group of Companies discusses CSA-B44 and NFPA 101 - the Canadian and American elevator recall codes. Learn how they relate to life safety and fire protection.
The units of the R series are made with the same dimensions as the rack units and have rear intake and front delivery, offering various advantages: the distribution of the treated air takes place near the servers, the horizontal intake and delivery does not change the direction of the flow to the inside of the machine, reducing pressure drops and consumption by the fans, and maintenance is easy thanks to front accessibility. The direct expansion RXA version has, as standard, the DC brushless inverter compressor and can be air condensed with the provided remote condenser, or water condensed. The RXU version is also available, with a chilled water coil. The R series can be configured with the Two Sources system with two distinct means of cooling, or with the free cooling system, which maximises energy savings. Advanced microprocessor electronic regulation unit for control of the unit, with the RS485 card as standard.
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
Reversible air/water heat pump for outdoor installation. Suitable for air-conditioning and heating, and the production of domestic hot water for small/medium services.
Cooling capacity: 8.81 ÷ 14.12 kW
Heating capacity: 11.04 ÷ 16.88 kW
R410A refrigerant
Cooling and heating
DHW
Scroll compressor
Axial fan
Plate exchanger
Pump kit (Option)
Water tank (Option)
Network operation (Option)
Compatible with ModBus protocol (Option)
Compatible with VMF system (Variable Multi Flow) (Option)
Internet connection (Option)
For two pipes plants
This presentation by David Sylvester of the Mircom Group of Companies discusses CSA-B44 and NFPA 101 - the Canadian and American elevator recall codes. Learn how they relate to life safety and fire protection.
The units of the R series are made with the same dimensions as the rack units and have rear intake and front delivery, offering various advantages: the distribution of the treated air takes place near the servers, the horizontal intake and delivery does not change the direction of the flow to the inside of the machine, reducing pressure drops and consumption by the fans, and maintenance is easy thanks to front accessibility. The direct expansion RXA version has, as standard, the DC brushless inverter compressor and can be air condensed with the provided remote condenser, or water condensed. The RXU version is also available, with a chilled water coil. The R series can be configured with the Two Sources system with two distinct means of cooling, or with the free cooling system, which maximises energy savings. Advanced microprocessor electronic regulation unit for control of the unit, with the RS485 card as standard.
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
www.gonka.com.tr
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
www.gonka.com.tr
GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
www.gonka.com.tr
Unit 1 Coal based Power plants of Power Plant Engg (ME6701)PALANIVEL SUBBIAH
First unit of Power Plant Engineering : Deals with basic layout , different circuits of Power Plants, Types of Ash handling system, Cooling towers. Effects of Superheat, reheat, regeneration, sample of problems of this unit 1 are included.
How to use CFD for Water Cooled ElectronicsSimScale
Using fluid flow analysis (CFD), we will show you how to evaluate key metrics of water cooled electronic systems such as junction temperatures, energy consumption, energy removed and the path the heat takes out of the domain can be evaluated.
Subscribe to our YouTube channel to watch our webinar recording for more details:
https://youtu.be/s9QIyeD_qKM
Find more on our website:
https://www.simscale.com/
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
A Strategic Approach: GenAI in EducationPeter Windle
Artificial Intelligence (AI) technologies such as Generative AI, Image Generators and Large Language Models have had a dramatic impact on teaching, learning and assessment over the past 18 months. The most immediate threat AI posed was to Academic Integrity with Higher Education Institutes (HEIs) focusing their efforts on combating the use of GenAI in assessment. Guidelines were developed for staff and students, policies put in place too. Innovative educators have forged paths in the use of Generative AI for teaching, learning and assessments leading to pockets of transformation springing up across HEIs, often with little or no top-down guidance, support or direction.
This Gasta posits a strategic approach to integrating AI into HEIs to prepare staff, students and the curriculum for an evolving world and workplace. We will highlight the advantages of working with these technologies beyond the realm of teaching, learning and assessment by considering prompt engineering skills, industry impact, curriculum changes, and the need for staff upskilling. In contrast, not engaging strategically with Generative AI poses risks, including falling behind peers, missed opportunities and failing to ensure our graduates remain employable. The rapid evolution of AI technologies necessitates a proactive and strategic approach if we are to remain relevant.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
2. BÝlesuvar Olympic Training Complex
Bilesuvar Olympic Training Complex
! The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
! Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2002
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
2002
Are used in complex
2/3
5. Baku Turkish Anatolian High School
Baku Turkish Anatolian High School T.C. Ministry of Education From time to time school teacher who has visited or invited A school in Physics, Biology and Chemistry-A has a Computer
and Azerbaijan Respublikasý Study on Nazir February 28, 1992 guests or conferences for students in this hall is carried Laboratory. In all three laboratories are in a position to
according to the memorandum of understanding signed on out.Understanding of technical systems in conference rooms respond to needs in terms of materials. Physics, Chemistry
24.01.1994 was opened.
with a modern arrangement was.Every moment ready and Biology teachers try in this laboratory, as well as have the
School, celebration of certain days and weeks, panel, sound system, computer and projection equipment are ability to make the computer-aided instruction.
debate and cinema shows a conference room of 200
available.
people can be made available.
6. Göyçay Olympic Training Complex
Göyçay Olympic Training Complex
! The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
! Swimming pool, & whole olympic training facilities are
2008
existing in the complex the whole job is finished at 2002
6/7
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
7. Boiler house, pump station and piping whole mechanical job Ductwork
Chiller Air Cooled
Fan Coils Ceeling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
8. Hövsan Olympic Training Complex
Hövsan Olympic Training Complex
! The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
! Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2002
Chiller Air Cooled
Fan Coils Ceeling & Wall Type
Air Handling Units
Boiler Systems
Are used in complex
2008
8/9
9. Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling Evaporator; Shell- tube evaporator whose cooling liquid Low noise level.
groups, with its models in the range of high efficiency and side and water side have one-circuit, multiple transitional, Multiple compressor, multiple cyclical, high efficiency.
high capacity, are ideal for cooling operations related to two mirrored construction. %25-%100 continuous modulating capacity control in
Refrigerating Circuit;Cooling Circuit; Cooling circuit and every compressor.
comfort and industrial purposes.
circuit elements entirely independent for every compressor. Hardconstruction and long life.
R22 , R134a or R407c options. Easy handling, installation and service.
Electrical Screen and Control Board; board including
Compressors; Half hermetic screw compressors. Effortless service.
switch and micro-processor controlled module and control
Compressors changing between 1 and 4 according to Compatible with available BMS systems.
cards as well as elements such as systemic control Meeting consumer requirements in the most suitable way
cooling capacity.
elements and fuse, thermic magnetic switch and relay. through broad accessory and option alternatives.
Condenser; Highly efficient, original condenser situated in V
Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP
type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through value.
low sound level axial fans situated in the open edge of the simplified device failure follow-up and easily recognized Trouble-proof operations under high temperatures.
condenser. electrical diagram. Rational control.
11. Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling GONKA Screw compressor air cooled water cooling
groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and groups, with its models in the range of high efficiency and
high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to high capacity, are ideal for cooling operations related to
comfort and industrial purposes. comfort and industrial purposes. comfort and industrial purposes.
R22 , R134a or R407c options. R22 , R134a or R407c options. R22 , R134a or R407c options.
Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors. Compressors; Half hermetic screw compressors.
Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to Compressors changing between 1 and 4 according to
cooling capacity. cooling capacity. cooling capacity.
Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V Condenser; Highly efficient, original condenser situated in V
type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and type and condensation provided through 900 cyclical and
low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the low sound level axial fans situated in the open edge of the
condenser. condenser. condenser.
12. Balaken Olympic Training Complex
Balaken Olympic Training Complex
! The Whole Mechanical Job ; piping, duct work, heating
system, boiler house, cooling system, were made by
GÖNKA A.S. With the equipment produced by GÖNKA
! Swimming pool, & whole olympic training facilities are
existing in the complex the whole job is finished at 2002
2002
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Boiler Systems
12/13 Are used in complex
14. 14/15
2002Baku Administration Of The National Archive Building
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
15. Air handling unit
Standard Accessories; Standard Series Optional Accessories;
! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder,
mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and
different productivity levels on demand. microprocessor control unit.
! 8 different models which provide required humidity
! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide
heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity.
range of 3000m³/h and 100.000 m³/h.
electrically heated; in cooling coils, 2 options: chilled
water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for
! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air.
structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board.
Rubber gaskets which reduce air leakage through
blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter
galvanized iron in a standard way.
! Fans; Statically and dynamically balanced aspirators
and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in
type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a
and high duct pressures,. standard way.
17. Packaged hygienic air conditioner Laminar flow air system
! Highly efficient filtration of supply and extract air. ! HEPA filters which clean filtrated air before going into
! Maximum function control: room temperature and operating room.
relative humidity control throughout the year.
! Mounting situated in ceiling of the operating theatre in
! Meeting fresh air that surgical operations require
such a way that it should locate over operating table.
! Quiet and non-vibrating operation that operating
theatres require. ! Stainless steel air distribution box, Hepa filters,
! An independent system which is under direct control of transparent air distributor (laminarizator) and pendant
authorized health staff.
operating table lighting connection.
! Pressure control in aseptic and septic surgical
operations. ! Easy maintenance and disinfection because of
! Continuous control of room temperature and humidity. transparent air distributor's being pulled down.
! Quiet and non-vibrating operation. Operating theatre lighting system made up of airproof
! Replacing the old installation in available places and construction.
generally, because their sizes are small, occupying less ! A laminar, vertical air flow from transparent air
room than any time before, however available air
distributor through operating table prevents turbulent
canal and water installation could be, easy erection in
any type of health institutions. air flow in conventional air systems and offers a high
level cleanliness class around the operating table
! In fan part, one or two directly actuated highly static
during the operati
pressurized fans to provide required air volumetric flow
rate even when filters are choked. ! The system which remove particulates and microbes
! Fans with inverter; St316 stainless steel fans which are from operation part due to laminar flow.
used as a higher standard in respect to epoxy dyed
! Special design for operation theatres which require
standard fans in terms of hygiene and endurance.
With a view to achieving continuous speed control, especially high level sterilization in accordance with
inverter equipment in supply and extract fans. DIN 1946.
! Air Filters; F5 class filter in fresh air input and F9 class ! Differential pressure sensors. Easy connection
filters on the extract side.
differential pressure sensors and leakage testing.
! Dx battery;
! Easy installation to all kinds of ceilings.
! Vapor humidifiers; Standard steam cylinder, dipping
electrodes, stainless steam distributor and micro-
process control.
! Compressor; 1 or 2 Scroll Compressors according to
the capacity.
! Electrical Board; All of the elements required for the
trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of
temperature and relative humidity over all of the
operation and safety functions integrally (I) or rational-
integrally (PI).
! PCO2 micro-processor of device control and
adjustment system which provides remote control
terminal with erection inside the clean room.
18. Baku Ministry Of Health Topçubaþov Hospital
Laminar flow air system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
2008
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
18/19 operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
22. Serin Hospital Azerbaijan
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air. ! Replacing the old installation in available places and ! Dx battery;
generally, because their sizes are small, occupying less Vapor humidifiers; Standard steam cylinder, dipping
! Maximum function control: room temperature and !
room than any time before, however available air electrodes, stainless steam distributor and micro-
relative humidity control throughout the year.
canal and water installation could be, easy erection in process control.
! Meeting fresh air that surgical operations require any type of health institutions.
! Compressor; 1 or 2 Scroll Compressors according to
! Quiet and non-vibrating operation that operating ! In fan part, one or two directly actuated highly static the capacity.
theatres require. pressurized fans to provide required air volumetric flow
rate even when filters are choked. ! Electrical Board; All of the elements required for the
! An independent system which is under direct control of trouble-proof operation of master switch and device.
2008
authorized health staff. ! Fans with inverter; St316 stainless steel fans which are
used as a higher standard in respect to epoxy dyed ! Micro-processor; AC micro-processor control of
! Pressure control in aseptic and septic surgical temperature and relative humidity over all of the
operations. standard fans in terms of hygiene and endurance.
operation and safety functions integrally (I) or rational-
With a view to achieving continuous speed control,
! Continuous control of room temperature and humidity. integrally (PI).
inverter equipment in supply and extract fans.
! Quiet and non-vibrating operation. ! PCO2 micro-processor of device control and
! Air Filters; F5 class filter in fresh air input and F9 class adjustment system which provides remote control
22/23 filters on the extract side. terminal with erection inside the clean room.
23.
24. Azerbaijan Military Hospital 300 Bed
Laminar flow air system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
2007
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
24/25 operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
26. Sincan Organize Sanayi Bölgesi
Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6
Göktürk Caddesi No : 6
Karwan Mtk Azerbaijan
Sincan / ANKARA / TURKEY
Sincan / ANKARA / TURKEY
Tel :+90 312 267 09 90(pbx) Tel :+90 312 267 09 90(pbx)
Fax:+90 312 267 09 93 Fax:+90 312 267 09 93
http://www.gonka.com.tr http://www.gonka.com.tr
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
e-mail: gonka@turk.net ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA e-mail: gonka@turk.net
CUSTOMER KARVAN MTK CUSTOMER KARVAN MTK
JOB NAME KARVAN RESIDANS - BAKU JOB NAME KARVAN RESIDANS - BAKU
UNIT TYPE AIR COOLED LIQUID CHILLER UNIT TYPE HIDDEN CEILING TYPE FAN COIL UNIT
MODEL GHSC 1V10s SERIAL NO 08/1005 FLOOR PIPE
GFC LEFT
COMPRESSOR TYPE 1 Screw compressor TYPE WALL CONNECTION
400 RIGHT
CAPACITY 640.4 kW CEILING DIRECTION
EVAPORATOR WATER PROD. DATE FEBRUARY / 2008 SERIAL NO 08/1467
12/7 ° C
INLET/OUTLET TEMP.
EVAPORATOR WATER FLOW RATE 110 m³/h HEATING CAPACITY 9.350 W
OUTSIDE AIR TEMP. 34 °C COOLING CAPACITY SENSIBLE 3.110 W
REFRIGERANT R407C TOTAL 4.320 W
MAX. COMP. CURRENT 440 A AIR FLOW RATE 800 m³/h
OPERATING VOLTAGE 380V/50 Hz VOLTAGE 220 V MONOPHASE POWER 65 W
PRODUCTION DATE FEBRUARY / 2008 HEATING COOLING
QUALITY CONTROL DATE APRIL / 2008
OPERATING HOT WATER 80/60 °C WATER TEMP. 6/10°C
CONDITIONS SUPERHEATED 130/90 °C WATER TEMP. 7/12°C
TSEK WATER
STEAM 0,1 ATÜ
KAZAKHSTAN
QUALITY CONTROL DATE APRIL / 2008
2002
26/27
28. Central Bank of Azerbaijan Republic
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
2009
28/29
29.
30. Azerbaijan Mc Donald’s
Azerbaijan Mc Donald’s
Centrifugal roof extracts
Technical specification The manufactured centrifugal roof Body It is designed according to the bat environment Fan has dense fimed, low sound level and
extract unit has been designed for the effective exhaust. it is conditions Galvanized stell frame, aluminium upper cover highperformance.It is easy to open the fan and clean the fin
possible to montage in the desired angle with the small are used. Moto-fan group Cenrifugal ventilatör is statically at shot notice. By the help aof special protection cover, itwork
sound Ievel it may be used in for the industrial applications and dynamically balanced.Motor serves 380V/50 Hz 900- many years without any problem. Centrifugal roof extract
and kitchens. It has been designed for Iong service Iife 1400d/d as astandard and directly coupled with d-phase units designed as direct extraction or combined with a duct
without maintenance. The manufacturing range 500-12.000 electirical motor.By this way, it works quitely and without type.
m³/h air and 0-50 mmSS pressure. vibration.
2002
30/31
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
34. 34/35
2008 Baku State University Kitchen And Restaurant
ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA
35. Laminar flow air system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
37. GÖNKA ....
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. from operation part due to laminar flow.
Operating theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with
such a way that it should locate over operating table. ! A laminar, vertical air flow from transparent air DIN 1946.
distributor through operating table prevents turbulent
! Stainless steel air distribution box, Hepa filters, ! Differential pressure sensors. Easy connection
air flow in conventional air systems and offers a high
transparent air distributor (laminarizator) and pendant level cleanliness class around the operating table differential pressure sensors and leakage testing.
operating table lighting connection. during the operati
! Easy installation to all kinds of ceilings.
38. Azerbaijan Baku Endos. Hospital
TOROSLAR DAÐ TURÝZM LTD. ÞTÝ.- AZERBAYCAN -2002
AZERBAYCAN BAKÜ ENDOS. HASTANESÝ
Klima santrallarý, Egzost aspiratör, Fan-Coil cihazlarý, Otomatik kontrol malzemeleri
LAZERÝN HASTANESÝ ?
2002
38/39
39.
40. GÖNKA Azerbaijan References
- Hövsan Olympic Training Complex
- Baku Turkish Anatolian High School
- Göyçay Olympic Training Complex
- Serin Hotel Baku
- Balaken Olympic Structure
- BÝlesuvar Olympic Structure
- Baku Administration Of The National
Archive Building
- Hb Clinique Baku
- Azerbaijan Baku Endos. Hospital
- Azerbaijan Military Hospital 300 Bed
- Karwan Mtk Azerbaijan
- Ata Okul Azerbaijan
- Serin Hospital Azerbaijan
- Baku Ministry Of Health Topçubaþov
Hospital
- Baku State University Kitchen And
Restaurant
FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE
Sincan Organize Sanayi Nasimi Rayonu, .
Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7,
Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN
Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29
Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29