What's continuous
  integration ?
What's continuous
          integration ?

•   Is not just tools, Is also a concept

•   Goal

    •   build a better software

    •   improve your development
Concept

•   Martin Fowler in 01 May 06

•   “software development practice”

•   The term 'Continuous Integration' originated
    with the Extreme Programming development
    process
Who’s Martin Fowler ?

•   http://martinfowler.com/

•   ThoughtWorks

•   Books

•   Agile development
Which “software development
    practice” we know ?
•   Agile software development

    •   Scrum

    •   Extreme Programming

    •   Feature Driven Development

    •   ...

•   Waterfall model
Requirements

•   > 1 contributor on the project

•   “contributor” : developer, tester, QA
    responsible, ...

•   > 1 man/day of work
What’s integration
 means here?
What’s integration
         means here?
•   merging my work with the work of others

    •   Source code

    •   Database

    •   Resources

    •   ....
Classic method
1. I took a task
2. I checkout or update my code with the
   corresponding branch
3. I develop
4. I test if it works
5. I commit
Continuous Integration
       method
1. Classic Method
2. Regularly, a server start a build
  a. checkout or update the corresponding
     branch
  b. test if it works
  c. stamp if the build fail or success
Ok, but where is the
         difference
•   First : it test the “integration” of your code with
    the code of others success

•   Second : it oblige you to write test executable
    by a machine (repeatable)

•   Second bis : if you do acceptance test. It oblige
    you to write an application installable by a
    machine
Cool, but what’s the
              benefit ?

•   never gets so far away from that base that it
    takes very long to integrate back with it.

    •   Link to scrum methodology

•   Less time is spent trying to find bugs
Objectives
•   Unit tests

•   End-to-End(Acceptance) tests

•   Database tests

•   Quality Assurance
    •   Software metrics

    •   Code duplication

    •   Coding standard
So, yes you convinced me
  where I should start ?
Tools

•   Unit Test : SimpleTest, PHPUnit

•   Acceptance Test : Selenium

•   Software Metrics : PHPmd, pdepend, phpcpd

•   Coding Standard : PHP_CodeSniffer
Prepare your repository
•   be able to launch the build in one command
    line call

•   write a script

    •   Shell Script, Ant, PHP, Phing, Maven for PHP

•   include resources needed in your repository or
    available trough your script

•   Test It!!!
Which server of “continuous
  integration” we have ?


•   A lot but most of them are written in Java

•   Some are better integrate with PHP context
Which server of “continuous
integration” we have in PHP ?

•   CruiseControl (phpUnderControl)

•   Xinc

•   Hudson

•   Bamboo
CruiseControl

•   Java

•   ThoughtWorks

•   Open source

•   Mother of all CI servers
CruiseControl
phpUnderControl

•   Based on CruiseControl

•   Java and PHP

•   http://phpundercontrol.org

•   Opensource

•   PHP dedicated
phpUnderControl
Xinc

•   Xinc is not CruiseControl

•   PHP

•   http://code.google.com/p/xinc/

•   Open source

•   PHP dedicated
Xinc
Hudson

•   Java                 •   Difference between
                             build failure and
•   More user friendly       rules failures

•   Extendable           •   Not only dedicated
                             to PHP
•   Active development

•   Open Source          •   Sun Continuous
                             Integration Server
Hudson
Bamboo

•   Atlassian

•   Commercial

•   Integration with PHPUnit

•   Java
Bamboo
Demo ?
Which one is the best ?


•   The one that fit your need

•   Test different tools

•   Give feedback
Good rules

•   Everyone Commits To the Mainline Every Day

•   Every Commit Should Build the Mainline on an
    Integration Machine

•   Keep your build as fast as possible
Remarks

•   Don’t expect that your build will success or
    don’t communicate about that from the start

•   all those cliches about Rome's build schedule
    apply.

•   choose specific point to test or objectives to
    reach
Conclusion




Continuous Integration reduced risk
              of fail!
Question ?
Thanks


•   Ján Lukács for Quitter Icon

•   Robert S. Donovan for toolbox picture
References

•   http://en.wikipedia.org/wiki/
    Continuous_integration

•   http://www.webopedia.com/TERM/E/
    Extreme_Programming.html

•   http://www.jetbrains.com/devnet/academy/
    concepts/cont_integration.html

Continuous Integration In A PHP World

  • 1.
    Continuous integration in a PHP World PHP Barcelona Conference 2009
  • 2.
    Davide Mendolia • http://davidemendolia.blogspot.com • dmendolia@php.net or @davideme • lead developer APM (Alternative PHP Monitor) • Contributor on php-benchmark • http://www.php-ci.net • Working @
  • 3.
    What's continuous integration ?
  • 6.
    What's continuous integration ? • Is not just tools, Is also a concept • Goal • build a better software • improve your development
  • 7.
    Concept • Martin Fowler in 01 May 06 • “software development practice” • The term 'Continuous Integration' originated with the Extreme Programming development process
  • 8.
    Who’s Martin Fowler? • http://martinfowler.com/ • ThoughtWorks • Books • Agile development
  • 9.
    Which “software development practice” we know ? • Agile software development • Scrum • Extreme Programming • Feature Driven Development • ... • Waterfall model
  • 10.
    Requirements • > 1 contributor on the project • “contributor” : developer, tester, QA responsible, ... • > 1 man/day of work
  • 11.
  • 13.
    What’s integration means here? • merging my work with the work of others • Source code • Database • Resources • ....
  • 14.
    Classic method 1. Itook a task 2. I checkout or update my code with the corresponding branch 3. I develop 4. I test if it works 5. I commit
  • 15.
    Continuous Integration method 1. Classic Method 2. Regularly, a server start a build a. checkout or update the corresponding branch b. test if it works c. stamp if the build fail or success
  • 16.
    Ok, but whereis the difference • First : it test the “integration” of your code with the code of others success • Second : it oblige you to write test executable by a machine (repeatable) • Second bis : if you do acceptance test. It oblige you to write an application installable by a machine
  • 17.
    Cool, but what’sthe benefit ? • never gets so far away from that base that it takes very long to integrate back with it. • Link to scrum methodology • Less time is spent trying to find bugs
  • 18.
    Objectives • Unit tests • End-to-End(Acceptance) tests • Database tests • Quality Assurance • Software metrics • Code duplication • Coding standard
  • 19.
    So, yes youconvinced me where I should start ?
  • 20.
    Tools • Unit Test : SimpleTest, PHPUnit • Acceptance Test : Selenium • Software Metrics : PHPmd, pdepend, phpcpd • Coding Standard : PHP_CodeSniffer
  • 21.
    Prepare your repository • be able to launch the build in one command line call • write a script • Shell Script, Ant, PHP, Phing, Maven for PHP • include resources needed in your repository or available trough your script • Test It!!!
  • 22.
    Which server of“continuous integration” we have ? • A lot but most of them are written in Java • Some are better integrate with PHP context
  • 23.
    Which server of“continuous integration” we have in PHP ? • CruiseControl (phpUnderControl) • Xinc • Hudson • Bamboo
  • 24.
    CruiseControl • Java • ThoughtWorks • Open source • Mother of all CI servers
  • 25.
  • 26.
    phpUnderControl • Based on CruiseControl • Java and PHP • http://phpundercontrol.org • Opensource • PHP dedicated
  • 27.
  • 28.
    Xinc • Xinc is not CruiseControl • PHP • http://code.google.com/p/xinc/ • Open source • PHP dedicated
  • 29.
  • 30.
    Hudson • Java • Difference between build failure and • More user friendly rules failures • Extendable • Not only dedicated to PHP • Active development • Open Source • Sun Continuous Integration Server
  • 31.
  • 32.
    Bamboo • Atlassian • Commercial • Integration with PHPUnit • Java
  • 33.
  • 34.
  • 35.
    Which one isthe best ? • The one that fit your need • Test different tools • Give feedback
  • 36.
    Good rules • Everyone Commits To the Mainline Every Day • Every Commit Should Build the Mainline on an Integration Machine • Keep your build as fast as possible
  • 37.
    Remarks • Don’t expect that your build will success or don’t communicate about that from the start • all those cliches about Rome's build schedule apply. • choose specific point to test or objectives to reach
  • 38.
  • 39.
  • 40.
    Thanks • Ján Lukács for Quitter Icon • Robert S. Donovan for toolbox picture
  • 41.
    References • http://en.wikipedia.org/wiki/ Continuous_integration • http://www.webopedia.com/TERM/E/ Extreme_Programming.html • http://www.jetbrains.com/devnet/academy/ concepts/cont_integration.html