Briefing purpose

    VicRoads issued an EOI for contact centre technology in April
     2011.

    The procurement process for replacement of contact centre
     technology was temporarily placed on hold in mid-2011
     pending determination of a number of strategic and operating
     issues in both a VicRoads and Victorian government context.

    Approval has now been obtained to proceed with the
     replacement of existing contact centre technology.

    A decision has been reached to close the EOI and proceed with
     an open RFT due to VicRoads’ having further refined its
     requirements and identified its preferred service delivery
     model.
Project procurement objective

    VicRoads is committed to procuring a call centre solution for the
     VicRoads Customer Contact Centre and Service Desk, to
     replace existing technology used across the 2 current locations,
     Ballarat and Kew, and include:

      – An integrated robust, reliable, dynamic, scalable,
        geographically independent call centre solution that meets
        the current and future business needs of the VicRoads
        Contact Centre and Service Desk.
      – A value for money solution that meets VicRoads’ functional
        and non-functional requirements.
      – A transition approach from the current system to the new
        system.
      – Additional functionality and improved service levels.
Importance of project for VicRoads


   VicRoads current call centre technology is supported by 5
    different vendors.

   All existing support contracts were recently extended to June
    2013 on the assumption this project will deliver a replacement
    prior to this time.

   The current set of technology utilised by the Call Centre is
    provided by a number of vendors, is poorly integrated, and in
    some cases nearing or at end life, and as a whole no longer
    meets business requirements.

   It is anticipated that new technology with increase operational
    efficiency and improve customer service.
Project Procurement scope

   The approval to proceed with the strategic replacement of
    Contact Centre technology includes:

    – Stage 1 - replacement for the following:
       • Call Management (including Call Routing, voice
         recording, PABX and Telephony equipment)
       • IVR
       • Workforce Management

    – Stage 2 – optional for replacement for the following:
       • Speech recognition
       • Quality management
Procurement Approach


   Open RFT will be issued with detailed requirements and
    threshold criteria.

   Ensure procurement process is open and fair to all vendors.

   Recognise the burden procurement processes impose on
    vendors.

   Wish to minimise the overhead for vendors not aligned to
    VicRoads’ detailed requirements.

   Procurement process will offer vendors the opportunity to self
    select.
Next Steps

   Draft RFT on Consultation Hub:

    – A draft of the proposed RFT will be posted on VicRoads’
      Consultation Hub in early August for a two week period.

    – Vendors are invited to review and provide suggestions for
      change.

    – Queries from vendors are also encouraged during this
      period via the Consultation Hub.
Next Steps cont.


   Open RFT
     – An open RFT will be issued in late August 2012.
     – A vendor briefing will be held after issue of the RFT.
     – Vendors can ask clarification questions for two weeks after
       the RFT has been issued.

   Tenders Submitted
     – Tenders will be due in late September

   Contract Award
     – Contract Award is intended in late 2012
Project probity

   The procurement approach has been determined based on
    considerations of probity and to be open and fair to all
    vendors.

   Vendors who provide existing services to VicRoads will not be
    provided with information about the Contact Centre
    Technology Project by VicRoads staff other than via the
    Consultation Hub.

   Notice of the upcoming RFT will be provided to the market
    following today’s briefing. A subset of slides from today’s
    powerpoint presentation will be available via the Consultation
    Hub.

   A separate briefing will be held after the RFT is issued.
VicRoads Contact


  • Questions can be posted via the Consultation Hub.

More Related Content

What's hot

2 the service lifecycle
2 the service lifecycle2 the service lifecycle
2 the service lifecycle
sagaroceanic11
 
Selected Significant Projects
Selected Significant ProjectsSelected Significant Projects
Selected Significant Projects
SChobbs88
 

What's hot (7)

From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
From ALM Process Definition to Process Execution with IBM DevOps at Poland's ...
 
2 the service lifecycle
2 the service lifecycle2 the service lifecycle
2 the service lifecycle
 
4. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.54. ocp cfops.monitoring reporting.guideline.2019.5
4. ocp cfops.monitoring reporting.guideline.2019.5
 
17. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.117. ocp cfops.integration.guideline.2019.1
17. ocp cfops.integration.guideline.2019.1
 
Selected Significant Projects
Selected Significant ProjectsSelected Significant Projects
Selected Significant Projects
 
Sap Eng Presentation Win It07 Project Managment02
Sap Eng Presentation Win It07 Project Managment02Sap Eng Presentation Win It07 Project Managment02
Sap Eng Presentation Win It07 Project Managment02
 
5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt5. Process: ocp cfops work orders and project mgmt
5. Process: ocp cfops work orders and project mgmt
 

Similar to Contact Centre Technology Project

Rfp cis implementation v3
Rfp cis implementation v3Rfp cis implementation v3
Rfp cis implementation v3
iambilal14
 
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATIONNEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
Eze Igwe
 
Managed Services Portfolio
Managed Services PortfolioManaged Services Portfolio
Managed Services Portfolio
Quintin Smith
 
State of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy ModernizationState of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy Modernization
Alexander Doré
 
IT Services Management
IT Services ManagementIT Services Management
IT Services Management
Chetan Goenka
 

Similar to Contact Centre Technology Project (20)

Rfp cis implementation v3
Rfp cis implementation v3Rfp cis implementation v3
Rfp cis implementation v3
 
Managed Services: Yielding Excellent Results at Videocon
Managed Services: Yielding Excellent Results at VideoconManaged Services: Yielding Excellent Results at Videocon
Managed Services: Yielding Excellent Results at Videocon
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docx
 
Norwegian subsea
Norwegian subseaNorwegian subsea
Norwegian subsea
 
Norway_Sub sea business 2015
Norway_Sub sea business 2015Norway_Sub sea business 2015
Norway_Sub sea business 2015
 
Clipper 2.0 planning
Clipper 2.0 planningClipper 2.0 planning
Clipper 2.0 planning
 
A. Feigl_Level-UpProject.pdf
A. Feigl_Level-UpProject.pdfA. Feigl_Level-UpProject.pdf
A. Feigl_Level-UpProject.pdf
 
Jonathan Newton - Vodafone
Jonathan Newton - VodafoneJonathan Newton - Vodafone
Jonathan Newton - Vodafone
 
ScaleFocus Telecom Roaming Regulations
ScaleFocus Telecom Roaming RegulationsScaleFocus Telecom Roaming Regulations
ScaleFocus Telecom Roaming Regulations
 
Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...Department for Transport SBRI Rail Competition Briefing - Application Process...
Department for Transport SBRI Rail Competition Briefing - Application Process...
 
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATIONNEW C2C SITE FOR DTT NICHE MARKET PENETRATION
NEW C2C SITE FOR DTT NICHE MARKET PENETRATION
 
Managed Services Portfolio
Managed Services PortfolioManaged Services Portfolio
Managed Services Portfolio
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing pack
 
State of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy ModernizationState of Nevada RFP Legacy Modernization
State of Nevada RFP Legacy Modernization
 
IT Services Management
IT Services ManagementIT Services Management
IT Services Management
 
Mobile number protability
Mobile number protability  Mobile number protability
Mobile number protability
 
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
PiT Briefing - Glenn Walker - Executive Director, ICT Renewal and Strategic S...
 
Cloud Navigator
Cloud NavigatorCloud Navigator
Cloud Navigator
 
Electric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon SourcingElectric Motors and Iron Castings case study by Dragon Sourcing
Electric Motors and Iron Castings case study by Dragon Sourcing
 

Recently uploaded

Recently uploaded (20)

Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara Laskowska
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
SOQL 201 for Admins & Developers: Slice & Dice Your Org’s Data With Aggregate...
 
In-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT ProfessionalsIn-Depth Performance Testing Guide for IT Professionals
In-Depth Performance Testing Guide for IT Professionals
 
Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John Staveley
 
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová10 Differences between Sales Cloud and CPQ, Blanka Doktorová
10 Differences between Sales Cloud and CPQ, Blanka Doktorová
 
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
Exploring UiPath Orchestrator API: updates and limits in 2024 🚀
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 

Contact Centre Technology Project

  • 1. Contact Centre Technology Project Vendor Update July 2012
  • 2. Briefing purpose  VicRoads issued an EOI for contact centre technology in April 2011.  The procurement process for replacement of contact centre technology was temporarily placed on hold in mid-2011 pending determination of a number of strategic and operating issues in both a VicRoads and Victorian government context.  Approval has now been obtained to proceed with the replacement of existing contact centre technology.  A decision has been reached to close the EOI and proceed with an open RFT due to VicRoads’ having further refined its requirements and identified its preferred service delivery model.
  • 3. Project procurement objective  VicRoads is committed to procuring a call centre solution for the VicRoads Customer Contact Centre and Service Desk, to replace existing technology used across the 2 current locations, Ballarat and Kew, and include: – An integrated robust, reliable, dynamic, scalable, geographically independent call centre solution that meets the current and future business needs of the VicRoads Contact Centre and Service Desk. – A value for money solution that meets VicRoads’ functional and non-functional requirements. – A transition approach from the current system to the new system. – Additional functionality and improved service levels.
  • 4. Importance of project for VicRoads  VicRoads current call centre technology is supported by 5 different vendors.  All existing support contracts were recently extended to June 2013 on the assumption this project will deliver a replacement prior to this time.  The current set of technology utilised by the Call Centre is provided by a number of vendors, is poorly integrated, and in some cases nearing or at end life, and as a whole no longer meets business requirements.  It is anticipated that new technology with increase operational efficiency and improve customer service.
  • 5. Project Procurement scope  The approval to proceed with the strategic replacement of Contact Centre technology includes: – Stage 1 - replacement for the following: • Call Management (including Call Routing, voice recording, PABX and Telephony equipment) • IVR • Workforce Management – Stage 2 – optional for replacement for the following: • Speech recognition • Quality management
  • 6. Procurement Approach  Open RFT will be issued with detailed requirements and threshold criteria.  Ensure procurement process is open and fair to all vendors.  Recognise the burden procurement processes impose on vendors.  Wish to minimise the overhead for vendors not aligned to VicRoads’ detailed requirements.  Procurement process will offer vendors the opportunity to self select.
  • 7. Next Steps  Draft RFT on Consultation Hub: – A draft of the proposed RFT will be posted on VicRoads’ Consultation Hub in early August for a two week period. – Vendors are invited to review and provide suggestions for change. – Queries from vendors are also encouraged during this period via the Consultation Hub.
  • 8. Next Steps cont.  Open RFT – An open RFT will be issued in late August 2012. – A vendor briefing will be held after issue of the RFT. – Vendors can ask clarification questions for two weeks after the RFT has been issued.  Tenders Submitted – Tenders will be due in late September  Contract Award – Contract Award is intended in late 2012
  • 9. Project probity  The procurement approach has been determined based on considerations of probity and to be open and fair to all vendors.  Vendors who provide existing services to VicRoads will not be provided with information about the Contact Centre Technology Project by VicRoads staff other than via the Consultation Hub.  Notice of the upcoming RFT will be provided to the market following today’s briefing. A subset of slides from today’s powerpoint presentation will be available via the Consultation Hub.  A separate briefing will be held after the RFT is issued.
  • 10. VicRoads Contact • Questions can be posted via the Consultation Hub.