From:    Brandon Valdez                   To: David Ficklin - OnGoal
                                                                           Rory O’Connor – OnGoal
                             Office: Kansas City                           Lee Turner – OnGoal
                             Date:    10.6.2010                            Andy Heitmann – Turner
                                                                           Dave Dudzik - Turner
                             Re:      Wizards Stadium Project
                                      Update – Week of
                                      10.4.2010



 Current Activities this Week:

 Foundations:
 Area 4 Field Level – Foundations for “infill” area
 between Column Lines 39-1 are ongoing.

 Concrete Flatwork:
 Area 3 Field Level – Concrete for slab-on-grade up to
 Stair 1 will be placed this week.                            Field Level Area 3 – Concrete slab-on grade
                                                              prep is ongoing to column line 4.
 Masonry:
 Area 1 – Field level masonry installation is ongoing in
 Area H, G, F, E and D. Area 2/3 – Concourse building
 masonry installation is ongoing.

 Steel Erection:
 Area 4 – Steel erection for “infill” area is ongoing
 (Sequence 3-3). Truss installation has started.
 Area 2 – Steel joist and metal decking installation for
 concourse buildings is ongoing. Canopy decking               Field Level Area 3 – Masonry in Section D is
 installation is ongoing. Canopy gutter enclosure framing     ongoing.
 installation is ongoing.

 Roofing and Sheetmetal:
 Area 1 – Permanent roofing installation at West
 Building is ongoing. Area 2/3 – Canopy gutter installation
 is ongoing.




                                                              Area 4 – Trusses 41 and 42 being set and
                                                              connected. 1 more truss remains (40 Line).
Building the Future
Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels are ongoing. Exterior metal stud framing
 and sheathing installation is ongoing at Field, Suite, and
 Press Levels.

 Glass:
 Area 1 - Curtainwall framing and glass installation is
 ongoing at West Building on west, south and east
                                                               Field Level Area 4 – Structural steel and
 elevations. South “wing” framing has started.
                                                               foundations are ongoing at Cauldron Club.
 MEP Rough-in:
 Area 3 – Underground MEP rough-in is ongoing.
 West Building - Ductwork installation on
 Concourse, Suite and Press Levels are ongoing.
 Plumbing rough-in is ongoing on Suite and
 Press Levels. Fire Protection rough-in is ongoing on
 Concourse, Suite and Press Levels. Electrical rough-in is
 ongoing on Concourse, Suite and Press Levels.


 Projected Activities occurring next Week:                     Area 3 – Shot of the Canopy decking
                                                               installation that has started on the east side.
 Foundations:
 Area 3/4 Field Level – Foundations for “infill” area
 Between Column Lines 39-1 will be complete.

 Concrete Flatwork:
 Area 3 Field Level – Concrete placement for Slab-on
 Grade from lower dock area to Column Line 1.

 Area 3 and 4 Field Level – Installation of on-grade seating
 risers and intermediate stairs will continue.

 Masonry:                                                      Area 1 – Curtainwall “wing” framing at south
 Area 1 – Field level masonry installation will continue in    end is being constructed.
 Area H, G, F, E and D. Area 2/3 – Concourse building
 masonry installation will continue.




Building the Future
Structural Steel Erection:
 Area 4 – Structural steel erection for “infill” area will
 be ongoing. Area 2 – Steel joist and metal decking
 installation for concourse buildings will continue.
 Canopy decking installation will continue. Canopy gutter
 enclosure framing installation will continue.

 Roofing and Sheetmetal:
 Area 1 – Permanent roofing installation at West               Field – Installation of the Storm Loop around
 Building will continue. Area 3 – Canopy gutter installation   playing field has started.
 will continue.

 Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels will continue. Exterior Framing and
 sheathing installation will continue.

 Glass:
 Area 1 – Curtain Framing and Glass installation around West
 Building will continue. Curtainwall framing on Suite and
 Press Level balconies will continue. Curtainwall framing
 at Field Side of Main Concourse will continue.

 MEP Rough-in:
                                                               Area 1 – Shot of the west building showing
 MEP Rough-in at Concourse, Suite and Press Levels will
                                                               the progress of the exterior envelope.
 continue. Ductwork installation on Concourse, Suite, and
 Press Level will continue. Fire Sprinkler installation will
 continue on Concourse, Suite and Press Levels.




Building the Future
Additional Photos:




Area 3– On-grade seating installation is   Area 3 – Burnished CMU wall topped out at
ongoing at north elevation.                Stair 1.




                                           Concourse Level Area 3 – Canopy gutter and
Area 1 – Concrete in Stair 9 is placed.    gutter enclosure framing is ongoing.




Area 2 – Shot of the Canopy decking and    Area 4 – Shot of Column Line 42 truss be
gutter at the SE corner.                   raised into place.




Building the Future

More Related Content

More from Kansas City Wizards

More from Kansas City Wizards (12)

Memo wizards 08-25-2010
Memo wizards 08-25-2010Memo wizards 08-25-2010
Memo wizards 08-25-2010
 
Construction Update 07-28-2010
Construction Update 07-28-2010Construction Update 07-28-2010
Construction Update 07-28-2010
 
Unicorn Wizards Scouting
Unicorn Wizards ScoutingUnicorn Wizards Scouting
Unicorn Wizards Scouting
 
KC Soccer Stadium
KC Soccer Stadium KC Soccer Stadium
KC Soccer Stadium
 
Construction Update 7-6-2010
Construction Update 7-6-2010Construction Update 7-6-2010
Construction Update 7-6-2010
 
Weekly Construction Update 06-14-10
Weekly Construction Update 06-14-10Weekly Construction Update 06-14-10
Weekly Construction Update 06-14-10
 
Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010
 
Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010Weekly Construction Update 06-06-2010
Weekly Construction Update 06-06-2010
 
Construction Update 5-5-2010
Construction Update 5-5-2010Construction Update 5-5-2010
Construction Update 5-5-2010
 
Construction Update 4-14-2010
Construction Update 4-14-2010Construction Update 4-14-2010
Construction Update 4-14-2010
 
Construction Update 4-7-2010
Construction Update 4-7-2010Construction Update 4-7-2010
Construction Update 4-7-2010
 
Construction Update 5-12-2010
Construction Update 5-12-2010Construction Update 5-12-2010
Construction Update 5-12-2010
 

Recently uploaded

Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
jual Obat Aborsi Bandung, Wa : 085180626899 Apotik jual Obat Cytotec Di Bandung
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
brennadilys816
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 

Recently uploaded (20)

Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
 
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
5 Brilliant Ways To Buy Verified Payoneer Accounts In 2024
5 Brilliant Ways To Buy Verified Payoneer Accounts In 20245 Brilliant Ways To Buy Verified Payoneer Accounts In 2024
5 Brilliant Ways To Buy Verified Payoneer Accounts In 2024
 
(推特)Twitter账号批发(自助购买网址🎉top233.com🎉)
(推特)Twitter账号批发(自助购买网址🎉top233.com🎉)(推特)Twitter账号批发(自助购买网址🎉top233.com🎉)
(推特)Twitter账号批发(自助购买网址🎉top233.com🎉)
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdfDaftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 

Construction Update 10-6-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 10.6.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 10.4.2010 Current Activities this Week: Foundations: Area 4 Field Level – Foundations for “infill” area between Column Lines 39-1 are ongoing. Concrete Flatwork: Area 3 Field Level – Concrete for slab-on-grade up to Stair 1 will be placed this week. Field Level Area 3 – Concrete slab-on grade prep is ongoing to column line 4. Masonry: Area 1 – Field level masonry installation is ongoing in Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation is ongoing. Steel Erection: Area 4 – Steel erection for “infill” area is ongoing (Sequence 3-3). Truss installation has started. Area 2 – Steel joist and metal decking installation for concourse buildings is ongoing. Canopy decking Field Level Area 3 – Masonry in Section D is installation is ongoing. Canopy gutter enclosure framing ongoing. installation is ongoing. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Building is ongoing. Area 2/3 – Canopy gutter installation is ongoing. Area 4 – Trusses 41 and 42 being set and connected. 1 more truss remains (40 Line). Building the Future
  • 2. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Exterior metal stud framing and sheathing installation is ongoing at Field, Suite, and Press Levels. Glass: Area 1 - Curtainwall framing and glass installation is ongoing at West Building on west, south and east Field Level Area 4 – Structural steel and elevations. South “wing” framing has started. foundations are ongoing at Cauldron Club. MEP Rough-in: Area 3 – Underground MEP rough-in is ongoing. West Building - Ductwork installation on Concourse, Suite and Press Levels are ongoing. Plumbing rough-in is ongoing on Suite and Press Levels. Fire Protection rough-in is ongoing on Concourse, Suite and Press Levels. Electrical rough-in is ongoing on Concourse, Suite and Press Levels. Projected Activities occurring next Week: Area 3 – Shot of the Canopy decking installation that has started on the east side. Foundations: Area 3/4 Field Level – Foundations for “infill” area Between Column Lines 39-1 will be complete. Concrete Flatwork: Area 3 Field Level – Concrete placement for Slab-on Grade from lower dock area to Column Line 1. Area 3 and 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Masonry: Area 1 – Curtainwall “wing” framing at south Area 1 – Field level masonry installation will continue in end is being constructed. Area H, G, F, E and D. Area 2/3 – Concourse building masonry installation will continue. Building the Future
  • 3. Structural Steel Erection: Area 4 – Structural steel erection for “infill” area will be ongoing. Area 2 – Steel joist and metal decking installation for concourse buildings will continue. Canopy decking installation will continue. Canopy gutter enclosure framing installation will continue. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Field – Installation of the Storm Loop around Building will continue. Area 3 – Canopy gutter installation playing field has started. will continue. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels will continue. Exterior Framing and sheathing installation will continue. Glass: Area 1 – Curtain Framing and Glass installation around West Building will continue. Curtainwall framing on Suite and Press Level balconies will continue. Curtainwall framing at Field Side of Main Concourse will continue. MEP Rough-in: Area 1 – Shot of the west building showing MEP Rough-in at Concourse, Suite and Press Levels will the progress of the exterior envelope. continue. Ductwork installation on Concourse, Suite, and Press Level will continue. Fire Sprinkler installation will continue on Concourse, Suite and Press Levels. Building the Future
  • 4. Additional Photos: Area 3– On-grade seating installation is Area 3 – Burnished CMU wall topped out at ongoing at north elevation. Stair 1. Concourse Level Area 3 – Canopy gutter and Area 1 – Concrete in Stair 9 is placed. gutter enclosure framing is ongoing. Area 2 – Shot of the Canopy decking and Area 4 – Shot of Column Line 42 truss be gutter at the SE corner. raised into place. Building the Future