- The document describes the strategy of working backwards to solve problems where some information is missing, usually at the beginning. It involves starting with the answer and working methodically backwards to deduce the missing information.
- Examples are provided to illustrate how to work backwards, such as reversing mathematical operations, starting with a known final value and deducing earlier steps/values.
- Students must understand concepts like reversing operations when working backwards and starting with the end answer to deduce the starting point or missing information.