Configurable Stack Fixtures
Pressure
Control
Group
Subsea
Stack
Project
Manufacturing
for
Excellence
One company … unlimited solutions
Configurable Stack Design
Modularity
• Product-Centered Approach
• Reduce Re-Engineering
• Customization without Redesign
Optimization
• Rectangular Stack Design
• Funnel Up Design
• Improve LMRP to BOP Interface
• Integration of Guidance System into Legs
Configurable Stack Design for Manufacturing & Assembly Meets Customer Needs
Internal Goals Achieved:
• Shift from project to product philosophy
• Reduce Cost of ENG, MFG, & ASSEMBLY
• Reduce structural weight
• Achieve greater bottle capacity per stack
Customer Goals Achieved:
• Customized stack for individual rig needs
• Reduce time to market per stack
• Minimize impact to envelop
• Interchangeable structural components
One company … unlimited solutions
Customer Demands
1) Market evolving to spare Subsea Stacks per
Rig or operational area
2) Major components must be interchangeable
with much closer tolerances
3) 24 Subsea Stacks to deliver in 2013, and
expected 28 for 2014, and 2015 probable.
One company … unlimited solutions
LMRP Spider
LMRP Legs
Upper Platforms
Lifting
Lower Stack Legs
Upper Spider
Lower Spider
Mini Spiders
One company … unlimited solutions
Major Structural Components
LMRP Assembly
● LMRP Spider
● LMRP Legs
● Upper Platforms
● Lifting Beams
Lower Stack Assembly
● Upper Spider
● Lower Stack Legs
● Lower Spider
● Mini Spiders
One company … unlimited solutions
Example – LMRP (upper) Spider
One company … unlimited solutions
Challenges
■ Interchangeability
● Extremely challenged based on current design and
manufacturing methods of major structural frame
components
■ Actual fabricated tolerances now vary from ¼” best case to as much as ½” or more
variation
● To overcome variations, extra material stock, extra welding
and machining operations, as well as additional inspection
points are added to check warping, then corrections are
made during manufacturing and at the stack-pad.
■ Increases re-work at critical path assembly points on stack-pad;
further requiring hot work at height.
One company … unlimited solutions
Configurable Stack – 

Major Structural Components Test Fixtures
■ Design & fabricate (in-house) Test Fixtures/jigs that
allow fabrication of the main structural components in
a precise frame.
■ Ex. LMRP (upper)
Spider Pull Test
Assembly.
One company … unlimited solutions
Configurable Stack Test Fixtures

Benefits
■ Tolerances held from 1/32” to 1/16”
■ Cuts direct labor cost a minimum of $250K per stack -
multiplied by 24 stacks annually saves $6.07 million per year
■ Significant elimination of scrap, rework, and wasted non-value
added operations – quality built in by design
■ Greatly decreases potentially unsafe operations by moving
almost all welding away from stack pad operations (heights) to
the production floor (ground level) at shop.
■ Contributes to overall reduction of Stack Pad Assembly cycle
time from 10-12 weeks to 6-8 weeks target with new
Configurable Stack Design.
One company … unlimited solutions
Configurable Stack Test Fixtures

Benefits Continued
■ Reduced errors, greater efficiency, and uninterrupted work
flow – work tasks in all departments performed the same way
on every project with highly repetitive, known tasks
■ All but eliminates dependence on outside vendors for pull
tests, smash tests, fabrication, and machining of major stack
structural components
■ In house manufacturing and testing of components reduces
cost and lead times, and improves quality
■ Stack assembly and alignment of components always
ensured – no modifications, no delays, rework reduced; major
structural components fit every time
One company … unlimited solutions
Proposal & Return on Investment
■ Equipment Needed - $2.78 Million Total
● $1.05M for 6 base frame fixtures – universal use for both
LMRP and upper spider fabrication
● $330K for 3 leg fixtures – universal use for both LMRP legs
and lower stack Legs fabrication
● $160K for 1 fixture for lower spider fabrication
● $810K for 3 pull test units, and lifting units for spiders,
LMRP, legs, and safety barriers
● $110K for various small alignment and fit up jigs and
templates
● $120K for 7 stack pad assembly stands
● $200K to move large floor mill and new foundation
One company … unlimited solutions
Proposal & Return on Investment
■ Investment $2.78 million
■ Annual Savings 24 Stacks $6.074 million
● $253.1K labor savings per stack
● 1,600 hours @ $107 per hour fabrication
reduction for LMRP & Spiders
● 280 hours @ $117 per hour stack pad welding
eliminated
● 420 hours @ $117 per hour stack pad assembly
eliminated
One company … unlimited solutions
Proposal & Return on Investment
■ Investment – $2.78 million
■ Annual Savings 24 Stacks – $6.074 million
■ Payback Period – 0.7 Years
■ Internal Rate of Return – 142.03%
■ Net Present Value – 9.727 million
■ Net Cash Inflows
● 2012 – ($2.780 million)
● 2013 – $1.177 million
● 2014 – $5.133 million
● 2015 – $9.089 million

More Related Content

What's hot

PTI-Custom-Engineered-Solutions
PTI-Custom-Engineered-SolutionsPTI-Custom-Engineered-Solutions
PTI-Custom-Engineered-Solutions
Jason Kayzar
 
Hot Stamping Process Simulation Using Integrated using Structural & CFD Analysis
Hot Stamping Process Simulation Using Integrated using Structural & CFD AnalysisHot Stamping Process Simulation Using Integrated using Structural & CFD Analysis
Hot Stamping Process Simulation Using Integrated using Structural & CFD Analysis
Altair
 
Ring Free Machining Case Study
Ring Free Machining Case StudyRing Free Machining Case Study
Ring Free Machining Case Study
Dave Rees
 
01 VHST-hot stamping die
01 VHST-hot stamping die01 VHST-hot stamping die
01 VHST-hot stamping die
Tina Deng
 
Great Design in Steel - Gestamp 2016
Great Design in Steel - Gestamp 2016Great Design in Steel - Gestamp 2016
Great Design in Steel - Gestamp 2016
Christophe Cazes
 

What's hot (18)

Esteem - the fired heater company
Esteem - the fired heater companyEsteem - the fired heater company
Esteem - the fired heater company
 
PTI-Custom-Engineered-Solutions
PTI-Custom-Engineered-SolutionsPTI-Custom-Engineered-Solutions
PTI-Custom-Engineered-Solutions
 
Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)
 
Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)
 
Propel ppt
Propel pptPropel ppt
Propel ppt
 
SW CNC Çeşitleri
SW CNC ÇeşitleriSW CNC Çeşitleri
SW CNC Çeşitleri
 
Orscheln Brake Damper - Team 4
Orscheln Brake Damper - Team 4Orscheln Brake Damper - Team 4
Orscheln Brake Damper - Team 4
 
Hot Stamping Process Simulation Using Integrated using Structural & CFD Analysis
Hot Stamping Process Simulation Using Integrated using Structural & CFD AnalysisHot Stamping Process Simulation Using Integrated using Structural & CFD Analysis
Hot Stamping Process Simulation Using Integrated using Structural & CFD Analysis
 
Kurt PinLock - Workholding Today
Kurt PinLock - Workholding TodayKurt PinLock - Workholding Today
Kurt PinLock - Workholding Today
 
Comparing Replacement Components to Extend the Life of Gearboxes
Comparing Replacement Components to Extend the Life of GearboxesComparing Replacement Components to Extend the Life of Gearboxes
Comparing Replacement Components to Extend the Life of Gearboxes
 
Design for Additive Manufacturing Essentials
Design for Additive Manufacturing EssentialsDesign for Additive Manufacturing Essentials
Design for Additive Manufacturing Essentials
 
Business plan
Business plan  Business plan
Business plan
 
Ring Free Machining Case Study
Ring Free Machining Case StudyRing Free Machining Case Study
Ring Free Machining Case Study
 
GearBox Group 4k - Design Presentation
GearBox Group 4k - Design PresentationGearBox Group 4k - Design Presentation
GearBox Group 4k - Design Presentation
 
01 VHST-hot stamping die
01 VHST-hot stamping die01 VHST-hot stamping die
01 VHST-hot stamping die
 
Shanthi Gears | Manufacturers and Exporters of Gears
Shanthi Gears | Manufacturers and Exporters of GearsShanthi Gears | Manufacturers and Exporters of Gears
Shanthi Gears | Manufacturers and Exporters of Gears
 
Great Design in Steel - Gestamp 2016
Great Design in Steel - Gestamp 2016Great Design in Steel - Gestamp 2016
Great Design in Steel - Gestamp 2016
 
Summer Internship in Jaypee Group
Summer Internship in Jaypee Group Summer Internship in Jaypee Group
Summer Internship in Jaypee Group
 

Viewers also liked

ترجمة عبرية ترجمه عبري - مترجم عبري
ترجمة عبرية   ترجمه عبري - مترجم عبريترجمة عبرية   ترجمه عبري - مترجم عبري
ترجمة عبرية ترجمه عبري - مترجم عبري
Alhayah Translation
 
Sun flowers are bigger and they are yellow
Sun flowers are bigger and they are yellowSun flowers are bigger and they are yellow
Sun flowers are bigger and they are yellow
djolson
 

Viewers also liked (13)

Tarea del seminario 5
Tarea del seminario 5Tarea del seminario 5
Tarea del seminario 5
 
ترجمة عبرية ترجمه عبري - مترجم عبري
ترجمة عبرية   ترجمه عبري - مترجم عبريترجمة عبرية   ترجمه عبري - مترجم عبري
ترجمة عبرية ترجمه عبري - مترجم عبري
 
Graph-Based Editing of Linked Data Mappings using the RMLEditor | ESWC2016 De...
Graph-Based Editing of Linked Data Mappings using the RMLEditor | ESWC2016 De...Graph-Based Editing of Linked Data Mappings using the RMLEditor | ESWC2016 De...
Graph-Based Editing of Linked Data Mappings using the RMLEditor | ESWC2016 De...
 
MBA Presentation
MBA PresentationMBA Presentation
MBA Presentation
 
Paper city - Digital Fabrication Lab, Aalto University
Paper city - Digital Fabrication Lab, Aalto UniversityPaper city - Digital Fabrication Lab, Aalto University
Paper city - Digital Fabrication Lab, Aalto University
 
Oracle CX Cloud Certificate
Oracle CX Cloud CertificateOracle CX Cloud Certificate
Oracle CX Cloud Certificate
 
Sun flowers are bigger and they are yellow
Sun flowers are bigger and they are yellowSun flowers are bigger and they are yellow
Sun flowers are bigger and they are yellow
 
Redes Sociales, Facebook Vs. Twitter
Redes Sociales, Facebook Vs. TwitterRedes Sociales, Facebook Vs. Twitter
Redes Sociales, Facebook Vs. Twitter
 
Towards a Uniform User Interface for Editing Mapping Definitions
Towards a Uniform User Interface for Editing Mapping DefinitionsTowards a Uniform User Interface for Editing Mapping Definitions
Towards a Uniform User Interface for Editing Mapping Definitions
 
Textalytics - Voice of the Customer - Sentiment Analysis Symposium 2014
Textalytics - Voice of the Customer - Sentiment Analysis Symposium 2014Textalytics - Voice of the Customer - Sentiment Analysis Symposium 2014
Textalytics - Voice of the Customer - Sentiment Analysis Symposium 2014
 
Conductor types and sizes
Conductor types and sizesConductor types and sizes
Conductor types and sizes
 
Eeva Furman and Eeva Hellstrom: Sustainable Development Goals - Working for t...
Eeva Furman and Eeva Hellstrom: Sustainable Development Goals - Working for t...Eeva Furman and Eeva Hellstrom: Sustainable Development Goals - Working for t...
Eeva Furman and Eeva Hellstrom: Sustainable Development Goals - Working for t...
 
Kannustinloukut
KannustinloukutKannustinloukut
Kannustinloukut
 

Similar to Config Stack DFMA Report

Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
Mach Cao Xuan
 
Groschopp Inc. Engineering & History
Groschopp Inc. Engineering & HistoryGroschopp Inc. Engineering & History
Groschopp Inc. Engineering & History
Groschopp Inc.
 
Karl Zemlin resume 2017
Karl Zemlin resume 2017Karl Zemlin resume 2017
Karl Zemlin resume 2017
Karl Zemlin
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
Chris Baichoo
 
GTC's High Performance Tray Tower Solutions
GTC's High Performance Tray Tower SolutionsGTC's High Performance Tray Tower Solutions
GTC's High Performance Tray Tower Solutions
GTC Technology
 
Strategic Advantages of implementing Enventive 6
Strategic Advantages of implementing Enventive 6Strategic Advantages of implementing Enventive 6
Strategic Advantages of implementing Enventive 6
Alan Smith
 

Similar to Config Stack DFMA Report (20)

6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT6 MONTH INTERNSHIP AT
6 MONTH INTERNSHIP AT
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
 
ie450pp4.ppt
ie450pp4.pptie450pp4.ppt
ie450pp4.ppt
 
Zeni Software Presentation 2022
Zeni Software Presentation 2022Zeni Software Presentation 2022
Zeni Software Presentation 2022
 
Groschopp Inc. Engineering & History
Groschopp Inc. Engineering & HistoryGroschopp Inc. Engineering & History
Groschopp Inc. Engineering & History
 
Cast craft v1
Cast craft v1 Cast craft v1
Cast craft v1
 
How to Increase ROI with Returnables
How to Increase ROI with ReturnablesHow to Increase ROI with Returnables
How to Increase ROI with Returnables
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
Tru design coatings
Tru design coatingsTru design coatings
Tru design coatings
 
Seismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsSeismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipments
 
Lite Resin Transfer Moulding at Bright Autoplast
Lite Resin Transfer Moulding at Bright AutoplastLite Resin Transfer Moulding at Bright Autoplast
Lite Resin Transfer Moulding at Bright Autoplast
 
54 paul gibbs_helioscope
54 paul gibbs_helioscope54 paul gibbs_helioscope
54 paul gibbs_helioscope
 
Karl Zemlin resume 2017
Karl Zemlin resume 2017Karl Zemlin resume 2017
Karl Zemlin resume 2017
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling Projects
 
GTC's High Performance Tray Tower Solutions
GTC's High Performance Tray Tower SolutionsGTC's High Performance Tray Tower Solutions
GTC's High Performance Tray Tower Solutions
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Strategic Advantages of implementing Enventive 6
Strategic Advantages of implementing Enventive 6Strategic Advantages of implementing Enventive 6
Strategic Advantages of implementing Enventive 6
 
Introduction of design of machine element
Introduction of design of machine elementIntroduction of design of machine element
Introduction of design of machine element
 
Jk files (india) limited
Jk files (india) limitedJk files (india) limited
Jk files (india) limited
 

Config Stack DFMA Report

  • 1. One company … unlimited solutions Configurable Stack Fixtures Pressure Control Group Subsea Stack Project Manufacturing for Excellence
  • 2. One company … unlimited solutions Configurable Stack Design Modularity • Product-Centered Approach • Reduce Re-Engineering • Customization without Redesign Optimization • Rectangular Stack Design • Funnel Up Design • Improve LMRP to BOP Interface • Integration of Guidance System into Legs Configurable Stack Design for Manufacturing & Assembly Meets Customer Needs Internal Goals Achieved: • Shift from project to product philosophy • Reduce Cost of ENG, MFG, & ASSEMBLY • Reduce structural weight • Achieve greater bottle capacity per stack Customer Goals Achieved: • Customized stack for individual rig needs • Reduce time to market per stack • Minimize impact to envelop • Interchangeable structural components
  • 3. One company … unlimited solutions Customer Demands 1) Market evolving to spare Subsea Stacks per Rig or operational area 2) Major components must be interchangeable with much closer tolerances 3) 24 Subsea Stacks to deliver in 2013, and expected 28 for 2014, and 2015 probable.
  • 4. One company … unlimited solutions LMRP Spider LMRP Legs Upper Platforms Lifting Lower Stack Legs Upper Spider Lower Spider Mini Spiders
  • 5. One company … unlimited solutions Major Structural Components LMRP Assembly ● LMRP Spider ● LMRP Legs ● Upper Platforms ● Lifting Beams Lower Stack Assembly ● Upper Spider ● Lower Stack Legs ● Lower Spider ● Mini Spiders
  • 6. One company … unlimited solutions Example – LMRP (upper) Spider
  • 7. One company … unlimited solutions Challenges ■ Interchangeability ● Extremely challenged based on current design and manufacturing methods of major structural frame components ■ Actual fabricated tolerances now vary from ¼” best case to as much as ½” or more variation ● To overcome variations, extra material stock, extra welding and machining operations, as well as additional inspection points are added to check warping, then corrections are made during manufacturing and at the stack-pad. ■ Increases re-work at critical path assembly points on stack-pad; further requiring hot work at height.
  • 8. One company … unlimited solutions Configurable Stack – 
 Major Structural Components Test Fixtures ■ Design & fabricate (in-house) Test Fixtures/jigs that allow fabrication of the main structural components in a precise frame. ■ Ex. LMRP (upper) Spider Pull Test Assembly.
  • 9. One company … unlimited solutions Configurable Stack Test Fixtures
 Benefits ■ Tolerances held from 1/32” to 1/16” ■ Cuts direct labor cost a minimum of $250K per stack - multiplied by 24 stacks annually saves $6.07 million per year ■ Significant elimination of scrap, rework, and wasted non-value added operations – quality built in by design ■ Greatly decreases potentially unsafe operations by moving almost all welding away from stack pad operations (heights) to the production floor (ground level) at shop. ■ Contributes to overall reduction of Stack Pad Assembly cycle time from 10-12 weeks to 6-8 weeks target with new Configurable Stack Design.
  • 10. One company … unlimited solutions Configurable Stack Test Fixtures
 Benefits Continued ■ Reduced errors, greater efficiency, and uninterrupted work flow – work tasks in all departments performed the same way on every project with highly repetitive, known tasks ■ All but eliminates dependence on outside vendors for pull tests, smash tests, fabrication, and machining of major stack structural components ■ In house manufacturing and testing of components reduces cost and lead times, and improves quality ■ Stack assembly and alignment of components always ensured – no modifications, no delays, rework reduced; major structural components fit every time
  • 11. One company … unlimited solutions Proposal & Return on Investment ■ Equipment Needed - $2.78 Million Total ● $1.05M for 6 base frame fixtures – universal use for both LMRP and upper spider fabrication ● $330K for 3 leg fixtures – universal use for both LMRP legs and lower stack Legs fabrication ● $160K for 1 fixture for lower spider fabrication ● $810K for 3 pull test units, and lifting units for spiders, LMRP, legs, and safety barriers ● $110K for various small alignment and fit up jigs and templates ● $120K for 7 stack pad assembly stands ● $200K to move large floor mill and new foundation
  • 12. One company … unlimited solutions Proposal & Return on Investment ■ Investment $2.78 million ■ Annual Savings 24 Stacks $6.074 million ● $253.1K labor savings per stack ● 1,600 hours @ $107 per hour fabrication reduction for LMRP & Spiders ● 280 hours @ $117 per hour stack pad welding eliminated ● 420 hours @ $117 per hour stack pad assembly eliminated
  • 13. One company … unlimited solutions Proposal & Return on Investment ■ Investment – $2.78 million ■ Annual Savings 24 Stacks – $6.074 million ■ Payback Period – 0.7 Years ■ Internal Rate of Return – 142.03% ■ Net Present Value – 9.727 million ■ Net Cash Inflows ● 2012 – ($2.780 million) ● 2013 – $1.177 million ● 2014 – $5.133 million ● 2015 – $9.089 million